MDOT Coldwater Welcome Center - HVAC Repairs - CD Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- RFQ 171 260000000398 3
- Issued by
- Michigan
About this file
MDOT Coldwater Welcome Center - HVAC Repairs
This document comprises construction design drawings prepared by the State of Michigan Department of Technology, Management and Budget for the Department of Transportation's Coldwater Welcome Center HVAC system repairs project located at I-69 Northbound, Mile Marker 6, Coldwater, Michigan 49036 (File Number: 591/26017.JLM, Matrix Project Number: 260347.00). The project involves comprehensive HVAC system repairs and replacements including six air handling units (AHU-1 through AHU-6), six condensing units (CU-1 through CU-6), two boiler systems (B-1 and B-2), two boiler pumps (P-1 and P-2), associated ductwork, hydronic piping, DX refrigerant piping, controls, and thermostats distributed across two mechanical rooms. The construction documents include mechanical demolition, piping demolition, new mechanical installation, new piping installation, and electrical power requirements. The phasing schedule requires careful coordination between summer cooling season work (June 1 – October 1, 2026) and heating season work (October 1, 2026 – June 1, 2027), with provisions to maintain minimum building temperatures of 60 degrees Fahrenheit throughout construction and ensure at least five air handling units remain operational during heating season.
The project requires compliance with the Michigan Mechanical Code and relevant industry standards including ASHRAE, NFPA, and NEC standards. Contractors must maintain heating system operability during boiler replacement and coordinate all work across mechanical, electrical, and architectural trades to avoid conflicts. The construction documents specify that work shall proceed sequentially, with replacement equipment fully installed and tested before demolition of existing systems. Specific requirements include low-pressure loss duct fittings per SMACNA standards, minimum 26-gauge galvanized ductwork, vibration isolation for motorized equipment, proper condensate drain slope and trapping, material recycling documentation, and post-construction warranty period meetings at six and eleven months. The contractor assumes responsibility for all coordination, patching, painting, wall and ceiling restoration, exterior wall penetration sealing, and completion of a final TAB (Test and Adjust/Balance) report to verify supply and return air flows throughout the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL DRAWING INDEX
I-69 NORTHBOUND (MILE MARKER 6),
COLDWATER, MI 49036
FILE NUMBER: 591/26017.JLM
MATRIX PROJECT NUMBER: 260347.00MECHANICAL/ELECTRICAL ENGINEER
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FOR DEPARTMENT OF TRANSPORTATION
COLDWATER WELCOME CENTER - HVAC SYSTEM REPAIRS
N SITE MAP
MECHANICAL DRAWING INDEX
MDOT COLDWATER WELCOME CENTER
MDOT PROGRAM NUMBER: F000910CON
M-000
DBP
CAT
TITLE SHEET
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
07/17/2026 CD SET
GENERAL HVAC NOTES
1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
2. LOCATE EXHAUST OUTLETS OF COMBUSTION EQUIPMENT
STACKS VENTS AT LEAST 10 FEET FROM OUTDOOR AIR
INTAKES.
3. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
4. ALL EXISTING SYSTEMS (INCLUDING EXHAUST FANS; AIR
HANDLING UNITS; PUMPS) THAT SERVES AREAS BEING
RENOVATED SHALL BE REBALANCED AS REQUIRED.
5. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION
THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
6. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS
NEEDED.
7. LOCATIONS OF THE THERMOSTATS TO BE VERIFIED IN FIELD.
8. SMOKE DETECTORS SHALL BE FURNISHED AND CONNECTED
BY ELECTRICAL CONTRACTOR, INSTALLATION BY MECHANICAL
CONTRACTOR.
9. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
10. PROVIDE MANUAL AIR VENTS WITH 3/4" HOSE CONNECTION AT
ALL HIGH POINTS.
11. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
12. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT
MAY AFFECT THE WORK.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
14. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.
15. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT
FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED
OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED
SHEET METAL, MIN. 26 GA.
16. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION.
INCREASE DUCT SIZE FOR LINING.
17. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE
FLEXIBLE DUCT CONNECTORS.
18. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.
19. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA
AIR GAP.
20. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
21. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
22. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE
STATUTES, ORDINANCES, CODES OR REGULATIONS OF
FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
23. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY
OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,
ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION
BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE
FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING
AND SPECIFICATIONS.
24. DUCTWORK SHALL BE ACOUSTICALLY LINED WITHIN 10 FT OF
THE INTAKE AND/OR DISCHARGE OF A FAN.
25. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR
TO INSTALLATION. ANY CONTRACTOR INSTALLING WORK
WITHOUT PRIOR COORDINATION SHALL RELOCATE HIS WORK
AT HIS EXPENSE TO ALLOW PROPER INSTALLATION OF ANY
AND ALL TRADES WORK.
26. UNLESS OTHERWISE NOTED, ALL DUCT/PIPING SHALL BE
CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME
ESCUTCHEON OR ALUMINUM DUCT COLLAR AT EACH
PENETRATION OF A FINISHED SURFACE.
27. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN
THE SERVICE SPACE REQUIRED BY THE NATIONAL ELECTRICAL
CODE.
28. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS
REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.
CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY
LOCAL CODES OR THE SPECIFICATIONS. POWER SHALL BE
PROVIDED BY THE ELECTRICAL CONTRACTOR.
29. PROVIDE TRAP FOR CONDENSATION DRAIN LINES.
30. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A
MOTORIZED PIECE OF EQUIPMENT BY THE HVAC
CONTRACTOR.
31. MOUNT THERMOSTAT/SENSORS AT 48" AFF UNLESS NOTED
OTHERWISE.
32. CONTRACTOR TO ATTEND A 6 MONTH AND AN 11 MONTH POST
CONSTRUCTION MEETING WITH THE ENGINEER AND OWNER
TO REVIEW AND FIX ISSUES DURING THE WARRANTY PERIOD.
33. CONTRACTOR TO TRACK AND PROVIDE PAPERWORK TO
OWNER OF THE AMOUNT OF MATERIAL BEING RECYCLED
THROUGHOUT THE PROJECT.
34. COMBUSTION AIR AND VENT EXTERIOR WALL PENETRATIONS
ARE TO BE PATCHED TO MATCH EXISTING AND AND SEALED
WATER TIGHT.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLS
HVAC PIPING
HVAC DUCTWORK
F/S F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS
HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
SUCTION (REFRIGERANT)
LIQUID (REFRIGERANT)
SUCTION (DIRECT EXPANSION)
LIQUID (DIRECT EXPANSION)
LOW PRESSURE STEAM (0-20 LBS.)
MEDIUM PRESSURE STEAM (21-75 LBS.)
HIGH PRESSURE STEAM (76 LBS. & ABV.)
STEAM CONDENSATE (GRAVITY)
PUMPED STEAM CONDENSATE
STEAM CONDENSATE BOILER FEED
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
EXPANSION COMPENSATOR
FLOAT & THERMOSTATIC STEAM TRAP
INVERTED BUCKET STEAM TRAP
THERMOSTAT
PROGRAMMABLE THERMOSTAT
THERMOSTAT (W/ NIGHT SETBACK)
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
SCP
SC
DXS
DXL
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWS
S
L
LPS
MPS
HPS
SC (BF)
TAG CFM
NECK REMARKS
SIZE
BT
FT
SD-1 250
8"ø ---
P
H
S
T
T P
T N
M
M
SD
1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL
OTHER TRADES PRIOR TO DEMOLITION.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
6. PATCH AND REPAIR ALL WALL AND CEILING SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING PIPING, DUCTWORK, OTHER FIXED
ACCESSORIES AND EQUIPMENT WITH MATERIALS TO MATCH EXISTING, AS
ACCEPTABLE TO THE OWNER.
7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
9. ALL DEMOLITION SHALL BE APPROVED BY THE PSC/DTMB PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
10. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER ANY SUCH WORK WHICH BECOMES DAMAGED.
11. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
12. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT PSC/DTMB
TO CLARIFY ANY ITEMS NOT SHOWN ON THESE DOCUMENTS OR SHOWN NOT
MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
1. CONTRACTOR TO NOT DEMOLISH ANY EXISTING EQUIPMENT OR ASSOCIATED MATERIALS UNTIL ALL OF THE REPLACEMENT EQUIPMENT, DUCTWORK, PIPING, AND
OTHER COMPONENTS ARE RECEIVED AND READY TO BE INSTALLED.
2. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING HEATING IN THE BUILDING THROUGHOUT THE DURATION OF THE PROJECT. CONTRACTOR TO ENSURE OCCUPIED SPACE MAINTAINS A MINIMUM TEMPERATURE OF 60 DEG F. CONTRACTOR TO PROVIDE ELECTRIC TEMPORARY HEAT AS REQUIRED TO ENSURE THE OCCUPIED SPACE
MAINTAINS THE MINIMUM TEMPERATURE THROUGHOUT CONSTRUCTION.
3. BOILER AND HEATING SYSTEMS WORK:
3.1. CONTRACTOR IS TO COMPLETE THE DEMOLITION AND REPLACEMENT OF THE FAILED BOILER, BOILER PUMP, AND ASSOCIATED PIPING/ACCESSORIES AS SHOWN ON THE CONSTRUCTION DOCUMENTS WHILE THE EXISTING OPERATIONAL BOILER SERVES THE EXISTING HEATING SYSTEM. CONTRACTOR IS TO INSTALL THE NEW BOILER, BOILER PUMP, AND ASSOCIATED AND ASSOCIATED PIPING/ACCESSORIES AS SHOWN ON THE CONSTRUCTION DOCUMENTS WHILE THE EXISTING BOILER SERVES THE EXISTING HEATING SYSTEM. CONTRACTOR IS RESPONSIBLE FOR ENSURING THE EXISTING BOILER AND HEATING SYSTEM REMAIN OPERATIONAL WHILE INSTALLING THE NEW BOILER BESIDES SHORT CHANGE OVER SHUTDOWNS (2 HOURS OR LESS) THAT ARE APPROVED BY DTMB/MDOT IN ADVANCE.
3.2. AFTER THE NEW BOILER, BOILER PUMP AND ALL ASSOCIATED ACCESSORIES ARE TESTED AND ARE FULLY OPERATIONAL, CONTRACTOR CAN COMPLETE THE DEMOLITION AND REPLACEMENT OF THE OTHER EXISTING BOILER, BOILER PUMP, AND ASSOCIATED PIPING/ACCESSORIES AS SHOWN ON THE CONSTRUCTION DOCUMENTS. CONTRACTOR IS TO COMPLETE THE INSTALLATION OF THE SECOND NEW BOILER, BOILER PUMP, AND ASSOCIATED AND ASSOCIATED PIPING/ACCESSORIES AS SHOWN ON THE CONSTRUCTION DOCUMENTS WHILE ENSURING THE HEATING SYSTEM REMAINS FULLY OPERATIONAL.
4. FOR AHU/CU WORK COMPLETED DURING COOLING SEASON (JUNE 1, 2026 TO OCTOBER 1, 2026):
4.1.1. CONTRACTOR TO COMPLETE THE DEMOLITION AND REPLACEMENT OF ALL (3) AIR HANDLING UNITS IN ONE MECHANICAL ROOM AT ONE TIME. THE REPLACEMENT OF THE (3) AIR HANDING UNITS INCLUDES THE REPLACEMENT OF THE EXTERIOR CONDENSING UNITS, THERMOSTATS, CONTROL WIRING, DX PIPING, HYDRONIC PIPING, CONDENSATE PIPING, DUCTWORK MODIFICATIONS, AND ALL OTHER SCOPE INDICATED ON THE CONSTRUCTION DOCUMENTS.
4.1.2. ONCE THE ENTIRE SCOPE OF WORK IS COMPETED FOR THE AIR HANDLING UNITS IN ONE MECHANICAL ROOM, CONTRACTOR CAN THAN BEGINNING THE DEMOLITION AND REPLACEMENT OF ALL (3) AIR HANDLING UNITS IN THE OTHER MECHANICAL ROOM AT ONE TIME. THE REPLACEMENT OF THE (3) AIR HANDING UNITS INCLUDES THE REPLACEMENT OF THE EXTERIOR CONDENSING UNITS, THERMOSTATS, CONTROL WIRING, DX PIPING, HYDRONIC PIPING, CONDENSATE PIPING, DUCTWORK MODIFICATIONS, AND ALL OTHER SCOPE INDICATED ON THE CONSTRUCTION DOCUMENTS.
4.1.3. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT AT LEAST (5) AIR HANDLING UNITS (NEW AND/OR EXISTING) ARE FULLY ONLINE BY HEATING SEASON (OCTOBER 1, 2026). CONTRACTOR IS TO COORDINATE WITH THE OWNER IF AN AIR HANDLING UNIT IS OFFLINE DURING HEATING SEASON AND PROVIDE TEMPORARY ELECTRIC HEAT AS REQUIRED TO KEEP THE ZONES/SPACES SERVED BY THE AIR HANDLING UNIT THAT IS OFFLINE AT AN ADEQUATE
TEMPERATURE.
5. FOR AHU/CU WORK COMPLETED DURING HEATING SEASON (OCTOBER 1, 2026 TO JUNE 1, 2027):
5.1.1. CONTRACTOR TO COMPLETE THE DEMOLITION AND REPLACEMENT OF EACH AIR HANDLING UNIT AND ALL CORRESPONDING SCOPE OF WORK ONE AT A TIME (FIVE AIR HANDLING UNITS MUST BE FULLY OPERATIONAL AT ALL TIMES). CONTRACTOR IS TO COORDINATE WITH THE OWNER WHEN AN AIR HANDLING UNIT IS OFFLINE AND PROVIDE TEMPORARY ELECTRIC HEAT AS REQUIRED TO KEEP THE ZONES SERVED BY THE AIR HANDLING UNIT THAT IS OFFLINE AT AN
ADEQUATE TEMPERATURE.
PHASING SCHEDULE
M-100
DBP
CAT
MECHANICAL SYMBOLS,
NOTES, ABBREVIATIONS,
AND SCHEDULES
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M
M
M M
X-SD 500
20x10 TYP. 4
X-12x16 SA X-12x16 SA
X-18x16 SA
X-18x16 SA X-18x16 SA
X-18x16 SA
X-RG ---
36x16 ---
X-18x16 RA
X-18x16 RA
X-18x16 RA
X-SD 230
24x24 TYP. 6
X-10" SA
X-10" SA X-10" SA X-10" SA
X-10" SA
X-10" SA
X-SD ---
24x12 ---
X-10x12 SA X-18x12 SA X-18x14 SA X-18x14 SA
X-18x14 RA X-18x14 RA
X-SD 250
12x12 TYP. 2
X-14x8 SA
X-14x8 SA
X-10" EA
X-EG 300
12x12 TYP. 2
X-EG 300
12x12 ---
X-EG 225
12x12 ---
X-12x18 SA
X-SD 665
20x12 ---
X-18x22 SA
X-12x22 SA
X-12x18 SA
X-14x8 SA
X-14x8 SA
X-12x18 SA
X-10" EA
X-10" EA
X-10" EA
X-EG 100
8x8 ---
X-L (24x20, 1250 CFM)
X-24x10 OAX-14x10 OA
X-10x8 OAX-10x10 OA
X-EF-2
X-18x12 EA
X-L (48x12, 2800 CFM)
X-4" EA
X-4" EA X-SOFFIT
GRILLE (150 CFM)X-24x16 RA
X-24x16 RA
X-SD 250
12x12 TYP. 2
X-RG ---
48x24 ---
X-15x15 EA
X-15x15 EA
X-EF-4
X-EF-3
X-SOFFIT
GRILLE (50 CFM)
X-4" EA
X-AHU-4X-AHU-5X-AHU-6
X-CU-5X-CU-6 X-CU-4
X-CU-2X-CU-1 X-CU-3
T
X-AHU-5
T
X-AHU-4
T
SX-AHU-6
X-15x15 EA
M
X-12x16 SA X-12x16 SA
X-18x16 SA
X-18x16 SA
X-18x16 SA X-18x16 SA
X-18x16 RA
X-18x16 RA
X-18x16 RA
X-8" SA
X-10" SA
X-8" SA
X-10" SA
X-8" SA
X-10x12 SA X-18x12 SA X-18x14 SA X-18x14 SA
X-18x14 RA X-18x14 SA
X-14x8 SA
X-14x8 SA
X-12x18 SA X-18x22 SA
X-12x22 SA
X-12x18 SA
X-14x8 SA
X-14x8 SA
X-12x18 SA
X-10" EA
X-10" EA
X-10" EA
X-EG 100
8x8 ---
X-L (24x20, 1250 CFM)
X-24x10 OAX-14x10 OA
X-10x8 OAX-10x10 OA
X-EF-5
X-18x12 EA
X-24x16 RA
X-24x16 RA
X-SD 250
12x12 TYP. 2
X-RG ---48x24 ---
X-15x15 EA
X-15x15 EA
X-AHU-3X-AHU-2X-AHU-1
X-AHU-2
T
X-AHU-3
T
S
X-AHU-1
X-15x15 EA
X-4" EA
T
X-SD 150
24x24 ---
X-SD 290
24x24 TYP. 3
X-SD 225
24x24 ---
X-SD 500
20x10 TYP. 4
X-RG ---
36x16 ---
X-SD 150
24x24 ---
X-RG ---
24x12 ---
X-SD 250
12x12 TYP. 2
X-EG 300
12x12 ---
X-EG 300
12x12 TYP. 2
X-EG 225
12x12 ---
M M
X-RG ---
12x12 ---
X-10" SA
X-18x14 RA
X-18x14 RA
X-EF-1
X-4" EA
X-4" EA
X-WALL CAP (75 CFM)
X-10"
EA
X-B
X-B
3 3 3
X-SD 665
20x12 ---
X-5" CA & V
X-WALL CAP
X-5" CA & V
X-WALL CAP
X-P
X-P
X-CONCRETE PAD
(TYP. 2) 5
X-BOILER EPO6
X-BOILER CONTROLLER
OFFICE
BREAK AREA
WORK ROOM
POLICE
ROOM
TOILET
SERVER
COMPUTER
LITERATURE LOBBY
LITERATURE STORAGE
LOBBY
MEN'S RESTROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
WOMEN'S RESTROOM
VENDING
ELECTRICAL ROOM
VENDING CLOSET
MAIN. & MECH. ROOM
MAIN. & MECH. ROOM
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. ALL EXISTING EQUIPMENT, DUCTWORK, DIFFUSERS/GRILLES, CONTROLS, AND ALL
ASSOCIATED ACCESSORIES TO REMAIN AND BE RE-USED UNLESS OTHERWISE
NOTED.
2. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING WALLS IN THE LOCATIONS
OF DEMOLISHED THERMOSTAT/SENSORS AS REQUIRED TO MATCH EXISTING WALL.
3. CONTRACTOR TO REFER TO THE CONSTRUCTION PHASING SCHEDULE ON THE
M-100 DRAWING FOR HOW THE PHASING OF DEMOLITION/NEW WORK IS TO BE
COMPLETED.
4. CONTRACTOR TO PATCH EXTERIOR WALL PENETRATIONS AS REQUIRED TO MATCH
EXISTING AND SEAL WATER TIGHT.
DISCONNECT, REMOVE, AND DEMO EXISTING AIR HANDLING UNIT, EQUIPMENT STAND,
HEATING COIL, COOLING COIL, THERMOSTAT, SENSOR, CONTROLS, CONTROL WIRING,
AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO
DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY AIR DUCTWORK AND ALL
ASSOCIATED ACCESSORIES UP TO THE EXISTING FLEXIBLE DUCTWORK CONNECTOR.
THE EXISTING FLEXIBLE DUCTWORK CONNECTOR IS TO REMAIN AND BE RE-USED.
CONTRACTOR TO MODIFY EXISTING SUPPLY AIR DUCTWORK AND RETURN AIR
DUCTWORK AS REQUIRED TO REMOVE THE EXISTING AIR HANDLING UNIT AND INSTALL
THE NEW AIR HANDLING UNIT SHOWN ON THE NEW DRAWING.
DISCONNECT, REMOVE, AND DEMO EXISTING AIR HANDLING UNIT, EQUIPMENT STAND,
DUCT MOUNTED HEATING COIL, COOLING COIL, THERMOSTAT, CONTROLS, CONTROL
WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO
DISCONNECT, REMOVE, AND DEMO EXISTING SUPPLY AIR DUCTWORK, DUCT MOUNTED
HEATING COIL, AND ALL ASSOCIATED ACCESSORIES UP TO THE EXISTING FLEXIBLE
DUCTWORK CONNECTOR. THE EXISTING FLEXIBLE DUCTWORK CONNECTOR IS TO
REMAIN AND BE RE-USED. CONTRACTOR TO MODIFY EXISTING SUPPLY AIR DUCTWORK
AND RETURN AIR DUCTWORK AS REQUIRED TO REMOVE THE EXISTING AIR HANDLING
UNIT AND INSTALL THE NEW AIR HANDLING UNIT SHOWN ON THE NEW DRAWING.
DISCONNECT, REMOVE, AND DEMO EXISTING EXTERIOR CONDENSING UNIT, DX PIPING,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
EXISTING OUTSIDE AIR DAMPER, DAMPER ACTUATOR, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN. CONTRACTOR TO MODIFY EXISTING CONTROLS AS
REQUIRED TO BE CONNECTED TO NEW AHU AS SHOWN ON THE NEW DRAWINGS.
DISCONNECT, REMOVE, AND DEMO, EXISTING BOILER, BOILER PUMP, CONTROLS,
CONTROL WIRING, COMBUSTION AIR, VENT, WALL CAP, AND ALL ASSOCIATED
ACCESSORIES IN THEIR ENTIRETY. CONTRACTOR TO MODIFY EXISTING EXTERIOR
BLOCK WALL AS REQUIRED TO COMPLETE THEIR WORK. PATCH EXTERIOR WALL AS
REQUIRED TO MATCH EXISTING AND SEAL WATERTIGHT. EXISTING CONCRETE PAD TO
REMAIN AND BE RE-USED AS SHOWN ON NEW DRAWINGS. EXISTING TEKMAR BOILER
CONTROLLER TO REMAIN AND BE RE-USED AS SHOWN ON NEW DRAWINGS.
EXISTING EPO SWITCH AND ALL ASSOCIATED ACCESSORIES TO REMAIN. CONTRACTOR
TO RE-USE EXISTING EPO AS SHOWN ON NEW DRAWINGS.
M-300
DBP
CAT
FIRST FLOOR PLAN -
MECHANICAL DEMOLITION
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
07/17/2026 CD SET
FIRST FLOOR PLAN - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10
N
X-AHU-4X-AHU-5X-AHU-6
X-CU-5X-CU-6 X-CU-4
X-CU-2X-CU-1 X-CU-3
X-AHU-3X-AHU-2X-AHU-1
X-B
X-B
X-P
X-P
OFFICE
BREAK AREA
WORK ROOM
POLICE
ROOM
TOILET
SERVER
COMPUTER
LITERATURE LOBBY
LITERATURE STORAGE
LOBBY
MEN'S RESTROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
WOMEN'S RESTROOM
VENDING
ELECTRICAL ROOM
VENDING CLOSET
MAIN. & MECH. ROOM
MAIN. & MECH. ROOM
X-DX (STACKED)
X-DX (STACKED)
X-DX (STACKED)
X-DX (STACKED)
X-DX (STACKED)
X-DX (STACKED)
X-DX (STACKED)
X-DX (STACKED)
X-
DXX-
DX
X-
DXX-
DX
X-
DXX-
DX
X-
DXX-
DX
X-
DXX-
DX
X-
DXX-
DX
X-DX
X-DX
X-DX
X-DX
X-DX
X-DX
X-
DX
X-
DXX-
DX
X-
DXX-
DX
X-
DX
X-DX
X-DX
X-DX
X-DX
X-DX
X-DX
X-
DX
X-
DXX-
DX
X-
DXX-
DX
X-
DX
X-HS
X-HR
X-HS
X-HR
X-HS
X-HR
X-CD X-CD
X-1" X-1"
X-1/2" X-1/2" X-1/2"
X-1-1/4" X-1" X-1"
X-1"X-1"X-1-1/4"
X-2" X-2"
X-HS
X-HR
X-HS
X-HR
X-HS
X-HR
X-CD X-CD
X-1" X-1"
X-1/2" X-1/2" X-1/2"
X-1-1/4" X-1" X-1"
X-1" X-1-1/4"
X-1-1/2" X-1" X-1"
1 2 2
3 3
3 3
3 3
4 4 4
IN ATTIC SPACE
IN ATTIC SPACEIN ATTIC SPACE
IN ATTIC SPACE
IN ATTIC SPACEIN ATTIC SPACE
1 2 4
1 2 4
1 2 4
1 2 4
1 2 4 1 2 4
4 4
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
1. ALL EXISTING EQUIPMENT, PIPING, CONTROLS, AND ALL ASSOCIATED
ACCESSORIES TO REMAIN AND BE RE-USED UNLESS OTHERWISE NOTED.
2. CONTRACTOR TO MODIFY EXISTING WALLS/CEILING AS REQUIRED TO COMPLETE
THEIR WORK. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING
WALLS/CEILINGS AT LOCATIONS WHERE DEMOLITION/NEW WORK IS COMPETED AS
REQUIRED TO MATCH EXISTING WALL AND MAINTAIN EXISTING RATINGS.
3. DISCONNECT, REMOVE, AND DEMO EXISTING DX PIPING, FITTINGS, HANGERS,
SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY. DX PIPING
INSIDE THE BUILDING IS ROUTED IN THE ABOVE CEILING ATTIC SPACE BESIDES THE
DROPS IN THE LOCATIONS SHOWN. CONTRACTOR TO RE-USED EXISTING DX PIPING
EXTERIOR WALL PENETRATIONS FOR NEW DX PIPING AS SHOWN ON NEW
DRAWINGS.
4. HYDRONIC PIPING AND CONDENSATE PIPING SHOWN ON DRAWINGS IS ROUTED
WITHIN THE OCCUPIED MECHANICAL ROOM SPACE.
5. CONTRACTOR TO UTILIZE EXISTING ACCESS HATCHES (ONE ACCESS HATCH IN
EACH MECHANICAL ROOM) FOR ACCESS INTO THE ATTIC SPACE.
6. REFER TO BOILER PIPING DIAGRAM FOR PIPE SIZES AND EXTENTS OF BOILER,
BOILER PUMP, AND PIPING DEMOLITION WORK.
DISCONNECT, REMOVE, AND DEMO EXISTING AIR HANDLING UNIT, HEATING COIL,
COOLING COIL, DX PIPING, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY/RETURN PIPING AND
CONDENSATE PIPING AS REQUIRED TO REMOVE EXISTING AIR HANDLING UNIT AND
INSTALL NEW AIR HANDLING UNIT AS SHOWN ON NEW DRAWINGS.
DISCONNECT, REMOVE, AND DEMO EXISTING AIR HANDLING UNIT, DUCT MOUNTED
HEATING COIL, COOLING COIL, DX PIPING, AND ALL ASSOCIATED ACCESSORIES IN THEIR
ENTIRETY. DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY/RETURN
PIPING AND CONDENSATE PIPING AS REQUIRED TO REMOVE EXISTING AIR HANDLING
UNIT AND INSTALL NEW AIR HANDLING UNIT AS SHOWN ON NEW DRAWINGS.
DISCONNECT, REMOVE, AND DEMO EXISTING HEATING SUPPLY PIPING, HEATING
RETURN PIPING, CONDENSATE PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND
ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN.
DISCONNECT, REMOVE, AND DEMO EXISTING EXTERIOR CONDENSING UNIT, DX PIPING,
PIPING SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THEIR ENTIRETY.
DISCONNECT, REMOVE, AND DEMO EXISTING BOILER, BOILER PUMP, HEATING SUPPLY
PIPING, HEATING RETURN PIPING, GAS PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS,
AND ALL ASSOCIATED ACCESSORIES TO THE EXTENTS SHOWN. CONTRACTOR TO
MODIFY EXISTING PIPING AS REQUIRED TO MAKE NEW CONNECTION AS SHOWN ON NEW
DRAWINGS. EXISTING CONCRETE PAD IS TO REMAIN AND BE RE-USED AS SHOWN ON
NEW DRAWINGS.
X-B
X-HS
X-HR
X-CONCRETE
PAD
X-BX-P
X-CONCRETE
PAD
X-1-1/2"
X-
HS
X-
HR
X-
HS
X-
HR
X-1-1/2"
X-2-1/2"X-2-1/2"
X-HS
X-HR
X-P
X-1-1/2"
X-
HS
X-
HR
X-
HS
X-
HR
X-1-1/2"
X-GX-G
X-2"
X-SHUTOFF
VALVE (TYP.)
X- G
X- G
X-1"X-1"
X- G
X- G
X-1"X-1"
5 5
X-FLOOR
M-301
DBP
CAT
FIRST FLOOR PLAN - PIPING
DEMOLITION
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
07/17/2026 CD SET
FIRST FLOOR PLAN - PIPING DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10
MECHANICAL ROOM BOILER PIPING DIAGRAM - PIPING
DEMOLITION
SCALE: 1/4" = 1'-0"
M
M M
X-SD 500
20x10 TYP. 4
X-12x16 SA X-12x16 SA
X-18x16 SA
X-18x16 SA X-18x16 SA
X-18x16 SA
X-RG ---
36x16 ---
X-18x16 RA
X-18x16 RA
X-18x16 RA
X-SD 230
24x24 TYP. 6
X-10" SA
X-10" SA X-10" SA X-10" SA
X-10" SA
X-10" SA
X-SD ---
24x12 ---
X-10x12 SA X-18x12 SA X-18x14 SA X-18x14 SA
X-18x14 RA X-18x14 RA
X-SD 250
12x12 TYP. 2
X-14x8 SA
X-14x8 SA
X-10" EA
X-EG 300
12x12 TYP. 2
X-EG 300
12x12 ---
X-EG 225
12x12 ---
X-12x18 SA
X-SD 665
20x12 ---
X-18x22 SA
X-12x22 SA
X-12x18 SA
X-14x8 SA
X-14x8 SA
X-12x18 SA
X-10" EA
X-10" EA
X-10" EA
X-EG 100
8x8 ---
X-L (24x20, 1250 CFM)
X-24x10 OAX-14x10 OA
X-10x8 OAX-10x10 OA
X-EF-2
X-18x12 EA
X-L (48x12, 2800 CFM)
X-4" EA
X-4" EA X-SOFFIT
GRILLE (150 CFM)X-24x16 RA
X-24x16 RA
X-SD 250
12x12 TYP. 2
X-RG ---
48x24 ---
X-15x15 EA
X-15x15 EA
X-EF-4
X-EF-3
X-SOFFIT
GRILLE (50 CFM)
X-4" EA
X-15x15 EA
M
X-12x16 SA X-12x16 SA
X-18x16 SA
X-18x16 SA
X-18x16 SA X-18x16 SA
X-18x16 RA
X-18x16 RA
X-18x16 RA
X-8" SA
X-10" SA
X-8" SA
X-10" SA
X-8" SA
X-10x12 SA X-18x12 SA X-18x14 SA X-18x14 SA
X-18x14 RA X-18x14 SA
X-14x8 SA
X-14x8 SA
X-12x18 SA X-18x22 SA
X-12x22 SA
X-12x18 SA
X-14x8 SA
X-14x8 SA
X-12x18 SA
X-10" EA
X-10" EA
X-10" EA
X-EG 100
8x8 ---
X-L (24x20, 1250 CFM)
X-24x10 OAX-14x10 OA
X-10x8 OAX-10x10 OA
X-EF-5
X-18x12 EA
X-24x16 RA
X-24x16 RA
X-SD 250
12x12 TYP. 2
X-RG ---48x24 ---
X-15x15 EA
X-15x15 EAX-15x15 EA
X-4" EA
X-SD 150
24x24 ---
X-SD 290
24x24 TYP. 3
X-SD 225
24x24 ---
X-SD 500
20x10 TYP. 4
X-RG ---
36x16 ---
X-SD 150
24x24 ---
X-RG ---
24x12 ---
X-SD 250
12x12 TYP. 2
X-EG 300
12x12 ---
X-EG 300
12x12 TYP. 2
X-EG 225
12x12 ---
M M
X-RG ---
12x12 ---
X-10" SA
X-18x14 RA
X-18x14 RA
X-EF-1
X-4" EA
X-4" EA
X-WALL CAP (75 CFM)
X-10"
EA
X-SD 665
20x12 ---
X-CONCRETE PAD
(TYP. 2)
X-BOILER EPO
X-BOILER CONTROLLER
OFFICE
BREAK AREA
WORK ROOM
POLICE
ROOM
TOILET
SERVER
COMPUTER
LITERATURE LOBBY
LITERATURE STORAGE
LOBBY
MEN'S RESTROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
WOMEN'S RESTROOM
VENDING
ELECTRICAL ROOM
VENDING CLOSET
MAIN. & MECH. ROOM
MAIN. & MECH. ROOM
AHU-4AHU-5AHU-6
AHU-3AHU-2AHU-1
CU-2CU-1 CU-3
CU-5CU-6 CU-4
T
AHU-5
T
AHU-4
T
SAHU-6
AHU-2
T
AHU-3
T
S
AHU-1
T
HC-4
HC-5
HC-3
HC-2
2 2 2
2 2
2 2
3 3
3 3
B-1
B-2
3" CA & V
WALL CAP
3" CA & V
WALL CAP
P-1
P-2
S
CARBON MONOXIDE
SENSOR
MECHANICAL KEY NOTES
GENERAL MECHANICAL NOTES
1. CONTRACTOR TO MODIFY EXISTING WALLS/CEILINGS AS REQUIRED TO COMPLETE
THEIR WORK. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING WALLS/CEILINGS
IN THE LOCATIONS OF DEMOLITION/NEW WORK AS REQUIRED TO MATCH EXISTING
WALL/CEILINGS. CONTRACTOR TO ENSURE THAT ALL WALL/CEILING RATINGS ARE
MAINTAINED.
2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. ENSURE ALL MANUFACTURER REQUIRED CLEARANCES ARE
MAINTAINED.
3. CONTRACTOR TO PROVIDE NEW THERMOSTATS, SPACE TEMPERATURE SENSORS,
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES/DEVICES
REQUIRED TO HAVE THE NEW AIR HANDLING UNITS OPERATE STANDALONE PER THE
PROJECT SEQUENCE OF OPERATIONS. CONTRACTOR TO PROVIDE ALL NEW
CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES/DEVICES
REQUIRED TO CONNECT EXISTING DAMPER ACTUATORS, HEATING CONTROL
VALVES, AND OTHER EXISTING CONTROL DEVICES TO THE NEW AIR HANDLING UNIT
CONTROLS TO HAVE THE UNITS OPERATE PER THE PROJECT SEQUENCE OF
OPERATIONS. ALL NEW CONTROL WIRING, RACEWAYS, AND ALL ASSOCIATED
ACCESSORIES TO BE CONCEALED IN WALLS OR ABOVE CEILING SPACE.
CONTRACTOR TO CUT, PATCH, PRIME, AND PAINT WALLS AS NEEDED TO INSTALL
CONCEALED WIRING TO MATCH EXISTING.
4. CONTRACTOR TO MOUNT NEW AIR HANDLING UNITS ON NEW CONTRACTOR
FABRICATED 33" TALL METAL STANDS. CONTRACTOR TO COORDINATE THE
DIMENSIONS FOR THE NEW STANDS WITH THE APPROVED AIR HANDLING UNITS
PRIOR TO CONSTRUCTING. NEW STANDS ARE TO CONSTRUCTED FROM 2x2 ANGLE
IRON WITH WELDED JOINTS AND ARE TO BE FABRICATED IN A SIMILAR FASHION TO
THE EXISTING METAL STANDS TO ALLOW THE RETURN DUCTWORK TO BE ROUTED
TO THE BOTTOM RETURN ON THE AIR HANDLING UNITS. NEW AIR HANDLING UNITS
STANDS ARE TO BE PRIMED AND PAINTED BLACK WITH CORROSION INHIBITING
PAINT. THE NEW AIR HANDLING UNIT STANDS ARE TO BE FASTENED TO THE EXISTING
CONCRETE FLOOR WITH WEDGE STYLE ANCHOR BOLTS.
5. CONTRACTOR TO REFER TO THE CONSTRUCTION PHASING SCHEDULE ON THE M-100
DRAWING FOR HOW THE PHASING OF DEMOLITION/NEW WORK IS TO BE COMPLETED.
6. CONTRACTOR IS TO COMPLETE A FINAL TAB REPORT FOR THE SUPPLY/RETURN AIR
FLOWS THROUGHOUT THE BUILDING AFTER THE NEW AIR HANDLING UNITS ARE
INSTALLED. CONTRACTOR TO BALANCE THE EXISTING SUPPLY DIFFUSERS AND
RETURN GRILLES TO THE CFM SHOWN ON THE DRAWINGS.
INSTALL NEW AIR HANDLING UNIT, METAL ELEVATED EQUIPMENT STAND, HEATING COIL,
COOLING COIL, DUCTWORK, THERMOSTAT, SENSOR, CONTROLS, CONTROL WIRING, AND
ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. CONTRACTOR TO INSTALL NEW SUPPLY DUCTWORK AND
ALL ASSOCIATED ACCESSORIES AS REQUIRED TO CONNECT TO THE EXISTING FLEXIBLE
CONNECTOR. CONTRACTOR TO MODIFY THE EXISTING SUPPLY DUCTWORK AS
REQUIRED FOR NEW CONNECTION. CONTRACTOR TO MODIFY THE EXISTING RETURN
AIR DUCTWORK AS REQUIRED TO CONNECT TO NEW AIR HANDLING UNIT. CONTRACTOR
TO PROVIDE ALL NEW CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES/DEVICES REQUIRED TO CONNECT EXISTING OUTDOOR AIR DAMPER
ACTUATOR, HEATING COIL CONTROL VALVES, AND OTHER EXISTING CONTROL DEVICES
TO THE NEW AIR HANDLING UNIT CONTROLS
INSTALL NEW AIR HANDLING UNIT, METAL ELEVATED EQUIPMENT STAND, COOLING COIL,
DUCT MOUNTED HEATING COIL, DUCTWORK, THERMOSTAT, CONTROLS, CONTROL
WIRING, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO INSTALL NEW
SUPPLY DUCTWORK AND ALL ASSOCIATED ACCESSORIES AS REQUIRED TO INSTALL
NEW DUCTWORK MOUNTED HEATING COIL AND CONNECT TO THE EXISTING FLEXIBLE
CONNECTOR. CONTRACTOR TO MODIFY THE EXISTING SUPPLY DUCTWORK AS
REQUIRED FOR NEW CONNECTION. CONTRACTOR TO MODIFY THE EXISTING RETURN
AIR DUCTWORK AS REQUIRED TO CONNECT TO NEW AIR HANDLING UNIT. CONTRACTOR
TO PROVIDE ALL NEW CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED
ACCESSORIES/DEVICES REQUIRED TO CONNECT EXISTING OUTDOOR AIR DAMPER
ACTUATOR, HEATING COIL CONTROL VALVES, AND OTHER EXISTING CONTROL DEVICES
TO THE NEW AIR HANDLING UNIT CONTROLS
INSTALL NEW EXTERIOR CONDENSING UNIT, DX PIPING, CONTROLS, CONTROL WIRING,
AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. MOUNT NEW CONDENSING UNITS ON
THE EXISTING CONCRETE SLAB IN THE LOCATION SHOWN.
INSTALL NEW BOILER, BOILER PUMP, CONTROLS, CONTROL WIRING, COMBUSTION AIR,
VENT, WALL CAP, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER
THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO MODIFY
EXISTING BLOCK WALL AS REQUIRED TO COMPLETE THEIR WORK. CONTRACTOR TO
PATCH AND SEAL EXISTING WALL AND SEAL WATER TIGHT. CONTRACTOR TO INSTALL
NEW BOILER ON THE EXISTING CONCRETE PAD. CONTRACTOR TO PROVIDE ALL
CONTROL WIRING AND ALL ASSOCIATED ACCESSORIES TO CONNECT NEW BOILER TO
EXISTING EPO SWITCH AND VERIFY PROPER OPERATION. CONTRACTOR TO PROVIDE
CONTROL WIRING AND ASSOCIATED ACCESSORIES AS REQUIRED TO CONNECT NEW
BOILER AND BOILER PUMP TO THE EXISTING TEKMAR BOILER CONTROLLER.
INSTALL NEW WALL MOUNTED CARBON MONOXIDE SENSOR (KIDDE M/N: KN-COPP-3 OR
APPROVED EQUIVALENT) AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION
SHOWN. NEW CARBON MONOXIDE SENOR TO MEET BOILER INSPECTION
REQUIREMENTS.
CONTRACTOR TO PROVIDE AND INSTALL NEW PROTECTIVE COVERING OVER
CONDENSING UNIT. CONTRACTOR TO REFER TO M-800 DRAWING FOR NEW PROTECTIVE
COVERING DETAIL.
M-400
DBP
CAT
FIRST FLOOR PLAN -
MECHANICAL NEW
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
07/17/2026 CD SET
FIRST FLOOR PLAN - MECHANICAL NEW
SCALE: 1/4" = 1'-0"
OFFICE
BREAK AREA
WORK ROOM
POLICE
ROOM
TOILET
SERVER
COMPUTER
LITERATURE LOBBY
LITERATURE STORAGE
LOBBY
MEN'S RESTROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
WOMEN'S RESTROOM
VENDING
ELECTRICAL ROOM
VENDING CLOSET
MAIN. & MECH. ROOM
MAIN. & MECH. ROOM
AHU-4AHU-5AHU-6
AHU-3AHU-2AHU-1
CU-2CU-1 CU-3
CU-5CU-6 CU-4
B-1
B-2
P-1
P-2
OFFICE
BREAK AREA
WORK ROOM
POLICE
ROOM
TOILET
SERVER
COMPUTER
LITERATURE LOBBY
LITERATURE STORAGE
LOBBY
MEN'S RESTROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
WOMEN'S RESTROOM
VENDING
ELECTRICAL ROOM
VENDING CLOSET
MAIN. & MECH. ROOM
MAIN. & MECH. ROOM
X-HS
X-HR
X-HS
X-HR
X-HS
X-HR
X-CD X-CD
X-1" X-1"
X-1"X-1"X-1-1/4"
X-2" X-2"
X-HS
X-HR
X-HS
X-HR
X-HS
X-HR
X-CD X-CD
X-1" X-1"X-1"
X-1-1/4"
X-1-1/2" X-1" X-1"
3/4" 3/4"3/4"
1-1/4" 1" 1"
DX (STACKED)
DX (STACKED)
DX (STACKED)
DX (STACKED)
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
IN ATTIC SPACE
IN ATTIC SPACEIN ATTIC SPACE
IN ATTIC SPACE
IN ATTIC SPACEIN ATTIC SPACE
3/4"
1-1/4" 1"
3/4"
1"
3/4"
DX (STACKED)
DX (STACKED)
DX (STACKED)
DX (STACKED)
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
DX
HC-4HC-5
HC-3
HC-2
2 2
4 4
4 4 4
5 5
5 5 5
PIPE SUPPORT
(TYP.)
PIPE SUPPORT
(TYP.)
PIPING KEY NOTES
GENERAL PIPING NOTES
1. CONTRACTOR TO MODIFY EXISTING WALLS/CEILING AS REQUIRED TO COMPLETE
THEIR WORK. CONTRACTOR TO PATCH, PRIME, AND PAINT EXISTING WALLS/CEILINGS
IN THE LOCATIONS OF DEMOLITION/NEW WORK AS REQUIRED TO MATCH EXISTING
WALL/CEILING. CONTRACTOR TO ENSURE THAT ALL WALL/CEILING RATINGS ARE
MAINTAINED.
2. CONTRACTOR TO PATCH EXTERIOR WALL PENETRATIONS AS REQUIRED TO MATCH
EXISTING AND SEAL WATER TIGHT.
3. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. ENSURE ALL MANUFACTURER REQUIRED CLEARANCES ARE
MAINTAINED.
4. INSTALL 0.020" THICK ALUMINUM, STUCCO EMBOSSED JACKET AROUND ALL
EXPOSED, EXTERIOR ROUTED REFRIGERANT PIPING.
5. CONTRACTOR TO REFER TO THE CONSTRUCTION PHASING SCHEDULE ON THE M-100
DRAWING FOR HOW THE PHASING OF DEMOLITION/NEW WORK IS TO BE COMPLETED.
6. CONTRACTOR TO RE-BALANCE THE EXISTING CIRCUIT SETTERS SERVING NEW AIR
HANDLING UNIT HEATING COILS TO MATCH THE FLOW RATES TO IN THE AIR
HANDLING UNIT SCHEDULE.
7. CONTRACTOR TO UTILIZE EXISTING ACCESS HATCHES (ONE ACCESS HATCH IN EACH
MECHANICAL ROOM) FOR ACCESS INTO THE ATTIC SPACE.
8. REFER TO BOILER PIPING DIAGRAM FOR PIPE SIZES AND EXTENTS OF NEW BOILERS,
BOILER PUMPS, AND PIPING INSTALLATION.
INSTALL NEW AIR HANDING UNIT, EXTERIOR CONDENSING UNIT, HEATING COIL, COOLING
COIL, HEATING SUPPLY/RETURN PIPING, DX PIPING, CONDENSATE PIPING, VALVES,
FITTINGS, HANGERS, SUPPORTS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION
SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO
CONNECT EXISTING HEATING CONTROL VALVE TO NEW AIR HANDLING UNIT AS
REQUIRED TO BE CONTROLLED BY THE AIR HANDLING UNIT CONTROLS.
INSTALL NEW AIR HANDING UNIT, EXTERIOR CONDENSING UNIT, DUCT MOUNTED
HEATING COIL, COOLING COIL, HEATING SUPPLY/RETURN PIPING, DX PIPING,
CONDENSATE PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. CONTRACTOR TO CONNECT EXISTING HEATING CONTROL VALVE TO
NEW AIR HANDLING UNIT AS REQUIRED TO BE CONTROLLED BY THE AIR HANDLING UNIT
CONTROLS.
INSTALL NEW HEATING SUPPLY/RETURN PIPING, HANGERS, SUPPORTS, VALVES,
FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE
MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONNECT NEW HEATING
SUPPLY/RETURN PIPING TO THE EXISTING HEATING SUPPLY/RETURN PIPING IN THE
LOCATION SHOWN. MODIFY THE EXISTING HEATING SUPPLY/RETURN PIPING AS
REQUIRED FOR NEW CONNECTION.
INSTALL NEW DX PIPING, HANGERS, SUPPORTS, FITTINGS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. ROUTE NEW DX PIPING THROUGH EXISTING EXTERIOR WALL
PENETRATIONS AND CEILING PENETRATIONS. PATCH EXTERIOR WALL PENETRATIONS
TO MATCH EXISTING AND SEAL WATER TIGHT. PATCH, PRIME, AND PAINT CEILING
PENETRATIONS AS REQUIRED TO MATCH EXISTING.
