This document is an Engineering Change Proposal (ECP) template for a Next Generation Troposcatter (NGT) system. The ECP outlines the process for proposing and approving changes to technical requirements, costs, and schedules. It includes sections for describing the proposed change, identifying affected documentation and systems, and estimating impacts to performance, logistics, operations, and costs. Cost estimates are broken down by recurring and non-recurring factors for production, retrofit, and integrated logistics support. The template requires recommendations from approving authorities and signatures documenting final disposition.

The related federal contract opportunity is a solicitation from the Marine Corps Systems Command seeking proposals for an NGT system and sustainment support. Offerors are asked to provide a secure Beyond Line of Sight digital data transmission solution to meet the Marine Corps' requirements. Proposals are due by the date listed in the solicitation. The award will be made to provide the NGT system and long-term sustainment services to the United States Marine Corps.

CDRL Attachment 8. *Note, as of Amendment 0002, CDRL Attachment 3 has been marked "reserved" and the reference in CDRL A00J has been removed.

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation Troposcatter, newest first.
File Type Posted
M67854-19-R-2000_Amendment_0005.docx DOCX document
M67854-19-R-2000_Amendment_0004.docx DOCX document
M67854-19-R-2000_Amendment_0003.docx DOCX document
NGT_CDRL_Attachment_7-Maintenance_Manual_Content_Selection_Sheet.docx DOCX document
M67854-19-R-2000-0002_Attachment_3_v1.docx DOCX document
M67854-19-R-2000_Amendment_0002.pdf PDF
NGT_CDRL_Attachment_6-Operator_Manual_Content_Selection_Sheet.docx DOCX document
M19-R-2000_DD_254_CONT_Sheets.pdf PDF
NGT_CDRL_Attachment_2.docx DOCX document
M67854-19-R-2000-0002_NGT_CDRLs_v1.docx DOCX document
NGT_CDRL_Attachment_5-LPD_Attribute_Selection_Sheet.docx DOCX document
NGT_CDRL_Attachment_4-DITPR-DON_Questionnaire.docx DOCX document
Q&A.pdf PDF
NGT_CDRL_Attachment_1.docx DOCX document
M67854-19-R-2000_Amendment_0001.docx DOCX document
M67854-19-R-2000_Attachment_2_-_SB_Subk_Record.docx DOCX document
M67854-19-R-2000_Attachment_4_-_PSPEC.pdf PDF
M67854-19-R-2000_Attachment_5_DD_254.pdf PDF
M67854-19-R-2000_Attachment_3_-_SB_Part_&_Comm_Strat.docx DOCX document
M67854-19-R-2000_Exhibit_1_CDRLs.docx DOCX document
M67854-19-R-2000_Attachment_1_-PSPEC_Compliance_Matrix.xlsx XLSX spreadsheet
M67854-19-R-2000_NGT_RFP.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. DATE PREPARED 2.b. REVISION:

(DD-MMM-YYYY)CHANGE PROPOSAL (CP)

3. TITLE OF CHANGE:

5. CLASS OF CP:

Class I Class II

6. PRIORITY:

E - Emergency U - Urgent R - Routine

7. CP TYPE:

F - Formal

8. JUSTIFICATION CODE: B - Interface C - Compatibility D - Correction of Deficiency L - Logistics Support

O - Operational or Product Improvement P - Production Stoppage

9. DESCRIPTION OF CHANGE:

R - Cost Reduction S - Safety V - Value Engineering

10. NEED FOR CHANGE:

11. TYPE DESIGNATOR/NAME: 12. MAJOR CI/COMPONENT NOMENCLATURE: 13. AFFECTED CONFIGURATION ITEM:

14.a. OTHER EXTERNAL SYSTEM AFFECTED? Yes No

b. IF BLOCK 14.a. IS YES, LIST OTHER EXTERNAL SYSTEMS OR CONFIGURATION ITEMS AFFECTED:

15. ALL LOWER OR HIGHER

ITEMS AFFECTED:

16. BASELINE DOCUMENTS AFFECTED (Continue in enclosure if necessary) c.

CURRENT

d.

NOR

a. DOCUMENT NO. b. DOCUMENT TITLE REVISION NO.

17. BASELINE(S) AFFECTED: 18. IN PRODUCTION:

22. PRODUCTION EFFECTIVITY (Lot No., Serial No., Date): 23. EFFECT ON PRODUCTION DELIVERY SCHEDULE:

Functional Allocated Product Yes No

No

b. IF BLOCK 24.a. IS YES, DESCRIBE RETROFIT

EFFECTIVITY:

c. COST IMPACT FROM CP?

d. IF 24.c. IS YES, DESCRIBE:

Yes No

4. ORIGINATOR

24.a. RETROFIT TO EXISTING ASSETS?

25.a. SUBMITTING ACTIVITY:

a. NAME (Submitter):

c. TELEPHONE:

d. E-MAIL:

b. AUTHORIZED SIGNATURE:

b. ADDRESS (Street, City, State, Zip Code):

c. NAME AND TITLE (Authorizing Official):

26. BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY

a. RECOMMENDATIONS:

b. NAME and TITLE:

Approval Disapproval Approval with Modification

c. DATE SIGNED (DD-MMM-YYYY): d. SIGNATURE:

27.a. DISPOSITION (Configuration Change Authority) Approved Disapproved Approved with Modification

b. NAME and TITLE: c. DATE SIGNED (DD-MMM-YYYY): d. SIGNATURE:

PM CS CHANGE PROPOSAL/1, AUG 2017

DISTRIBUTION STATEMENT:

FOR USE BY MCSC, PfM CES, PM CS PROGRAMS e.

PROPOSED

REVISION

19. NEW ACQUISITION PROGRAM:

Yes No

20. CURRENT/FIELDED VERSION:

a. System Version: b. Hardware Version: c. Software Version:

21. TARGET/FUTURE VERSION:

a. System Version: b. Hardware Version: c. Software Version:

2.a. CP NUMBER:

P - Preliminary

Yes

CHANGE PROPOSAL (CP), PAGE 2

28.a. CP NUMBER:

EFFECTS ON CONFIGURATION DOCUMENTATION, LOGISTICS AND OPERATIONS

(X) FACTOR ENCL. PAR. (X) FACTOR ENCL. PAR.

29. EFFECT ON CONFIGURATION

DOCUMENTATION OR CONTRACT

31. EFFECTS ON OPERATIONAL

EMPLOYMENT

a. PERFORMANCE a. SAFETY

b. WEIGHT-MOMENT b. SURVIVABILITY

c. CDRL, TECHNICAL DATA c. RELIABILITY

d. NOMENCLATURE d. MAINTAINABILITY

e. SERVICE LIFE

f. OPFOR SOP/PROCEDURES

30. EFFECT ON INTEGRATED LOGISTICS

SUPPORT (ILS) ELEMENTS

g. ELECTROMAGNETIC INTERFERENCE

h. ACTIVATION SCHEDULE

a. ILS PLANS

i. CRITICAL SINGLE POINT FAILURE ITEMS

b. MAINTENANCE CONCEPTS, PLANS AND

PROCEDURES j. INTEROPERABILITY

c. LOGISTICS SUPPORT ANALYSES

d. INTERIM SUPPORT PROGRAMS

e. SPARES AND REPAIR PARTS

f. TECH MANUALS 32. OTHER CONSIDERATIONS

g. FACILITIES a. INTERFACE

h. SUPPORT EQUIPMENT b. OTHER AFFECTED EQUIPMENT/GFE/GFP

i. OPERATOR MANPOWER/TRAINING c. PHYSICAL CONSTRAINTS

j. OPERATOR TRAINING EQUIPMENT d. COMPUTER PROGRAMS AND RESOURCES

k. MAINTENANCE MANPOWER/TRAINING e. REWORK OF OTHER EQUIPMENT

l. MAINTENANCE TRAINING EQUIPMENT f. SYSTEM TEST PROCEDURES

m. CONTRACT MAINTENANCE g. WARRANTY/GUARANTEE

n. PACKAGING, HANDLING, STORAGE, TRANSPORTABILITY

h. PARTS CONTROL

i. LIFE CYCLE COSTS

o. PROVISIONING DATA

33. ALTERNATE SOLUTIONS

34. DEVELOPMENTAL STATUS/CONCEPT

35. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS 36. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT

a. ORGANIZATION b. INTERMEDIATE c. DEPOT d. OTHER

37. THIS CHANGE MUST BE ACCOMPLISHED

BEFORE WITH AFTER THE FOLLOWING CHANGES

38. IS CONTRACTOR FIELD

SERVICE ENGINEERING

REQUIRED?

