This bridge inspection report details the condition of the NASA Access Bridge located at the Goddard Space Flight Center in Maryland. The 381-foot long steel girder bridge carries the NASA access road over the Baltimore-Washington Parkway and connects to the employee entrance. The biennial routine inspection found damage to the south exterior beam in span 2 after an impact, requiring the bridge's closure. Maintenance and rehabilitation needs are identified over the next five years, including replacement of expansion bearings, cleaning and painting structural steel, replacing deck joints, and removing unsound concrete from piers. Estimated costs total over $4 million. The related federal contract opportunity is a solicitation from the Department of Transportation Federal Highway Administration seeking bridge inspection and rehabilitation services for the damaged NASA Access Bridge.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - MD SP NASA 2(1).pdf | ||
| Amendment 0001 - MD SP NASA 2(1).pdf | ||
| IFB Solicitation - MD SP NASA 2(1).pdf | ||
| Plans - MD SP NASA 2(1).pdf | ||
| FP14_Eng.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| MD SP NASA 2(1)_Bridge_Insp_Rpt_2021.pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
NASA ACCESS BRIDGE
NASA ACCESS ROAD OVER BALTIMORE-WASHINGTON PARKWAY
GODDARD SPACE FLIGHT CENTER
LOOKING EAST
STRUCTURE NO. 2170-001P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 4/26/2022
DAMAGE TO SOUTH EXTERIOR BEAM IN SPAN #2
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 2170-001P
NASA ACCESS BRIDGE INSPECTION DATE : 04/26/2022
226 PRIORITY OF IMPROVEMENT E
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
60.11
SEAL JOINTS ALONG SLOPE PROTECTION AT ABUTMENTS
AND ALONG PAVED WATERWAYS AT WINGWALLS TO HELP
PREVENT WATER INTRUSION.
1 LS 10000 10000
59.11
REMOVE VEGETATION GROWTH FROM PAVED
WATERWAYS AND TREES ENCROACHING ON GIRDERS. 1 LS 3000 3000
58.2,58.7, 222.9
PERIODICALLY REMOVE DEBRIS AND VEGETATION
GROWTH FROM DECK EXPANSION JOINTS, ALONG
CURBLINES AND APPROACH PARAPETS.
1 LS 2000 2000
PRELIM. MAINTENANCE TOTAL : 15000
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
59.1 REPLACE EXPANSION BEARINGS AND REPAIR
BEARING SEATS AND BOLSTERS AS
NECESSARY.
1 LS 1800000 1800000
59.1 CLEAN, PAINT, AND LUBRICATE FIXED
BEARINGS AND REPAIR BEARING SEATS AND
BOLSTERS AS REQUIRED.
1 LS 320000 320000
59.2 CLEAN AND SPOT PAINT STRUCTURAL STEEL
AS NEEDED. 1 LS 15000 15000
58.2 REPLACE COMPRESSION SEALS IN DECK
JOINTS OVER PIERS #1 AND #2. 1 LS 15000 15000
58.2 REPAIR BROKEN ANCHOR STUD TO DECK
ARMORING WELDS. 1 LS 3000 3000
60.13 REMOVE UNSOUND CONCRETE FROM PIERS
AS NECESSARY AND PLACE NEW CONCRETE
TO ORIGINAL DIMENSIONS.
1 LS 150000 150000
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 2170-001P
NASA ACCESS BRIDGE INSPECTION DATE : 04/26/2022
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
E
222.3 REPLACE APPROACH GUARDRAIL.
1 LS 50000 50000
222.4 MILL AND OVERLAY APPROACHES AND INSTALL
ROADWAY STRIPING ALONG DECK SURFACE
AND APPROACHES.
1 LS 35000 35000
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, DESIGN, AND
CONSTRUCTION ENGINEERING.
1 LS 1700000 1700000
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 4088000
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
15000
4088000
PRELIMINARY ESTIMATE TOTAL * :
4103000
4103000
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates are based on data from similar projects.
STRUCTURE LOAD RATING STRUCTURE NO. 2170-001P
NASA ACCESS BRIDGE INSPECTION DATE: 04/26/2022
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 26 24 44 40
HS 40 36 67 61
TYPE 3 35 32 58 53
TYPE 3S2 52 47 87 79
TYPE 3-3 68 62 114 103
DESIGN LOADING: 5 - HS 20
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 08/01/2017
LOAD RATING CONTROLLED BY: SPAN #1 INTERIOR GIRDER MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 2170-001P
STRUCTURE IDENTIFICATION
(201) PARK: GODDARD SPACE FLIGHT CENTER
(202) STRUCTURE NAME:..............NASA ACCESS BRIDGE
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........2170-001 P
(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................NASA
(211) PROJECT NO(S):................... 1D16,E13
(212) DRAWING NUMBERS:...........NONE
(21) MAINTAINED BY:......................75 - NASA
(22) OWNER:................................... 75 - NASA
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
243 - MARYLAND
24033 PRINCE GEORGE'S
40435
1 6 6 00000 0
BALT MORE-WASHINGTON
PARKWAY
NASA ACCESS ROAD
2170001P0000000
Beltway to Exit 22 - Route 295 (B-W Parkway) North. 3nd exit (employee entrance) for NASA Goddard Space Flight Center. U-Turn to bridge.
99.99 FT ( 99.99 M)
.00 (KM PT: 0 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........3 - STEEL (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR (44B) APPR. STR. TYPE:.................... 00 - OTHER
GIRDER
(45) NO. OF MAIN SPANS:..............006 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............86.3 FT ( 26.3 M)
(49) STRUCTURE LENGTH:........... 381. FT ( 116.1 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 0 - NONE
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE
(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE
(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... YES
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................5 - HS 20 (41) LOAD RESTRICTION:.................. K - CLOSED
(66) INVENTORY RATING:..............0 TONS ( 0 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL
LOADS
(64) OPERATING RATING:..............0 TONS ( 0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 04/26/2022 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 1 - DECK SURVEY INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: 06/01/1992 (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 2170-001P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 39° 00'20 50 " (51) CURB TO CURB WIDTH:............ 38.0 FT ( 11.6 M)
(17) LONGITUDE:............................ 76 51° '45 00 " (52) DECK WIDTH:.......................... 41.7 FT ( 12.7 M)
(19) DETOUR LENGTH:.................. 0 MI ( 0 KM) (32) APPR. ROADWAY WIDTH:...... 38.0 FT ( 11.6 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 38.0 FT ( 11.6 M)
(28B) LANES UNDER STRUCT:......04 LEFT SHOULDER:............... 0 0 FT ( 0 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 0 0 FT ( 0 M)
(42B) SERVICE UNDER:................. 6 - HIGHWAY - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............10000 (34) SKEW ANGLE:......................... 16 °
(30) YEAR OF ADT:......................... 2020 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................11000 (47) TOTAL HORIZ. CLEARANCE:.. 38 FT ( 11.6 M)
(115) YEAR OF FUTURE ADT:........2040 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)
WATERWAY (BRIDGE PERMIT NOT
REQUIRED)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 2 - MOUNTED ON PARAPET
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 4 - STEEL
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:..............................9.80 FT ( 2.99 M) (215) BRIDGE RAIL HEIGHT:.......... 4 25 FT ( 1.3 M)
(56) LEFT:................................ 5.4 FT ( 1.6 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 14.17 FT ( 4.32 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT:.................................N
(222) APPROACHES:
(223) RETAINING WALL:.................N
(36) TRAFFIC SAFETY FEAT: 1 1 1 1
(75A) TYPE OF WORK:................... 35 - REHABILITATION - DETERIORATION
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT
(76) IMPROVEMENT LENGTH:.......381.0 FT ( 116.1 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:.................... 5 - SCOUR WITHIN LIMITS OF
FOOTING OR PILES
(225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(226) PRIORITY OF IMPROVEMENT: E - SPECIAL
(227) MAINTENANCE COST:
(228) REHAB / RECNSTR COST:
(229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
PREVIOUSLY INSPECTED AS STRUCTURE NO. 3230-012P. 2004 REHABILITATION INCLUDED DECK REPLACEMENT, REPAINTING OF STEEL SUPERSTRUCTURE, AND CONCRETE REPAIRS TO SUBSTRUCTURE. 2021-IMPACT DAMAGE TO SPAN #2. BRIDGE CLOSED BY NASA.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Zane Bailey Structure Number: 2170001P0000000
Inspection Date: 04/26/2022 Facility Carried: NASA ACCESS ROAD
Bridge Inspection Report
Pictures
PHOTO 3
Description CLOSED RAMP TO ACCESS NASA GODDARD FROM NORTHBOUND BW PARKWAY
PHOTO 4
Description CLOSED RAMP TO ACCESS NASA GODDARD FROM SOUTHBOUND BW PARKWAY
Bridge Inspection Report
Pictures
PHOTO 5
Description CLOSURE OF EAST ACCESS TO BRIDGE
PHOTO 6
Description PREVIOUSLY USED NASA EMPLOYEE ENTRANCE; NOTE CLOSED WITH DOUBLE GATES
Bridge Inspection Report
Pictures
PHOTO 7
Description GENERAL TOPSIDE VIEW OF SPAN #2
PHOTO 8
Description INTERIOR VIEW OF SOUTH EXTERIOR BEAM IN SPAN #2; NOTE BOTTOM FLANGE IS
UPWARDS APPROXIMATELY 8"
Bridge Inspection Report
Pictures
PHOTO 9
Description DAMAGE TO NORTH EXTERIOR GIRDER IN SPAN #2