Exhibit_3_-_CDRLs.docx

DOCX document 555 KB Posted

Attached to
Advance Battery Charger
Solicitation number
M67854-16-R-5009
Issued by

About this file

Exhibit 3_Final CDRLs

View the file

Other files

File Type Posted
Exhibit_2_PSpec.docx DOCX document
Amendment0004.docx DOCX document
Amendment0003.docx DOCX document
Amendment0002.docx DOCX document
Exhibit_2_PSpec_5_24_2016.docx DOCX document
Amendment_0001.docx DOCX document
RFP.docx DOCX document
Exhibit_2_PSpec_5_2_2016.docx DOCX document
Exhibit_4_Past_Performance_Quest.rtf RTF text file
Exhibit_1_Final_SOW_4_29_2016.docx DOCX document
QA_Amendment0001.docx DOCX document
RFP.docx DOCX document
Attachment_4_Past_Performance_Questionnaire.rtf RTF text file
Attachment_3_CDRLs.docx DOCX document
Attachment_2_Final_ABC_Pspec.docx DOCX document
Attachment_1-final_ABC_SOW.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

17. PRICE GROUP

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

CONFERENCE AGENDA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMIN-81249A

5. CONTRACT REFERENCE

SOW PARA. 3.2.2; 3.2.3; 3.2.5; 3.2.6

6. REQUIRING OFFICE

MARCORSYSCOM (PDM EPS)18. ESTIMATED TOTAL PRICE

7. DD 250 REQ

LT

9. DIST

STATEMENT

A

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT A: Approved for public release.

BLK 12/13: The contractor shall prepare agendas prior to each review, submit the draft meeting agenda five (5) business days before each meeting. The Government shall have three (3) business days to review and comment.

The agenda shall contain at a minimum the following information:

Dates Location Agenda Items Previous Open Action Items

The contractor shall submit the Final Agenda the day prior to conduct of each meeting.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

CONFERENCE MEETING MINUTES

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMIN-81250A

5. CONTRACT REFERENCE

SOW PARA. 3.2.2; 3.2.3; 3.2.5; 3.2.6

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

A

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT A: Approved for public release.

BLK 12/13: The contractor shall prepare and submit the draft meeting minutes, reports and conference presntation materials five (5) business days after completion of each meeting. The Government shall have (5) business days to review and comment. The contractor shall have 5 business days to incorporate Government comments and submit final meeting minutes.

The report shall contain at a minimum the following information:

Dates Location Participant Names Agenda Items Discussion Points Action Items/Assigned to/due date

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

WARRANTY BIRTH RECORDS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

NONE

5. CONTRACT REFERENCE

SOW PARA. 5.8

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

A

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT A: Approved for public release.

BLK 12/13: The contractor shall provide the warranty claim birth record information with each delivery order in Microsoft Excel (.xml) format. The contractor shall attach the warranty birth record to each Wide Area Work Flow (WAWF) submission.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

DESIGN REVIEW INFORMATION PACKAGE

3. SUBTITLE

DESIGN REVIEW

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

5. CONTRACT REFERENCE

SOW para 3.2.3

6. REQUIRING OFFICE

7. DD 250 REQ

ss

9. DIST

STATEMENT

B

10. FREQUENCY

ONE/R

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK 12/13 - The contractor shall deliver to the Government a draft of all information to be presented and referenced at technical reviews no later than ten (10) calendar days prior to the review. The final information that was presented and referenced shall be delivered ten (10) calendar days after the review.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

DESIGN REVIEW INFORMATION PACKAGE

3. SUBTITLE

TEST READINESS REVIEW

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

5. CONTRACT REFERENCE

SOW para 3.2.4

6. REQUIRING OFFICE

7. DD 250 REQ

SS

9. DIST

STATEMENT

B

10. FREQUENCY

ONE/P

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK 12/13 - The contractor shall deliver to the Government a draft of all information to be presented and referenced at the Test Readiness Review no later than forty five (45) calendar days prior to the review. The final information that was presented and referenced shall be delivered at the review.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

PRODUCT DRAWINGS MODELS AND ASSOCIATED LIST

3. SUBTITLE

PRODUCT SPECIFICATION

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-8100E

5. CONTRACT REFERENCE

SOW para 4.1

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK12: The contractor shall deliver the Product Specification at the Design Review.

