ARF_Plan Location Chiller.pdf
PDF 483 KB Posted
- Solicitation number
- 36C24125R0009
About this file
This is an architectural floor plan drawing showing the layout and location of a chiller system installation for an Animal Research Facility (ARF) at the VA CT Healthcare System West Haven campus. The drawing includes detailed equipment placement, mechanical systems, and construction notes for the 9th floor of Building 2.
The plan illustrates the location of key mechanical equipment including chiller units, ductwork, and associated infrastructure. Construction notes and specifications are provided on the left side of the drawing, with a north arrow indicator at the bottom. The drawing appears to be part of a design-build package for the replacement of an existing chiller system that will service approximately 13,000 gross square feet of space while utilizing existing rooftop dunnage, plumbing, and connections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 950 Campbell Ave.-ACM Bulk Report - A0001 Attachment 1.pdf | ||
| 36C24125R0009 0001.docx | DOCX document | |
| IMG_1251 - JCI - A0001 Attachment 2.jpg | JPG image | |
| S02 Solicitation 36C24125R0009.docx | DOCX document | |
| S02_SOW_689-25-113_R1.docx | DOCX document | |
| Mechanical Schedule_Chillers.pdf | ||
| S02 Limitations on Subcontracting Certification of Compliance.docx | DOCX document | |
| S02 Past Performance Questionnaire.pdf | ||
| Wage Rate CT20240023 mod 9 dated 08-09-2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHACONGuedeA Rectangle
File details come from the government source that posted it. Updated .