Solicitation Amendment H9225726QE0200002 SF 30.pdf

PDF 1 MB Posted

Attached to
Switch Replacement - MARSOC
Solicitation number
Not on record
Issued by

About this file

This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued on 25 June 2026 for solicitation H9225726QE020, originally dated 27 May 2026. The amendment extends the response due date from 22 June 2026 to 2 July 2026 and extends delivery dates by one month across all line items. The contracting office is MARSOC (Marine Special Operations Command) located at Camp Lejeune, North Carolina, ATTN G4 Contract, with contracting officer Krissia Avelares Valle.

The solicitation is a Total Small Business Set-Aside under NAICS 334210 for Cisco brand networking equipment and services. Line item 0001 (Group A) requires Cisco C8300 Series Secure Router (C8375-E-G2++) with associated components including 16GB memory, M.2 USB 32GB storage, rack mount kit, software licenses (IOS XE 17.18), and related support services with a 36-month CX Level 1 support contract. Line item 0002 (Group B) specifies the Cisco C8400 Series Secure Router (C8475-G2) with 32GB DRAM, rack mount kit, software, and 36-month support. Line item 0003 includes Cisco Routing Advantage licenses and On-Premises Catalyst Center management tools for 84 months. All items must be brand new, TAA-compliant, and submitted on an all-or-none basis. Delivery deadlines for most items are 31 August 2026; specialized routing subscription items are due 5 September 2026. Quoters must be registered in SAM and provide UEI, Cage Code, and TIN. Award will be made to the responsible quoter offering the Lowest Price Technically Acceptable (LPTA) quote. Questions deadline is 29 June 2026 at 12:00 PM EDT; quotes are due 2 July 2026 at 11:00 AM EDT via email to Ger.yang.mil@socom.mil and krissia.i.avelares.mil@socom.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following modifications were made:

Information From To Response Due Time Zone Eastern Standard Time (UTC -5) Eastern Daylight Time (UTC -4) Response Due Date 22 Jun 2026 02 Jul 2026

Supplies or Services & Prices or Costs

Line Item 0001AA

The following Line Item modifications were made:

Information From To

Description Cisco C8300 Series Secure Router, C8375-E-G2++, incl. OS Ess

C8375-E-G2++ TAA compliant, COO: Mexico Lead time: 32 business days Cisco C8300 Series Secure Router, C8375-E-G2++, incl.

OS Ess

Line Item 0001AB

The following Line Item modifications were made:

Information From To

Description CX Level 1 8X5XNBD Cisco Secure WAN C83

CX LEVEL 1 8X5XNBD Cisco Secure WAN C83 (36 Months)

Line Item 0001AC

The following Line Item modifications were made:

Information From To

Description 16GB Memory for Cisco 8300-G2 Series

[TO BE INCLUDED WITH SLIN 0001AB]

16GB Memory for Cisco 8300-G2 Series Cost Constraints Not Separately Priced

Line Item 0001AD

The following Line Item modifications were made:

Information From To

Description M.2 USB 32GB for Cisco 8300/8400/8500L Series COO: China

M.2 USB 32GB for Cisco 8300/8400/8500L Series

Line Item 0001AE

The following Line Item modifications were made:

Information From To

Description Cisco Catalyst 8300 Rack mount kit 19 1R

[TO BE INCLUDED IN SLIN 0001AD]

Cisco Catalyst 8300 Rack mount kit 19 1R Cost Constraints Not Separately Priced

Line Item 0001AF

The following Line Item modifications were made:

Information From To

Description No RFID

[TO BE INCLUDED IN SLIN 0001AD]

No RFID Cost Constraints Not Separately Priced

Line Item 0001AG

The following Line Item modifications were made:

Information From To

Description SM Blank for Cisco 8300 Series

[TO BE INCLUDED IN SLIN 0001AD]

SM Blank for Cisco 8300 Series Cost Constraints Not Separately Priced

Line Item 0001AH

H9225726QE0200002

The following Line Item modifications were made:

Information From To

Description PIM Blank for Cisco 8300 Series

[TO BE INCLUDED IN SLIN 0001AD]

PIM Blank for Cisco 8300 Series Cost Constraints Not Separately Priced

Line Item 0001AJ

The following Line Item modifications were made:

Information From To

Description Network Plug-n-Play Connect for zero-touch device deployment

[TO BE INCLUDED IN SLIN 0001AD]

Network Plug-n-Play Connect for zero-touch device deployment

Cost Constraints Not Separately Priced

Line Item 0001AK

The following Line Item modifications were made:

Information From To

Description TE agent for IOSXE on Enterprise Routing for G2 Platforms

[TO BE INCLUDED IN SLIN 0001AD]

TE agent for IOSXE on Enterprise Routing for G2 Platforms

Cost Constraints Not Separately Priced

Line Item 0001AM

The following Line Item modifications were made:

