GCSS-MC_LCM_Increment_1_Architecture.pptx
PPTX presentation 2 MB Posted
- Attached to
- Tactical Warehouse Management System Industry Day Announcement & RFI Federal contract opportunity
- Solicitation number
- M67854-17-I-TWMSRFI
- Issued by
- United States Marine Corps
About this file
Increment Architecture Diagram
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CRM.xlsx | XLSX spreadsheet | |
| Industry_Day_Attendees.xlsx | XLSX spreadsheet | |
| T-WMS_Industry_Day_Brief_12_Jan_17.pptx | PPTX presentation | |
| GCSS-MC_TWMS_Glossary.xlsx | XLSX spreadsheet | |
| TWMS_overview.docx | DOCX document | |
| DRAFT_GCSS-MC_T-WMS_Requirements_Spec_20161205.xlsx | XLSX spreadsheet | |
| TWMS_PWS_Version_2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Global Combat Support System – Marine Corps / Logistics Chain Management (GCSS-MC/LCM) Increment 1
Logical and Physical Architecture DISTRIBUTION STATEMENT A. Approved for public release: Distribution is unlimited.
GCSS-MC Operational View (OV-1)
CC/JTF: Combatant Commander/Joint Task Force MAGTF: Marine Air Ground Task Force NLI: Naval Logistics Integration HQMC I&L: Headquarters Marine Corps Installations and Logistics MEFs: Marine Expeditionary Force GCSS-MC/LCM: Global Combat Support System – Marine Corps/Logistics Chain Management
GCSS-MC
High Level Architecture
GCSS-MC Physical Architecture
GCSS-MC/LCM EDE
| INSTANCES | B1Dev | TempDev | Dev | TempCM | CM | TRI PSS | TRI PROD | |
| Carpathia | Carpathia | TBD | Carpathia | TBD | MITSC-E | MITSC-E | ||
| Availability | ONLINE | OFFLINE | OFFLINE | ONLINE | OFFLINE | ONLINE | ONLINE | |
| Applicable CR | CR 1075 | CR 1762 | CR TBD | |||||
| Est. May2017 | CR 1825 | CR TBD |
Est. May 2017
| Baseline | RM Version 7.0.5.0/ | ||
| Patch Set 42 | RM Version 7.0.5.0/ | ||
| Patch Set 42 | RM Version 7.0.5.0/ |
Patch Set 42
| COMPONENTS |
| Oracle EBS Database 11.2.0.4 |
| Oracle EBS 11i Rel. 11.5.10.2 |
| Oracle MFS 10.3.0.3 |
| Oracle Discoverer 11.1.1.7 |
| Oracle Authentication Stack 11.1.1.7 |
| Oracle Authentication Stack 11.1.1.9 |
| Oracle BAM 11.1.1.9 |
| Oracle SOA/B2B/BPEL 10.1.3.5.0 |
| Oracle Web Services (older) |
| Oracle Web Services 11.1.1.9 |
| Oracle APS Database 11g 11.2.0.3 |
| Oracle APS Database 11g 11.2.0.4 |
| Oracle APS(ASCP) /R12 Rel. 12.1.3 |
| Oracle Grid Infra- Exadata 12.1.0.2.0 |
| Exadata X5-2 Firmware 3.2.4.60 |
| RHEL |
| OEL 5.11/6.6 |
Legend Red - not ready, Grey - will never get, Yellow - old configuration, Green - matching TRI Production, White - applicable but not yet configured Configuration of SDE and PSS Directly Supporting TRI Production Status As Of 27 October 2016 As of: 27 Oct 2016
| INSTANCES | B1Dev | TempDev | Dev | TempCM | CM | TRI PSS | TRI PROD | |
| Carpathia | Carpathia | TBD Awarded | Carpathia | TBD Awarded | MITSC-E MCEITS | MITSC-E MCEITS | ||
| Availability | ONLINE | OFFLINE | OFFLINE | ONLINE | OFFLINE | ONLINE | ONLINE | |
| Applicable CR | CR 1075 | CR 1762 | CR TBD | |||||
| Est. May2017 | CR 1825 | CR TBD |
Est. May 2017
| Baseline | SW Version 8.0.0.0/ | |
| Patch Set TBD | SM Version 7.0.5.0/ | |
| Patch Set 42 | SW Version 8.0.0.0/ | |
| Patch Set TBD | SW Version 8.0.0.0/ | |
| Patch Set TBD | SW Version 8.0.00/ |
Patch Set TBD
| COMPONENTS |
| Oracle EBS Database 11.2.0.4 |
| Oracle EBS 11i Rel. 11.5.10.2 |
| Oracle MFS 10.3.0.3 |
| Oracle Discoverer 11.1.1.7 |
| Oracle Authentication Stack 11.1.1.7 |
| Oracle Authentication Stack 11.1.1.9 |
| Oracle BAM 11.1.1.9 |
| Oracle SOA/B2B/BPEL 10.1.3.5.0 |
| Oracle Web Services (older) |
| Oracle Web Services 11.1.1.9 |
| Oracle APS Database 11g 11.2.0.3 |
| Oracle APS Database 11g 11.2.0.4 |
| Oracle APS(ASCP) /R12 Rel. 12.1.3 |
| Oracle Grid Infra- Exadata 12.1.0.2.0 |
| Exadata X5-2 Firmware 3.2.4.60 |
| RHEL |
| OEL 5.11/6.6 |
Legend Red - not ready, Grey - will never get, Yellow - old configuration, Green - matching TRI Production, White - applicable but not yet configured Configuration of SDE and PSS Directly Supporting Production Projected FY18, 2ndQTR Projected 2QFY18 image3.png image4.png image5.png image6.emf image7.png image8.jpg image1.png image2.png
File details come from the government source that posted it. Updated .