Bid Tab 26-173-Q LW Part 12-D - filled.pdf
PDF 59 KB Posted
- Attached to
- EWEB RFP #26-173-Q Part 12D Report Consulting
- Solicitation number
- S-P00140-00018184
- Issued by
- Lane County, Oregon
About this file
This is a Bid Tab for RFP 26-173-Q issued by the Eugene Water & Electric Board (EWEB) for consulting services to perform independent safety inspection and assessment services for the Leaburg-Walterville Hydroelectric Project under 18 CFR Part 12, Subpart D. The scope of work includes project management, development of a Part 12D Inspection Plan, preparation of a Pre-Inspection Preparation Report, execution of the sixth periodic inspection of the Leaburg Development and Walterville Development facilities on the McKenzie River (FERC License No. 2496), and preparation of a comprehensive Periodic Inspection Report. Major deliverables are due between late 2027 and early 2028, with the final report to FERC due no later than April 30, 2028. The proposal closing date was November 10, 2026 at 2:00 PM PST. A mandatory Pre-Proposal Conference was held on October 22, 2026 at 1:30 PM via Microsoft Teams. The contract commences December 31, 2026 and expires April 30, 2029, with possible extension to a maximum total duration of five years. Three proposals were received from qualified firms: GEI Consultants, Inc., McMillen Inc., and RJH Consultants, Inc., all of which submitted compliant responses to the Proposal Form, Minimum Qualification Response, Evaluation Criteria Response, and Addenda Acknowledged sections.
The engineer's estimate for this not-to-exceed compensation is $250,000 for all services, deliverables, and allowable expenses. This is a three-step qualifications-based selection process, with pricing evaluated only after shortlisting in Step Three. Selected proposers were required to submit detailed pricing including hourly rate schedules, estimated hours by task, direct expenses at GSA travel rates, and sub-consultant markups limited to 4% on direct labor costs only within 24 hours of notification. Minimum qualifications are highly restrictive and include continuous operation in engineering or design services for at least seven years, work products prepared by appropriately licensed Oregon engineers, listing on FERC's Previously Approved Independent Consultants list as of September 18, 2026, and completion of at least three previous Part 12 Safety Inspection Reports accepted by FERC within the past seven years. The bid tab was opened by Sandra Hahn and witnessed by Kristin Kokkeler.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1~41.pdf | ||
| 26-173-Q LW Part 12D Report~1.pdf | ||
| 26-173-Q LW Part 12D Report.pdf | ||
| Mandatory Pre-Bid Attendance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Closing Date: November 10, 2026 Closing Time: 2:00 pm PST
DESCRIPTION
GEI Consultants, Inc. McMillen Inc. RJH Consultants, Inc.
Proposal Form Section 6 Yes Yes Yes Yes / No Minimum Qualification Response (3) Yes Yes Yes Yes / No
Evaluation Criteria Response (5) Yes Yes Yes Yes / No
Addenda Acknowledged (1) Yes Yes Yes Yes / No
Opened by: Sandra Hahn Witnessed by: Kristin Kokkeler
TAB SHEET
RFP 26-173-Q Leaburg - Walterville 6th CSIR Part 12D Report