NO

39. OUT OF SERVICE TIME

40. EFFECT OF THIS CP AND PREVIOUSLY APPROVED CP'S ON

ITEM

41. DATE CONTRACTUAL AUTHORITY NEEDED FOR(DD-MMM-YYYY)

a. PRODUCTION

b. RETROFIT

PM CS CHANGE PROPOSAL/2, AUG 2017

DISTRIBUTION STATEMENT:

FOR USE BY MCSC, PfM CES, PM CS PROGRAMS

k. ENERGY EFFICIENCY

YES

j. CYBERSECURITY

28.b. REVISION:

p. MODIFICATION/TECHNICAL INSTRUCTIONS

CHANGE PROPOSAL (CP), PAGE 3

42.a. CP NUMBER:

43. ESTIMATED NET TOTAL COST IMPACT (Use parentheses for savings)

FACTOR

COST / SAVINGS UNDER CONTRACT

Other Costs/

Savings to the Government

(f)

Non- Recurring

(a)

RECURRING

Total

(e) Unit (b)

Quantity (c)

Total (Recurring) (d)

a. PRODUCTION COSTS / SAVINGS

(1) CONFIGURATION ITEM / CSCI

(2) FACTORY TEST EQUIPMENT

(3) SPECIAL FACTORY TOOLING

(4) SCRAP

(5) ENGINEERING, ENGINEERING DATA REVISION

(6) REVISION OF TEST PROCEDURES

(7) QUALIFICATION OF NEW ITEMS

(8) SUBTOTAL OF PROD COSTS / SAVINGS

b. RETROFIT COSTS

(1) ENGINEERING DATA REVISION

(2) PROTOTYPE TESTING

(3) KIT PROOF TESTING

(4) RETROFIT KITS FOR OPERATIONAL SYSTEMS

(5) PREP. OF MI/TI

(6) SPECIAL TOOLING FOR RETROFIT

(7) INSTALLATION - CONTRACTOR PERSONNEL

(8) INSTALLATION - GOVERNMENT PERSONNEL

(9) TESTING AFTER RETROFIT

(10) MODIFICATION OF GFE/GFP

(11) QUALIFICATION OF GFE/GFP

(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS

c. INTEGRATED LOGISTICS SUPPORT COSTS/

SAVINGS

(1) SPARES/REPAIR PARTS REWORK

(2) NEW SPARES AND REPAIR PARTS

(3) SUPPLY/PROVISIONING DATA

(4) SUPPORT EQUIPMENT

(5) RETROFIT KITS FOR SPARES

(6) OPERATOR TRAINING COURSES

(7) MAINTENANCE TRAINING COURSES

(8) REVISION OF TECHNICAL MANUALS

(9) NEW TECHNICAL MANUALS

(10) TRAINING/TRAINERS

(11) INTERIM SUPPORT

(12) MAINTENANCE MANPOWER

(13) COMPUTER PROGRAMS/DOCUMENTATION

(14) SUBTOTAL OF ILS COSTS/SAVINGS

d. OTHER COSTS/SAVINGS

e. SUBTOTAL COSTS/SAVINGS

(1) SUBTOTAL UNDER CONTRACT

f. COORDINATION OF CHANGES WITH OTHER CONTRACTORS

g. COORDINATION CHANGES BY GOVERNMENT

h. ESTIMATED NET TOTAL COSTS/SAVINGS

PM CS CHANGE PROPOSAL/3, AUG 2017

DISTRIBUTION STATEMENT:

FOR USE BY MCSC, PfM CES, PM CS PROGRAMS

42.b. REVISION:

Note: If providing detailed cost impact in a separate enclosure, check here, reference the enclosure, and enter the net total cost impact. No further information is required on this page. Enclosure: Total:

CHANGE PROPOSAL (CP), PAGE 4

44.a. CP NUMBER:

45. SCHEDULE

PM CS CHANGE PROPOSAL/4, AUG 2017

DISTRIBUTION STATEMENT:

FOR USE BY MCSC, PfM CES, PM CS PROGRAMS

44.b. REVISION:

46. PROPOSED BREACH CRITERIA

a. SCHEDULE

b. COST

c. PERFORMANCE

dd1692-1 NSC 150225
ENGINEERING CHANGE PROPOSAL
1. DATE PREPARED
5. CLASS OF ECP:
25. BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY
a. RECOMMENDATIONS:
b. NAME and TITLE:
27. TO BE COMPLETED BY THE ACTIVITY ACCOMPLISHING REVISION UPON NEW REVISION RELEASE
a. NAME and TITLE:

DISTRIBUTION STATEMENT:

dd1692-2 NSC 150227
dd1692-3 NSC 150227
NSC DD 1692-4 150309.pdf
dd1692-1 NSC 150225
ENGINEERING CHANGE PROPOSAL
1. DATE PREPARED
5. CLASS OF ECP:
25. BELOW TO BE COMPLETED BY THE APPROVING ACTIVITY
a. RECOMMENDATIONS:
b. NAME and TITLE:
27. TO BE COMPLETED BY THE ACTIVITY ACCOMPLISHING REVISION UPON NEW REVISION RELEASE
a. NAME and TITLE:

DISTRIBUTION STATEMENT:

dd1692-2 NSC 150227
dd1692-3 NSC 150227
DATE PREPARED:
TITLE OF CHANGE:
a NAME:
b ADDRESS:
c TELEPHONE:
d EMAIL:
Class: Class II
Priority: Routine
Justification: Operational
DESC OF CHANGE:
NEED FOR CHANGE:
System Name:
Major CI:
Affected CI:
Ext Affected: No
LOWER HIGHER ITEMS AFFECTED:
DOCUMENT NORow1:
DOCUMENT TITLERow1:
CURRENT REVISIONRow1:
NOR NORow1:
PROPOSED REVISIONRow1:
DOCUMENT NORow2:
DOCUMENT TITLERow2:
CURRENT REVISIONRow2:
NOR NORow2:
PROPOSED REVISIONRow2:
DOCUMENT NORow3:
DOCUMENT TITLERow3:
CURRENT REVISIONRow3:
NOR NORow3:
PROPOSED REVISIONRow3:
DOCUMENT NORow4:
DOCUMENT TITLERow4:
CURRENT REVISIONRow4:
NOR NORow4:
PROPOSED REVISIONRow4:
DOCUMENT NORow5:
DOCUMENT TITLERow5:
CURRENT REVISIONRow5:
NOR NORow5:
PROPOSED REVISIONRow5:
DOCUMENT NORow6:
DOCUMENT TITLERow6:
CURRENT REVISIONRow6:
NOR NORow6:
PROPOSED REVISIONRow6:
FBL: Off
ABL: Off
PBL: Yes
In Production: Yes
Current System Version:
Current HW Version:
Current SW Version:
Target System Version:
Target HW Version:
Target SW Version:
EFFECTIVITY: N/A
EFFECT ON DELIVERY SCHEDULE: N/A
Retrofit: No
Cost Impact: Yes
RETROFIT REQT:
Originator Acty:
NAME AND TITLE:
Recommendation: Off
Chair Name and Title:
DATE SIGNED CCB:
Disposition: Off
Approving Auth Name and Title:
DATE SIGNED DISPOSITION:
ENCLa PERFORMANCE:
PARa PERFORMANCE:
ENCLa SAFETY:
PARa SAFETY:
ENCLb SURVIVABILITY:
PARb SURVIVABILITY:
ENCLc RELIABILITY:
PARc RELIABILITY:
ENCLd MAINTAINABILITY:
PARd MAINTAINABILITY:
ENCLe SERVICE LIFE:
PARe SERVICE LIFE:
ENCLf OPERATING PROCEDURES:
PARf OPERATING PROCEDURES:
ENCLg ELECTROMAGNETIC INTERFERENCE:
PARg ELECTROMAGNETIC INTERFERENCE:
ENCLh ACTIVATION SCHEDULE:
PARh ACTIVATION SCHEDULE:
ENCLa ILS PLANS:
PARa ILS PLANS:
ENCLi CRITICAL SINGLE POINT FAILURE ITEMS:
PARi CRITICAL SINGLE POINT FAILURE ITEMS:
ENCLb MAINTENANCE CONCEPTS PLANS AND PROCEDURES:
PARb MAINTENANCE CONCEPTS PLANS AND PROCEDURES:
ENCLj INTEROPERABILITY:
PARj INTEROPERABILITY:
ENCLc LOGISTICS SUPPORT ANALYSES:
PARc LOGISTICS SUPPORT ANALYSES:
ENCLk ENERGY EFFICIENCY:
ENCLd INTERIM SUPPORT PROGRAMS:
PARd INTERIM SUPPORT PROGRAMS:
ENCLe SPARES AND REPAIR PARTS:
PARe SPARES AND REPAIR PARTS:
ENCLf TECH MANUALS:
PARf TECH MANUALS:
ENCLg FACILITIES:
PARg FACILITIES:
ENCLa INTERFACE:
PARa INTERFACE:
ENCLh SUPPORT EQUIPMENT:
PARh SUPPORT EQUIPMENT:
ENCLb OTHER AFFECTED EQUIPMENTGFEGFP:
PARb OTHER AFFECTED EQUIPMENTGFEGFP:
ENCLi OPERATOR MANPOWERTRAINING:
PARi OPERATOR MANPOWERTRAINING:
ENCLc PHYSICAL CONSTRAINTS:
PARc PHYSICAL CONSTRAINTS:
ENCLj OPERATOR TRAINING EQUIPMENT:
PARj OPERATOR TRAINING EQUIPMENT:
ENCLd COMPUTER PROGRAMS AND RESOURCES:
PARd COMPUTER PROGRAMS AND RESOURCES:
ENCLk MAINTENANCE MANPOWERTRAINING:
PARk MAINTENANCE MANPOWERTRAINING:
ENCLe REWORK OF OTHER EQUIPMENT:
PARe REWORK OF OTHER EQUIPMENT:
ENCLl MAINTENANCE TRAINING EQUIPMENT:
PARl MAINTENANCE TRAINING EQUIPMENT:
ENCLf SYSTEM TEST PROCEDURES:
PARf SYSTEM TEST PROCEDURES:
ENCLm CONTRACT MAINTENANCE:
PARm CONTRACT MAINTENANCE:
ENCLg WARRANTYGUARANTEE:
PARg WARRANTYGUARANTEE:
ENCLn PACKAGING HANDLING STORAGE TRANSPORTABILITY:
PARn PACKAGING HANDLING STORAGE TRANSPORTABILITY:
ENCLh PARTS CONTROL:
PARh PARTS CONTROL:
ALTERNATE SOLUTIONS:
DEVELOPMENTAL STATUS:
a ORGANIZATION:
b INTERMEDIATE:
c DEPOT:
d OTHER:
RETROFIT TEST HOURS:
Other Changes:
With: Off
After: Off
OUT OF SERVICE TIME:
a PRODUCTION:
b RETROFIT:
Weight-Moment: Off
Performance: Off
Maint Concept: Off
Log Spt Analyses: Off
Interim Spt: Off
Spares: Off
Tech Manuals: Off
Facilities: Off
Spt Equip: Off
Operator Training: Off
Operator Trg Equip: Off
Maint Training: Off
Maint Trg Equip: Off
Contr Maint: Off
Packaging: Off
Safety: Off
Survivability: Off
Reliability: Off
Maintainability: Off
Service Life: Off
Oper Proc: Off
EMI: Off
Act Sched: Off
Single Pt of Fail: Off
Interop: Off
Interface: Off
Other Affected Equip: Off
Phys Constraints: Off
Comp Pgms and Res: Off
Rework of Other Equip: Off
Test Proc: Off
Warranty: Off
Parts Ctrl: Off
Energy Efficiency: Off
Contractor Reqd: No
Non Recurring a1 CONFIGURATION ITEM CSCI:
Unit b1 CONFIGURATION ITEM CSCI:
Quantity c1 CONFIGURATION ITEM CSCI:
Total Recurring d1 CONFIGURATION ITEM CSCI: 0
Total e1 CONFIGURATION ITEM CSCI: 0
Other Costs Savings to the Government f1 CONFIGURATION ITEM CSCI:
Non Recurring a2 FACTORY TEST EQUIPMENT:
Unit b2 FACTORY TEST EQUIPMENT:
Quantity c2 FACTORY TEST EQUIPMENT:
Total Recurring d2 FACTORY TEST EQUIPMENT: 0
Total e2 FACTORY TEST EQUIPMENT: 0
Other Costs Savings to the Government f2 FACTORY TEST EQUIPMENT:
Non Recurring a3 SPECIAL FACTORY TOOLING:
Unit b3 SPECIAL FACTORY TOOLING:
Quantity c3 SPECIAL FACTORY TOOLING:
Total Recurring d3 SPECIAL FACTORY TOOLING: 0
Total e3 SPECIAL FACTORY TOOLING: 0
Other Costs Savings to the Government f3 SPECIAL FACTORY TOOLING:
Non Recurring a4 SCRAP:
Unit b4 SCRAP:
Quantity c4 SCRAP:
Total Recurring d4 SCRAP: 0
Total e4 SCRAP: 0
Other Costs Savings to the Government f4 SCRAP:
Non Recurring a5 ENGINEERING ENGINEERING DATA REVISION:
Unit b5 ENGINEERING ENGINEERING DATA REVISION:
Quantity c5 ENGINEERING ENGINEERING DATA REVISION:
Total Recurring d5 ENGINEERING ENGINEERING DATA REVISION: 0
Total e5 ENGINEERING ENGINEERING DATA REVISION: 0
Other Costs Savings to the Government f5 ENGINEERING ENGINEERING DATA REVISION:
Non Recurring a6 REVISION OF TEST PROCEDURES:
Unit b6 REVISION OF TEST PROCEDURES:
Quantity c6 REVISION OF TEST PROCEDURES:
Total Recurring d6 REVISION OF TEST PROCEDURES: 0
Total e6 REVISION OF TEST PROCEDURES: 0
Other Costs Savings to the Government f6 REVISION OF TEST PROCEDURES:
Non Recurring a7 QUALIFICATION OF NEW ITEMS:
Unit b7 QUALIFICATION OF NEW ITEMS:
Quantity c7 QUALIFICATION OF NEW ITEMS:
Total Recurring d7 QUALIFICATION OF NEW ITEMS: 0
Total e7 QUALIFICATION OF NEW ITEMS: 0
Other Costs Savings to the Government f7 QUALIFICATION OF NEW ITEMS:
Non Recurring a8 SUBTOTAL OF PROD COSTS SAVINGS: 0