BLK13: The contractor shall deliver the Final Product Specification that is under configuration management within forty five (45) calendar days after SVR.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

SAFETY ASSESSMENT REPORT (SAR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102C

5. CONTRACT REFERENCE

SOW para 4.2.1

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

ONE/R

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK 12 - Draft report shall be submitted not later than thirty (30) calendar days prior to the TRR.

BLK 13 – Contractor shall submit as required to provide updates.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP) REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81397C

5. CONTRACT REFERENCE

SOW para 4.2.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK 12/13 - The contractor shall deliver to the Government a draft of all information to be presented and referenced at technical reviews no later than ten (10) calendar days prior to the Test Readiness Review (TRR). The final information that was presented and referenced shall be delivered ten (10) calendar days after the TRR.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

INTERFACE CONTROL DOCUMENT (ICD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81248B

5. CONTRACT REFERENCE

SOW para 4.3.3

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK 12 - Report due forty five ( 45) calendar days after contract award. Government will required fifteen (15) calendar days to review and provide comments. Contractor shall incorporate comments and submit within fifteen (15) calendar days.

BLK 13 - Contractor shall submit updated ICD within fifteen (15) calendar days of any approved changes.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

DESIGN REVIEW INFORMATION PACKAGE (SVR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

5. CONTRACT REFERENCE

SOW para 4.5.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLOCK 12/13: The contractor shall deliver data fifteen (15) calendar days prior the SVR. The final information that was presented and referenced shall be delivered at the review.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. Digital Copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

DESIGN REVIEW INFORMATION PACKAGE (PRR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81757A

5. CONTRACT REFERENCE

SOW para 4.5.3

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLOCK 12/13: The contractor shall deliver data fifteen (15) calendar days prior the PRR. The final information that was presented and referenced shall be delivered at the review.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to the COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

HARDWARE, SOFTWARE AND FIRMWARE CHANGES

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80639C

5. CONTRACT REFERENCE

SOW para 4.3.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLOCK 12/13: The contractor shall notify the government immediately upon identification of any hardware, software or firmware changes. The contractor shall deliver data thirty (30) calendar days after the final approval from the identification of the required hardware, software or firmware change of the system.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to the COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

LOGISTICS PRODUCT DATA

3. SUBTITLE

Maintenance Analysis

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81758A

5. CONTRACT REFERENCE

SOW para 5.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

A

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

D

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT A: Approved for public release.

BLK 12 – Maintenance Analysis date shall be submitted forty five (45) calendar days after contract award.

BLK 13 - Contractor shall submit as required to provide updates due to system changes.

BLK 14: The contractor shall deliver 1 draft digital copy of the document to COR and 1 final digital copy to the COR. Digital copies shall utilize Microsoft Office. A digital copy shall be delivered to: william.e.jones@usmc.mil.

MCSC:

PDM EPS
1
1
15. TOTAL ---------
1
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

C002

2. TITLE OF DATA ITEM

LOGISTICS PRODUCT DATA

3. SUBTITLE

Provisioning and Other Pre-Procurement Screening Data (POPS)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81758A

5. CONTRACT REFERENCE

SOW para 3.2.6; 5.3.1

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

A

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT A: Approved for public release.

BLK 12 - Draft submittal shall be 30 calendar days after LGC. The Government requires 30 calendar days for review and comment.

BLK 13 - The Contractor shall incorporate government comments and resubmit within 15 calendar days after the Provisioning Conference. The review cycle shall continue until Government acceptance of data.

