MB358PG9-17.pdf

PDF 2 MB Posted

Attached to
Cable Creek Basin (Upper) RFP
Solicitation number
PWG126-ADMIN-6438
Issued by
San Bernardino County, San Bernardino City, California

About this file

This is a Scope of Work document from the Massachusetts Bay Transportation Authority (MBTA) for a construction project involving the removal and replacement of existing switches and frogs on the Red Line between Broadway and North Quincy stations. The project encompasses the procurement and installation of high-speed movable point switches and associated track infrastructure to enhance operational efficiency and safety on this critical transit corridor. The work includes removal of existing rail infrastructure, delivery and installation of new switch systems, track geometry corrections, and restoration of the roadbed. The MBTA anticipates issuing the bid documents with a response deadline in the coming months, with construction activities scheduled to commence following the award phase. The contract will be competitively bid, and site visits are available for interested bidders to familiarize themselves with existing conditions and project scope. The contract term will extend through the completion of all construction activities and final acceptance of work by the MBTA.

The pricing structure will be based on lump-sum and unit-price bid items covering mobilization, switch and frog removal, new switch installation, track work, drainage modifications, and restoration activities. The project is funded through the MBTA's capital budget and federal transit funding sources, with the total project cost to be determined through the competitive bidding process. There are no identified set-asides for this procurement. The incumbent contractor information, if applicable, will be noted in the final bid documents. The current environment reflects the MBTA's ongoing commitment to infrastructure renewal and modernization of aging rail systems to support reliable transit service for the Boston metropolitan area.

View the file

Other files

File Type Posted
3038-153 REC ALL.pdf PDF
57603-01.pdf PDF
3-9_Irvington Land and Water.pdf PDF
932504447 Plotted Easements.pdf PDF
1-32 MAP RECORDOFSURVEY.pdf PDF
2268-146.pdf PDF
261-13_ASSESSOR MAP.pdf PDF
Invoice 932504448-1.pdf PDF
78701-04.pdf PDF
56803-02 (1).pdf PDF
Finishes.Metal Framing Systems.Stud.jpg JPG image
230241_Cable_Creek_RW.txt TXT text file
AM 0348-08.pdf PDF
Sitework.Paving - Surfacing.Asphalt.1.jpg JPG image
RS0073P0086-0086.pdf PDF
21-32 MAP SUBDIVISION.pdf PDF
BG2025_0813_Cable Creek.pdf PDF
4594-204 REC ALL.pdf PDF
RS0146P0077-0079.pdf PDF
197-22 MAP SUBDIVISION.pdf PDF
230241CableCreekTopoSBCO2025.dwg DWG drawing
EAS 1988-122325.pdf PDF
RFP-PWG126-ADMIN-6438-Cable Creek Basin.pdf PDF
1991-474266 street.pdf PDF
Sitework.Planting.Gravel.Crushed.jpg JPG image
RS0138P0086-0087.pdf PDF
VESTING 2268-146.pdf PDF
7-23 MAP SUBDIVISION.pdf PDF
261-12 MAP ASSESSOR.pdf PDF
932504427 Plotted Easements.pdf PDF
Invoice 932504435-1.pdf PDF
RS0121P0028-0028.pdf PDF
56803-02 (1).jpg JPG image
PP_152.1.pdf PDF
Sitework.Planting.Grass.Short.jpg JPG image
AM 0261-13.pdf PDF
m - APN Map.pdf PDF
2-32 of Maps.pdf PDF
932504437 Plotted Easements.pdf PDF
4507-130 REC ALL.pdf PDF
RS0043P0017-0018.pdf PDF
RS0163P0007-0007.pdf PDF
AM 0261-12.pdf PDF
APN 0261-121-10-0000.pdf PDF
MB0162P0059-0060.pdf PDF
Invoice 932504451-1.pdf PDF
Sitework.Planting.Soil.jpg JPG image
4462-73 REC ALL.pdf PDF
Tax_12-18 MAP SUBDIVISION.pdf PDF
PP_106.81.pdf PDF
Show 40 more

Latest 50 of 140 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .