RFQM6700114T0004.pdf
PDF 459 KB Posted
- Attached to
- O-Level Aircraft Maintenance on CH53 E
- Solicitation number
- M6700114T0004
- Issued by
-
United States Marine Corps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_PART_TWO_M6700114T0004.pdf | ||
| Questions_and_Answers_M6700114T0004.pdf | ||
| RFQM6700114T0004_Amendment_01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M67001MARINE CORPS FIELD CONTRACTING SYS
P.O. BOX 8368 BLDG 1116
CAMP LEJEUNE NC 28547-8368
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$30 Million
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
M67001-14-T-0004 25-Apr-2014
b. TELEPHONE NUMBER
910-451-1467
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 28 May 2014
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
M67001
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE M01053 16. ADMINISTERED BY
MARINE WING HEADQUARTERS SQUADRON 2
IGNATIUS K. HICKMAN
BLDG 4464
CHERRY POINT NC 28533-0076
TEL: 252-466-2222 FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
HAROLD KOSTEM
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
488190
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
2 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
M67001-14-T-0004
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months
AIRCRAFT MAINTENANCE SERVICES
FFP
O-LEVEL MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS
SET FORTH IN THE STATEMENT OF WORK
FOB: Destination
NET AMT
1001 12 Months
OPTION AIRCRAFT MAINTENANCE SERVICES
FFP
O-LEVEL MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS
2001 12 Months
OPTION AIRCRAFT MAINTENANCE SERVICES
FFP
O-LEVEL MAINTENANCE IN ACCORDANCE WITH THE REQUIREMENTS
INTRODUCTION
This acquisition will be conducted in accordance with FAR Subpart 13.5, Test Program for Certain Commercial
Items.
The United States Marine Corps MCIEast Contracting Department intends to procure O-level Aircraft Maintenance
Services. M67001-14-T-0004 is issued as a Request for Quotation (RFQ) to provide the Government aircraft maintenance services. The contractor shall provide O-level maintenance at Marine Heavy Helicopter Training
Squadron 302 (HMHT-302) by performing labor and services for scheduled and unscheduled inspections/maintenance on CH-53E aircraft. The contractor shall accomplish the functions outlined in the
Statement of Work (SOW). The location of performance is MCAS New River, NC. A detailed description of services are located in attachment one (RFQ). The RFQ documents and incorporates provisions and clauses that are in effect through Federal Acquisition Circular 2005-70, effective September 30, 2014 and DFARS Change Notice
(DCN) 20130930, effective 30 September 2013. This solicitation is 100% Service Disabled Veteran Owned Small
Business Set a Side. The associated North American Industrial Classification System (NAICS) code for this requirement is 488190 and the small business size standard is $30,000,000.00. The provision at 52.212-1, Instructions to Offerors – Commercial Items applies to this acquisition. The service the contractor provides shall comply with all Federal, State, and Local regulations.
The period of performance is 05 August 2014 thru 04 August 2015 plus two (2) one-year option periods. This acquisition is expected to result in a firm-fixed price level of effort term open market contract that will be awarded to one small business contractor.
INSTRUCTIONS TO QUOTERS
A1. Quotes shall be received by the Contracting Department by 4:00 pm, on 28 May 2014, to be considered for award. Vendor may send quotes, via e-mail, to harold.kostem@usmc.mil, or the quotes may be mailed, shipped or faxed to (910) 451-2331. All portions of the quote, even those submitted separately via mail, fax, courier, email, or other shipment shall also be received by 4:00 pm, on 28 May 2014. The information submitted shall be clear and legible (Note: repetitively copied data loses its clarity and legibility). The address for submitting quotes, via United States Postal Service (USPS) is: Contracting Department, Attn: Harold Kostem, PSC Box 8368, Camp
Lejeune, NC 28547. If the method for submitting a quote is courier service, the delivery address is: Contracting
Department, Attn: Harold Kostem, Bldg 1116, Birch Street, Marine Corps Base, Camp Lejeune, NC 28547-8368.
The technical quote is to be submitted with vendor’s identifying information ONLY on the cover page of the technical quote. Failure to follow this instruction may result in rejection of the quote.
The Government will not accept questions after 16 May 2013, 11:00 am.
Vendors shall submit all questions via email to harold.kostem@usmc.mil and Laurie.L.Lenser@usmc.mil.
A2. The basis of the award is “best value” to the Government. The Government will issue a single firm fixed-price order. However, the Government reserves the right to award no contract at all, depending on the quality of the quotes submitted.
A3. All quotes submitted shall be the Quoters' Best Quote inclusive of any discounts.
A4. A quote will be complete and forwarded to the evaluators when it:
1. Contains all applicable documentation that sufficiently and clearly identifies and/or demonstrates the functionality and operability of required services.
2. Separately and completely addresses each of the evaluation factors.
3. Clearly demonstrates the ability to meet the period of performance requirement.
4. Contains no company identifying information on any page except the cover page.
5. Is submitted by due date and time stated within this solicitation.
The Government reserves the right to remove a quote from further consideration for award if any of the foregoing criteria are not met.
A5. Submission Requirement
A5.1 Note of importance: The Government, as stated in item A2 above, intends to make an award based on a vendor’s initial quote, therefore the initial quote should contain the vendor’s best terms from a price and technical standpoint. The Government requires that the vendor’s quote provide a complete response to the evaluation criteria set forth in the request for quote and to the requirements set forth in this document. The Government reserves the right to award without conversations, or to conduct conversations with vendors if later determined by the Contracting
Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest; and may waive informalities and minor irregularities in quotes received. Vendors shall not request clarification of quoted information or request additional information once the quotes have been submitted, pursuant to the dates and times specified in A1. It is the vendor’s responsibility to provide sufficient information. The Government must be able to match and identify descriptions and schedule prices with information submitted.
CONTENTS OF QUOTES: All quotes must be submitted with the minimum content specified herein. Quotes without the minimum content will be rejected. The quote shall be divided tabbed and indexed. The quote shall contain sufficient information to enable evaluators to make complete analyses of quotes. The technical quote shall not contain cost/pricing information.
TECHNICAL/MANAGEMENT:
The vendor's Technical Quote shall be specific and shall address every requirement stated in the SOW. The Quote shall address the following topics:
1. Technical /Management approach. Provide detailed statement.
2. Corporate Experience. The vendor’s technical and management proposal shall consist of a narrative and supporting data that demonstrates the vendor’s experience in supporting this type of requirement and the ability to meet all technical requirements contained in this solicitation. The narrative should demonstrate the vendor’s understanding of the requirements. The quote shall show a clear understanding of the requirements and how the experience and resources of their organization can best provide the development and management personnel necessary to carry out this requirement.
mailto:harold.kostem@usmc.mil mailto:Laurie.L.Lenser@usmc.mil
3. Methodology and Work Accomplishment Plan. The vendor shall provide a plan for accomplishment of work that explains how the requirements of this solicitation will be accomplished. Vendor shall describe the methodology to accomplish the required effort. The vendor shall demonstrate how the vendor will organize, plan and control the work. Additionally, the vendor shall demonstrate their ability and plan to seamlessly transition into performance of the contract without disruption.
4. Organization. The vendor shall demonstrate his ability to provide personnel with documented skills and direct experience as detailed in the Performance Work Statement and the degree of experience.
5. Resumes/or position description (PD). Resumes/detailed PD shall be provided detailing qualifications that demonstrate the ability to meet educational requirements, additional training, particular skills and experience in similar efforts. Additionally, employment agreements and resumes shall be provided No Later Than 5 days after contract award for all employees that are not currently working for the vendor.
PAST PERFORMANCE:
The vendor's Past Performance Quote shall be specific and shall address every requirement stated in the PWS. The
Quote shall include the following:
Vendors shall submit three (3) past performance references for contracts performed within the past three (3) years.
Vendor’s Past Performance will be rated equally with the Technical Quote and will be an important factor in evaluating the credibility of the vendor's quote and relative capability to meet performance requirements. Vendors shall furnish past performance reference data for contracts which required the same or similar type services with their offer.
Past performance information utilized will be obtained from the vendors' references, other customers known to the
Government and others who may have relevant information. Evaluation of past performance may be quite subjective based on consideration of all relevant facts and circumstances; however, the basis for conclusions of judgment will be documented. No information will be considered which is over 3 years old. The government may use any authorized method of obtaining and evaluating past performance including personal knowledge of the vendor’s performance from government employees who have worked with that vendor.
