Mandatory Pre-Bid Attendance.pdf
PDF 55 KB Posted
- Attached to
- EWEB RFP #26-173-Q Part 12D Report Consulting
- Solicitation number
- S-P00140-00018184
- Issued by
- Lane County, Oregon
About this file
This is a Mandatory Pre-Proposal Meeting Attendance document for Eugene Water & Electric Board (EWEB) RFP #26-173-Q regarding Part 12D Report Consulting services for the Leaburg-Walterville Hydroelectric Project. The meeting was held on October 22, 2026 at 1:30 PM via Microsoft Teams, with proposals due November 10, 2026 at 2:00 PM PST. Attendees included McMillen RJH Consultants, GEI Entrust Solutions, KCorp Alaska, and HDR. The scope involves independent safety inspection and assessment services for the two-facility Leaburg Development and Walterville Development on the McKenzie River (FERC License No. 2496), including project management, development of a Part 12D Inspection Plan, Pre-Inspection Preparation Report, execution of the sixth periodic inspection, and preparation of a comprehensive Periodic Inspection Report. Major deliverables are due by late 2027 to early 2028, with the final report to FERC due no later than April 30, 2028. The contract commences December 31, 2026 and expires April 30, 2029, with possible extension to a maximum total duration of five years.
Minimum qualifications are highly restrictive and include continuous operation in engineering or design services for at least seven years, work products prepared by appropriately licensed Oregon engineers, listing on FERC's Previously Approved Independent Consultants list as of September 18, 2026, and completion of at least three previous Part 12 Safety Inspection Reports accepted by FERC within the past seven years. The engineer's estimate is $250,000 as the not-to-exceed compensation for all services, deliverables, and allowable expenses. This is a three-step qualifications-based selection process where pricing is evaluated only after shortlisting in Step Three; selected proposers have 24 hours to submit detailed pricing including hourly rate schedules, estimated hours by task, direct expenses at GSA travel rates, and sub-consultant markups limited to 4% on direct labor costs only. Work is performed at the consultant's business location and at EWEB facilities in Eugene, Walterville, and Leaburg, Oregon. EWEB will conduct reference checks and reserves the right to investigate proposer responsibility and past performance prior to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1~41.pdf | ||
| Bid Tab 26-173-Q LW Part 12-D - filled.pdf | ||
| 26-173-Q LW Part 12D Report~1.pdf | ||
| 26-173-Q LW Part 12D Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mandatory Pre-Proposal Meeting
In Attendance:
McMillen
RJH Consultants
GEI
Entrust Solutions
KCorp Alaska
HDR
File details come from the government source that posted it. Updated .