Marine_Debris_Sculpture_SOW.docx

DOCX document 511 KB Posted

Attached to
Sculpture for a marine debris exhibit at KAHO
Solicitation number
140P8222Q0005
Issued by

View the file

Other files

File Type Posted
Sol_140P8222Q0005_Amd_0002.pdf PDF
Answers_to_Questoins_II_0002.docx DOCX document
Revised_Marine_Debris_Sculpture_SOW_0002.docx DOCX document
Revised_Marine_Debris_Sculpture_SOW_0001.docx DOCX document
Sol_140P8222Q0005_Amd_0001.pdf PDF
Answers_to_Solicitation_Questions_0001.docx DOCX document
Sol_140P8222Q0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quote

Kaloko-Honokōhau National Historical Park Marine Debris Sculpture

I. BACKGROUND

Kaloko-Honokōhau National Historical Park is located on the west coast of the island of Hawai'i and was established in 1978. Within its 1,200-acre boundary, the park protects the site of an ancient Hawaiian settlement and is home to coral reefs, anchialine pools, tidepools, and wetland bird habitats. Marine debris has become a significant issue in the park, and the park is developing an exhibit to raise awareness of this issue.

II. PURPOSE

Purchase of a sculpture for a marine debris exhibit at Kaloko-Honokōhau National Historical Park.

III. SCOPE OF WORK

The contractor shall provide the National Park Service (NPS) with a sea turtle sculpture and mounting system for a marine debris exhibit for Kaloko-Honokōhau National Historical Park. The Park will place marine debris inside the sculpture so that visitors can see the amount and types of marine debris that has been collected.

The Contractor shall:

A. Build one (1) sea turtle (honu) sculpture for a marine debris exhibit

a. The sculpture shall be a hollow structure constructed with a steel frame which shall be covered with a combination of steel mesh and steel sheeting. The covering shall have the capacity to retain the marine debris inside the sculpture but shall still allow for the marine debris to be seen from the outside. Steel shall be either

i. Stainless steel, or

ii. Mild steel with either a non-toxic powder coat or painted to protect it from the elements. Paint colors will be selected with contractor after contract is awarded.

b. Fins may be constructed of either hollow construction or of solid or steel sheeting construction. The fins do not need to have the ability to hold marine debris.

c. An easily accessed hatch, opening, or other access point shall be included on the top of the turtle sculpture to allow for cleaned marine debris to be put inside, and another hatch shall be included on the bottom of the turtle sculpture so that the debris can be easily removed from the sculpture. Sculpture must be able to hold and retain marine debris with a minimum size of 6” x 6” without the debris falling out, while still being visible from below the sculpture. Marine debris will remain securely contained inside the sculpture until it begins to breaks up at which time it will be replaced.

d. The sculpture shall be securely suspended from the breezeway ceiling of the visitor center.

e. The main body of the sculpture (exclusive of head, fins, and tail) shall measure approximately 6 feet long by 5 feet wide by 3 feet high.

B. Supply a marine-grade pulley system to raise, lower, and remove the sculpture during inclement weather.

a. Design and supply a marine-grade pulley system to securely suspend the sculpture from the breezeway ceiling of the visitor center. It shall have the ability to raise and lower the sculpture, and with the ability to remove the sculpture for hurricanes. It must be able to be raised and lowered by one or two people.

b. The pulley system shall be made of rust-resistant materials.

c. Contractor shall provide instructions on pulley system use.

C. Deliver the sculpture and pulley system to the park, and install.

IV. DELIVERABLES

A. The contractor shall provide the following to the NPS project manager:

a. Sculpture and an associated marine-grade pulley system, delivered to Kaloko-Honokōhau National Historical Park.

b. Install the sculpture and pulley system assembly.

V. TIME FOR COMPLETION

All tasks and deliverables for this contract must be completed before August 15, 2022.

VI. POINT OF CONTACT FOR EXHIBIT DELIVERY

Prior to delivery of the sculpture, contractor shall contact the NPS project manager and the COR to advise of exact dates and arrangements made for delivery.

VII. ATTACHMENTS - The following items are attached and incorporated into this order:

A. Pictures of installation location in visitor center breezeway ceiling 2 pages

Picture of visitor center breezeway ceiling

Close-up of installation location in visitor center breezeway ceiling.

image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .