Question No.
Document/ Section Paragraph/ Reference
| Question/Issue/Concern |
| Government Response |
| 1 |
| Performance Specification |
| 3.4.6.2 |
| Steady state noise level during operation is required to be less than 85 dB(A). Historically it has been common place for specifications to allow for exceeding the 85 dB(A) and incorporating the appropriate noise hazard signage. We have pursued procedures for noise suppression, however, size and weight requirements make these options impractical. Given the application and the systems proximty to operational aircraft, it is assumed that hearing protection will be required during normal operations. Question: Will the Government allow for system noise levels beyond 85 dB(A), provided the system has appropriate noise hazard signage? |
| No, Steady state noise level during standard operation of the system shall be less than 85 decibels in accordance with MIL-STD 1474E as stated in Performance Specification Paragraph 3.4.6.2. |
| 2 |
| Solicitation - Section B |
| CLIN 1001 |
| TAGRS Production, as specified in CLIN 1001, will not be ordered until the 25th through 36th months after contract award. Question: Please confirm the Government desires to wait until at least the 25th month after contract award to order production quantities of TAGRS. |
| Yes, the Governement will not order production quantities of the TAGRS until atleast the 25th month after contract award. |
| 3 |
| Solicitation - Section L |
| L-2.2; Technical Volume |
| Please confirm that the Cross Reference Matrix is only for the Performance Specification and does not include cross references for Statement of Work requirements. |
| Yes, the Cross Reference Matrix is only for the Performance Specification. The Technical Volume shall include a Cross-Reference Matrix showing the proposal paragraph number where an evaluator will find the detailed discussion of the requirements listed in Section L-2.2; Section II – Factor 1. |
| 4 |
| Solicitation - Section L |
| L-2.2; Technical Volume |
| Is Section II of the Technical Volume required to provide responses for both Performance Specification and Statement of Work requirements, or just Performance Specification requirements. |
| Section II of the Technical Volume shall provide responses for Factor 1: Technical Capability and Approach and Factor 2: Production Time and Capability as stated in Section L and M of the Soliciation. In addition, Offerors shall certify their ability to meet or exceed all requirements of the Pspec and SOW. A statement so certifying is required. |
| 5 |
| Solicitation - Section L |
| L-2.2; Technical Volume |
| Should the offeror limit the technical response to just the 8 items bullet listed under Factor 1: Technical Capability and Approach? |
| The Technical Volume should focus on the bulleted items listed under Factor 1: Technical Capability and Approach and the requirements list under Factor 2: Production Time and Capability. However, Offerors shall certify their ability to meet or exceed all requirements of the Performance Specification (PSpec) and Statement of Work (SOW). A statement so certifying is required. |
| 6 |
| Solicitation - Section M |
| M-2.1 |
| Does the Government intend to limit their evaluation to just the 8 items bullet listed in this paragraph? |
| The Government will specifically evaluate the items in M-2.1. However, as stated in L-2.2, “Offerors shall certify their ability to meet or exceed all requirements of the Performance Specification (PSpec) and Statement of Work (SOW). A statement so certifying is required. A failure to meet or exceed all requirements may result in an Offeror being excluded from further evaluation.” |
| 7 |
| Solicitation - Section C (SOW) |
| 3.5.10.1 (and elsewhere) |
| TMCR 1391-001 is referenced but not provided and not found to be available. Please provide TMCR 1391-001. |
| TMCR 1391 will be provided via a follow-on Amendment to the Request for Proposal. |
| 8 |
| Solicitation Document |
| DFAR |
| We are interested in utilizing an Indian-owned company, as a sub-contractor / materials provider, for some components and ancillary equipment of the TAGRS. As such, we respectfully request DFAR 252.226-7001 be added to the solicitation. A fact sheet for the Indian Incentive Program is being included with this email for your information. |
| DFAR 252.226-7001 will not be added to the Soliciation. The Contracting Officer may incorporate this clause into the Contract if requested by an Offeror at Contract Award. |
| 9 |
| Performance Specification |
| The problem is if the filters have to be rated based on the most current E1581 standard, which is the 6th Edition. Long story, but in the 5th Edition, as test was inserted that feeds fuel with a “huge” amount of free water in it. This would mean someone upstream really screwed up and it was not caught. Facet, from a legal liability standpoint, has to derate the filters we use to 21 GPM to comply with the standard, from the 50 GPM they have been for 20+ years. We would have to add 6 more filters to our system, on that basis. If the testing is going to be on that basis we are going to have a problem. If the testing will start with fuel that is reasonably close to what we can expect in the field, that is a different matter. |
| In accordance with the Performance Specification paragraph 3.4.8.2 the filters shall be qualified to Energy Institute (EI) 1581 current edition (T=O). The current edition is the 6th Edition. |