This is Amendment 0001 to solicitation 36C24125R0009 for a two-phase design-build project to replace the Animal Research Facilities (ARF) chiller system at VA Connecticut Healthcare System West Haven Campus. The amendment extends the Phase 1 proposal submission deadline from January 13, 2025, at 4:00 pm EST to January 21, 2025, at 10:00 am EST.
The amendment includes responses to four RFIs, clarifying that: 1) No ACM testing reports are available but ACM is not anticipated since equipment is less than 10 years old, 2) The project scope is limited to chiller replacement only with all supporting equipment remaining, 3) Johnson Controls is the current BMS provider and will handle system integration, and 4) No temporary chiller will be installed during the project, with new chiller expected to be operational by end of April 2026. Two attachments were included with the amendment: an ACM Bulk Report and a photo of the Johnson Controls panels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 950 Campbell Ave.-ACM Bulk Report - A0001 Attachment 1.pdf | ||
| IMG_1251 - JCI - A0001 Attachment 2.jpg | JPG image | |
| S02 Solicitation 36C24125R0009.docx | DOCX document | |
| S02_SOW_689-25-113_R1.docx | DOCX document | |
| Mechanical Schedule_Chillers.pdf | ||
| S02 Limitations on Subcontracting Certification of Compliance.docx | DOCX document | |
| S02 Past Performance Questionnaire.pdf | ||
| Wage Rate CT20240023 mod 9 dated 08-09-2024.pdf | ||
| ARF_Plan Location Chiller.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
01/08/2025
689-25-113
Department of Veterans Affairs Network Contracting Office 1 950 Campbell Avenue
West Haven CT 06516
To all Offerors/Bidders
36C24125R0009 12-12-2024
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 01-21-2025 10:00 am EST
The solicitation identified in block 9a above for Project 689-25-113, Two Phase Design Build ARF Chiller Replacement at the VA Connecticut Healthcare System West Haven Campus, is hereby amendment as follows:
1. All requests for information (RFIs) received and the Government's response to the RFIs are included on page 2 of this amendment. Please note that the due date for submissions of RFIs has past and no further RFIs will be answered.
2. The due date for submission of Phase 1 proposals is extended from January 13, 2025, at 4:00 pm Eastern Time to January 21, 2025, at 10:00 am Eastern Time.
3. There are no further changes incorporated into the solicitation through this amendment.
Judith Ruggiero Contracting Officer
VA-VHA-RPOE-2022-296595
Page 2 – Amendment A0001 Solicitation 36C24125R0009 ARF Research Chiller Replacement West Haven, CT RFIs with Answers for Solicitation:
1: Are any ACM testing Reports Available? Is ACM encountered thought to be included in this project?
We do not have any testing reports available. As per the attached ACM Bulk Report, the majority of asbestos containing elements are associated with masonry and insulation. The scope of this project is to replace equipment and piping that was installed within the past 10 years, and we do not anticipate encountering ACM. It is the responsibility of the design portion of this contract to identify any potential for ACM and account for its removal.
2: Are the Ahu’s and other ancillary equipment to be replaced as well or is this just a chiller swap?
All supporting equipment is function as intended, this project is solely for a chiller swap and to bring the system back online.
3: What exactly are they looking for as BMS and who is their current BMS?
Johnson Controls is the current BMS provider. It is expected that JCI will be contracted to integrate the new system. JCI panels are located within the adjacent mechanical space, please see attached photo.
4. Our question might be more relevant in Phase 2 but in terms of our phase 1 technical approach is a temporary chiller going to be in place prior to this project?
There will be no temporary chiller installed. The intent of this project is to have the new chiller fully operational by the end of April 2026.
------------------------------------------------------END------------------------------------------------------------------ See attached document: 950 Campbell Ave.-ACM Bulk Report - A0001 Attachment 1.
See attached document: IMG_1251 - JCI - A0001 Attachment 2.
File details come from the government source that posted it. Updated .