This briefing document outlines a forthcoming solicitation from the United States Marine Corps for lightweight hard armor plate. The Marine Corps plans to release solicitation number M67854-19-R-1500 in November 2018 seeking proposals due in February 2019 for the procurement of 170,000 sets of lightweight hard armor plates over a five year period of performance. The solicitation will have full and open competition and utilize a firm fixed price contract vehicle. The Marine Corps intends to conduct testing of samples at Aberdeen Test Center and lot testing at an NIJ certified lab. Evaluation criteria will assess technical performance including ballistic performance, design, manufacturing capability, and thickness uniformity. Past performance, small business participation, and total evaluated price will also be evaluated. A SECRET facility clearance is required by proposal submission and samples must meet specified maximum weight thresholds.
Updated Industry Day Brief
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lightweight Plate Pre-Solicitation/ Industry Brief Mr. Nick Pierce Team Lead PM Infantry Combat Equipment (ICE) nick.pierce@usmc.mil
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.
Hard Armor IPT
| Name | Position | Organization |
| Nick Pierce | Individual Armor Team Lead | MCSC, PM ICE |
| Cherelda Stephens | Project Officer | MCSC, PM ICE |
| Flora (Mackie) Jordan | Engineer | MCSC, PM ICE |
| Kathleen Halo | Engineer | MCSC, PM ICE |
| Megan Hoey | Engineer | MCSC, PM ICE |
| Scott McDonald | Logistician | MCSC, PM ICE |
| Peggy Smith | PM ICE PCO | MCSC, PM ICE |
| Erin Howard | Contract Specialist | MCSC, PM ICE |
| Capt Lukas Searcy | Capabilities Integration Officer | CDI, FMID |
| Ralph Croce | Live Fire Team Lead | MCOTEA |
POC for Solicitation – Erin Howard, erin.howard1@usmc.mil
Background Current ESAPI is excessively heavy and is an overmatch against prevalent battlefield threats Excess weight increases fatigue and musculoskeletal injury Excess weight decreases mobility, cognitive abilities, amount of ammunition that can be carried and overall survivability Hard Armor Trade Space Study At least 38 vendors currently producing plates capable of defeating certain prevalent threats Extrapolation of study data shows potential for further weight reduction
Solicitation Lightweight Hard Armor Plate Solicitation # M67854-19-R-1500 RFP Release planned for Nov 2018/Proposals due Feb 2019 Unrestricted Full and Open (pending approval from MCSC Small Business Office) Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity Minimum Quantity: First Delivery Order Maximum Quantity: 170,000 sets (340K front/back and 340K side plates) 5 Year Period of Performance (One 5-year Ordering Period) Best Value, Trade Off, VATEP Testing Locations Source Selection Testing: TBD (NIJ Certified Lab) First Article Testing at Aberdeen Test Center Lot testing at NIJ lab of contractors choice with ATC/MCOTEA witness SOW: Questions?
Section L Volume I: Technical Proposal (no more than 30 pages – First 30 printed pages of the written portion of the Technical Proposal) Source Selection Samples (finished plates/dry layups) Claimed Weights Manufacturing Berry Amendment compliance Volume II: Past Performance Proposal (no page limit) Volume III: Small Business Participation (no page limit) Volume IV: Business Proposal (no page limit)
Section M Evaluation Factors Factor 1: Technical Performance (Combined Technical/Risk Rating Method) Subfactor 1: Ballistic Performance Subfactor 2: Design and Workmanship Subfactor 3: Manufacturing Subfactor 4: Thickness Factor 2: Past Performance (acceptable/unacceptable) Factor 3: Small Business Participation (acceptable/unacceptable) Subfactor 1: Small Business Participation Plan Subfactor 2: Small Business Subcontracting Plan Factor 4: Price Sub Factors under Factor 1 are in descending order of importance Technical performance is approximately equal to price Importance of price as a factor in the final award determination will increase with the degree of equality in the non-price factors of the proposal.
Go/No Go Criteria Criteria 1: Offerors with a SECRET Facility Clearance (FCL) at the time of proposal submission will receive a “GO.” Offeror’s without a SECRET Facility Clearance (FCL) at the time of proposal submission will receive a “NO GO” and the proposal will receive no further evaluation.
