Mechanical Schedule_Chillers.pdf

PDF 3 MB Posted

Attached to
Z1DB--689-25-113 ARF Chiller Replacement, West Haven CT Two-Phase Design-Build
Solicitation number
36C24125R0009
Issued by

About this file

This mechanical schedule drawing shows detailed equipment specifications for chillers and related HVAC components for an Animal Research Facility renovation project at the VA CT Healthcare System in West Haven. The schedule includes air-cooled chiller specifications, chiller package pump details, hot gas bypass/hot gas oil schedule, steam generator schedule, steam humidifier specs, and heat transfer package information.

The drawing contains multiple detailed equipment schedules with technical specifications such as capacities, flow rates, temperatures, and electrical requirements. The air-cooled chiller schedule indicates specific model numbers, locations, and performance parameters. The document appears to be part of the mechanical design documentation for the chiller replacement project, prepared by multiple consulting firms including Eagle Environmental, Inc. and AT Engineers, Inc. as shown in the title block. The drawing number is MH4-01 and is specifically for the Animal Research Facility HVAC renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .