About this file
This is a 100% Construction Documents set for a renovation project at the Municipal Building Commission, City of Minneapolis, specifically for Room 121 restack renovation. The project involves comprehensive architectural, mechanical, electrical, plumbing, and fire protection improvements to Room 121 located at 350 S 5th Street, Minneapolis, Minnesota 55415. The renovation creates multiple functional spaces including a meeting area (121-06), lockers (121-01), two changing rooms (121-02 and 121-04), gear storage (121-03), and storage (121-05), with an alternate scope including a shower/restroom in room 121-02. The construction documents were issued on September 24, 2026, as prepared by OPN Architects (Joe Wallace, AIA, Project Manager) with mechanical, electrical, and plumbing engineering by Victus Engineering. The project includes complete demolition and removal of existing systems with installation of new partition types, door hardware sets, finishes, HVAC systems with variable air volume (VAV) terminal units, plumbing fixtures including water closets and lavatories, fire protection sprinkler systems, and electrical infrastructure.
The project scope encompasses approximately 2,200 CFM supply air capacity with pressure-independent VAV control, new plumbing fixtures with sensor-controlled flushing and handsfree lavatories, fire protection systems designed for light hazard wet pipe classification at 0.10 GPM/SQ FT, and comprehensive mechanical, electrical, and plumbing demolition and new installation throughout the space. All work must comply with National and Local Codes, with coordination required among all trades including structural, architectural, mechanical, plumbing, electrical, and fire protection disciplines. The project requires field verification of existing conditions, proper firestopping at rated assembly penetrations, and ongoing coordination with the owner representative regarding existing system modifications, utility shutdowns, and weather-tight facility maintenance throughout construction. Material selections include American Standard plumbing fixtures, Price SDV VAV units, and compliance with SMACNA ductwork standards, with all systems to be tested, balanced, and commissioned prior to project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECT
OPN ARCHITECTS
212 N. 3RD AVE, SUITE 312
MINNEAPOLIS, MN 55401
MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEER
VICTUS ENGINEERING
2327 WYCLIFF ST, SUITE 230
ST. PAUL, MN 55114
212 N 3rd Ave. Suite 312, Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
MUNICIPAL BUILDING COMMISSION - CITY OF
MINNEAPOLIS - RESTACK RENO RM 121
350 S 5th St, , Minneapolis, MN 55415
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
/2
/2
PROJECT LOCATION
ARCHITECTURAL DRAWINGS
NUMBER NAME
000 COVER
A001 PROJECT INFORMATION & STANDARDS
A002 WALL TYPES
A003-A DOOR SCHEDULE AND FINISH SPECIFICATIONS
A101-A ROOM 121 PLANS
AD101-A ROOM 121 DEMO PLANS
MECHANICAL DRAWINGS
NUMBER NAME
M000 MECHANICAL TITLE SHEET
M101-A MECHANICAL PLANS - ROOM 121
M200-A MECHANICAL DETAILS
M201-A MECHANICAL DETAILS
M300-A MECHANICAL SCHEDULES
M400-A MECHANICAL CONTROLS
M500-A MECHANICAL CALCULATIONS
MD101-A MECHANICAL DEMO PLAN - ROOM 121
ELECTRICAL DRAWINGS
NUMBER NAME
E000-A ELECTRICAL TITLE SHEET
E001-A ELECTRICAL DEMOLITION PLANS - ROOM 121
E100-A ELECTRICAL PLANS - ROOM 121
E500-A ELECTRICAL SCHEDULES - ROOM 121
ALTERNATE #1:
REVISE CHANGING ROOM 121-02 AS INDICATED TO
SHOWER/RESTROOM. REFER TO DRAWINGS.
All questions regarding these plans and specifications should be directed to:
Joe Wallace, AIA Project Manager jwallace@opnarchitects.com 612-355-7111
SHEET INDEX
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional architect under the laws of the state of
Minnesota.
Signature: ____________________________________
Name:
Minnesota Registration No:
Sheets covered by this seal:
Joseph D.L. Wallace
61723
Listed As "Architectural"
PLUMBING DRAWINGS
NUMBER NAME
P000 PLUMBING TITLE SHEET & SCHEDULES
P101-A PLUMBING PLANS - ROOM 121
P200-A PLUMBING RISER DIAGRAM
FIRE PROTECTION DRAWINGS
NUMBER NAME
F000 FIRE PROTECTION TITLE SHEET & SCHEDULES
F101-A FIRE PROTECTION PLANS - ROOM 121
FD101-A FIRE PROTECTION DEMO PLAN - ROOM 121
LAVATORY SOAP
DISPENSER
FIRE
EXTINGUISHER
CABINET
S. NAPKIN
DISPENSER
HAND
SANITIZER
TOWEL / TRASH
COMBO
AIR
FRESHENER
TRASH
RECEPTACLE
COAT
HOOK
URINAL WALL
HUNG
SCREEN
URINAL
(H.C.)
WATER
FOUNTAIN
48" MIN
M
IN
TOWEL
DISPENSER
FINISHED
CEILING
SHELFTOILET
SEAT COVER
DISPENSER
HYDRATION
STATION
NOTE: CONCEALED BLOCKING
TO EXTEND MIN. 6" BEYOND EACH
END AND 6" ABOVE AND BELOW
ALL ACCESSORY ITEMS.3
M
IN
"2
48" MIN
" 4
SANITARY
NAPKIN
DISPOSAL
TOILET TISSUE
DISPENSER
BABY
CHANGING
STATION
HEIGHT TO TABLE
TOP SURFACE
WHEN OPEN
ELECTRICAL
OUTLET
DATA
OUTLET
SWITCH TV
POWER/DATA
EXIT SIGNFIRE HORN/
STROBE
FIRE PULL
STATION
THERMOSTAT CARD READER SECURITY
CAMERA
SPEAKER
P E
R E
L E
V A
T
IO
N
U
N O
U
N O
ABOVE
COUNTER
HEIGHTS
U
N O
HAND
DRYER
U
N O
U
N O
U
N O
CLOCKSMOKE
DETECOR
ADA PUSH
BUTTON
OPERATOR
NOTE: CONCEALED BLOCKING
TO EXTEND MIN. 6" BEYOND EACH
END AND 6" ABOVE AND BELOW
ALL ACCESSORY ITEMS.
24"
A3
OF TOILET
8" FROM FRONT
A14
A10
DASHED LINES
INDICATES FACE
OF FINISH.
A11A12
NOTE: CONCEALED BLOCKING TO
EXTEND MIN. 6" BEYOND EACH END
AND 6" ABOVE AND BELOW ALL
ACCESSORY ITEMS.
12"
A14
24"
OF TOILET
8" FROM FRONT
12"
18"
40"
A3
A10
A11
A12
" 4
A13
DASHED LINES
INDICATES FACE
OF FINISH.
# NUMBER
ACM ALUMINUM COMPOSITE METAL
PANEL
ACP ACOUSTICAL CEILING PANEL
AFF ABOVE FINISH FLOOR
AWP ACOUSTIC WALL PANEL
BAS BUILDING AUTOMATION SYSTEM
BC BOTTOM OF CURB
BM BENCH MARK
BOC BACK OF CURB
BOS BOTTOM OF STEEL
BOW BOTTOM OF WALL
BR BUMPER GUARD/BUMPER RAIL
BRG BEARING
BS BOTTOM OF STAIR
C CHANNEL
CC CUBICLE CURTAIN
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CG CORNER GUARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CK CORK FLOORING
CL CENTER LINE
CLG CEILING
CLL CONSTRUCTION LIMITS LINE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CRK CORK
DEMO DEMOLISH / DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DS DOWNSPOUT
EC ELECTRICAL CONTRACTOR
EIFS EXTERIOR INSULATION FINISH
SYSTEM
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EPF EPOXY FLOORING
EPT EPOXY PAINT
EQ EQUAL
EWC ELECTRIC WATER COOLER
EX EXISTING
FAF FLUID APPLIED FLOORING
FD FLOOR DRAIN
FF FACTORY FINISH
FFE FINISHED FLOOR ELEVATION
FOC FACE OF CURB
FOF FACE OF FINISH
FOG FACE OF GLAZING
FRP FIBER REINFORCED PANEL
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GHM GALVANIZED HOLLOW METAL
GL GLASS
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
HORZ HORIZONTAL
HM HOLLOW METAL
HT HEIGHT
HVAC HEATING/VENTING/AIR
CONDITIONING
ID INSIDE DIAMETER
L ANGLE
LB/LBS POUND / POUNDS
LVT LUXURY VINYL TILE
MAX MAXIMUM
MB MARKERBOARD
MC MECHANICAL CONTRACTOR
MDF MEDIUM DENSITY FIBERBOARD
MFR MANUFACTURERS
MH MANHOLE
MIL MIL THICKNESS
MIN MINIMUM
MO MASONRY OPENING
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OA OVERALL
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED OWNER
INSTALLED
OH OVERHEAD
ORD OVERFLOW ROOF DRAIN
OTS OPEN TO STRUCTURE
PCT PORCELAIN CERAMIC TILE
PL PLATE
PLAM PLASTIC LAMINATE
PP POLYMER PANEL
PVC POLY VINYL CHLORIDE
PT PAINT
QT QUARTZ
RAD RADIUS
RAF RESILIENT ATHLETIC FLOORING
RB RESILIENT BASE
RD ROOF DRAIN
REX RESIN
REV REVISION
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RSF RESILIENT SHEET FLOORING
RST RESILIENT STAIR TREAD
RTF RESILIENT TILE FLOORING
RUB RUBBER
SC SEALED CONCRETE
SF SQUARE FEET
SIM SIMILAR
SS SOLID SURFACE
STN STONE
ST STL STAINLESS STEEL
SUSP SUSPENDED
T TILE
T&G TONGUE AND GROOVE
TG TEMPERED GLASS
TOC TOP OF CURB
TOM TOP OF MASONRY
TOS TOP OF SLAB / TOP OF STEEL
TOW TOP OF WALL
TP TOILET PARTITION
TPF TACKABLE PANEL FABRIC
TRZ TERRAZZO
TS TOP OF STAIR
TYP TYPICAL
UL UNDERWRITERS LABORATORIES,
INC.
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
WB WALL BASE
WC WALL COVERING
W/ WITH
W/O WITHOUT
WD WOOD
WGH WALLGUARD HANDRAIL
WM WALK-OFF MAT
WP WALL PROTECTION
WT WINDOW TREATMENT
WWF WELDED WIRE FABRIC
STANDARD ABBREVIATIONS
STANDARD SYMBOLS
ROOM IDENTIFICATION
ROOM NAME
ROOM NUMBER
VIEW TITLE
DRAWING NUMBER
DRAWING TITLE
DRAWING SCALE
SECTION REFERENCE
DARKENED AREA
DENOTES DIRECTION OF
SECTION CUT
SECTION NUMBER
SHEET NUMBER
ELEVATION REFERENCE
DARKENED AREA
DENOTES ELEVATION
DRAWN
ELEVATION NUMBER
SHEET NUMBER
A201
WINDOW IDENTIFICATION
W12
WALL IDENTIFICATION
WINDOW TYPE
PLAN DETAIL REFERENCE
DETAIL NUMBER
SHEET NUMBER
00 00 A1
KEYNOTE
REFERENCE
NUMBER
ARROW POINTS TO
REFERENCED
OBJECT
ROOF/FLOOR IDENTIFICATION
NORTH DIRECTION
REFERENCE
MATCH LINE
TAG REFERENCES
CORRESPONDING
VIEW
A1 / A112
DETAIL REFERENCE
A1 c 0
PARTITION TYPE
SIZE
RATING
MODIFICATION
X
2A15
OFFICE
A321
XXX
1/8" = 1'-0" X
DETAIL NUMBER
SHEET NUMBER
CEILING IDENTIFICATION
TYPE AA
10' - 0" AFF
CEILING TYPE
CEILING HEIGHT
SIM/OPP TAG
A101
SIM
A101
SIM
DOOR IDENTIFICATION
XXXX.A
DOOR NUMBER
NEW DEMOLITION EXISTING
R1
ROOF/FLOOR TYPE
SIM/OPP TAG
KEYNOTE REFERENCE
STANDARD SYMBOLS
CABINET DESIGN
SERIES NUMBER
MODIFICATION
100M.A 30-34-24
Note
ADA COMPLIANT
DIMENSIONS* W-H-D
MODIFICATION
DESCRIPTION
CASEWORK IDENTIFICATION
*FOR BASE CABINETS AND COUNTERTOPS HEIGHT IS
MEASURED FROM FINISH FLOOR TO TOP OF COUNTERTOP
COUNTERTOP TYPE
(SEE A800 FOR
SPECIFICATIONS)
C-SS.A
30-34-24
ADA COMPLIANT
DIMENSIONS* W-H-D
SCB
SCRIBE IDENTIFIER
SCRIBE WIDTH
CW
STOREFRONT IDENTIFICATION
CURTAIN WALL/
CURTAIN WALL/
STOREFRONT
IDENTIFIER
CURTAIN WALL/
STOREFRONT TYPE
SF
ELEVATION TAG
DENOTES
ELEVATION HEIGHT
DENOTES OBJECT
REFERENCE
STRUCTURAL GRID
A
B
GRID REFERENCE
DRAWING REVISION
REVISION
REFERENCE
NUMBER
DIMENSIONS
FACE OF FINISH TO
FACE OF FINISH
15' - 0"
LEVEL 1
ITC
4'-0" 4'-0"
GRANULAR FILL
ALUMINUM BLOCKING - CONTINUOUS BLOCKING - DISCONTINUOUS
GLASS
RIGID INSULATION PLYWOOD SEMI-RIGID
INSULATION
GYPSUM BOARD LUXURY VINYL
TILE
PORCELAIN
CERAMIC TILE
BRICK
EARTH/FILL
STONE
CONCRETE
MASONRY UNIT
CONCRETECARPETBATT INSULATION
QUARTZ
WOOD
SOLID SURFACE
MDF
SAND
STEELSPRAY FOAM
INSULATION
STANDARD MOUNTING HEIGHTS
STANDARD TOILET ACCESSORIES MOUNTING LOCATIONS ACCESSIBLE TOILET ACCESSORIES MOUNTING LOCATIONS
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional architect under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
61723
/2
/2
:4
:1
A M
A001
PROJECT INFORMATION &
STANDARDS
26708000
100% CONSTRUCTION
DOCUMENTS
CITY OF MINNEAPOLIS - RESTACK
RENO RM 121
MUNICIPAL BUILDING COMMISSION
JOSEPH D.L. WALLACE
350 S 5th St
, Minneapolis, MN 55415
350 S 5th St
Minneapolis, MN 55415
RESPONSIBILITY MATRIX
Revision Description Date
GENERAL NOTES
1. REFER TO FLOOR PLANS FOR
PARTITION TYPE LOCATIONS.
2. STEEL FRAME PARTITIONS ARE BASED
ON DESIGN INFORMATION INCLUDED
IN PRODUCT TECHNICAL INFORMATION
OF THE STEEL STUD
MANUFACTURER'S ASSOCIATION
(SSMA) PUBLICATION DATED 2000 AND
THE FOLLOWING PERFORMANCE
CRITERIA:
A. LIMITING HEIGHT CRITERIA:
• DEFLECTION OF L/360 AT ALL
WALLS TO RECEIVE TILE.
• DEFLECTION OF L/240 AT ALL
OTHER WALLS AT 5 LBS. PER SQ.
FT.
B. THICKNESS - STEEL COMPONENTS:
GAUGE DESIGN THICKNESS
25 0.0188 22 0.0283 20 0.0346 18 0.0451
PARTITION TYPE AND SYMBOL LEGEND
A1 c 0
PARTITION TYPE
SIZE
RATING
MODIFICATION
X
PARTITION TYPE
A STEEL FRAMED
B SHAFT WALL
C FURRED
D MASONRY
E SPECIAL FINISHES
T TEMPORARY PARTITION
SYSTEM
SIZE
STEEL STUD
a 1 5/8" b 2 1/2" c 3 5/8" d 6" e 7 1/4"
SHAFT WALL STUD
f 2 1/2" g 4" h 6"
STEEL FURRING
j 7/8" Hat Channel k 1" Z l 1 1/2" Z m 2" Z n 3" Z
CONCRETE MASONRY UNIT
p 4" q 6" r 8" s 10" t 12"
LIGHT GAUGE STRUCTURAL STEEL
(SEE STRUCTURAL)
u 6" v 12"
RATING
0 NON-RATED
S SMOKE
1 1 HOUR
2 2 HOUR
3 3 HOUR
4 4 HOUR
3. MINIMUM GAUGE: IF LIMITING HEIGHT
AS SCHEDULED IN PARTITION DETAILS
EXCEEDS PROJECT CONDITIONS OR IF
THE SELECTED STEEL STUD
MANUFACTURER'S THICKNESS OF
STEEL COMPONENTS VARIES FROM
THE BASIS OF DESIGN AS SET FORTH
ABOVE, PROVIDE MANUFACTURER'S
STANDARD THICKNESS(GAUGE) THAT
MEETS OR EXCEEDS LIMITING HEIGHT
PERFORMANCE CRITERIA FOR STUD
DEPTH AND SPACING INDICATED.
4. WOOD BLOCKING CONCEALED BY
GYPSUM BOARD DOES NOT NEED TO
BE FIRE TREATED.
A1STEEL FRAMED PARTITION
HEAD
PLAN
BASE
NON RATED / NON-LOAD BEARING
STUD UL DESIGN
WIDTH SIZE NUMBER
FINISHED CEILING - SEE RCP
STEEL STUD (SEE SCHEDULE)
1 LAYER 5/8" GYPSUM BOARD
EACH SIDE
CONTINUOUS STEEL RUNNER
BASE & FLOOR FINISH AS SCHEDULED
4 7/8" 3 5/8" N/A
7 1/4" 6" N/A
ACOUSTIC BATT INSULATION
HEAD
PLAN
BASE
SMOKE RATED / NON-LOAD BEARING
1 LAYERS 5/8" TYPE X GYPSUM
BOARD EACH SIDE
STEEL STUD (SEE SCHEDULE)
CONTINUOUS STEEL RUNNER
BASE & FLOOR FINISH AS SCHEDULED
CONTINUOUS SMOKE SEALANT
4 7/8" 3 5/8" U465
7 1/4" 6" U465
ACOUSTIC BATT INSULATION
CONTINUOUS SEALANT
HEAD
PLAN
BASE
2 HOUR RATED / NON-LOAD BEARING
2 LAYERS 5/8" TYPE X GYPSUM
BOARD EACH SIDE
STEEL STUD (SEE SCHEDULE)
CONTINUOUS STEEL RUNNER
BASE & FLOOR FINISH AS SCHEDULED
CONTINUOUS FIRE SEALANT
4 7/8" 3 5/8" U411
7 1/4" 6" U411
ACOUSTIC BATT INSULATION
STUD UL DESIGN
WIDTH SIZE NUMBER
SEAL PENETRATIONS SMOKE SEAL PENETRATIONS FIRE SEAL PENETRATIONS
A1 0c
A1 0d
A1 sc
A1 sd
A1 2c
A1 2d
UNDERSIDE OF RED IRON STRUCTURE
EXTEND GYP & STUD TO DECK UNO
FINISHED CEILING
UNDERSIDE OF STRUCTURE
CONTINUOUS SMOKE SEALANT
EXTEND GYP & STUD TO DECK UNO
DEFLECTION TRACK
FINISHED CEILING
UNDERSIDE OF STRUCTURE
CONTINUOUS FIRE SEALANT
EXTEND GYP & STUD TO DECK
DEFLECTION TRACK
HEAD
PLAN
BASE
1 HOUR RATED / NON-LOAD BEARING
1 LAYERS 5/8" TYPE X GYPSUM
BOARD EACH SIDE
STEEL STUD (SEE SCHEDULE)
CONTINUOUS STEEL RUNNER
BASE & FLOOR FINISH AS SCHEDULED
CONTINUOUS FIRE SEALANT
4 7/8" 3 5/8" U465
7 1/4" 6" U465
ACOUSTIC BATT INSULATION
SMOKE SEAL PENETRATIONS
A1 1c
A1 1d
FINISHED CEILING
UNDERSIDE OF STRUCTURE
CONTINUOUS FIRE SEALANT
EXTEND GYP & STUD TO DECK
DEFLECTION TRACK
STUD UL DESIGN
WIDTH SIZE NUMBER
STUD UL DESIGN
WIDTH SIZE NUMBER
NOTE: INCLUDE A MINIMUM OF TWO (2) KICKERS TO RED IRON FOR
ADDITIONAL SUPPORT.
10'-0"
AFF
COLD ROLLED CHANNEL (CRC)
@ 6'-0" AFF
A2STEEL FRAMED PARTITION
HEAD
PLAN
BASE
NON RATED / NON-LOAD BEARING
STUD UL DESIGN
WIDTH SIZE NUMBER
UNDERSIDE OF STRUCTURE
FINISHED CEILING
STEEL STUD (SEE SCHEDULE)
1 LAYER 5/8" GYPSUM BOARD
CONTINUOUS STEEL RUNNER
BASE & FLOOR FINISH AS SCHEDULED
4 1/4" 3 5/8" N/A
6 5/8" 6" N/A
ACOUSTICAL BATT INSULATION
2 1/4" 1 5/8" N/A
CONTINUOUS SEALANT
CONTINUOUS SEALANT
A2 0a
A2 0c
A2 0d
EXTEND GYP & STUD TO DECK UNO
DEFLECTION TRACK
SEAL PENETRATIONS
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional architect under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
61723
/2
/2
:4
:1
A M
A002
WALL TYPES
26708000
100% CONSTRUCTION
DOCUMENTS
CITY OF MINNEAPOLIS - RESTACK
RENO RM 121
MUNICIPAL BUILDING COMMISSION
JOSEPH D.L. WALLACE
350 S 5th St
, Minneapolis, MN 55415
350 S 5th St
Minneapolis, MN 55415
GENERAL DOOR NOTES
1. SEE FRAME PLANS AND INTERIOR ELEVATIONS FOR
DIMENSIONAL SIZES WITH MATERIALS OF FRAMES.
2. COORDINATE WITH OWNER ON IDENTIFICATION OF
SALVAGED DOORS FOR REPLACEMENT/ NEW
HARDWARE.
3. PROVIDE PUSH PLATES (2) TO COVER EXISTING
HARDWARE PREP NOT COVERED BY NEW HARDWARE.
NEW PLATES TO BE BRONZE TONE TO MATCH
HARDWARE - TYP.
1.0
S C
H E
D U
L E
S E
E
SCHEDULE
SEE
2" 2"
1.1
S C
H E
D U
L E
S E
E
SCHEDULE
SEE
2" 2"
DOOR HARDWARE SET 1:
FUNCTION: EXIT-ONLY PANIC HARDWARE WITH ELECTRIC LATCH RETRACTION. OUTSIDE
LEVER ALWAYS DISENGAGED - ENTRANCE BY KEY OR ACCESS CONTROL ONLY. ALLOW
OUTSIDE SPINDLE TO DISENGAGE FROM LATCH WHEN LOCKED. INSIDE PUSH PAD
RETRACTS LATCH FOR EGRESS.
DOOR HARDWARE SET 2:
FUNCTION: PRIVACY WITH OCCUPIED INDICATOR LEVER RETRACTS LATCHBOLT FROM
EITHER SIDE. DEADBOLT THROWN OR RETRACTED BY KEY OUTSIDE (RETRACTION BY KEY
REQUIRED IN THE EVENT OF AN EMERGENCY) OR INSIDE THUMBTURN. THROWING
DEADBOLT LOCKS OUTSIDE LEVER AND DISPLAYS OCCUPIED PLATE. ROTATING INSIDE
LEVER SIMULTANEOUSLY RETRACTS BOTH DEADBOLT AND LATCHBOLT AND UNLOCKS
OUTSIDE LEVER.
DOOR HARDWARE SET 3:
FUNCTION: STOREROOM LOCK. FIXED OUTSIDE TRIM - OUTSIDE KEY OR INSIDE LEVER
RETRACTS LATCH. INSIDE LEVER ALWAYS UNLOCKED. ELECTRIC STRIKE UNLOCKED BY
ACCESS CONTROL SYSTEM FOR PUSH/PULL OPERATION - COORDINATE WITH OWNER
SCHEDULE
SEE
S C
H E
D U
L E
S E
E
F
SCHEDULE
SEE
FG
SCHEDULE
SEE
FG2
S C
H E
D U
L E
S E
E
/4
A
.F .F
6" 6" 6" 6"
S C
H E
D U
L E
S E
E
A
.F .F
/4
FINISH NOTES
A. REFER TO 'MUNICIPAL BUILDING
COMMISSION (MBC) STANDARDS FOR
MORE INFORMATION. IN THE EVENT
OF A DISCREPANCY, MBC STANDARDS
GOVERNS.
B. ALIGN GROUT JOINT WITH BOTTOM OF
LIGHT FIXTURE.
C. SCHLUTER EDGE TRIM TYP. AT ALL
OUTSIDE CORNERS. JOINTS TO OCCUR
AT UPPER MOST CONTINUOUS GROUT
LINE
D. START FULL WALL TILE AS SHOWN
E. SCHLUTER AT TOP OF TILE TO
TRANSITION TO GYPSUM WALL BOARD
F. CENTER FIXTURE ON GROUT JOINT
G. CENTER TILE AT DOORWAY
H. ALIGN BOTTOM OF HAND SOAP WITH
BOTTOM OF MIRROR
I. ALIGN BOTTOM OF FIXTURES
J. CENTER WALL TILE JOINT ON CENTER
OF WALL AS SHOWN
K. CENTER FLOOR TILE GROUT JOINT AS
SHOWN
L. CENTER FLOOR TILE GROUT JOINT ON
CENTER OF WALL
M. CENTER FULL WALL TILE ON CENTER
OF WALL
N. ALIGN ALL WALL TILE GROUT JOINTS
WITH FLOOR TILE GROUT JOINTS
O. CENTER FULL FLOOR TILE ON CENTER
OF WALL
P. START FULL FLOOR TILE AS SHOWN
PAINT - BY OWNER:
PT-1 SYSTEM:
MANUFACTURER: SEE BUILDING STANDARDS
COLOR: SEE BUILDING STANDARDS
FINISH: EGGSHELL, SEMI-GLOSS ON CMU
APPLICATION: FIELD PAINT - U.N.O.
DOOR SCHEDULE
DOOR
NUMBER
PANEL FRAME
FIRE
RATING HEAD DETAIL JAMB DETAIL REMARKS
HARDWARE
SET
PANEL
QUANTITY PANEL TYPE WIDTH HEIGHT PANEL 1 WIDTH
PANEL 2
WIDTH
PANEL
MATERIAL PANEL FINISH FRAME TYPE MATERIAL FINISH
121-01 3'-0" 7'-0" WD EXIST. 1.0 WD STN 1 3
121-02 3'-0" 7'-0" WD EXIST. 1.0 WD STN 1, 2 2
121-04 3'-0" 7'-0" WD EXIST. 1.0 WD STN 2, 3 2
121-06A 3'-0" 7'-0" WD EXIST. 1.0 WD STN 1 1
121-06B 3'-0" 7'-0" WD EXIST. 1.0 WD STN 1 1
121-06C 3'-0" 7'-0" WD EXIST. 1.0 WD STN 1 1
DOOR FRAME ELEVATIONSLEGEND - HARDWARE SETS DOOR PANEL TYPES
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional architect under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
61723
/2
/2
:4
:1
A M
A003-A
DOOR SCHEDULE AND
FINISH SPECIFICATIONS
26708000
100% CONSTRUCTION
DOCUMENTS
CITY OF MINNEAPOLIS - RESTACK
RENO RM 121
MUNICIPAL BUILDING COMMISSION
JOSEPH D.L. WALLACE
350 S 5th St
, Minneapolis, MN 55415
350 S 5th St
Minneapolis, MN 55415
ROOM FINISH SCHEDULE
Level Number ROOM NAME
FLOOR WALL FINISH
CEILING FINISHFINISH BASE NORTH EAST SOUTH WEST
Level 1
Level 1 121-06 MEETING AREA CPT-1 VB-1 PT-TBD PT-TBD PT-TBD PT-TBD ACP-1
Level 1 121-02 CHANGING CPT-1 VB-1 PT-TBD PT-TBD PT-TBD PT-TBD GYP
Level 1 121-01 LOCKERS CPT-1 VB-1 PT-TBD PT-TBD PT-TBD PT-TBD ACP-1
Level 1 121-05 STORAGE EXIST. VB-1 PT-TBD PT-TBD PT-TBD PT-TBD EXIST.
Level 1 121-04 CHANGING CPT-1 VB-1 PT-TBD PT-TBD PT-TBD PT-TBD EXIST.
Level 1 121-03 GEAR STORAGE EXIST. VB-1 PT-TBD PT-TBD PT-TBD PT-TBD EXIST.
DOOR HARDWARE REMARKS
1. SALVAGED WOOD DOOR IN NEW FRAME - PROVIDE PREP
FOR NEW HARDWARE AND HINGES AS SPECIFIED AND NEW
WOOD FRAME & CASINGS TO MATCH EXISTING DOOR
FINISH.
2. PROVIDE OCCUPANCY INDICATOR.
3. PROVIDE NEW DOOR HARDWARE ON EXISTING DOOR AND
FRAME - PROTECT IN PLACE. SEE GENERAL NOTES.
MINNEAPOLIS CITY HALL FINISH STANDARDS (FOR REFERENCE)
OS
OS
OS
OS
OS
OS
F
F
F
F
OS
F S
D
F S
D
C O
CO
CO
C O
CO
MEETING
AREA
121-06
STORAGE
121-05
CHANGING
121-04
GEAR
STORAGE
121-03
DATA
141-12
SHAFT
141-12A
STAIR
STE-01
STOR
SHAFT 2
CIRC
C1-02
REMOVE EXIST. WOOD LOCKER
BASE
DEMO PORTION OF BRICK WALL
FOR NEW PENETRATION -
REFER TO MECH
GENERAL NOTES
1. IDENTIFICATION AND/OR ABATEMENT
OF HAZARDOUS MATERIALS IS NOT
PART OF THIS SCOPE OF WORK. IF
ASBESTOS OR OTHER HAZARDOUS
MATERIALS ARE ENCOUNTERED, THE
CONTRACTOR SHALL NOTIFY THE
OWNER IMMEDIATELY.
2. REMOVE LOOSE PAINT AND
MISCELLANEOUS HANGING OBJECTS
FROM WALLS AND CEILINGS AT ALL
AREAS TO RECEIVE NEW FINISHES.
3. OPENING IN THE EXISTING STRUCTURE
SMALLER THAN 12" IN ANY DIRECTION
ARE NOT IDENTIFIED ON THESE
DRAWINGS. SUB-CONTRACTORS
SHALL BE RESPONSIBLE FOR
PROVIDING OPENINGS SMALLER THAN
12" AS REQUIRED FOR INSTALLATION
OF THEIR WORK.
4. OPENINGS IN THE EXISTING
STRUCTURE SHALL NOT BE MADE
WITHOUT PRIOR APPROVAL OF THE
STRUCTURAL ENGINEER.
5. PATCH AND REPAIR ALL EXISTING
FLOOR SLABS AND WALL SURFACES
DAMAGED FROM DEMOLITION OR
PRIOR USE.
6. PATCH ALL AREAS OF ELECTRICAL
AND MECHANICAL DEMOLITION THAT
WILL NOT BE REUSED.
7. CONTRACTOR TO FIELD VERIFY ALL
EXISTING DIMENSIONS AND
CONDITIONS. IN THE EVENT OF A
DISCREPANCY BETWEEN THE
DRAWINGS AND THE EXISTING
CONDITIONS, NOTIFY THE ARCHITECT
BEFORE PROCEEDING.
8. DO NOT REMOVE ANY ITEMS WHICH
JEOPARDIZE THE STRUCTURAL
INTEGRITY OF THE BUILDING. IF
HIDDEN ELEMENTS OR DETERIORATED
ELEMENTS ARE ENCOUNTERED,
NOTIFY THE ARCHITECT IMMEDIATELY.
9. EXISTING BUILDING IS TO REMAIN
WEATHER-TIGHT DURING ALL
DEMOLITION ACTIVITIES.
10. REFER TO CONSULTANT DRAWINGS
FOR ADDITIONAL DEMOLITION OF
OTHER DISCIPLINES.
11. PROTECT ALL ADJACENT AREAS AND
ITEMS "TO REMAIN" DURING
DEMOLITION/CONSTRUCTION.
REPAIR/REPLACE ALL ITEMS DAMAGED
DURING CONSTRUCTION.
12. EXISTING BUILDING CONDITIONS
SHOWN ON THESE DRAWINGS ARE
DERIVED FROM DRAWINGS OF THE
ORIGINAL BUILDING AND FROM LIMITED
FIELD OBSERVATION.
13. INDICATED EXISTING BUILDING
CONDITIONS ARE ASSUMED TO BE
REPRESENTATIVE OF THE ACTUAL
CONSTRUCTION OF THE BUILDING.
LOCAL CONDITIONS MAY VARY.
14. THE CONTRACTOR SHALL PROVIDE
AND MAINTAIN ADDITIONAL MEANS OF
EGRESS AS NEEDED AS A RESULT OF
CONSTRUCTION SEQUENCING AND/OR
REGULATORY REQUIREMENTS.
MEETING
AREA
121-06
CHANGING
121-04
GEAR
STORAGE
121-03
STORAGE
121-05
DEMOLITION LEGEND
INDICATES EXISTING 1 HR
FIRE BARRIER
DENOTES AREA OF
COMPLETE REMOVAL OF AN
EXISTING BUILDING ELEMENT
DEMOLITION CEILING LEGEND
EXISTING CEILING OR CEILING
COMPONENT TO BE
REMOVED IN ITS ENTIRETY,
INCLUDING LIGHT FIXTURES,
MECHANICAL GRILLES,
CEILING FANS, AND
ELECTRICAL DEVICES;
UNLESS NOTED OTHERWISE
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional architect under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
61723
/2
/2
:4
:1
A M
AD101-A
ROOM 121 DEMO PLANS
26708000
100% CONSTRUCTION
DOCUMENTS
9/24/2026
CITY OF MINNEAPOLIS - RESTACK
RENO RM 121
MUNICIPAL BUILDING COMMISSION
JOSEPH D.L. WALLACE
350 S 5th St
, Minneapolis, MN 55415
350 S 5th St
Minneapolis, MN 55415
1/8" = 1'-0"
FIRST LEVEL DEMO FLOOR PLAN
1/8" = 1'-0"
LEVEL 1 DEMO RCP
OS OS
F F
FF
F
F
FOS
SS S S
SS S S
SS S S
WAP
F S
D
F S
D
C O
CO
CO
C O
CO
F S
D
MEETING
AREA
121-06
LOCKERS
121-01 CHANGING
121-04
GEAR
STORAGE
121-03
STORAGE
121-05
CHANGING
121-02
ACP-1
10'-0" AFFEXIST. HT.
GYP
9'-0" AFF
REPLACE SALVAGED LIGHTS -
SEE ELEC. FOR MORE
INFORMATION
ACP-1
9'-0" AFFEXIST. HT.
PROTECT EXISTING BULKHEAD IN PLACE
EXIST.
EXIST.
STAIR
STE-01
STOR
CIRC
C1-02
SHAFT 2
DATA
141-12
SHAFT
141-12A
ACP-1
10'-0" AFFEXIST. HT
MEETING
AREA
121-06
CHANGING
121-02
LOCKERS
121-01
STORAGE
121-05
CHANGING
121-04
GEAR
STORAGE
121-03
DATA
141-12
SHAFT
141-12A
STAIR
STE-01
STOR
SHAFT 2
CIRC
C1-02
-0
B
-0
A
-0
C
A2 0c
A2 0c
A101-A
ALT
A1 0c
A1 0c
A2 0c
OFCI SALVAGED WOOD DOOR IN EXISTING FRAME -
PROVIDE NEW HARDWARE, WOOD CASINGS TO MATCH
EXIST. SEE DOOR SCHEDULE.
A101-A4
A101-A7
ANGLED STEEL DOOR
STOP - ANCHORED AT SLAB,
PAINT TO MATCH DOOR
A2 0c
A2 0c SHELVING - OFOI
BENCH - OFOI
1'-4"
INCLUDE A MINIMUM OF TWO
(2) KICKERS TO RED IRON
FOR ADDITIONAL SUPPORT -
REFER TO WALL TYPES
-0
1 PROVIDE BRAKE METAL TRIM
ENCLOSURE AT WALL
PENETRATION - BOTH SIDES
FURN SHOWN
FOR REF. OFOI
-0
121-04
PATCH COLUMN
FOR DEMO
EXTENTS
CHANGING
121-02
TILE WAINSCOT
- SEE FINISH SCHED.
FD
TILE SHOWER - SLOPE TO DRAIN
NOTE: FLOOR AND WALL TILE PROVIDED BY OWNER - OFCI. SEE FINISH SCHEDULE
-0
GENERAL NOTES
1. REFER TO 'MUNICIPAL BUILDING
COMMISSION (MBC) STANDARDS FOR
MORE INFORMATION. IN THE EVENT
OF A DISCREPANCY, MBC STANDARDS
GOVERNS.
2. REFER TO RESPONSIBILITY MATRIX
INDICATED ON A001.
3. DIMENSIONS ARE MEASURED FACE-
OF-FINISH TO FACE-OF-FINISH OR
ROUGH MASONRY OPENING UNLESS
NOTED OTHERWISE - TYPICAL FOR ALL
DRAWINGS.
4. FIELD VERIFY ALL DIMENSIONS AND
EXISTING CONDITIONS - TYPICAL FOR
ALL DRAWINGS.
5. IN THE EVENT OF A DISCREPANCY
BETWEEN ARCHITECTURAL AND
CONSULTANT DRAWINGS, NOTIFY
ARCHITECT IMMEDIATELY PRIOR TO
COMMENCING WORK - TYPICAL FOR
ALL DRAWINGS.
6. ALL PENETRATIONS IN FIRE RATED
FLOORS AND WALLS MUST BE SEALED
WITH APPROPRIATE FIRESTOPPING
SYSTEM.
7. PATCH AND REPAIR EXISTING FLOOR
SLABS AND WALL SURFACES
DAMAGED FROM DEMOLITION.
GENERAL NOTES
1. CEILINGS ARE ACP-1 U.N.O.
2. CEILING-MOUNTED FIXTURES,
SPRINKLERS AND EQUIPMENT SHALL
BE CENTERED IN CEILING PANELS OR
GYPSUM BOARD SOFFITS AND
EQUALLY SPACED UNLESS NOTED
OTHERWISE
3. CENTER CEILING GRID IN ROOMS AS
SHOWN UNLESS NOTED OTHERWISE.
4. CONCEALED SPRINKLER HEAD
COVERS SHALL BE PAINTED BY
MANUFACTURER TO MATCH ADJACENT
SOFFIT/ACP UNLESS NOTED
OTHERWISE.
5. COORDINATE LOCATIONS OF EXIT
LIGHTS AND EMERGENCY LIGHTS
SHOWN ON ARCHITECTURAL
DRAWINGS. IN THE EVENT OF A
DISCREPANCY, VERIFY WITH
ARCHITECT PRIOR TO INSTALLATION.
6. CEILING FIXTURE DIMENSIONS ARE
TAKEN FROM CENTERLINE OF FIXTURE
UNLESS NOTED OTHERWISE.
7. REFER TO ARCHITECTURAL DRAWINGS
(ELEVATIONS & REFLECTED CEILING
PLANS) FOR ALL MECHANICAL AND
ELECTRICAL DEVICE AND FIXTURE
LOCATIONS & MOUNTING HEIGHTS. IF
NOT CLEARLY SPECIFIED, CONTACT
ARCHITECT FOR FURTHER
CLARIFICATION. MECHANICAL &
ELECTRICAL DRAWINGS ARE FOR
FIXTURE TYPE REFERENCE ONLY.
8. PAINT ALL EXPOSED STRUCTURE,
DECK, DUCTWORK, CONDUIT, ETC. IN
AREAS NOTED TO BE OPEN TO
STRUCTURE UNLESS NOTED
OTHERWISE. PAINTING OF EXPOSED
STRUCTURE TO BE DONE AFTER ALL
UTILITIES ARE INSTALLED.
CEILING TYPES
ACP-1
MANUFACTURER: TBD
STYLE: MATCH EXISTING.
EDGE TRIM: COMPASSO
(TYPICAL)
SIZE: 2' X 2'
GRID: 9/16" CENTRICITEE
DXT (COORDINATE
WITH OWNER-
PROVIDED CEILING
TILE.
COLOR: WHITE
GRID COLOR: WHITE
APPLICATION: SEE RCP -
COORDINATE WITH MBC ON
REPLACEMENT OF SALVAGED OR
ATTIC STOCK CEILING TILE IN NEW
CEILING GRID.
GYP
GYPSUM BOARD CEILING ON METAL
STUD FRAMING
DASHED LINE DENOTES
LOCATIONS OF ACOUSTIC
PARTITIONS TO RECEIVE
ACOUSTICAL BATT INSULATION
AND SOUND SEALANT AT
PERIMETER AND PENETRATIONS.
REFER TO FLOOR PLANS FOR
WALL TYPES.
WALL BASE - AS SCHEDULED
EQ EQ PROVIDE BLOCKING AS REQ'D
FOR NEW EQUIPMENT - PT TO
MATCH WALL
TV - OFOI
WALL BASE - AS SCHEDULED
PROVIDE BLOCKING AS
REQ'D FOR NEW EQUIPMENT
TV - OFOI
WALL BASE - AS SCHEDULED
24X76X24 SLOPED TOP STEEL
LOCKERS & BENCH - OFOI
STEEL SCRIBE, BOTH SIDES -
MATCH PROFILE - OFOI
WALL BASE - AS SCHEDULED
1/8" = 1'-0"
LEVEL 1 RCP
1/8" = 1'-0"
FIRST LEVEL FLOOR PLAN
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional architect under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
61723
/2
/2
:4
:1
A M
A101-A
ROOM 121 PLANS
26708000
100% CONSTRUCTION
DOCUMENTS
9/24/2026
CITY OF MINNEAPOLIS - RESTACK
RENO RM 121
MUNICIPAL BUILDING COMMISSION
JOSEPH D.L. WALLACE
350 S 5th St
, Minneapolis, MN 55415
350 S 5th St
Minneapolis, MN 55415
1/4" = 1'-0"
ALT 1 - ENLARGED PLAN - SHOWER ROOM
1/4" = 1'-0"
INT ELEVATION - MEETING WEST
1/4" = 1'-0"
INT ELEVATION - MEETING NORTH
1/4" = 1'-0"
INT ELEVATION - MEETING SOUTH
1/4" = 1'-0"
INT. ELEVATION - LOCKERS - WEST
1/4" = 1'-0"
INT. ELEVATION - LOCKERS NORTH
PIV
PIPING ANNOTATION
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
SYMBOLS
SPRINKLER MAIN WITH ASSOCIATED
RISER ZONE NUMBER
SM-#
FIRE SPRINKLER PIPEF
FIRE SPRINKLER PIPE WITH
SIZE OF PIPE NOTED
#"F
#" FIRE DEPARTMENT CONNECTION PIPE#"FDC
ABBREVIATIONS
SYMBOL
ABBREVIATIONS
DESCRIPTIONSYMBOL
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURE/ARCHITECT
AUX AUXILIARY
AVG AVERAGE
BAS BUILDING AUTOMATION SYSTEM
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
CL CENTERLINE
CLG CEILING
CLR CLEAR
CONT CONTINUED
DIA DIAMETER
DIM DIMENSION
DIV DIVISION
DN DOWN
DNA DATA NOT AVAILABLE
DPS DIFFERENTIAL PRESSURE SWITCH
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DWG(S) DRAWING(S)
(E) EXISTING
EA EXHAUST AIR OR EACH OR ENTERING AIR (PER CONTEXT)
EC ELECTRICAL CONTRACTOR
ECM ELECTRONICALLY COMMUTATED MOTOR
EL ELEVATION
ELEC ELECTRIC / ELECTRICAL
EQ EQUAL
EQU EQUIPMENT
EXT EXTERNAL
F FAHRENHEIT
FDC FIRE DEPARTMENT CONNECTION
FDV FIRE DEPARTMENT VALVE
FF FINISHED FLOOR
FLR FLOOR
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FT FEET / FOOT
FT-HD HEAD IN FEET
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD
HORIZ HORIZONTAL
HP HORSEPOWER OR HIGH PRESSURE (PER CONTEXT)
HR HOUR
HZ HERTZ
ID INSIDE DIAMETER OR INDIRECT DRAIN (PER CONTEXT)
IE INVERT ELEVATION
IN INCH/INCHES
IPS IRON PIPE SIZE
KW KILOWATTS
LB(S) POUNDS
LF LINEAR FEET
LIQ LIQUID
LRA LOCKED ROTOR AMPS
LVL LEVEL
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPS
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MTD MOUNTED
MV MANUAL (AIR) VENT
NA NOT APPLICABLE OR NOT AVAILABLE (PER CONTEXT)
NEG NEGATIVE
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OS&Y OUTSIDE STEM AND YOKE
PD PRESSURE DROP
PH PHASE
PIV POST-INDICATOR VALVE
PLBG PLUMBING
PRV PRESSURE REGULATING/REDUCING VALVE
PSC PERMANENT SPLIT CAPACITOR MOTOR
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
REQD REQUIRED
RLA RUNNING LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
SF SQUARE FOOT
SHT SHEET
SP STATIC PRESSURE
SPD STATIC PRESSURE DIFFERENTIAL
SPKLR SPRINKLER
SQ SQUARE
SS STAINLESS STEEL
TBD TO BE DETERMINED
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE OR TEMPORARY (PER CONTEXT)
TOD TOP OF DUCT
TOP TOP OF PIPE
TPD TOTAL PRESSURE DROP
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UG UNDERGROUND
V VOLTS
VAC VACUUM
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
W/O WITHOUT
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DIFFERENTIAL
WT WEIGHT
DESCRIPTION
PIPE ANCHOR
CONTINUATION PIPE NOT SHOWN
REDUCER
BACKFLOW PREVENTER
DISCONNECT FROM EXISTING
CONNECT NEW TO EXISTING
PIPE CAP
PIPE DOWN
PIPE GUIDE
PIPE TEE
PIPE TEE DOWN
PIPE TEE UP
PIPE UP
PIPE ELBOW
SPRINKLER RISER
FIRE DEPARTMENT CONNECTION (FDC)
FULLY CONCEALED PENDENT SPRINKLER
EXPOSED UPRIGHT SPRINKLER
HORIZONTAL SIDEWALL SPRINKLER
DRY PENDENT SPRINKLER
D
(E) F EXISTING TO REMAIN
DEMOLISHED
BACKFLOW PREVENTER
CONTINUATION PIPE NOT SHOWN
DRY PENDENT SPRINKLER
FIRE DEPARTMENT CONNECTION (FDC)
OS&Y VALVE (SUPERVISED STUT-OFF VALVE)
DRY PENDENT SPRINKLER
POST INDICATOR VALVE (PIV)
PRESSURE GAUGE W/COCK
RECESSED PENDENT SPRINKLER
SPRINKLER ZONE CONTROL VALVE
ASSEMBLY
STRAINER
UNION
FIRE PROTECTION GENERAL NOTES
A. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF
NATIONAL AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.
B. FINAL DESIGN/CONSTRUCTION DOCUMENTS SHALL BE
PREPARED BY A REGISTERED/CERTIFIED SPRINKLER DESIGNER
PROFICIENT IN FIRE PROTECTION SYSTEM DESIGN AND SHALL
BE IN ACCORDANCE WITH THE LOCAL AUTHORITY HAVING
JURISDICTION. CONTRACTOR SHALL OBTAIN ALL REQUIRED
PERMITS AND APPROVALS FROM THE LOCAL AUTHORITY
HAVING JURISDICTION.
C. DRAWINGS ARE DIAGRAMMATIC, INTENDED TO CONVEY THE
SCOPE OF WORK AND GENERAL ARRANGEMENT OF THE
SYSTEM. COORDINATE THE SPRINKLER SYSTEM LAYOUT WITH
ALL ARCHITECTURAL, STRUCTURAL, HVAC, PLUMBING AND
ELECTRICAL COMPONENTS. PROVIDE OFFSETS AS NECESSARY
TO AVOID CONFLICTS.
D. ALL SPRINKLER PIPING ELEVATIONS ARE TO BE COORDINATED
WITH STRUCTURE, CEILINGS, MECHANICAL, PLUMBING AND
ELECTRICAL TRADES PRIOR TO ORDERING OF MATERIALS.
E. REFER TO ARCHITECTURAL PLANS FOR CEILING TYPES AND
HEIGHTS, AND LOCATIONS OF EXPOSED STRUCTURE.
COORDINATE ALL SPRINKLER LOCATIONS IN AS AESTHETIC
SPACING AS POSSIBLE. REVIEW SPRINKLER PLANS WITH
ARCHITECT/ENGINEER BEFORE INSTALLATION.
F. ROUTE SPRINKLER PIPING AS HIGH AS POSSIBLE THROUGHOUT
STRUCTURE, UNLESS SPECIFICALLY NOTED OTHERWISE ON
DRAWINGS.
G. ALL PIPING AND SPRINKLERS IN EXPOSED AREAS SHALL BE
COORDINATED WITH ARCHITECTURAL AND STRUCTURAL
FEATURES, DUCTWORK AND LIGHTS. EXPOSED SPRINKLERS
SHALL BE UPRIGHT UNLESS SPECIFICALLY SHOWN OTHERWISE
ON THE DRAWINGS.
H. SPRINKLER CONTRACTOR TO DETERMINE AVAILABLE WATER
PRESSURES AND FLOW FROM LOCAL WATER DEPARTMENT.
CONTRACTOR SHALL SUBMIT HYDRANT FLOW TEST DATA THAT
IS NOT MORE THAN ONE YEAR OLDER THAN THE DATE OF SHOP
DRAWING SUBMITTAL.
I. COORDINATE INSTALLATION OF ALL PIPING SYSTEMS WITH
GENERAL CONTRACTOR TO PREVENT PIPING FREEZEUPS.
NOTIFY ARCHITECT AND ENGINEER OF AREAS FOR POTENTIAL
FREEZEUP CONCERNS.
J. ALL HOLES FOR PIPING AND CONDUIT SHALL BE DRILLED OR
CORE DRILLED, NO BREAKING OF CONCRETE OR C.M.U. SHALL
BE PERMITTED.
K. MECHANICAL TEE AND EXTRUDED TEE FITTINGS ARE NOT
ALLOWED.
L. ALL PENETRATIONS AT FIRE WALLS, FIRE BARRIERS AND SMOKE
BARRIERS (OR OTHER RATED ASSEMBLIES REQUIRED TO BE
SEALED PER SPECIFICATIONS. REFER TO ARCHITECTURAL CODE
PLAN.
FIRE DEMOLITION NOTES
A. FIRE PROTECTION CONTRACTOR'S SCOPE OF WORK INCLUDES
MODIFICATION TO THE EXISTING AUTOMATIC SPRINKLER
SYSTEM IN ALL AREAS OF RENOVATION. SPRINKLER PIPING
SHALL BE MODIFIED AS NEEDED TO ACCOMODATE NEW FLOOR
PLAN AND NEW REFLECTED CEILING PLANS. FIRE PROTECTION
CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH ALL
OTHER TRADES.
B. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL,
PLUMBING, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
DEMOLITION NOTES THAT MIGHT EFFECT FIRE PROTECTION
WORK AND VICE VERSA
C. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING
DEMOLITION WORK. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING SYSTEMS, EQUIPMENT, AND FIXTURES TO
REMAIN AND BE RE-USED. NOTIFY ENGINEER OF ANY
CONFLICTS OR UNEXPECTED CONDITIONS IMMEDIATELY.
D. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF
NATIONAL AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.
E. COORDINATE DEMOLITION WORK WITH SCHEDULES,
CONSTRUCTION REQUIREMENTS, AND SUBCONTRACTOR'S
OPERATIONS. COORDINATE SEQUENCING WITH THE ALL
DISCIPLINES, AND, WHERE SUCH EXISTS, OWNER
REPRESENTATIVE.
F. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING
FACILITY OPERATIONS WITHOUT PRIOR COORDINATION AND
APPROVAL OF THE WORK WITH THE OWNER’S REPRESENTATIVE
(WHERE SUCH EXISTS).
G. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS,
ETC.) AS REQUIRED FOR DEMOLITION & CONSTRUCTION
ACTIVITIES.
H. FACILITY NEEDS TO BE KEPT WEATHER TIGHT REGARDLESS OF
WEATHER CONDITIONS. MAINTAIN WEATHER TIGHT CONDITIONS
24 HOURS A DAY FOR THE DURATION OF THE PROJECT.
I. ANY WALL, FLOOR, ROOF, OR PARTITION PATCHING MADE
NECESSARY BY THE FIRE PROTECTION DEMOLITION SCOPE
SHALL BE COORDINATED BY THE FIRE PROTECTION
CONTRACTOR WITH ARCHITECTURAL / GENERAL TRADES.
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
47146
/1
/2
:1
:4
P M
F000
FIRE PROTECTION TITLE
SHEET & SCHEDULES
26708000
100% CD SET 09/24/2026
CITY OF MINNEAPOLIS - RESTACK
RENO
MUNICIPAL BUILDING COMMISSION
Somphavanh Boualaphanh
350 S 5TH ST
MINNEAPOLIS, MN 55415
350 S 5th St
Minneapolis, MN 55415
FIRE PROTECTION SHEET INDEX
SHEET NO. SHEET NAME
F000 FIRE PROTECTION TITLE SHEET & SCHEDULES
F101-A FIRE PROTECTION PLANS - ROOM 121
FD101-A FIRE PROTECTION DEMO PLAN - ROOM 121
FIRE PROTECTION SPRINKLER SYSTEM DESIGN CRITERIA
AREA PROTECTED CEILING TYPE HAZARD CLASSIFICATION SYSTEM TYPE DESIGN DENSITY
DESIGN AREA (MOST
DEMANDING AREA)
AREA MAXIMUM SQ FT
HEAD
HOSE
ALLOWANCE
WATER SUPPLY
DURATION (HR)
SPRINKLER HEADS
NOTES TYPE RESPONSE
TEMP RATING
(°F) FINISH
LAY-IN CEILING LIGHT HAZARD WET 0.10 GPM/SQ FT 1500 SQ FT 225 100 GPM 0.5 FULLY CONCEALED PENDENT QUICK 165 WHITE
GYP BOARD LIGHT HAZARD WET 0.10 GPM/SQ FT 1500 SQ FT 225 100 GPM 0.5 RECESSED PENDENT QUICK 165 CHROME PLATED
EXPOSED STRUCTURE LIGHT HAZARD WET 0.10 GPM/SQ FT 1500 SQ FT 225 100 GPM 0.5 UPRIGHT QUICK 165 BRONZE
EXPOSED STRUCTURE ORDINARY HAZARD GROUP 1 WET 0.15 GPM/SQ FT 1500 SQ FT 130 250 GPM 1 UPRIGHT QUICK 165 BRONZE
KEYNOTE LEGEND
1. DASHED LINE AREA INDICATES EXISTING FIRE PROTECTION SPRINKLERS TO BE
DISCONNECTED AND REMOVED TO ACCOMMODATE NEW CEILING LAYOUT.
TERMINATE BRANCH PIPING FOR RECONNECTION TO NEW SPRINKLERS.
2. EXISTING FIRE PROTECTION VALVE, HOSE CONNECTION AND STANDPIPE TO
REMAIN.
1/8" = 1'-0"
FIRE PROTECTION DEMOLITION PLAN - ROOM 121
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
47146
/1
/2
:1
:4
P M
FD101-A
FIRE PROTECTION DEMO
PLAN - ROOM 121
26708000
100% CD SET 09/24/26
CITY OF MINNEAPOLIS - RESTACK
RENO
MUNICIPAL BUILDING COMMISSION
Somphavanh Boualaphanh
350 S 5TH ST
MINNEAPOLIS, MN 55415
350 S 5th St
Minneapolis, MN 55415
N
KEYNOTE LEGEND
1. EXISTING FIRE PROTECTION VALVE, HOSE CONNECTION AND STANDPIPE TO
REMAIN.
2. FIRE MAIN SERVING AREA OF NEW WORK FROM THIS RISER CONTROL VALVE.
3. DASHED LINE AREA INDICATES AREA WITH NEW SPRINKLER WORK; MODIFY
EXISTING FIRE PROTECTION PIPING AS REQUIRED FOR NEW SPRINKLER LAYOUT.
1 2
(E) 3" F
MEETING AREA
121-06
LOCKERS
121-01
CHANGING
121-02
CHANGING
121-04
GEAR STORAGE
121-03
SHAFT 2
STORAGE
121-05
1 2
(E) 3" F
MEETING AREA
121-06
LOCKERS
121-01
CHANGING
121-04
GEAR STORAGE
121-03
SHAFT 2
STORAGE
121-05
SHOWER/TOILET
121-02
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
47146
/1
/2
:1
:4
P M
F101-A
FIRE PROTECTION PLANS -
ROOM 121
26708000
100% CD SET 09/24/2026
CITY OF MINNEAPOLIS - RESTACK
RENO
MUNICIPAL BUILDING COMMISSION
Somphavanh Boualaphanh
350 S 5TH ST
MINNEAPOLIS, MN 55415
350 S 5th St
Minneapolis, MN 55415
NN
NO SCALE
FIRE PROTECTION PLAN - ROOM 121
1/8" = 1'-0"
FIRE PROTECTION PLAN - ROOM 121 RESTROOM ALTERNATE
COLD WATER (CW)
CONDENSATE DRAIN (SEE DIV 23 SPEC)
HOT WATER (HW)
RECIRCULATING HOT WATER (RHW)
SANITARY WASTE ABOVE GRADE
SANITARY BELOW GRADE
SANITARY VENT
W
PIPING ANNOTATION PLUMBING SYMBOLS
EQUIPMENT TAG
UNIT NUMBER
EQUIPMENT TYPE
PIPE ANCHOR
CLEAN OUT
CLEAN OUT (FLOOR)
CLEAN OUT (WALL)
FLOW DIRECTION
CONTINUATION PIPE NOT SHOWN
REDUCER
WCO
FCO
DESCRIPTIONSYMBOLDESCRIPTIONSYMBOL
STORM/RWL ABOVE GRADE
STORM/RWL BELOW GRADE
W
OVERFLOW STORM/RWL ABOVE GRADE
OVERFLOW STORM/RWL BELOW GRADE
ABBREVIATIONS
SYMBOL
ABBREVIATIONS
DESCRIPTIONSYMBOL
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURE/ARCHITECT
AUX AUXILIARY
AVG AVERAGE
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BOB BOTTOM OF BEAM
BOP BOTTOM OF PIPE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
BWV BACKWATER VALVE
CD CONDENSATE
CL CENTERLINE
CLG CEILING
CLR CLEAR
CO CLEAN OUT OR CARBON MONOXIDE (PER CONTEXT)
CONT CONTINUED
DEG DEGREES
DIA DIAMETER
DIM DIMENSION
DIV DIVISION
DN DOWN
DNA DATA NOT AVAILABLE
DS DOWNSPOUT
DW DISHWASHER
DWG(S) DRAWING(S)
(E) EXISTING
EA EXHAUST AIR OR EACH OR ENTERING AIR (PER CONTEXT)
EC ELECTRICAL CONTRACTOR
ECM ELECTRONICALLY COMMUTATED MOTOR
EFF EFFICIENCY
EL ELEVATION
ELEC ELECTRIC / ELECTRICAL
EQ EQUAL
EQU EQUIPMENT
EXT EXTERNAL
F FAHRENHEIT
FF FINISHED FLOOR
FLR FLOOR
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FT FEET / FOOT
FT-HD HEAD IN FEET
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HD HEAD
HORIZ HORIZONTAL
HP HORSEPOWER OR HIGH PRESSURE (PER CONTEXT)
HR HOUR
HZ HERTZ
ID INSIDE DIAMETER OR INDIRECT DRAIN (PER CONTEXT)
IE INVERT ELEVATION
IN INCH/INCHES
IPS IRON PIPE SIZE
KW KILOWATTS
LB(S) POUNDS
LF LINEAR FEET
LIQ LIQUID
LRA OCKED ROTOR AMPS
LVL LEVEL
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPS
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MTD MOUNTED
NA NOT APPLICABLE OR NOT AVAILABLE (PER CONTEXT)
NC NORMALLY CLOSED
NEG NEGATIVE
NO NORMALLY OPEN OR NUMBER (PER CONTEXT)
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OS&Y OUTSIDE STEM AND YOKE
PD PRESSURE DROP
PH PHASE
PIV POST-INDICATOR VALVE
PLBG PLUMBING
PPH POUNDS PER HOUR
PPM PARTS PER MILLION
PRV PRESSURE REGULATING/REDUCING VALVE
PSC PERMANENT SPLIT CAPACITOR MOTOR
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
REQD REQUIRED
RLA RUNNING LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
SAN SANITARY
SF SQUARE FOOT
SHT SHEET
SPKLR SPRINKLER
SQ SQUARE
SS STAINLESS STEEL
T&P TEMPERATURE AND PRESSURE
TBD TO BE DETERMINED
TD TEMPERATURE DIFFERENTIAL
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE OR TEMPORARY (PER CONTEXT)
TMV THERMOSTATIC MIXING VALVE
TOD TOP OF DUCT
TOP TOP OF PIPE
TPD TOTAL PRESSURE DROP
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UG UNDERGROUND
V VOLTS
VAC VACUUM
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
W/O WITHOUT
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DIFFERENTIAL
WT WEIGHT
DESCRIPTION
FIXTURE TAG
DISCONNECT FROM EXISTING
FD-1
NATURAL GAS (SEE DIV 23 SPEC)
V
SD
SD
OSD
OSD
CD
G
NON-POTABLENP
140° HOT WATER
140° RECIRCULATING HOT WATER
140°
140°
ACID WASTE
ACID VENT
AW
AV
GREASE WASTEGW
COMPRESSED AIRA
CO
CONNECT NEW TO EXISTING
PIPE CAP
PIPE DOWN
PIPE GUIDE
PIPE TEE
PIPE TEE DOWN
PIPE TEE UP
PIPE UP
PIPE ELBOW
UNION
EXISTING TO REMAIN(E) W
DEMOLISHED
DEIONIZED WATER
DISTILLED WATER
LABORATORY COMPRESSED AIR
LABORATORY VACUUMLV
LAB PIPING ANNOTATION
DESCRIPTIONSYMBOL
DE
DI
LA
GWH
BACKFLOW PREVENTER
THERMOSTATIC BALANCING VALVE
CHECK VALVE
CONTINUATION PIPE NOT SHOWN
DRAIN VALVE WITH HOSE THREAD AND CAP
FLOW DIRECTION
PRESSURE GAUGE W/COCK
PRESSURE REGULATING DEVICE
PRESSURE RELIEF VALVE
SHUTOFF VALVE (TYP),
STRAINER
THERMOMETER
UNION
PLUMBING GENERAL NOTES
A. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF NATIONAL
AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.
B. PROVIDE OFFSETS AS REQUIRED TO MEET SPACE
REQUIREMENTS AND TO AVOID INTERFERENCE WITH OTHER
TRADES. NOT ALL PIPING RISERS AND DROPS ARE SHOWN.
ROUTE ALL PIPING AS HIGH AS POSSIBLE UNLESS NOTED
OTHERWISE.
C. COORDINATE FINAL LOCATION OF NEW PIPING AND PLUMBING
FIXTURES WITH STRUCTURE, LIGHTING, ARCHITECTURAL
ELEMENTS, DUCTWORK, PIPING AND SPRINKLERS.
D. REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS
FOR ACCESS PANELS. ANY PLUMBING EQUIPMENT (VALVES,
ETC.) NEEDING AN ACCESS PANEL NOT INDICATED ON THE
DRAWINGS SHALL ALSO BE PROVIDED BY PLUMBING
CONTRACTOR AND SUBMITTED TO THE ARCHITECT FOR
APPROVAL OF PANEL SIZE, DETAIL, AND PANEL LOCATION PRIOR
TO INSTALLATION OF ITEM REQUIRING ACCESS.
E. PROVIDE SLEEVES AT EACH PENETRATION OF FIRE AND SMOKE
RATED ASSEMBLIES AND SEAL PER SPECIFICATIONS.
F. COORDINATE FINAL LOCATION AND ELEVATION / MOUNTING
HEIGHT OF ALL WALL DEVICES WITH ARCHITECTURAL PLANS.
REFER TO INTERIOR ELEVATIONS, FLOOR, AND FURNITURE
PLANS FOR DETAILS.
G. ALL SANITARY PIPING IS DESIGNED TO, AND SHALL BE, SLOPED
AT NO LESS THAN 1/4” PER FOOT (2%).
H. ALL STORM PIPING IS DESIGNED TO, AND SHALL BE, SLOPED AT
NO LESS THAN 1/8” PER FOOT (1%).
I. ALL PLUMBING VENT-THRU-ROOF SHALL BE LOCATED A MINIMUM
OF 2'-0" FROM ANY WALL OR VERTICAL SURFACE AND A MINIMUM
OF 10'-0" FROM FRESH AIR INTAKES. IF THE BUILDING IS A
HEALTH CARE FACILITY, DISTANCE FROM FRESH AIR INTAKES
MUST BE NO LESS THAN 25 FEET.
J. PROVIDE 2-WAY CLEANOUT FOR SANITARY AND STORM
SYSTEMS IMMEDIATELY OUTSIDE OF EXTERIOR WALL.
K. MECHANICAL TEE AND EXTRUDED TEE FITTINGS ARE NOT
ALLOWED.
PLUMBING DEMOLITION NOTES
A. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF
NATIONAL AND LOCAL CODES, WHICHEVER IS MORE STRINGENT.
B. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING
DEMOLITION WORK. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING SYSTEMS, EQUIPMENT, AND FIXTURES TO
REMAIN AND BE RE-USED. NOTIFY ENGINEER OF ANY
CONFLICTS OR UNEXPECTED CONDITIONS IMMEDIATELY.
C. COORDINATE DEMOLITION SCOPE AND SCHEDULE WITH ALL
TRADES PRIOR TO START OF WORK.
D. WHERE WALLS OR PARTITIONS ARE INDICATED TO BE REMOVED,
CONTRACTOR SHALL REMOVE ANY PIPING AND OTHER
PLUMBING-RELATED ITEMS IN OR ON THEM, UNLESS OTHERWISE
NOTED. NOT ALL SUCH MAY BE SHOWN ON PLAN.
E. REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE
PROTECTION AND ELECTRICAL DRAWINGS FOR ADDITIONAL
DEMOLITION NOTES THAT MIGHT EFFECT PLUMBING WORK AND
VICE VERSA.
F. NO WORK SHALL BE STARTED WHICH AFFECTS EXISTING
FACILITY OPERATIONS WITHOUT PRIOR COORDINATION AND
APPROVAL OF THE WORK WITH THE OWNER’S REPRESENTATIVE
(WHERE SUCH EXISTS).
G. ALL SAW-CUTTING AND NOISE / VIBRATION PRODUCING
CONSTRUCTION SHALL BE SCHEDULED WITH OWNER AS TO NOT
INTERFERE WITH BUILDING OPERATIONS.
H. PROVIDE FIRE PROTECTION EQUIPMENT (FIRE EXTINGUISHERS,
ETC.) AS REQUIRED FOR DEMOLITION & CONSTRUCTION
ACTIVITIES.
I. ALL SHUTDOWNS OF PLUMBING, SPRINKLER, FIRE ALARM, AND /
OR ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH
OWNER.
J. FACILITY NEEDS TO BE KEPT WEATHER-TIGHT REGARDLESS OF
WEATHER CONDITIONS AT THE END OF EACH DAY. MAINTAIN
WEATHER-TIGHT CONDITIONS 24 HOURS A DAY FOR THE
DURATION OF THE PROJECT.
K. ANY WALL, FLOOR, ROOF, OR PARTITION PATCHING MADE
NECESSARY BY THE PLUMBING DEMOLITION SCOPE SHALL BE
COORDINATED BY THE PLUMBING CONTRACTOR WITH
ARCHITECTURAL / GENERAL TRADES.
L. CONTRACTOR SHALL CAP, SEAL, AND RE-INSULATE PIPING THAT
WAS IMPACTED BY DEMOLITION OR RE-CONNECTION TO
EXISTING.
A
19181716151413121110987654
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
P R
IN
T
E D
20 21
Sheet Name
Key Plan
19181716151413121110987654 20 21321
Sheet Number
Sheet Issue Date
OPN Project No.
Owner
All reports, plans, specifications, computer files, field data, notes and other documents and instruments prepared by
OPN Architects, Inc. as instruments of service shall remain the property of OPN Architects, Inc. OPN Architects, Inc.
shall retain all common law, statutory and other reserved rights, including the copyright thereto.
© 2025 OPN Architects, Inc.
Project
VICTUS ENGINEERING
2327 Wycliff St Ste 230
St Paul, MN 55114
P. (612) 859-8299
Mechanical, Electrical, & Plumbing Engineer
I hereby certify these plans and specifications were prepared by me or under my direct personal supervision and that I am a duly licensed professional engineer under the laws of the state of Minnesota.
Signature:
Printed Name:
Registration Number:
212 N 3rd Avenue, Ste. 312
Minneapolis, MN 55401
P: 612-355-7111 www.opnarchitects.com
47146
/1
/2
:1
:4
P M
P000
PLUMBING TITLE SHEET &
SCHEDULES
26708000
100% CD SET 09/24/2026
CITY OF MINNEAPOLIS - RESTACK
RENO
MUNICIPAL BUILDING COMMISSION
Somphavanh Boualaphanh
350 S 5TH ST
MINNEAPOLIS, MN 55415
350 S 5th St
Minneapolis, MN 55415
PLUMBING SHEET INDEX
SHEET NO. SHEET NAME
P000 PLUMBING TITLE SHEET & SCHEDULES
P101-A PLUMBING PLANS - ROOM 121
P200-A PLUMBING RISER DIAGRAM
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION ADA
WASTE
(IN)
VENT
(IN)
COLD
(IN)
HOT
(IN)
FIXTURE TRIM
NOTESMANUFACTURER MODEL MANUFACTURER MODEL
LV-1A WALL MOUNTED LAVATORY WITH CONCEALED ARMS SUPPORT AND 0.5 GPM HARDWIRED HANDSFREE FAUCET Yes 2 1-1/2 1/2" 1/2" AMERICAN STANDARD LUCERNE 0355.012 ZURN Z6915-XL-F-CWB 1, 2
SH-1 COMMERCIAL SHOWER SYSTEM TRIM KIT Yes - - 3/4 3/4 AMERICAN STANDARD TU662.213
WC-1A FLOOR MOUNTED WATER CLOSET, ENLONGATED, TOP SPUD, EVERCLEAN WITH DUAL FLUSH 1.6/1.1 GPF SOLAR POWERED WITH BATTERY BACK-UP SENSOR FLUSHOMETER Yes 4 2 1 - AMERICAN STANDARD MADERA 3043.001 SLOAN SOLIS 8111-1.6/1.1 3
PLUMBING DRAIN SCHEDULE
MARK DESCRIPTION WASTE (IN) VENT (IN) MANUFACTURER MODEL NOTES
FD-1 EPOXY COATED CASST IRON FLOOR DRAIN WITH 6" DIAMETER ROUND NICKEL BRONZE STRAINER 4 2 WATTS FD-100-A 1
SD-1 CAST IRON SHOWER FLOOR DRAIN WITH STAINLESS STEEL SAFETY GRATE 2 1-1/2 WATTS SD
NOTES;
1. PROVIDE WITH MOLDED COVERING FOR WATER AND WASTE PIPING; TRUEBO LAV GUARD2
2. PROVIDE WITH ZURN P6000-HW6 HARD WIRE POWER CONVERTER