INSTALL NEW CONDENSATE PIPING, HANGERS, SUPPORTS, FITTINGS, AND ALL
ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. CONNECT NEW CONDENSATE PIPING TO THE EXISTING
CONDENSATE PIPING IN THE LOCATION SHOWN. MODIFY THE EXISTING CONDENSATE
PIPING AS REQUIRED FOR NEW CONNECTION.
SUPPORT REFRIGERANT PIPING WITH PIPE SUPPORTS BASED ON MIRO #5-RAH-7 OR
APPROVED EQUIVALENT. SPACE PIPING SUPPORTS PER MANUFACTURER'S
RECOMMENDATIONS. INSTALL PIPE SUPPORT PAD OR MANUFACTURER APPROVED
EQUIVALENT.
INSTALL NEW BOILER, BOILER PUMP, HEATING SUPPLY PIPING, HEATING RETURN PIPING,
GAS PIPING, VALVES, FITTINGS, HANGERS, SUPPORTS, AND ALL ASSOCIATED
ACCESSORIES IN THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. CONTRACTOR TO MODIFY EXISTING PIPING AS REQUIRED TO MAKE NEW
CONNECTION AS SHOWN ON NEW DRAWINGS.
X-HS
X-HR
X-CONCRETE
PAD
X-CONCRETE
PAD
X-
HS
X-
HR
X-1-1/2"
X-2-1/2"X-2-1/2"
X-HS
X-HR
X-
HS
X-
HR
X-1-1/2"
X-GX-G
X-2"
X-SHUTOFF
VALVE (TYP.)
X- G
X- G
X-1"X-1"
X-FLOOR
UNION (TYP)
HS
PRESSURE RELIEF
VALVE (TYP)
THERMOMETER (TYP)
CHECK VALVE (TYP)
P-1
P/T (TYP.)
CONDENSATE
NEUTRALIZING KIT (TYP.)
TO FLOOR DRAIN (TYP.)
3/4" DRAIN VALVE PIPE
TO FLOOR DRAIN. (TYP)
B-1
B-2
1-1/2"
HS
P-2
1-1/2"
HR HR
G G
1"1"
7 7
3/4" 3/4"
DRIP LEG
(TYP.)
M-600
DBP
CAT
FIRST FLOOR PLAN -
PIPING NEW
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
07/17/2026 CD SET
FIRST FLOOR PLAN - PIPING NEW
SCALE: 1/4" = 1'-0"
0 1 5 10
1 MECHANICAL ROOM BOILER PIPING DIAGRAM - PIPING NEW
SCALE: 1/4" = 1'-0"
1 INSULATION HANGER DETAIL
SCALE: NTS
14 GAUGE ZINC
COATED SHEET
STEEL SADDLE, AT
LEAST 12" LONG
PIPE
INSULATION
THERMAL HANGERS
SHIELD INSERTS
(360-DEG)
6 AHU 3-WAY CONTROL VALVE HYDRONIC PIPING DIAGRAM
SCALE: NTS
COIL
X-HS
X-HR
3/4" HOSE END
DRAIN VALVE
X-SHUTOFF VALVE (TYP.)
X-CIRCUIT SETTER (TYP.)
X-UNION (TYP)
AUTOMATIC AIR
VENT (TYP.)
X-3-WAY MODULATING
CONTROL VALVE
ISOLATION
VALVES
FILTER DRYER
EXPANSION VALVE
(TYPICAL)
PITCH
EVAPORATOR COIL
L
CHARGING
VALVE
PITCH
CU
PITCH
S
SIGHT GLASS
NOTES:
1. PITCH ALL LINES MIN. 1/2" PER 10' IN
DIRECTION OF REFRIGERANT FLOW.
2. INSULATE SUCTION PIPING.
3. KEEP HORIZONTAL DISTANCE OF TRAPS TO
A MINIMUM.
4. PROVIDE TRAPS IF VERTICAL DISTANCE OF
PIPING EXCEEDS 8 FT.
EQUIPMENT MANUFACTURER TO PROVIDE
FACTORY APPROVED PIPING DETAIL VIA SHOP
DRAWINGS TO ENGINEER BEFORE CONSTRUCTION
BEGINS.
4 CONDENSING UNIT PIPING DIAGRAM
SCALE: NTS
TRAP
X-THERMOMETER (TYP.)
X-SA
X-RA
FLOOR
AHU
3 AHU-1 & 6 DETAIL
SCALE: NTS
DX PIPING
3/4" CD
3/4" CD TO
X-CD PIPING
X-RA
NEW METAL
FABRICATED STAND X-RA
X-FELX
CONNECTOR
HSHR
X-SA
X-RA
FLOOR
AHU
2 AHU-2, 3, 4, & 5 DETAIL
SCALE: NTS
DX PIPING
3/4" CD
3/4" CD TO
X-CD PIPING
X-RA
X-RA
X-FELX
CONNECTOR
HSHR
HC
NOTE:
90° ELBOW SHOWN
SIMILAR RADIUS
CONSTRUCTION FOR
ALL ANGLES
R
R
OFFSET
ELBOW
FULL RADIUS
(R=W)
FLOW
AIR
TRANSITION - CONTRACTION FLOW
TRANSITION - DIVERGING FLOW
FLOW
AIR
W
W
R=1/ W
W
RECTANGULAR TRANSITIONS, OFFSETS, AND
ELBOWS
SCALE: NTS
RADIUS ELBOW
NEW METAL
FABRICATED STAND
NOTE:
1. CONTRACTOR TO PROVIDE AND INSTALL MIRO INDUSTRIES:
6-HD(R) MECHANICAL SUPPORT (OR APPROVED EQUAL).
2. APPROXIMATE DIMENSIONS SHOWN, CONTRACTOR TO
COORDINATE FINAL DIMENSIONS FOR MIRO INDUSTRIES:
6-HD(R) MECHANICAL SUPPORT (OR APPROVED EQUAL) STAND
WITH APPROVED CONDENSING UNIT DIMENSIONS.
3. CONTRACTOR TO FASTEN FIBERGRATE FIBERGLASS MOLDED
GRATING (OR APPROVED EQUAL) TO STAND.
4. FIBERGRATE FIBERGLASS MICRO-MESH MOLDED GRATING (OR
APPROVED EQUAL) TO BE 1" THICK WITH 3/4" x 3/4" SQUARE
MESH. GRATING IS TO COLOR MATCH SUPPORT STAND.
FIBERGRATE FIBERGLASS
MICRO-MESH MOLDED
GRATING (OR APPROVED
EQUAL)
4'-0"5'-0"
4'-0"
7 CU-1 & CU-6 PROTECTIVE COVERING
SCALE: NTS
M-800
DBP
CAT
MECHANICAL DETAILS
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
1. ALL WALL AND FLOOR PENETRATIONS ARE TO BE SEALED TO MAINTAIN ORIGINAL
RATING.
2. ALL CONDUITS TO BE FIELD ROUTED ALONG EXISTING PIPING AND STRUCTURAL
STEEL.
3. THE DIVISION 26 CONTRACTORS SHALL VISIT THE PROJECT AND DETERMINE THE
EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE BIDDING THE PROJECT.
4. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED EQUIPMENT
WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED OTHERWISE.
5. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD WORK,
SURFACES SHALL BE PATCHED TO MATCH ADJACENT.
6. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL REMAIN
CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF ANY TRADE NEED
NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE CAPPED BELOW FINISH
SURFACE AND THEN PATCHED TO MATCH, OR AS NOTED.
7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR ENLARGED
TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL REQUIRED CUTTING AND
PATCHING.
8. IF ASBESTOS IS PRESENT, IT WILL BE REMOVED OR RENDERED HARMLESS UNDER
SEPARATE CONTRACT BY THE OWNER.
9. THE DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE EXISTING
WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL SURFACE MOUNTED
EQUIPMENT.