Solicitation will include a Classified Annex at the SECRET level All classified material must be handled in accordance with the DD254, Classified Annex, the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M), and Industrial Security Regulation (DoD 5220.22-R).
All FCL information will be verified through the Defense Security Service for all Offeror’s and their subcontractors.
Offeror’s without a security FCL will neither be able to discuss nor access key aspects of the program that are classified nor will they be able to pass such information on to their subcontractors.
Criteria 2: Offerors shall provide Source Selection samples in accordance with Table 1. Offerors that do not provide the required source selection samples will receive a “NO GO” and the proposal will receive no further evaluation.
Criteria 3: Source selection samples that do not exceed the threshold maximum weight as specified in Paragraph 3.7.1, Table 1 of the Lightweight Plate Performance Specification (PRF-18001A0010) will receive a “GO.” Source selection samples that exceed the threshold maximum weight requirements as specified in Paragraph 3.7.1, Table 1 of the LITE Plate Performance Specification (PRF-18001A0010) will receive a “NO GO,” and the proposal will receive no further evaluation.
Factor 1: Technical Performance Subfactor 1: Ballistic Performance Subfactor 2: Design and Workmanship Source Selection Samples examined for dimensional conformance, uniform areal density, functional integration Subfactor 3: Manufacturing Ability to produce at least 12,000 plates per month by 120 days after FAT approval (6,000 front/back and 6,000 side) Subfactor 4: Thickness Uniform thickness throughout - 1” (T) and .75” (O) Combined Technical/ Risk Rating Method
Combined Technical/Risk Rating Method
Factor 2: Past Performance
| Rating | Evaluation Criteria |
| Acceptable | Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. |
| Unacceptable | Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort. |
In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable”.
Factor 3: Small Business Participation Subfactor 1: Small Business Participation Plan Small Business: 5.25% Small Disadvantaged Business: 0.4% Women-Owned Small Business: 0.4% HUBZone Small Business: 0.4% Service-Disabled Veteran-Owned Small Business: 0.4% Subfactor 2: Small Business Subcontracting Plan (Large Only) Small Business: 36.7% Small Disadvantaged Business: 5% Women-Owned Small Business: 5% HUBZone Small Business: 3% Service-Disabled Veteran-Owned Small Business: 3% Proposals meeting or exceeding the percentage goals will receive an acceptable rating.
Proposals not meeting or exceeding the percentage goals will receive an unacceptable rating unless the proposal explains why and describes what the Offeror will do to increase the percentages for performance under contract. Justifications adequately describing valid actions toward increasing percentage goals will receive an acceptable rating.
Factor 4: Price
Total Proposed Price (TPP) - The Government will calculate an Offeror’s TPP by adding the total price for CLINs 0001 through 0006, including all sub-CLINs.
Total Evaluated Price (TEP) – The Government will calculate the Value Adjusted Total Evaluated Price (VATEP) in accordance with Section M.3.4.2.
Offerors shall propose a single blended unit price for all sizes (L.3.2.4.1)
VATEP
New Source Selection Guide:
Best Practices from Peer Reviews Introduces Value Adjusted Total Evaluated Price (VATEP) Appendix B, DoD Source Selection Procedures
What is VATEP?
A structured technique for objectivizing how some (or all) of the requirements would be treated in the tradeoff process and then communicating that to offerors in the RFP
Source: MCSC Assistant Commander, Contracts, Mrs. Mosqueira . Feb 2016.
B.2 Value Adjusted Total Evaluated Price Tradeoff
The VATEP technique monetizes different levels of performance that may correspond to the traditional requirements process of defining both threshold (minimum) and objective (maximum) performance and capabilities. It identifies in the RFP the percentage price increase (or dollar amount) the Government is willing to pay for measureable levels of performance between threshold (minimum) and objective (maximum) criteria (e.g., Probability of Hit, specific operational ranges, etc.). This amount is based on the value to the Government for above minimum performance or capabilities. Value and cost are completely separate concepts that VATEP links in the RFP to inform industry decisions on what to offer to gain a competitive advantage. As described herein, VATEP is merely a structured technique for objectivizing how some (or all) of the requirements would be treated in the tradeoff process and then communicating that to offerors via the RFP.