BLK 14- The contractor shall deliver 1 draft digital copy of the document to the COR and to MCSC Albany. Also, the contractor shall deliver 1 final digital copy of the document to each addressee. Digital copies shall utilize Microsoft office. A digital copy shall be delivered to: william.e.jones@usmc.mil and anthony.l.high@usmc.mil.

See Attachment GEIA-007A data item select list for required data elements.

MCSC:

PDM EPS
1
1
PDM EPS ALBANY
1
1
15. TOTAL ---------
2
2

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages
CODE
DEFINITION/DESCRIPTION
X
Data product required on all items
A
As applicable
T
Registered Support Equipment only
U
Non-Registered Support Equipment only
R
Repairables only
P
All “P” source coded items
N
New “P” source code items
Y
National Stock Number items
O
“Ref” items only
F
First appearance items only
G
Government Furnished Information
C
Commercial of The Shelf (COTS) items
I
Non-developmental Items (NDI)
D
Developmental items
L
Weapons Replaceable Assembly (WRA)/Line Replaceable Unit (LRU)
S
Shop Repairable Assembly (SRA)/Shop Repairable Unit (SRU)
M
Packaging, Common items
B
Packaging, Bulk items
E
Support Equipment
All Keys
All key data elements must be entered.

GEIA-0007A DATA ITEM SELECT LIST

LEGEND FOR SELECT COLUMN

XC ENTITY: SYSTEM END ITEM DATA

XC Key Elements

End_item acronym_code
2040

logistics_support_analysis_control_ number

2970
H77

alternate_logistics_support_analysis_ control_number_code

1200
H78

logistics_support_analysis_control_ number_type

XC Elements system_end_item_provisioning_ contract_control_number

4100
A1
usable_on_code
5790
D43

quantity_per_end_item_calculation_ option_code system_end_item_item_designator_ code system_end_item_provisioning_list_ item_sequence_number

4120
A2

system_end_item_quantity_per_ assembly

4190
C32

system_end_item_quantity_per_end_ item

4210
C33

system_end_item_type_of_change_

5620
A3
transportation_end_item_indicator
5550

XD ENTITY: SYSTEM END ITEM SERIAL NUMBER DATA

XD Key Elements

end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_ number_ type

serial_number_from
4690
F68
serial_number_to
4690
F68

XD Element serial_number_usable_on_code

XH ENTITY: COMMERCIAL AND GOVERNMENT ENTITY DATA

XH Key Elements

commercial_and_government_entity_ code
1520
A5

XH Elements

commercial_and_government_entity_city
1510
commercial_and_government_entity_ name
1530
commercial_and_government_entity_nation
1540
commercial_and_government_entity_postal_ zone
1550
commercial_and_government_entity_ state
1560
commercial_and_government_entity_ street
1570

HA ENTITY: ITEM IDENTIFICATION DATA

HA Key Elements commercial_and_government_ entity_code

1520
A5
reference_number
4400
A6

HA Elements

acquisition_method_code
1030
E62
acquisition_method_suffix_code
1040
E63
authorization_stock_list
4110
D48

automatic_data_processing_ equipment_code

1310
B28
common_and_bulk_item_list
4110
D48

contractor_technical_information_

1650
E61
critical_item_code
1730
criticality_code
1740
J88

defense_logistics_information_ service_screening_requirement_code

demilitarization_code
1820
B23
document_availability_code
1910
A9
document_identifier_code
1950
government_furnished_item_list
4110
D48
hazardous_code
2370
hazardous_materials_storage_cost
2390
hazardous_waste_disposal_cost
2400
hazardous_waste_storage_cost
2410

industrial_materials_analysis_of_ capacity

item_management_code
2770
E64
item_name
2790
A12
item_name_code
2780
J89
installation_and_checkout_item_list
4110
D48
interim_released_item_list
4110
D48
interim_support_item_list
4110
D48
long_lead_time_item_list
4110
D48
line_item_number
2870
material
3150
M92
material_leadtime
3130
material_weight
3140
national_stock_number_activity_code
3530
B15

national_stock_number_cognizance_

3540
B15

national_stock_number_federal_ supply_classification

2280
B15

national_stock_number_materiel_ control_code

3550
B15

national_stock_number_national_ item_identification_number

3520
B15

national_stock_number_special_ materiel_identification_code_ materiel_management_aggregation_ code

3560
B15
physical_security_pilferage_code
3920
B26
precious_metal_indicator_code
3940
B27
prescribed_load_list_item_list
4110
D48
production_lead_time
4020
B24
program_parts_selection_list
4050
A10
recommended_buy_list_item_list
4110
D48
reference_number_category_code
4390
A7
reference_number_variation_code
4410
A8
repairable_items_list
4110
D48
schedule_b_export_code
4620
shelf_life
4730
A13

Required when SMRC Source code = PC.

shelf_life_action_code
4720
A14

Required when SMRC S ource code = PC.

spares_acquisition_integrated_with_ production

special_maintenance_item_code
4870
D49
special_material_content_code
4900
D47
system_support_package_component_list
4110
D48
tools_and_test_equipment_list
4110
D48
unit_of_issue
5700
B18
unit_of_issue_conversion_factor
5690
B20

Required if UI ≠ UM

unit_of_measure
5720
B16
unit_size_height
2890
unit_size_length
2890
unit_size_width
2890
unit_weight
5770

HB ENTITY: ADDITIONAL REFERENCE NUMBER DATA

HB Key Elements additional_reference_number_item_ commercial_and_government_ entity_code

1520
A5

additional_reference_number_item_ reference_number

4400
A6

additional_reference_number_ entity_code

1520
A5
additional_reference_number
4400
A6

HB Element additional_reference_number_ reference_number_category_code

4390
A7

additional_reference_number_ reference_number_variation_code

4410
A8

HD ENTITY: ITEM UNIT OF MEASURE ISSUE PRICE DATA

HD Key Elements commercial_and_government_

1520
A5
reference_number
4400
A6
price_type_selection
4000

Tells if UI or UM price.

unit_price
3990
B17/B19

Require both UI price and UM price

HD Element

price_concurrent_production_code
3980
price_fiscal_year
2300
price_lot_quantity_from
3000
price_lot_quantity_to
3000
price_provisioning
4140
price_type_of_price_code
5640

HG ENTITY: PART APPLICATION PROVISIONING DATA

HG Key Elements commercial_and_government_

1520
A5
reference_number
4400
A6
end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_

HG Element

allowance_item_code
1180
D50
allowance_item_quantity
1190
D51

as_required_list_a_provisioning_ technical_documentation as_required_list_b_provisioning_ common_and_bulk_items_list_ provisioning_technical_documentation condemned_at_depot_maintenance_ task_distribution

3090
E57

condemned_below_depot_ maintenance_task_distribution

3090
E57
contractor_repair_cycle_time
4480
E58
data_status_code
1780

depot_shipyard_maintenance_task_ distribution

3090
E57
depot_shipyard_repair_cycle_time
4480
E58

depot_shipyard_replacement_task_

4530
E59
designated_rework_point_one
1880
E60
designated_rework_point_two
1880
E60
essentiality_code
2080
A11
hardness_critical_item
2350
B25
identification_number
2510
indenture_code
2520
A4

Attaching parts/hardware

Option 1

Option 2

Option 3

Option 4

Option 5

Indenture for kits

Option 1

Option 2

Option 3 interim_support_items_list_ intermediate_direct_support_

3090
E57

intermediate_direct_support_repair_ cycle_time

4480
E58

intermediate_direct_support_ replacement_task_distribution

4530
E59

intermediate_general_support_

3090
E57

intermediate_general_support_ repair_cycle_time

4480
E58

intermediate_general_support_ replacement_task_distribution

4530
E59
item_category_code
2730
line_replaceable_unit
2880
J90

long_lead_time_items_list_

maintenance_action_code
3010
C41
maintenance_replacement_rate_I
3060
C34
maintenance_replacement_rate_II
3070
C35

maintenance_replacement_rate_ modifier

3080
C36
maximum_allowable_operating_time
3160
C40
minimum_replacement_unit
3450
D52
not_repairable_this_station
3610
C42

organizational_maintenance_task_

3090
E57
organizational_repair_cycle_time
4480
E58

organizational_replacement_task_

4530
E59

post_conference_list_provisioning_ prior_item_provisioning_list_item_ sequence_number

4120
C39

Used when re-sequencing is required.

provisioning_list_item_sequence_ number

4120
A2

provisioning_parts_list_provisioning_

provisioning_remarks
4150
H79
provisioning_system_identifier_code
4160
quantity_per_assembly
4190
C32

Option 1

Option 2

Option 3

quantity_per_end_item
4210
C33

Option 1

Option 2

Option 3 recommended_initial_system_stock_ buy

4310
D54

recommended_minimum_system_ stock_level

4330
D53

recommended_tender_load_list_ quantity

4340
D55
remain_in_place_indicator
4470
E65
repair_survival_rate
4490
D56

repairable_items_list_provisioning_ same_as_provisioning_list_item_ sequence_number

4120
C38

short_form_provisioning_parts_list_ source_maintenance_and_ recoverability_code

4830
B22

special_repair_activity_maintenance_

3090
E57

special_repair_activity_repair_cycle_ time

4480
E58

special_repair_activity_replacement_

4530
E59
supression_indicator
5080

system_configuration_provisioning_ parts_list_provisioning_technical_ documentation tool_and_test_equipment_list_

total_quantity_recommended
5410
C37
type_of_change_code
5620
A3
work_unit_code
5920
J86

HH ENTITY: OVERHAUL KIT NEXT HIGHER ASSEMBLY PROVISIONING LIST ITEM

SEQUENCE NUMBER DATA

HH Key Elements commercial_and_government_entity_

1520
A5
reference_number
4400
A6
end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_ next_higher_assembly_provisioning_ list_item_sequence_number

3590
C29

HH Elements next_higher_assembly_provisioning_ list_item_sequence_number_indicator

3580
C30
overhaul_replacement_rate
3790
C31

HJ ENTITY: PROVISIONING REFERENCE DESIGNATION DATA

HJ Key Elements commercial_and_government_entity_

1520
A5
reference_number
4400
A6
end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_

reference_designation
4380
D44

If used; order of preference is option 1, 3 then 4.

Option 1

Option 2

Option 3

Option 4

Option 5

HJ Elements

reference_designation_code
4370
D46
technical_manual_code
5250
J80
figure_number
2290
J81
item_number
2800
J82

HK ENTITY: PARTS MANUAL DESCRIPTION DATA

HK Key Elements

figure_number
2290
J81
item_number
2800
J82

commercial_and_government_entity_

1520
A5
reference_number
4400
A6
end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_

technical_manual_code
5250
J80

HK Elements parts_manual_provisioning_ nomenclature

4130
K91
quantity_per_figure
4220
J85
technical_manual_change_number
5240
J83

technical_manual_functional_group_

5260
J86
technical_manual_indenture_code
5270
J84

HN ENTITY: PROVISIONING SERIAL NUMBER USABLE ON CODE DATA

HN Key Elements

end_item_acronym_code
2040

logistics_support_analysis_control_ serial_number_provisioning_logistics_ support_analysis_control_number

2970
H77

serial_number_provisioning_alternate_logistics_support_analysis_control_ number_code

1200
H78

serial_number_provisioning_ entity_code

1520
A5

serial_number_provisioning_

4400
A6

serial_number_provisioning_system_ end_item_logistics_support_analysis_ control_number

2970
H77

serial_number_provisioning_system_ end_item_alternate_logistics_support_analysis_control_number_code

1200
H78

serial_number_provisioning_serial_ number_from

4690
F68

serial_number_provisioning_serial_ number_to

4690
F68

HO ENTITY: PROVISIONING SYSTEM END ITEM USABLE ON CODE DATA

HO Key Elements

end_item_acronym_code
2040

logistics_support_analysis_control_ usable_on_code_provisioning_ commercial_and_government_entity_ code

1520
A5

usable_on_code_provisioning_

4400
A6
usable_on_code_provisioning_logistics_support_analysis_control_number
2970
H77

usable_on_code_provisioning_ alternate_logistics_support_analysis_ control_number_code

1200
H78

usable_on_code_provisioning_system_end_item_logistics_support_analysis_ control_number

2970
H77
usable_on_code_provisioning_system_end_item_alternate_logistics_support_analysis_control_number_code
1200
H78

HP ENTITY: DESIGN CHANGE INFORMATION DATA

HP Key Elements

end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_ commercial_and_government_entity_

1520
A5
reference_number
4400
A6
change_authority_number
1490
F66

HP Elements

interchangeability_code
2670
F67
prorated_exhibit_line_item_number
4080
G75
prorated_quantity
4090
G76
quantity_procured
4250
F73
quantity_shipped
4260
F72
replaced_or_superseding_provisioning_list_item_sequence_number
4520
F70

replaced_or_superseding_provisioning_list_item_sequence_number_ Indicator

4510
F71
total_item_changes
5400
F69

HQ ENTITY: SERIAL NUMBER EFFECTIVITY DATA

HQ Key Elements

end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_ commercial_and_government_entity_

1520
A5
reference_number
4400
A6
change_authority_number
1490
F66
from_serial_number_effectivity
4690
F68
to_serial_number_effectivity
4690
F68

HR ENTITY: DESIGN CHANGE USABLE ON CODE DATA

HR Key Elements

end_item_acronym_code
2040

usable_on_code_provisioning_ commercial_and_government_entity_ code

1520
A5

Will be determined at Provisioning Guidance Conference usable_on_code_provisioning_ reference_number

4400
A6
usable_on_code_provisioning_logistics_support_analysis_control_number
2970
H77

usable_on_code_provisioning_ alternate_logistics_support_analysis_ control_number_code

1200
H78

logistics_support_analysis_control_ usable_on_code_provisioning_system_end_item_logistics_support_analysis_ control_number

2970
H77
usable_on_code_provisioning_system_end_item_alternate_logistics_support_analysis_control_number_code
1200
H78
change_authority_number
1490
F66

HY ENTITY: PART APPLICATION IDENTIFICATION DIGITAL FILE DATA

HY Key Elements

end_item_acronym_code
2040

logistics_support_analysis_control_

2970
H77

alternate_logistics_support_analysis_

1200
H78

logistics_support_analysis_control_ commercial_and_government_entity_

1520
A5
reference_number
4400
A6
document_id
1940
F74
graphic_source_identification
2340

HZ ENTITY: CAGE REFERENCE NUMBER DIGITAL FILE DATA

HZ Key Elements commercial_and_government_entity_

1520
A5
A
reference_number
4400
A6
A
document_id
1940
F74
graphic_source_identification
2340

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

Advanced Battery Charger

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

C003

2. TITLE OF DATA ITEM

ENGINEERING DATA FOR PROVISIONING (EDFP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81874

5. CONTRACT REFERENCE

SOW para 3.2.6; 5.3.2

6. REQUIRING OFFICE

7. DD 250 REQ

9. DIST

STATEMENT

B

10. FREQUENCY

AS REQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies only for administrative use, (Contract Award Date). Other requests for this document shall be referred to Marine Corps Systems Command, PdM EPS, 2200 Lester Street, Quantico, VA 22143-6050.

BLK 12 - Submittal of Intial EDFP shall be forty five (45) calendar days after contract award. The Government requires thirty (30) calendar days for review and comment.

BLK 13 - Contractor shall incorporate Government comments and resubmit within fifteen (15) calendar days after Provisioning Conference. The review cycle shall continue until Government acceptance of data is met.

BLK 14- The contractor shall deliver 1 draft digital copy of the document to the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .