IFF_Antenna_CDRLs_Final.docx

DOCX document 263 KB Posted

Attached to
Identification Friend or Foe (IFF) Antenna AN/TPS-59
Solicitation number
M67854-17-R-6001
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
Attachment_5_-_0004_IFF_Antenna_RFP_Q&A.docx DOCX document
M67854-17-R-6001-0004.docx DOCX document
Attachment_5_-0003_IFF_Antenna_RFP_Q&A.docx DOCX document
M67854-17-R-6001-0003.docx DOCX document
Attachment_5_-0002_IFF_Antenna_RFP_Q&A.docx DOCX document
M67854-17-R-6001-0002.docx DOCX document
M67854-17-R-6001-0001.docx DOCX document
Attachment_5_-_IFF_Antenna_RFP_Q&A.docx DOCX document
Attachment_4_-_IFF_Antenna_Price_Submission_Worksheet.xlsx XLSX spreadsheet
Exhibit_A,_Appendix_2_TDP_Option_Selection_Work_Sheet.docx DOCX document
Exhibit_A,_Appendix_1_EL-CID_Cut_Sheet_Template.docx DOCX document
IFF_Antenna_CDRLs_Final.docx DOCX document
M67854-17-R-6001_IFF_Antenna_RFP.docx DOCX document
Attachment_1_-_IFF_Antenna_P._Spec.docx DOCX document
Exhibit_C,_Appendix_1_LMI_Work_Sheet.docx DOCX document
Attachment_2_-_IFF_Antenna_VCRM.xlsx XLSX spreadsheet
Attachment_4_-_IFF_Antenna_Price_Submission_Worksheet.xlsx XLSX spreadsheet
Exhibit_A,_Appendix_2_TDP_Option_Selection_Work_Sheet.docx DOCX document
Exhibit_A,_Appendix_1_EL-CID_Cut_Sheet_Template.docx DOCX document
Exhibit_C,_Appendix_1_LMI_Work_Sheet.docx DOCX document
M67854-17-R-6001_IFF_Antenna_RFP.docx DOCX document
Attachment_2_-_IFF_Antenna_VCRM.xlsx XLSX spreadsheet
Attachment_1_-_IFF_Antenna_P._Spec.doc DOC document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

17. PRICE GROUP

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Technical Report - Study/Services

3. SUBTITLE

Engineering and Test Documentation

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para 3.3, 3.3.1.1

6. REQUIRING OFFICE

MARCORSYSCOM (Radars)18. ESTIMATED TOTAL PRICE

7. DD 250 REQ

NO

9. DIST

STATEMENT

E

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 8 - The Government requires 7 calendar days for review. The Contractor shall submit updates 7 calendar days after receipt of Government comments until approved.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 - One time with revisions for each SETR event.

BLK 12 - This report is due 15 days prior to a SETR events (NIR, TRR, SVR, PCA) reference SIAT-HDBK-001.

BLK 13 - Subsequent submissions are based on the review cycle defined in BLK 8.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP __ TM _ _ OTHER __X __

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Spectrum Certification Spectral Characteristics Data

3. SUBTITLE

Equipment Location – Certification Information Database

4. AUTHORITY (Data Acquisition Document No.)

DI-EMCS-81827

5. CONTRACT REFERENCE

SOW Para 3.3.3

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - Exhibit A, Attachment 1 to the CDRL package contains the EL-CID Cut Sheet Template associated with this deliverable.

BLK 8 - The Government requires 15 calendar days for review. The Contractor shall submit updates 7 calendar days after receipt of Government comments until approved.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only,: Administrative or Operational Use, 30 April 2013.) Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050

BLK 12 - This report is due 30 days prior to TRR.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Product Drawings/Models and Associated Lists

3. SUBTITLE

Product Drawings/Models and Associated Lists

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000

5. CONTRACT REFERENCE

SOW Para 3.3.4

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/R

12. DATE OF 1ST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - Exhibit A, Appendix B to the CDRL package contains the TDP Option Selection Worksheet associated with this deliverable.

BLK 8 - The Government requires 15 calendar days for review. The Contractor shall submit updates 7 calendar days after receipt of Government comments until approved.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050

BLK 12 - This report is due 30 days after PCA.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format, AutoCAD DXF and Adobe. See section 'G' of the contract for distribution addresses and contact information.

PDM RS
1
1
Supt Contracto
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Safety Assessment Report (SAR)

3. SUBTITLE

SAR

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102C

5. CONTRACT REFERENCE

SOW Para 3.3.7

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 8 - The Government requires 15 calendar days for review. The Contractor shall submit updates 7 calendar days after receipt of Government comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - Submission shall occur 30 days prior to TRR.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Configuration Audit Summary Report and Certification

3. SUBTITLE

Physical Configuration Audit

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81022D

5. CONTRACT REFERENCE

SOW Para 3.3.8

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 8 - The Government requires 30 calendar days for review. The Contractor shall submit updates 15 calendar days after receipt of Government comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - Submit 30 calendar days after PCA.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Baseline Description Document

3. SUBTITLE

Baseline Description Document

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81121A

5. CONTRACT REFERENCE

SOW Para 3.3.9

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 8 - The Government requires 15 calendar days for review. The Contractor shall submit updates 7 calendar days after receipt of Government comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12/13 - Submission shall occur 15 days prior to PCA.

BLK 14 - Copies shall be delivered in accessable, searchable electronic MS Office Excel format. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Monthly Status Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW Para 3.2.1

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

MTHLY

12. DATE OF 1ST SUBMISSION

15DARP

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION 15DARP

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - DI-MGMT-80368A is tailored as follows: do not include content described in 3.2.3 itemized man-hours and costs.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 - The monthly status report will be due on the 15th working day of each month.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars

Supt Contractor

15. TOTAL ---------

2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Integrated Program Management Report (IPMR)

3. SUBTITLE

Integrated Master Schedule

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861

5. CONTRACT REFERENCE

SOW Para 3.2.3

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION MNTHLY

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - DI-MGMT-81861 is modified as follows: Integrated Master Schedule Format 6 only.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars

Supt Contractor

15. TOTAL ---------

2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE

Conference Minutes

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250B

5. CONTRACT REFERENCE

SOW Para 3.2.4, 3.4.1, 3.4.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

30 DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 8 - The Government requires 7 calendar days for review. The Contractor shall submit updates 7 calendar days after receipt of Government comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 - As required by Statement of Work (SOW).

BLK 12 - First submission shall be 7 days after scheduled event.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

Presentation Material

3. SUBTITLE

Presentation Material

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373

5. CONTRACT REFERENCE

SOW Para 3.2.4, 3.4.1, 3.4.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - DI-ADMIN-81373 paragraph 10.2 content shall include an agenda.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 - As required by Statement of Work (SOW) and SIAT-HDBK-001.

BLK 12/13 - First submission shall be 5 days before scheduled event.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars

Supt Contractor

15. TOTAL ---------

2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

Packaging Kit Contents List

3. SUBTITLE

Packaging Kit Contents List

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81499

5. CONTRACT REFERENCE

Section D

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION XDADO

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 - As required by Statement of Work (SOW) and CLIN deliverables.

BLK 12 - As required by Statement of Work (SOW) and CLIN deliverables.

BLK 14 - As required for CLIN delivery requirements.

15. TOTAL ---------
0
0
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

Logistics Product Data

3. SUBTITLE

Provisioning Parts List

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81758A

5. CONTRACT REFERENCE

SOW Para 3.4.3

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - Exhibit C, Attachment 1 to the CDRL package contains the attribute selection sheet associated with this deliverable. A sample of the data required is included in the appendix.

BLK 8 - The Government requires 60 calendar days to review. The Contractor shall submit updates within 30 calendar days after receipt of comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - Initial delivery shall be 60 calendar days prior to PCA.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office Excel format. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

D

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

Engineering Data for Provisioning

3. SUBTITLE

Engineering Data for Provisioning

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

SOW Para 3.3.5

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - DI-SESS-81874 is modified as follows: Delivery will include electronic and hard copy engineering drawings as defined in Exhibit Appendix A.

BLK 8 - The Government requires 15 calendar days to review. The Contractor shall submit updates within 30 calendar days after receipt of comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - The data shall be provided 30 days following successful testing (PQT) is complete..

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format (Word, Excel, Access, PowerPoint) or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _2_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

F

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

AN/TPS-59 IFF Antenna

E. CONTRACT/PR NO.

M67854-17-R-6001

F. CONTRACTOR

1. DATA ITEM NO.

F001

2. TITLE OF DATA ITEM

Training Data Products

3. SUBTITLE

Training Data Products

4. AUTHORITY (Data Acquisition Document No.)

MIL-PRF-29612B

5. CONTRACT REFERENCE

SOW Para 3.5

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

E

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - MIL-PRF-29612B is modified as follows: Delivery of paragraph 6.4 tailored to instructions and procedures in training product(s) providing detailed (i.e., text and figures) IFF Antenna Kit installation, operation, assembly, disassembly, maintenance, storage and troubleshooting.

BLK 8 - The Government requires 15 calendar days to review. The Contractor shall submit updates within 30 calendar days after receipt of comments.

BLK 9 - The following information shall be included on the deliverable:

DISTRIBUTION STATEMENT E: Distribution authorized to the Department of Defense only, Administrative or Operational Use, 30 April 2013. Other requests shall be referred to MARCORSYSCOM (PfM CES Radars), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - Initial delivery shall be 30 calendar days after to PQT. Training materials shall be demonstrated and evaluated during PQT.

BLK 14 - Copies shall be delivered in accessable, searchable electronic format MS Office format or Adobe. See section 'G' of the contract for distribution addresses and contact information.

Radars
1
1
Supt Contractor
1
1
15. TOTAL ---------
2
2
0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page _1_ of _1_ Pages

File details come from the government source that posted it. Updated .