VATEP may be appropriate when the RO wishes to optimally balance price and performance/capability above threshold (minimum) requirements to maximize the achievement of program objectives. One of the benefits of this process is that offerors may be more likely to propose innovative solutions which provide higher performance/capability if it is clear to Industry what value the end user places on exceeding the threshold (minimum) performance/capability and how that will influence the evaluated cost/price.
Source: DoD Source Selection Procedures, B-1. March 31, 2016.
No No Yes Yes Yes VATEP Adjustment Example TPP =Total Proposed Price TEP = Total Evaluated Price Offeror A TPP = $450 Offeror B TPP = $510 Offeror C TPP = $500 Offeror B No TPP Adjustment
TEP = TPP
TEP = $510
Offeror C Ineligible for further consideration for award Offeror A Goal Adjustment Applied
TEP = TPP – ($XX)
TEP = $450 – ($XX)
TEP =
Lightweight Plate VATEP Evaluation Steps **The VATEP process slides have been removed from this brief. The updated process is now Attachment 07 of the Lightweight Plate solicitation.**
Basic Security Requirement Process
SECRET FCL due NLT proposal submission
Facility Clearance Sponsorship 3 Days 5 Days 15 Days 10- 45 Days Points of Contact
PM ICE SPONSORSHIP
Sean P. Zickert
(540) 845-7427 sean.zickert@gidsolutionsllc.com Samantha Chesley samantha.chesley@gidsolutionsllc.com
EVERYTHING ELSE
Defense Security Service 1-888-282-7682 Option #3 dss.fcb.knowledgecenter@mail.mil Refer to the DSS FCL Orientation Handbook at http://www.dss.mil/isp/fac_clear/fac_clear.html for detailed information.
DSS FCL Orientation Handbook describes the general timeline, documentation, and action items for each stage.
Stage 1: D1-10: FCL Orientation Handbook & Telephonic Survey Stage 2: D10-20: Complete e-FCL Upload Stage 3: D20-45: FCL Initial Review Stage 4: Post FCL Initiatives
Discontinuation Points (By Stage) Stage 1: DSS determines FCL justification is not valid Stage 2: Failure to submit all docs and forms into e-FCL within 20 days of FCL Orientation Handbook receipt Stage 3: Failure to submit KMP e-QIPs within 45 days after FCL Orientation Handbook receipt.
Stage 4: Failure to comply with NISPOM requirements or implement a facility security program.
Vendor
Obtains Sponsorship Letter from PM ICE
Provides Required Information & Returns to PM ICE
PM ICE
Reviews Completed Sponsorship Letter
Approves Letter & Provides to HHQ Security Office
MCSC
Validates Sponsorship Letter
Endorses Sponsorship Letter
Forwards Sponsorship Letter to DSS
DSS
Validates Sponsorship Letter
Contacts Vendor for Continuing Actions
Obtains FCL Justification (DD254)
Industry Day Schedule
| 17 Oct 2018 | 18 Oct 2018 |
| 0730-0830: Check In | 0730-0830: Check In |
| 0830-0915: Government Brief | 0830-0915: Government Brief |
| 0930-1020: Point Blank Enterprises | 0930-1020: CoorsTek, Inc. |
| 1030-1120: Morgan Advanced Materials | 1030-1120: DSM Dyneema |
| 1120-1230: Lunch | 1120-1230: Lunch |
| 1230-1320: ATS Armor, LLC | 1230-1320: RMA |
| 1330-1420: Shotstop Armor | 1330-1420: Hardwire, LLC |
| 1430-1520: BAE Systems | 1430-1520: KIHOMAC, Inc |
| 1530-1620: TenCate Advanced Armor | 1530-1620: Engense, Inc. |
| 1630-1720: HESCO | 1630-1720: 3M Ceradyne |
image2.png image3.jpeg image4.emf
Microsoft_Word_Document1.docx Color Rating
Adjectival Rating
Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.