MACB (BOA)NOTICE OF INTENT-SYNOPSIS_Final.pdf
PDF 43 KB Posted
- Attached to
- Tinker AFB Multiple Award Construction Basic Ordering Agreement (MACB) Federal contract opportunity
- Solicitation number
- FA813721R0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA813721R0022 updated 20 May 21.pdf | ||
| Statement of Work 26 May 2021.pdf | ||
| TINKER AFB MACB RFI responses Rev1.pdf | ||
| MACB Industry Conference updated.pptx | PPTX presentation | |
| Statement of Work 18 March 2021.pdf | ||
| Solicitation - FA813721R0022.pdf | ||
| 2020 TAFB Facility Standard.pdf | ||
| 2020 TAFB Electrical Standards.pdf | ||
| 00 72 00 GENERAL ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf | ||
| Experience Matrix.pdf | ||
| Statement of Work 6 April 2021.pdf | ||
| 2020 TAFB Mechanical Standard.pdf | ||
| 00 71 00 GENERAL SAFETY REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf | ||
| 00 70 00 GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE.pdf | ||
| MACB Provision and Clause Matrix1.pdf | ||
| Section A_ Executive Summary.pdf | ||
| Solicitation - FA813721R0022.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE OF INTENT/ANNUAL REQUIREMENTS SYNOPSIS
COMPETITIVE MULTIPLE AWARD CONSTRUCTION BASIC ORDERING AGREEMENT
(BOA) (MACB)
This notice is for the Tinker Air Force Base (TAFB) Multiple Award Construction Basic
Ordering Agreement (BOA) Program to provide a broad range of construction, repair, and maintenance of real property. The BOA program will include: 35% Design-Build, 100% Design-
Build and Construction Only services at TAFB, OK.
This competitive acquisition approach will set-aside, for small businesses, Order Proposal
Requests (OPRs) with a magnitude of construction less than or equal to $25M and on a full and open basis for OPR(s) with a magnitude of construction more than $25M. The North American
Industry Classification System (NAICS) Code is 236210 Industrial Building Construction with corresponding annual size standard of $39,500,000.
As Identified in the BOA Source Sought Synopsis, the TAFB will procure all BOA requirements utilizing a phased procurement process outlined below:
Phase One- Competition for BOA Holders: Basic Ordering Agreement Invitation will be released at least once a year to allow interested contractors an opportunity to submit a proposal for evaluation to obtain an executed BOA. The Government will execute no-cost BOAs to offerors who are deemed responsible in accordance with (IAW) the FAR Part 9, as supplemented, whose proposal conforms to the BOA Invitation requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Instructions to Offerors and is assessed based on the evaluation factors and subfactors to be responsive, responsible, and qualified to the Government. The Government seeks to issue BOAs to offerors that gives the Air
Force the greatest confidence they will best meet the requirements.
The BOAs will be valid for a period of up to five (5) years beginning from the effective date of the initial BOA execution. An annual synopsis for requirements falling under the scope of the
MACB program will be released in beta.sam.gov. The annual synopsis covers requirements related to Construction Services that are within the scope of, and designated for, the MACB program and that emerge within the year after the annual synopsis is published. The Government will not conduct a separate BOA synopsis for any such emergent requirement prior to issuing the applicable competitive OPR(s)
Phase Two- Competitive Requirement/Order Process within BOA Holder Pool: The Procuring
Contracting Officer (PCO) will issue competitive OPRs for specific requirements falling under the scope of the MACB program. An offeror must be a qualified BOA holder as of the closing date of an OPR. The Government will confirm that an offeror is a qualified BOA holder by checking the effective date of an offerors BOA. All OPR(s) will result in order contracts. NOTE:
The annual BOA Invitation may be the only opportunity contractors will have to obtain an executed BOA in order to propose on OPRs issued within the year; additional BOA proposals may not be solicited, accepted, and may not be executed, at any time other than during the annual
BOA RFP, even for those emergent requirements not specifically identified in the annual synopsis. Therefore, if a contractor desires to participate in ANY future BOA OPR that may arise within the year, it is imperative that the contractor submit a proposal in response to the annual BOA Invitation.
A one-time Pre-BOA Invitation Conference teleconference will be conducted virtually. The exact date, time, and platform of the Pre-BOA Invitation Conference will be provided on this post at a later date. Registration will be necessary, and all required information and details will be detailed here on beta.sam.gov. Further, a formal BOA Invitation with supporting documents will be posted following to the pre-solicitation conference, thereby providing offerors the opportunity to thoroughly review and understand the requirement prior to proposal submission.
IMPORTANT NOTICE: Offerors are required to complete their registration in the System for
Award Management (SAM) database via the website https://www.sam.gov.. Offerors are strongly recommended to review their information in SAM to validate that it is current and up to date. Failure to register in SAM makes an offeror ineligible for BOA Issuance and award of DoD contracts IAW FAR 4.1102registered in SAM database (http://www.sam.gov/).
DISCLAIMER: The information being requested does not constitute a commitment on the part of the government to award a contract, nor to pay for any costs incurred as a result in replying to this notice. This notice should not be construed as a commitment by the government for any purpose.
ANNUAL SYNOPSIS:
An Annual BOA Synopsis is hereby published as follows:
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to DEMO FACILITY, B5915 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT GUARD HOUSE
AND CANOPY, HRUSKOCY GATE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in http://www.sam.gov/ accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between$100,000 and $250,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT FINAL DENIAL
AND OVERWATCH, HRUSKOCY GATE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT IMPROVED
PAVED SURFACES, HRUSKOCY GATE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT RESPONSE ZONE
CURBING AND LIGHTING, HRUSKOCY GATE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering
Agreement (BOA); And conform to all specifications including but not limited to appropriate
UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT PERIMETER
FENCE, HRUSKOCY GATE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR INDUSTRIAL WASTE
TREATMNT SYSTEM, TAC COMPLEX at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE TAXIWAY ECHO
PAVEMENT at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR DORMITORY, B5903 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$10,000,000 and $25,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR DORMITORY, B5913 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ROOF, B1083 B2
WEAPON SUPPORT CENTER at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC, DINING
FACILITY 5905 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ROOF, LOG FCLTY DEP
OPS B201 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR SIDING, E-3 MX
HANGAR, B230 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR E-3 MX Hangar Docks 1
& 3 HANGAR DOORS, B230 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
equipment, transportation and other incidentals necessary to REPAIR AND CONSTRUCT
PARKING AREA, N SECTION B3001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC SYSTEM AT CDC
EAST, B3904 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ROOF SECTION 2, BLDG 230, AWACS HANGAR at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE RISERS, SE
CORNER, BLDG1 (FSD1) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RECONDITION ELEVATOR
B1002 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $250,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ROOF SECTION 20
B3001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to INSTALL LIGHTS ON THE
APPROACH END RWY 13/31 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $250,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR OCC REGULATED
UNDERGROUND STORAGE TANKS at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR PARKING LOT AT
COMMISSARY AND BX at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ARNOLD AVE BTWN H
AVE AND M AVE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR ARNOLD AVE BTWN H
AVE AND M AVE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to MAINTAIN EXPANSION JOINTS
AND RNWY CRACKS at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to INSTALL CROSSWALK LIGHTS
ON STAFF DRIVE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE CAST IRON PIPE, B3904 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As estimated between $250,000 and $500,000.
equipment, transportation and other incidentals necessary to INSTALL CROSSWALK LIGHTS
ON STAFF DRIVE at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order
SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC R-22 PACKAGE
UNITS, B685 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC R-22 PACKAGE
UNITS, B685 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR 2 AIR HANDLERS
B6001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR 2 AIR HANDLERS
B6001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FLOOR, STRUCTURE
DAMAGE AND DOORWAYS B1 (RAC2) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE ALARMS &
WALLS, PZ AREA, BLDG3 (FSD3) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE ALARM
WARNING DEVICES,2NDFL ADMIN B469 (FSD III) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering
Agreement (BOA); And conform to all specifications including but not limited to appropriate
UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE PROTECTION, B4004 (FSD3) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
equipment, transportation and other incidentals necessary to REPAIR HVAC SYS FOR 2ND
FLR CLASSROOMS IN NW CORNER, B3705 at Tinker Air Force Base (TAFB), Oklahoma.
The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE EXISTING WINDOWS
B1 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB
Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR RESTROOMS, B1 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$1,000,000 and $5,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT AIRCRAFT PAD
B916 (FIRE DEPT) at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with
(IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB
Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Task
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $250,000 and $500,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR KITCHEN, B117 at
Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE RESTROOMS, B117 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between
$500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONSTRUCT STORM SHELTER
BTWN DORMS B5929&B5942 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement (BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work (SOW), and
Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.
The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR VENTILATION
SYSTEM, AFSC PZIM AREA, B3001 at Tinker Air Force Base (TAFB), Oklahoma. The contractor shall be responsible for insuring all construction services under this contract are in accordance with (IAW) the terms and conditions outlined in the Basic Ordering Agreement
(BOA); And conform to all specifications including but not limited to appropriate UFCs, UFGS, NFPA, TAFB Standards, TAFB Specifications, the overarching BOA Statement of Work
(SOW), and Order SOW. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000.