Information From To

Description IOS XE Autonomous for Unified image

[TO BE INCLUDED IN SLIN 0001AL]

IOS XE Autonomous for Unified image Cost Constraints Not Separately Priced

Line Item 0001AN

The following Line Item modifications were made:

Information From To

Description IOS XE 17.18

[TO BE INCLUDED IN SLIN 0001AL]

IOS XE 17.18

Cost Constraints Not Separately Priced

Line Item 0001AQ

The following Line Item modifications were made:

Information From To

Description AC Power Cord (North America), C13, NEMA 5-15P, 2.1m

[TO BE INCLUDED IN SLIN 0001AP]

AC Power Cord (North America), C13, NEMA 5-15P, 2.1m

Cost Constraints Not Separately Priced

Line Item 0001AS

The following Line Item modifications were made:

Information From To

Description Lead time: 65 business days Cisco Secure Routing Subscription

[TO BE INCLUDED IN SLIN 0001AR]

CISCO-ROUT-SUB

Lead time: 65 business days Cisco Secure Routing Subscription

Cost Constraints Not Separately Priced

Line Item 0002

The following Line Item modifications were made:

Information From To

Description [Group B] [Group B]

Line Item 0002AA

The following Line Item modifications were made:

Information From To

Description TAA Compliant Cisco C8400 Series Secure Router, C8475-G2, incl. OS Ess

C8475-G2++ TAA compliant lead time is 30 business days

Cisco 8400 Secure Router, C8475-G2, TAA, includes OS Ess

Line Item 0002AB

The following Line Item modifications were made:

Information From To

Description CX LEVEL 1 8X5XNBD Cisco 8475 Secure Ro

CX LEVEL 1 8X5XNBD Cisco 8475 Secure Ro (36 Months)

Line Item 0002AC

The following Line Item modifications were made:

Information From To

Description 32GB DRAM

[TO BE INCLUDED IN SLIN 0002AB]

32GB DRAM

Cost Constraints Not Separately Priced

Line Item 0002AE

The following Line Item modifications were made:

Information From To

Description 19 Rack Mount

[TO BE INCLUDED IN SLIN 0002AD]

19 Rack Mount Cost Constraints Not Separately Priced

Line Item 0002AF

The following Line Item modifications were made:

Information From To

Description No RFID

[TO BE INCLUDED IN SLIN 0002AD]

No RFID Cost Constraints Not Separately Priced

Line Item 0002AG

The following Line Item modifications were made:

Information From To

Description Network Plug-n-Play Connect for zero-touch device deployment

[TO BE INCLUDED IN SLIN 0002AD]

Network Plug-n-Play Connect for zero-touch device deployment

Cost Constraints Not Separately Priced

Line Item 0002AH

The following Line Item modifications were made:

Information From To

Description TE agent for IOSXE on Enterprise Routing for G2 Platforms

[TO BE INCLUDED IN SLIN 0002AD]

TE agent for IOSXE on Enterprise Routing for G2 Platforms

Cost Constraints Not Separately Priced

Line Item 0002AK

The following Line Item modifications were made:

Information From To

Description IOS XE Autonomous for Unified image

[TO BE INCLUDED IN SLIN 0002AJ]

IOS XE Autonomous for Unified image Cost Constraints Not Separately Priced

Line Item 0002AL

The following Line Item modifications were made:

Information From To

Description IOS XE 17.18

[TO BE INCLUDED IN SLIN 0002AJ]

IOS XE 17.18

Cost Constraints Not Separately Priced

Line Item 0002AM

The following Line Item modifications were made:

Information From To

Description 400W AC Power Supply

[TO BE INCLUDED IN SLIN 0002AJ]

400W AC Power Supply Cost Constraints Not Separately Priced

Line Item 0002AN

The following Line Item modifications were made:

Information From To

Description AC Power Cord (North America), C13, NEMA 5-15P, 2.1m

[TO BE INCLUDED IN SLIN 0002AJ]

AC Power Cord (North America), C13, NEMA 5-15P, 2.1m

Cost Constraints Not Separately Priced

Line Item 0003AA

The following Line Item modifications were made:

Information From To Description Cisco Routing Advantage Lic - Large Cisco Routing Advantage Lic - Large (84 Months)

Line Item 0003AB

The following Line Item modifications were made:

Information From To

Description Cisco On-Prem Catalyst Center Management for Routing

[TO BE INCLUDED IN SLIN 0003AA]

Cisco On-Prem Catalyst Center Management for Routing

Cost Constraints Not Separately Priced

Line Item 0003AC

The following Line Item modifications were made:

Information From To

Description Cisco Routing Advantage Lic - XLarge

Cisco Routing Advantage Lic - Xlarge (84 Months)

Deliveries or Performance

Line Item 0001AA

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AB

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AC

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AD

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AE

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AF

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AG

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AH

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AJ

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AK

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AL

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AM

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AN

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AP

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AQ

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AR

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0001AS

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 26 Aug 2026. Delivery Before 05 Sep 2026.

Line Item 0002AA

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AB

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AC

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AD

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AE

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AF

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AG

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AH

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AJ

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AK

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AL

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AM

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0002AN

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0003AA

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0003AB

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Line Item 0003AC

The following Delivery Information modifications were made:

Information From To Delivery Delivery Before 31 Jul 2026. Delivery Before 31 Aug 2026.

Instructions, Conditions, & Notices to Offerors or Quoters

Header Miscellaneous Text (Modified):

ADDENDUM 52.212-1 INSTRUCTION TO OFFERORS

Request for Quote and Submission Instructions.

(1) All questions concerning this procurement, either technical or contractual must be submitted in writing, via email, to the Contracting Office. The deadline for

29 June 2026submittal of questions regarding this solicitation is 12:00 PM Eastern Daylight Time (EDT) on . The government's responses will be provided via solicitation/RFQ amendment. No direct exchanges between the technical representative and a prospective Quoter shall be conducted unless it is deemed necessary by the Contracting Officer. Questions shall be submitted via email to: Ger.yang.mil@socom.mil.

(2) 2 July 2026Quotes must be received no later than 11:00 AM Eastern Daylight Time (EDT) on . Quotes received after this time frame shall not be considered for award. The Government will award the contract resulting from this solicitation to the responsible offeror whose quote is Acceptable and will be the Lowest Price Technically Acceptable (LPTA). The prospective quoter must be registered with the System for Award Management (SAM) website at https://www.sam.gov to be considered for award. All quotes must be submitted via email. No other form of submission will be acceptable. Quotes shall be emailed to: Ger.yang.mil@socom.mil, and krissia.i.avelares.mil@socom.mil.

(3) Quoters must provide the following information in their offers: UEI #, Cage Code #, and TIN #.

(4) All quotes will be evaluated on an all-or-none basis.

(5) Quoters shall fill in the following provisions incorporated in the solicitation only if the representations and certifications have not been completed or updated in the System for Award Management (SAM):

52.209-2, 52.209-5, 52.209-11, 52.229-11, 252.204-7016, 252.204-7017

(6) All transmissions must clearly state the Solicitation number and the name of the contracting specialist on the first page to ensure proper receipt.

(End of Provision)

Evaluation Factors for Award

Header Miscellaneous Text (Modified):

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

This requirement is being issued as a Total Small Business Set-Aside under NAICS 334210. Notice to Offerors:

The Small Business Administration (SBA) has issued a Class Waiver of the Nonmanufacturer Rule (NMR) for this NAICS code. Therefore, small business offerors are legally authorized to supply the required Brand Name items manufactured by a large business. The clause at , Nonmanufacturer Rule, does not apply to this 52.219-33 acquisition. All responsible business sources may submit a response which, if received in a timely manner, will be considered by the agency.

THE BASIS FOR AWARD:

H9225726QE0200002

https://www.sam.gov/

The Government will award a contract resulting from this solicitation to the responsible quoter whose quote meets the evaluation factors below.

Evaluation Factors:

Factor 1: Technical (Acceptable/Not Acceptable)

Technical acceptability will be evaluated based on the quoter's ability to:

- Provide the exact CISCO brand name products, quantity, and duration identified in the SLIN structure.

- Quotes offering "equal" or alternative products will not be considered.

- Quotes offering must be for BRAND NEW items.

- Quotes offering must be for All-or-None. Quotes not offering all requested items will be considered not acceptable.

Factor 2: Price

For those quotations determined to be technically acceptable, award will be made to the quoter whose quote is determined to be the Lowest Price Technically Acceptable (LPTA).

SUMMARY OF CHANGES
Solicitation/Contract Form
Supplies or Services & Prices or Costs
Deliveries or Performance
Instructions, Conditions, & Notices to Offerors or Quoters
Evaluation Factors for Award
IDCode: J
Page: 1
Pages: 10
AmendNo: 0002
EffDate: 25 Jun 2026
ReqNo:
ProjNo:
IssCode: H92257
AdmCode:
IssuedBy: MARSOC H92257

400 RR (BLDG), RIFLE RANGE ROAD, CAMP LEJEUNE ATTN G4 CONTRACT

SNEADS FERRY, NC 28460-0101

UNITED STATES

Ger SOLTEROYANG, Email: ger.yang.mil@socom.mil Telephone: 9104400872 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: H9225726QE020
SolDate: 27 May 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to re-open the solicitation and to clarify the requirement.
ContNameTitle:
CoNameTitle: Krissia Avelares Valle
ContDate:
CODate: 26 Jun 2026

File details come from the government source that posted it. Updated .