10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT VOLTAGES AND LOADS PRIOR TO
INSTALLING SERVICE TO EQUIPMENT.
11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL FIELD
OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR CLARIFICATION.
GENERAL ELECTRICAL NOTES
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST (E)
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
FU- FURNACE
FCPS
V
M C
VI
AV
B
C
DC
M
B
KP
SSCP
CR
SS
AS
TS
G
NCC
M P
E
A L B1 B2
S
SRS
X
X
X
CB
EMERGENCY PUSH STATION
CODE BLUE STATION
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVE
GLASS BREAK
DS
DUPLEX RECEPTACLE
TEACHER STATION
ADMINISTRATION STATION
STUDENT STATION
CARD READER
CARBON MONOXIDE DETECTOR
H
DOCK LIGHT FIXTURE
CONTROL MODULE
S
TELEPHONE / DATA OUTLET
DUTY STATION
STAFF STATION
STAFF REGISTER STATION
DOME LIGHT
DUAL BED STATION
SINGLE BED STATION
BED / LIGHT INTERFACE
PENDENT INTERFACE
EMERGENCY PULL STATION
MASTER STATION
NURSE CALL CONTROLLER
NURSE CALL
ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
THREE PHASE MOTOR
BELL
AUDIO / VIDEO INPUT
VIDEO INPUT
WALL MOUNTED SPEAKER / CLOCK COMBO
WALL MOUNTED SPEAKERS
DUAL FACE CLOCK
CCTV CONTROL PANELCCTV
SECURITY SYSTEM CONTROL PANEL
KEY PAD
BEAM DETECTOR
MOTION DETECTOR
DOOR CONTACT
CAMERA
MONITOR MODULE
FIRE CONTROL POWER SUPPLY
VISUAL ONLY UNIT
ELECTRICAL SYMBOLS LEGEND
DH
V
S
C
M
I
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
SINGLE FACE CLOCK
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
MECHANICAL
ELECTRIC WATER HEATER
ELECTRIC UNIT HEATER
PIPE TRACE HEATER
RESISTANCE HEATER, KW SHOWN
SINGLE PHASE MOTOR
SOUND and SIGNAL
INTERCOM OUTLET
MICROPHONE OUTLET
TELEVISION OUTLET
CHIME
BUZZER
VOLUME CONTROL
SPEAKER
SERVICE and EQUIPMENT
THERMOSTAT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER (BY x/C U.O.N.)
MAGNETIC STARTER (BY x/C U.O.N.)
DISCONNECT SWITCH (fuse size shown)
TRANSFORMER
CONTROL
xxVA connection by x/C) IRRIGATION CONTROLLER (120 volt
LIGHTING CONTACTOR
CONTROL TRANSFORMER
buttons indicated) PUSHBUTTON STATION (number of TIME CLOCK (24 hour U.O.N.)
PHOTOCELL (voltage as required)
HUMIDISTAT
FIRE ALARM
TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)
FIREFIGHTER COMMUNICATION JACK
MAGNETIC DOOR HOLDER
REMOTE INDICATING LIGHT, CLG. MTD.
REMOTE INDICATING LIGHT, WALL MTD.
END OF LINE DEVICE
ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
PULL STATION
SPEAKER & LIGHT
SPEAKER
HORN
DUCT SMOKE DETECTOR
HEAT DETECTOR
SMOKE DETECTOR
HORN & LIGHT
DESIGNATIONS
(by E.C.)
(by others)
TT
FACP
ANN
EOL
G
WW
PC
CT
TS
T
H
TC
IC
F
FC
F
T
1,3
OR
PM
WM
BD
UFD
B
F S
J
J
D
WH
PP
J
SENSOR SWITCH WSD-PDT SERIES
SWITCH STYLE OCCUPANCY SENSOR
OC
WATT STOPPER TS-400
DIGITAL TIME SWITCH
SENSOR SWITCH MP20 SERIES
POWER PACK
SENSOR SWITCH CMR-PDT SERIES
ULTRASONIC SENSOR - 360° - 500 SQ FT
SENSOR SWITCH CMR-PDT-10
ULTRASONIC SENSOR - 360° - 1000 SQ FT
SENSOR SWITCH CMR-PDT-10-2P
ULTRASONIC SENSOR - 360° - 2 CIRCUIT
SENSOR SWITCH CMR-PC-ADC SERIES
OCCUPANCY SENSOR / PHOTOCELL
SENSOR SWITCH WV-PDT-16 SERIES
WALL MOUNT DUAL TECHNOLOGY SENSOR
OS5
OS4
T
OS2
OS3
OS1
PP
DUCT SMOKE DETECTORF/S
CEILING MOUNTED WIFI
M
E-100
AWB
JFS
ELECTRICAL SYMBOLS,
NOTES, AND ABBREVIATIONS
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
X-EF-2
X-CU-5X-CU-6 X-CU-4
X-CU-2X-CU-1 X-CU-3
X-EF-5
X-AHU-6
X-AHU-1
X-AHU-4X-AHU-5
X-AHU-2 X-AHU-3
X-AHU-4 MOTOR
STARTER
X-AHU-6 MOTOR
STARTER
X-AHU-1 MOTOR
STARTER
X-AHU-3 MOTOR
STARTER
X-AHU-2 MOTOR
STARTER
3 33
3 3 3
X-CU-3
X-CU-2
X-CU-1
X-CU-6
X-CU-5
X-CU-4
2 2 2
3 3 3
X-AHU-5 MOTOR
STARTER
X-PNL"A"X-PNL"B"
X-PNL"MDP"
1 1
X-FACP
X-B
X-B
3X-BOILER EPO
X-P 3
X-B1
SWITCH
X-B2
SWITCH
X-P 3
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT AND REMOVE EXISTING EQUIPMENT. ASSOCIATED CONDUIT
AND WIRE TO REMAIN FOR CONNECTION TO NEW EQUIPMENT.
DISCONNECT EXISTING EQUIPMENT, FOR REMOVAL BY OTHERS.
ASSOCIATED CONDUIT AND WIRE TO REMAIN.
DISCONNECT EXISTING AND SALVAGE EXISTING DUCT DETECTOR. TO BE
RECONNECTED UPON COMPLETION OF WORK.
DEMOLITION NOTES
E-300
AWB
JFS
FIRST FLOOR PLAN -
ELECTRICAL DEMOLITION
260347.00
591/26017.JLM
file no.
checked by drawn by consultant issue date contract order no.
consultant job no.
M a t r ix funding code sheet description
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
07/17/2026 CD SET
FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/4" = 1'-0"
X-EF-2
X-EF-5
1 1 1
1 1 1
AHU-1
208V-3Ø,6.8FLA
AHU-2
208V-1Ø,5.6FLA
AHU-3
208V-1Ø,4FLA
CU-1
208V-3Ø,28FLA
CU-6
208V-3Ø,28FLA
1CU-2
208V-3Ø,17FLA
1CU-3
208V-3Ø,13FLA
1CU-5
208V-3Ø,17FLA
1CU-4
208V-3Ø,13FLA
B-17,19,21 B-14,16 B-13,15
A-19,21,23 A-15,17 A-16,18
AHU-6
208V-3Ø,6.8FLA
AHU-5
208V-1Ø,5.6FLA
AHU-4
208V-1Ø,4.8FLA
MDP-1
MDP-3
MDP-4
MDP-6
MDP-13
MDP-14
AHU-4
AHU-6
AHU-5
1 1 1
CU-3
CU-2
CU-1
CU-6
CU-5
CU-4
X-PNL"A"X-PNL"B"
X-PNL"MDP"
B-1
120V-1Ø,3.6FLA
B-2
120V-1Ø,3.6FLA
P-2
120V-1Ø,1.7FLA
P-1
120V-1Ø,1.7FLA
X-BOILER EPO
B1
SWITCH
B2
SWITCH
B-8
B-12
X-FACP
ELECTRICAL KEY NOTES
CONNECT NEW EQUIPMENT TO EXISTING CIRCUIT.