Total Recurring d8 SUBTOTAL OF PROD COSTS SAVINGS: 0
Total e8 SUBTOTAL OF PROD COSTS SAVINGS: 0
Other Costs Savings to the Government f8 SUBTOTAL OF PROD COSTS SAVINGS: 0
Non Recurring a1 ENGINEERING DATA REVISION:
Unit b1 ENGINEERING DATA REVISION:
Quantity c1 ENGINEERING DATA REVISION:
Total Recurring d1 ENGINEERING DATA REVISION: 0
Total e1 ENGINEERING DATA REVISION: 0
Other Costs Savings to the Government f1 ENGINEERING DATA REVISION:
Non Recurring a2 PROTOTYPE TESTING:
Unit b2 PROTOTYPE TESTING:
Quantity c2 PROTOTYPE TESTING:
Total Recurring d2 PROTOTYPE TESTING: 0
Total e2 PROTOTYPE TESTING: 0
Other Costs Savings to the Government f2 PROTOTYPE TESTING:
Non Recurring a3 KIT PROOF TESTING:
Unit b3 KIT PROOF TESTING:
Quantity c3 KIT PROOF TESTING:
Total Recurring d3 KIT PROOF TESTING: 0
Total e3 KIT PROOF TESTING: 0
Other Costs Savings to the Government f3 KIT PROOF TESTING:
Non Recurring a4 RETROFIT KITS FOR OPERATIONAL SYSTEMS:
Unit b4 RETROFIT KITS FOR OPERATIONAL SYSTEMS:
Quantity c4 RETROFIT KITS FOR OPERATIONAL SYSTEMS:
Total Recurring d4 RETROFIT KITS FOR OPERATIONAL SYSTEMS: 0
Total e4 RETROFIT KITS FOR OPERATIONAL SYSTEMS: 0
Other Costs Savings to the Government f4 RETROFIT KITS FOR OPERATIONAL SYSTEMS:
Non Recurring a5 PREP OF MWOTCTOSCALTTD:
Unit b5 PREP OF MWOTCTOSCALTTD:
Quantity c5 PREP OF MWOTCTOSCALTTD:
Total Recurring d5 PREP OF MWOTCTOSCALTTD: 0
Total e5 PREP OF MWOTCTOSCALTTD: 0
Other Costs Savings to the Government f5 PREP OF MWOTCTOSCALTTD:
Non Recurring a6 SPECIAL TOOLING FOR RETROFIT:
Unit b6 SPECIAL TOOLING FOR RETROFIT:
Quantity c6 SPECIAL TOOLING FOR RETROFIT:
Total Recurring d6 SPECIAL TOOLING FOR RETROFIT: 0
Total e6 SPECIAL TOOLING FOR RETROFIT: 0
Other Costs Savings to the Government f6 SPECIAL TOOLING FOR RETROFIT:
Non Recurring a7 INSTALLATION CONTRACTOR PERSONNEL:
Unit b7 INSTALLATION CONTRACTOR PERSONNEL:
Quantity c7 INSTALLATION CONTRACTOR PERSONNEL:
Total Recurring d7 INSTALLATION CONTRACTOR PERSONNEL: 0
Total e7 INSTALLATION CONTRACTOR PERSONNEL: 0
Other Costs Savings to the Government f7 INSTALLATION CONTRACTOR PERSONNEL:
Other Costs Savings to the Government f8 INSTALLATION GOVERNMENT PERSONNEL:
Non Recurring a9 TESTING AFTER RETROFIT:
Unit b9 TESTING AFTER RETROFIT:
Quantity c9 TESTING AFTER RETROFIT:
Total Recurring d9 TESTING AFTER RETROFIT: 0
Total e9 TESTING AFTER RETROFIT: 0
Other Costs Savings to the Government f9 TESTING AFTER RETROFIT:
Non Recurring a10 MODIFICATION OF GFEGFP:
Unit b10 MODIFICATION OF GFEGFP:
Quantity c10 MODIFICATION OF GFEGFP:
Total Recurring d10 MODIFICATION OF GFEGFP: 0
Total e10 MODIFICATION OF GFEGFP: 0
Other Costs Savings to the Government f10 MODIFICATION OF GFEGFP:
Non Recurring a11 QUALIFICATION OF GFEGFP:
Unit b11 QUALIFICATION OF GFEGFP:
Quantity c11 QUALIFICATION OF GFEGFP:
Total Recurring d11 QUALIFICATION OF GFEGFP: 0
Total e11 QUALIFICATION OF GFEGFP: 0
Other Costs Savings to the Government f11 QUALIFICATION OF GFEGFP:
Non Recurring a12 SUBTOTAL OF RETROFIT COSTSSAVINGS: 0
Total Recurring d12 SUBTOTAL OF RETROFIT COSTSSAVINGS: 0
Total e12 SUBTOTAL OF RETROFIT COSTSSAVINGS: 0
Other Costs Savings to the Government f12 SUBTOTAL OF RETROFIT COSTSSAVINGS: 0
Non Recurring a1 SPARESREPAIR PARTS REWORK:
Unit b1 SPARESREPAIR PARTS REWORK:
Quantity c1 SPARESREPAIR PARTS REWORK:
Total Recurring d1 SPARESREPAIR PARTS REWORK: 0
Total e1 SPARESREPAIR PARTS REWORK: 0
Other Costs Savings to the Government f1 SPARESREPAIR PARTS REWORK:
Non Recurring a2 NEW SPARES AND REPAIR PARTS:
Unit b2 NEW SPARES AND REPAIR PARTS:
Quantity c2 NEW SPARES AND REPAIR PARTS:
Total Recurring d2 NEW SPARES AND REPAIR PARTS: 0
Total e2 NEW SPARES AND REPAIR PARTS: 0
Other Costs Savings to the Government f2 NEW SPARES AND REPAIR PARTS:
Non Recurring a3 SUPPLYPROVISIONING DATA:
Unit b3 SUPPLYPROVISIONING DATA:
Quantity c3 SUPPLYPROVISIONING DATA:
Total Recurring d3 SUPPLYPROVISIONING DATA: 0
Total e3 SUPPLYPROVISIONING DATA: 0
Other Costs Savings to the Government f3 SUPPLYPROVISIONING DATA:
Non Recurring a4 SUPPORT EQUIPMENT:
Unit b4 SUPPORT EQUIPMENT:
Quantity c4 SUPPORT EQUIPMENT:
Total Recurring d4 SUPPORT EQUIPMENT: 0
Total e4 SUPPORT EQUIPMENT: 0
Other Costs Savings to the Government f4 SUPPORT EQUIPMENT:
Non Recurring a5 RETROFIT KITS FOR SPARES:
Unit b5 RETROFIT KITS FOR SPARES:
Quantity c5 RETROFIT KITS FOR SPARES:
Total Recurring d5 RETROFIT KITS FOR SPARES: 0
Total e5 RETROFIT KITS FOR SPARES: 0
Other Costs Savings to the Government f5 RETROFIT KITS FOR SPARES:
Non Recurring a6 OPERATOR TRAINING COURSES:
Unit b6 OPERATOR TRAINING COURSES:
Quantity c6 OPERATOR TRAINING COURSES:
Total Recurring d6 OPERATOR TRAINING COURSES: 0
Total e6 OPERATOR TRAINING COURSES: 0
Other Costs Savings to the Government f6 OPERATOR TRAINING COURSES:
Non Recurring a7 MAINTENANCE TRAINING COURSES:
Unit b7 MAINTENANCE TRAINING COURSES:
Quantity c7 MAINTENANCE TRAINING COURSES:
Total Recurring d7 MAINTENANCE TRAINING COURSES: 0
Total e7 MAINTENANCE TRAINING COURSES: 0
Other Costs Savings to the Government f7 MAINTENANCE TRAINING COURSES:
Non Recurring a8 REVISION OF TECHNICAL MANUALS:
Unit b8 REVISION OF TECHNICAL MANUALS:
Quantity c8 REVISION OF TECHNICAL MANUALS:
Total Recurring d8 REVISION OF TECHNICAL MANUALS: 0
Total e8 REVISION OF TECHNICAL MANUALS: 0
Other Costs Savings to the Government f8 REVISION OF TECHNICAL MANUALS:
Non Recurring a9 NEW TECHNICAL MANUALS:
Unit b9 NEW TECHNICAL MANUALS:
Quantity c9 NEW TECHNICAL MANUALS:
Total Recurring d9 NEW TECHNICAL MANUALS: 0
Total e9 NEW TECHNICAL MANUALS: 0
Other Costs Savings to the Government f9 NEW TECHNICAL MANUALS:
Non Recurring a10 TRAININGTRAINERS:
Unit b10 TRAININGTRAINERS:
Quantity c10 TRAININGTRAINERS:
Total Recurring d10 TRAININGTRAINERS: 0
Total e10 TRAININGTRAINERS: 0
Other Costs Savings to the Government f10 TRAININGTRAINERS:
Non Recurring a11 INTERIM SUPPORT:
Unit b11 INTERIM SUPPORT:
Quantity c11 INTERIM SUPPORT:
Total Recurring d11 INTERIM SUPPORT: 0
Total e11 INTERIM SUPPORT: 0
Other Costs Savings to the Government f11 INTERIM SUPPORT:
Non Recurring a12 MAINTENANCE MANPOWER:
Unit b12 MAINTENANCE MANPOWER:
Quantity c12 MAINTENANCE MANPOWER:
Total Recurring d12 MAINTENANCE MANPOWER: 0
Total e12 MAINTENANCE MANPOWER: 0
Other Costs Savings to the Government f12 MAINTENANCE MANPOWER:
Non Recurring a13 COMPUTER PROGRAMSDOCUMENTATION:
Unit b13 COMPUTER PROGRAMSDOCUMENTATION:
Quantity c13 COMPUTER PROGRAMSDOCUMENTATION:
Total Recurring d13 COMPUTER PROGRAMSDOCUMENTATION: 0
Total e13 COMPUTER PROGRAMSDOCUMENTATION: 0
Other Costs Savings to the Government f13 COMPUTER PROGRAMSDOCUMENTATION:
Non Recurring a14 SUBTOTAL OF ILS COSTSSAVINGS: 0
Total Recurring d14 SUBTOTAL OF ILS COSTSSAVINGS: 0
Total e14 SUBTOTAL OF ILS COSTSSAVINGS: 0
Other Costs Savings to the Government f14 SUBTOTAL OF ILS COSTSSAVINGS: 0
Non Recurring ad OTHER COSTSSAVINGS:
Total Recurring dd OTHER COSTSSAVINGS:
Total ed OTHER COSTSSAVINGS: 0
Other Costs Savings to the Government fd OTHER COSTSSAVINGS:
Non Recurring ae SUBTOTAL COSTSSAVINGS: 0
Total Recurring de SUBTOTAL COSTSSAVINGS: 0
Total ee SUBTOTAL COSTSSAVINGS: 0
Other Costs Savings to the Government fe SUBTOTAL COSTSSAVINGS: 0
Other Costs Savings to the Government f1 SUBTOTAL UNDER CONTRACT:
PARk ENERGY EFFICIENCY:
ILS Plans: Off
COORDINATION OF CHANGES WITH OTHER CONTRACTORS:
COORDINATION CHANGES BY GOVERNMENT:
ESTIMATED NET TOTAL COSTSSAVINGS: 0
Life Cycle Costs: Off
ENCLi LIFE CYCLE COSTS:
PARi LIFE CYCLE COSTS:
ENCLj INFO ASSURANCE:
PARj INFO ASSURANCE:
Tech Data: Off
Nomenclature: Off
ENCLb WEIGHTMOMENT:
PARb WEIGHTMOMENT:
ENCLc CDRL TECHNICAL DATA:
PARc CDRL TECHNICAL DATA:
ENCLd NOMENCLATURE:
PARd NOMENCLATURE:
PARf OTHER CONFIG 2:
ENCLe OTHER CONFIG 1:
PARe OTHER CONFIG 1:
ENCLf OTHER CONFIG 2:
Other Config Doc 1: Off
Other Config Doc 2: Off
Other Config Doc 1 Desc:
Other Config Doc 2 Desc:
ENCLp OTHER ILS 1:
PARp OTHER ILS 1:
ENCLq OTHER ILS 2:
Other ILS 1: Off
Other ILS 2: Off
Other ILS 1 Desc:
Other ILS 2 Desc:
PARq OTHER ILS 2:
Other Operational 2 Desc:
ENCLm OTHER OPERATIONAL 2:
PARm OTHER OPERATIONAL 2:
Other Operational 2: Off
ENCLl OTHER OPERATIONAL 1:
PARl OTHER OPERATIONAL 1:
Other Operational 1: Off
Other Operational 1 Desc:
PARk OTHER OTHER 1:
ENCLk OTHER OTHER 1:
Other Other 1 Desc:
Other Other 1: Off
Other Other 2: Off
Other Other 2 Desc:
ENCLl OTHER OTHER 2:
PARl OTHER OTHER 2:
Schedule:
CP Number:
CP Revision:
ENCLo PROVISIONING DATA:
PARo PROVISIONING DATA:
Prov Data: Off
Info Assurance: Off
MI TI: Off
ENCLp MI TI:
PARp MI TI:
40 EFFECT OF THIS CP AND PREVIOUSLY APPROVED CPS ON ITEM:
Before: Off
Cost in Enclosure: Off
Cost Impact Enclosure:
Cost Enclosure Total:
CP Cost Impact: 0
Cost Breach:
Schedule Breach:
Performance Breach:
OTHER SYSTEMS AFFECTED:
NEWACQPGM: NO
Type: Formal
DISTRO: [D-Distribution authorized to Department of Defense and U.S. DoD contractors only.]

File details come from the government source that posted it. Updated .