It is suggested that your references be notified that they are being named as a reference. The Government will contact the vendor’s customers to obtain information regarding the vendor’s actions under previously awarded contracts
No Past Performance History. In the case of a vendor without a record of relevant past performance or for whom information on past performance is not available, the vendor will not be evaluated favorably or unfavorably on past performance. Such vendors must make an affirmative statement that there is no past performance history available.
PRICE:
The price quoted shall be submitted separately from the technical proposal. The Government will evaluate the reasonableness of the price of each acceptable quote in relation to the vendor’s relative capability.
The unit price for CLIN 0001 (Maintenance) is the price per month. The CLIN’s net amount for 12 months will be the annual cost.
For the base year and all option years the vendor shall provide:
-The unit price (per CLIN)
-The net amount (per CLIN)
Additionally, the contractor shall provide the total cost of the base and all option years.
B. Evaluation Factors for Award
FACTOR #1 TECHNICAL/MANAGEMENT CAPABILITY
This factor is met when the vendor meets the acceptability standard for each sub factor: The sub factors are listed below:
Sub factor A: The vendor’s narrative demonstrates a clear understanding of the scope of work. Vendor has corporate experience that is commensurate to performance of this contract.
Sub factor B: Demonstrates acceptable work methods to perform the work. Work methods proposed adequately addresses all requirements.
Sub factor C: Vendor provided documented skills and experience as detailed in the Performance Work Statement.
Sub factor D: Resumes/or position description (PD). Resume/PD demonstrates personnel experience and qualifications that meet requirements detailed in the Statement Of Work.
Sub factor E: Demonstrates a process to manage and accomplish phase-in hiring and orientation to include complete workforce requirements and hiring of all personnel necessary to accomplish all contract requirements with no disruption.
Sub factor F: The vendor’s narrative demonstrates the ability to provide seamless phase-in of personnel to fully support requirements of this contract by 30 June 2014.
FACTOR #2 PAST PERFORMANCE.
This factor is met when:
A determination can be made that the vendor has satisfied its customers in the past and demonstrates past performance and has provided same or similar services, similar in size, scope and complexity within the past three
(3) years.
If the vendor does not have relevant past performance, a rating of neutral will be assigned to this factor.
Sub factor A Quality of service. Compliance with contract and standards of good workmanship.
Sub factor B Timeliness of performance. Met performance times and did not receive any cure or show cause notices nor have numerous complaints.
Sub factor C Customer (end-user) satisfaction. Customer (end-user) satisfaction of overall performance for services
Sub factor D Business relations. History of reasonable and cooperative behavior and overall business-like concern for the interests of the customer.
FACTOR #3 PRICE/COST PROPOSAL. Pricing will be the deciding factor for all quotes found to be equal in respect to technical capability and past performance. All pricing will be tested for reasonableness. Unreasonably high prices will be rejected and unrealistically low prices will be considered as evidence of lack of understanding of the requirement. The evaluation of pricing will be considered both objectively and subjectively in relation to the relative merits of the quotes submitted.
B1. Evaluation Criteria for Quotes The Government intends to award one contract as a result of this solicitation;
however, the Government reserves the right to award no contract. The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforms to the solicitation and will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:
1. Technical/Management Capability
2. Past performance
3. Price
Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
B1.1 Basis for Award. This is a best value competitive source selection. Award will be made to the vendor whose quote is determined to be the most advantageous to the Government, price and other factors considered. The technical/management proposal factors and past performance factors, when combined, are significantly more important than the price factor. Therefore, the Government may accept other than the lowest priced technically acceptable quote if it is determined that the additional technical merit quoted provides the best value to the
Government. Technical/management plan and past performance will be rated equally. The Government will evaluate information that demonstrates quality of performance relative to the size and complexity of the procurement under consideration. The Government intends to award one contract as a result of this request for quote. The Government reserves the right to make an award based on initial quotes received, without conversations, based on evaluation criteria discussed in A5.1 of this document.
The Government reserves the right to hold conversations with any vendor whose quote is determined to need further information or clarification if that is determined to be in the best interest of the government.
STATEMENT OF WORK
CH-53E
Contractor Maintenance Support (CMS)
1. INTRODUCTION
The purpose of this nonpersonal services contract is to provide Contractor Maintenance Support (CMS) for Marine
Heavy Helicopter Training Squadron 302 (HMHT-302). CMS will perform organizational level maintenance on the
CH-53E aircraft of HMHT-302.
HMHT-302 is currently the only Fleet Replacement Squadron (FRS) for the CH-53E aircraft and is responsible for the initial hands-on training of all pilots, aircrews, and maintainers of this aircraft. As such, the squadron requires a very high level of readiness to ensure aircraft are available for training.
Under this nonpersonal services contract, the contractor personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
2. DESCRIPTION OF SUPPLIES/SERVICES
The contractor shall perform organizational level maintenance on the CH-53E aircraft within HMHT-302 spaces at
Marine Corps Air Station (MCAS) New River, North Carolina (NC). The maintenance services provided by the contractor shall be within the skill classifications identified in this Statement Of Work.
3. SCOPE
Contractor Maintenance Support: Contractor will perform approximately 30,720 annual man hours of organizational level maintenance at HMHT-302 on CH-53E aircraft at MCAS New River, NC. The types of maintenance support to be provided are maintenance documentation, scheduled and unscheduled maintenance which includes inspections, servicing, lubricating, adjusting and the removal and replacement of aeronautical components, corrosion prevention and treatment.
4. CONTRACTOR FURNISHED
The contractor shall provide all supervision and labor while maintaining assigned common use tools and containers provided by the government IAW the most current version of the Tool Control Manual (TCM). All maintenance to be performed by the contractor shall be performed by technicians thoroughly trained and knowledgeable in operation and maintenance of the systems specified in the individual skill classifications as listed in enclosure (1). All qualifications/certifications listed in enclosure (1) must be currently held or have been previously held by CMS personnel assigned to production work centers. All qualifications/certifications will be documented and maintained using the Advanced Skills Management database.
5. APPLICABLE DOCUMENTS
The contractor shall perform all work in accordance with the most current version of Commander Naval Air Forces
Instruction (COMNAVAIRFORINST) 4790, also referred to as the Naval Aviation Maintenance Program (NAMP), and applicable CH-53E maintenance instruction manuals, Technical Directives (TDs), squadron Standard Operating
Procedures (SOPs), and such other instructions as may be applicable in the support of these tasks.
The contractor shall ensure that personnel have applicable training, qualifications, and certifications required to perform services involving Class V Ammunition and Explosive Material required for effectively maintaining and supporting the CH-53E aircraft. Qualification and certification shall be required for personnel performing Class V
Ammunition and Explosive Material work in accordance with MCO 8023.3 Series.
6. CMS WORK SPECIFICATIONS
The personnel complement shall include an adequate mixture of the following labor categories; maintenance control/team lead, quality assurance representative, technical directive (TD) coordinator, airframe mechanics, flight-line mechanics, electrical/avionics mechanics. The complements mixture shall be balanced in a manner to adequately support 30,720 man hours of scheduled and unscheduled maintenance which includes documentation, inspections, servicing, lubricating, adjusting and the removal and replacement of aeronautical components.
Additional guidance and minimum qualifications are provided in enclosure (2). These CMS personnel shall augment government maintenance personnel at the Organizational level (O-1evel). The goal of this effort is to clean, inspect, document, and repair O-Level discrepancies while assisting in the training and development of their Marine counterpart’s military occupational specialty (MOS) proficiency. The contractor shall perform the tasks prescribed herein as assigned by the Contracting Officer’s Representative (COR). Contractor personnel are employees of the contractor and under their administrative control and supervision.
The government’s estimated labor category mixture for CMS is:
- (1) Maintenance Controller/ Team Lead
- (1) Quality Assurance Representative
- (1) TD Coordinator
- (5) Airframe Mechanics
- (4) Flight-Line Mechanics
- (4) Electrical/Avionics Mechanics
A. The contractor shall report all interim Intermediate Level (I-Level) and Depot Level (D-Level) repair requirements found during inspection/corrective action, to the designated squadron Maintenance Material Control
Officer (MMCO).
B. All work performed shall be in accordance with the NAMP and existing local processes and procedures. All maintenance/inspections performed by the contractor shall be documented via Work Orders (WO). Contractor personnel shall acquire appropriate Special Maintenance Qualifications (SMQ) to initiate WOs and complete maintenance action within Squadron Naval Aviation Logistics Command/Management Information System
Optimized Organizational Maintenance Activity (NALCOMIS OOMA).
C. The CMS team members shall be qualified to examine, inspect, investigate, repair, and provide recommendations to the local Maintenance Control and/or government agency as required. CMS personnel will be highly qualified and technically competent in their assigned skill category, meeting the minimum qualifications identified in
Enclosure (2).
D. Selected contractor personnel may qualify as Collateral Duty Inspector (CDI), Collateral Duty Quality Assurance
Representative (CDQAR) and as a Plane Captain in accordance with the NAMP. All maintenance will be performed and inspected in accordance with the NAMP.
E. The contract requirement is for all employees to possess at minimum a favorable Nation Agency Check with
Inquiries (NACI) or a DoD-determined equivalent investigation.
7. WORK HOURS
A. The standard work week for federal employees is 40 hours per week. The standard 40 hour week is defined as five (5) days a week, eight (8) hours a day. The contractor is advised that deviation from this standard workweek may affect access to buildings, materials and or government employees.
The following is a list of holidays observed by the Government:
Name of Holiday Time of Observance
New Year’s Day 1 January
Martin Luther King Jr. Day Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran’s Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
B. Current shifts of government employees are as follows:
1. Monday-Friday 0700-1500 (1 st shift)
2. Sunday-Thursday 1500-2300 (2 nd shift)
3. Sunday-Thursday 2300-0700 (3 rd shift)
The contractor shall determine and set its own schedule providing that it supports the maintenance work schedule.
8. ADMINISTRATIVE INFORMATION
A. The contractor is responsible for maintaining the required minimum number of employees. The contractor alone shall approve and administer leave and holidays for its employees. The contractor will be responsible for tasking its employees in accordance with the work required. The COR will provide the Team Leader with all tasks the contractor will be responsible for completing and the contractor will decide how that work is assigned to its employees. The contractor will perform all supervision, evaluation and disciplinary functions for its employees.
B. Due to the urgent and continuous nature of this requirement, the government requires the contractor to maintain the proposed workforce at 100% manning. As such, the contractor is expected to develop a manning plan to fill any planned or unplanned vacancies on an expedited basis. Any vacancies that occur in the contractor’s proposed manning should be filled within 14 calendar days. Any manning vacancies that remain unfilled after 14 days will have an invoice offset calculated using the total proposed daily cost (including profit and overhead) for the position left vacant (based on a 30 day month) times the number of vacant days in the billing cycle plus an additional 10% of the cost calculated.
9. QUALIFICATION REQUIREMENTS OF CONTRACTOR’S EMPLOYEES
The contractor shall identify a member of their support team as the Team Leader. The team leader shall be responsible for all contractor activity and for overall supervision of the contract performance associated with the
CMS efforts.
A. CMS Personnel:
(1) Shall possess extensive maintenance, modification, and repair experience on Naval/United States Marine Corps rotorcraft or applicable platform or possess equivalent industry experience such as Airframe and Power Plant (A&P) or Federal Communication Commission (FCC) license. See enclosures (1) and (2) for specific qualifications and certifications.
(2) Must possess the ability to work independently, without technical guidance, to perform all tasks outlined in the
Maintenance Instruction Manual (MIM), and the technical proficiency to qualify as CDI or CDQAR.
(3) Shall be familiar with all publications relevant to the maintenance of the CH-53E appropriate to the assignment and have a thorough practical and theoretical knowledge of the equipment/systems.
(4) Shall possess knowledge of the learning process and how to transfer technical knowledge to less qualified personnel, including the ability to express thought in both oral and written communications.
(5) Shall possess thorough understanding of NALCOMIS OOMA maintenance documentation.
(6) Shall be U.S. citizens to ensure access to flight line work spaces and critical information systems.
10. SAFETY
The contractor shall comply with all applicable and local safety regulations and policies governing work performed on USMC aircraft. The Contractor shall ensure personnel are equipped with proper work attire to include safety boots, eye protection, and other Personal Protection Equipment (PPE) determined to be necessary. Working uniforms shall be clearly marked to identify personnel.
11. GOVERNMENT RESPONSIBILITIES
The Government will:
A. Provide workspace/hangar facilities for the servicing of aircraft and a secure space for storing contractor's common tools.
B. Provide office space for the CTS team and CMS personnel. The office shall include desks, chairs, filing cabinets, telephones, and access to computers as necessary to include Navy/Marine Corps Intranet (NMCI) accounts.
C. Provide all technical manuals.
D. Provide all special Individual Material Readiness List (IMRL) tools, Ground Support Equipment (GSE), ground handling equipment, precision measuring equipment (micrometers, torque wrenches, etc.), and special/common tools required to perform the aircraft maintenance tasks for the contractor’s usage as needed. Ownership and maintenance of these items will remain with the government.
E. Provide Defense Secure Network (DSN) and local MCAS New River phone service.
F. Provide all materials, consumable parts, and repairable parts needed to perform scheduled/unscheduled aircraft maintenance tasks.
G. Provide access to supply databases as required.
H. Provide existing squadron Pre-Expended Bins (PEBs) for use by the contractor maintenance personnel. All usage will be decremented via OOMA. PEB additions may be made with the concurrence of the COR and Marine
Aviation Logistics Squadron (MALS) Aviation Supply Officer.
I. Provide liaison for squadron concerns, including Engineering Investigations (EIs), hazardous material reports, and quality deficiency reporting.
J. Be responsible for Quality Assurance (QA) and CDI of all work accomplished by any member of the CTS/CMS team. In the absence of a qualified CMS CDIs or CDQARs, final responsibility for the completed work will remain with the Marine (the USMC) performing the required function.
K. Upon arrival, change of personnel, and at an annual minimum, CTS/CMS personnel are to be briefed on local policies, safety rules, and regulations.
L. Provide emergency medical care when injuries occur on the worksite: defined as medical care that is necessary to be performed until the individual can be transported to civilian medical facilities without endangering life. Closing lacerations and tending to unconscious personnel are examples of emergency medical care.
M. Provide all necessary personnel passes, identification badges, and vehicle permits required for access to work.
N. For the services described herein, the COR shall be responsible for ensuring services are received and properly performed in accordance with this Performance Work Statement.
12. TRAVEL
Work performed within a 50-mile radius of MCAS New River will be considered local travel, and will not be reimbursed by the government. Travel outside a 50 mile radius shall only be authorized by the COR and shall be in accordance with the Joint Federal Travel Regulations.
13. Level Of Effort Requirements Summary. The performance standards are stated in the summary below.
Objective Standard AQL Inspect or
Inspection, Type and
Frequency
Incentive
Maintaining
Required Staffing
Levels
In accordance with paragraph 6
(CMS) of the
SOW.
100%
COR
Observation
Random Monitoring
Option Exercised
Positive Contract Performance
Assessment Report System
(CPARS) Reporting
Qualified
Personnel with paragraph
9a of the SOW.
Option Exercised
Positive CPARS Reporting
Enclosure (1)
LIST OF REQUIRED QUALIFICATIONS/CERTIFICATIONS
ALL
CMS
(100%) -
NOTE
(1)
ALL CMS
(75%
MIN) -
NOTE (1)
AIRFRAMES
(75% MIN)
AVIONICS
(75% MIN)
FLIGHT
LINE
(75% MIN)
NOTE
(2)
Auxiliary Power Plant (APP) X
Blade Fold X
Brake Rider X
Egress Certified X
Level III Marine Aviation
Training and Education Program
(MATMEP)
Tow Qualified X
A/M42M-2A Portable Flood
Light
A/S32A-45 Tow Tractor X
BT-400-46 Pre-Heater (or legacy equivalent)
Flight Line Utility Vehicles (aka
Mighty Mites)
A/M32A-108 Mobile Electric
Power Plant (MEPP) X X
ACU-20/M Air Compressor X X
1428AS100 Portable Nitrogen
Cart
A/M26U-4B Nitrogen Cart X
A/M27T-15 Hydraulic Cart X
Hydraulic Contamination, Air
Frames (AF)
Tire and Wheel, Air Frames (AF) X
NC-10 A/B/C Mobile Electric
Power Plant (MEPP)
65A102-J1 Corrosion Cart X
A/M48M-4 Landa Pressure
Washer
Fuel Surveillance, Flight Line
(FL)
PDHW-4 Hydro Blaster Pressure
Washer
A/S32M-17 Aircraft Maintenance
Crane (TEREX)
MODEL 20 Jet-blast Portaformer
NOTE (1): applies to the 3 CMS production work centers only (Airframes, Avionics, and Flight Line).
NOTE (2): this qualification must be represented in some way by the collective CMS Team.
Enclosure (2)
REQUIRED CONTRACTOR EMPLOYEE COMPLEMENT AND QUALIFICATIONS
Note that contractor staffing levels shall be maintained in accordance with the Quality Assurance Surveillance Plan.
Contracted Maintenance Support (CMS):
The government’s estimated labor category mix consisting of 16 maintainers is consistent with the existing workload for CH-53E CMS and is not anticipated to change.
CATEGORY # WORKERS CDI CDQAR
MIN YRS
AVIATION
MAINT
EXPERIENCE
MIN YRS
H-53 MAINT
EXPERIENCE
AIRFRAMES 5 1 2 4 2
AVIONICS 4 1 1 4 2
FLIGHT LINE 4 1 2 4 2
QUALITY ASSURANCE
REPRESENTATIVE
N/A 1 6 6
MAINTENANCE
CONTROLLER (KEY)
N/A N/A 4 2
TECHNICAL DIRECTIVE (TD)
COORDINATOR
N/A N/A 4 0
NOTE (1): must have previously qualified as Quality Assurance Representative
NOTE (2): must have previously held Safe for Flight certification in CH-53E and working knowledge of Optimized
O-level Maintenance Activity (OOMA) NALCOMIS.
NOTE (3): must be intimately familiar with TD coordination, OOMA NALCOMIS, and naval message traffic format and function.
QASP
Quality Assurance Surveillance Plan (QASP)
1. Purpose. This Quality Assurance Surveillance Plan (QASP) has been developed to provide the standard of surveillance for monitoring contractor augmented aircraft maintenance services in support of the CH-53E aircraft. The Contracting Officer (KO) will be appointed at the time of award and COR Contact information will be provided. The COR will also serve as the Quality Assurance Evaluator (QAE) and will use this QASP to ensure the standards of the contract are being met. The COR/QAE will be referred to as the COR throughout this QASP.
2. Level Of Effort Standards. The QASP provides a systematic method to evaluate the service the
Contractor is required to furnish. The COR will assess the Contractor’s performance to ensure the
Contractor is performing up to the specified standards. The standards for this Statement Of work (SOW) are stated in the Level Of Effort Requirements Summary (PRS) included in this QASP. The standards for this procurement are subjective since specific metric-driven standards are not appropriate.
3. Management and Oversight. The QASP is based on the premise that the Contractor and not the
Government, is responsible for the management and any Quality Control action required to meet the terms of the contract. The Level Of Effort requirements recognize that the Contractor is not a perfect manager and that unforeseen requirements and uncontrollable problems do occur. Good management and use of an adequate Quality Control Plan will allow the Contractor to operate within specific performance requirements. QASPs are designed to be objective, fair, and consistent in evaluating Contractor performance against the provided standards.
4. Acceptable Quality Levels (AQLs). AQLs have been established in the Level Of Effort Requirements
Summary and provide performance standards that the Contractor will meet in performing the contract. If the contractor meets the required AQL, it will be paid the monthly amount agreed upon in the contract. In the event the Contractor does not meet the established AQLs, the KO has the right to exercise the negative incentives stated in this QASP.
5. Primary Method of Surveillance/Evaluation. The COR will evaluate the contractor’s performance using one or more of the following surveillance methods:
Observation/Random Monitoring: Observation/Random monitoring of staffing levels and personnel qualifications by the COR.
Random Inspection: Random inspection of maintenance actions/inspection documentation developed via
Work Order (WO) Optimized Organizational Maintenance Activity (OOMA) Naval Aviation Logistics
Command Management Information systems (NALCOMIS).
6. Negative Incentives. If any of the performance requirements do not meet the AQL set in the PRS table, the
COR shall document the discrepancy(s) and shall notify the Contractor promptly, and the KO, on a monthly basis, for appropriate action. When the performance is below the AQL standard, the Government may implement negative incentives that include: increased surveillance, reduction in contract price, decision not to exercise next option, increased Contractor reporting, and/or documentation of contractor’s failure to meet performance requirements in the Contractor’s Performance Assessment Reporting System (CPARS). Due to the urgent and continuous nature of this requirement, the government requires the contractor to maintain the proposed workforce at 100% manning. As such, the contractor is expected to develop a manning plan to fill any planned or unplanned vacancies on an expedited basis. Any vacancies that occur in the contractor’s proposed manning should be filled within 14 calendar days. Any manning vacancies that remain unfilled after 14 days will have an invoice offset calculated using the total proposed daily cost
(including profit and overhead) for the position left vacant (based on a 30 day month) times the number of vacant days in the billing cycle plus an additional 10% of the cost calculated.
7. Notification. The COR will notify the KO, in writing, of unacceptable quality levels. The CO will promptly provide written notification of discrepancies on a monthly basis, or immediately if the situation significantly affects the well-being of the project. The Contractor will be given the opportunity to respond, in writing, to each discrepancy.
8. Response. The Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within ten (10) working days after receipt of the KO’s notification. The Contractor should cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.
9. Records. The COR will maintain contract surveillance files as directed by the KO. Surveillance files will include, as a minimum, the following documentation for this Firm-Fixed Priced contract:
a. COR designation and appointment letters.
b. A copy of the contract and all contract modifications.
c. QASP, Quality Control Plan, and any other monitoring tools, checklists, etc.
d. All correspondence including KO notifications and the Contractor’s responses.
e. Contractor monthly status reports.
f. Monthly evidence of satisfactory performance provided by Maintenance Chief.
g. Evidence of price monitoring: copies of certified invoices tracked against each contract line item.
h. Quarterly technical reviews.
i. Surveillance reports and a summary of the surveillance logs prepared by the COR and submitted to the KO annually.
j. Copies of deficiency reports that may be submitted in support of unacceptable performance identified during the performance period by the COR, or when there is a significant change in the assessment in one or more evaluation areas.
k. Annual in-progress reviews conducted and entered into CPARS .
10. Ratings. The following criteria will be used for performance evaluations: Exceptional, Satisfactory, Marginal, or Unsatisfactory. Upward or downward arrows may be used to indicate an improving or worsening trend insufficient to change to the assessment status.
a. Exceptional. Indicates performance clearly exceeds contractual requirements. The area of evaluation may contain a few minor problems for which corrective action appears highly effective.
b. Satisfactory. Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.
c. Marginal. Indicates performance meets contractual requirements. The area of evaluation contains one or more serious problems for which corrective actions have not yet been identified, appear only marginally effective, or have not been fully implemented.
d. Unsatisfactory. Indicates the contractor is in danger of not being able to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains one or more serious problems for which the corrective actions appear ineffective.
11. Documentation. Documentation used and referenced to perform surveillance will consist of monthly reports, contractor plans and procedures, schedules, customer feedback and contract data requirements.
a. Recording Observations. The COR shall use Surveillance Logs to record information on scheduled observations and deficiencies noted. Each observation is recorded on the log. The documents then become a formal record for reference. The contractor is to be told each time that a deficiency is found during scheduled observations. The COR makes a notation on the Surveillance Log of the date and time the deficiency was discovered, then, the COR asks a contractor site manager to initial the notation, documenting notification of the deficiency only.
b. Potential Unacceptable Performance. The COR must identify the specific service that is unacceptable and the possible causes, and ask a number of questions which if answered, will probably pinpoint the source of the problem.
c. Documenting Unacceptable Performance. The COR must attempt to resolve the problem with the contractor. The original log and the attempted solution (along with an evaluation of results) are forwarded to the Contracting Officer through the COR.
Based on the severity of the discrepancy and the success of the solution, the COR will notify the KO. The contractor shall complete a response to the unacceptable evaluation if requested by the KO or by its own choice.
12. Taking Action.
a. The COR may evaluate the contractor’s performance and document any non-compliance, but only the KO may take action against the contractor for an unacceptable rating.
b. When the contractor’s performance is unacceptable and a formal action is indicated, the COR will determine what action is appropriate for the specific circumstances and make a recommendation to the KO.
13. Documentation. The COR retains a copy of all inspection schedules and surveillance activity logs during the course of the contract, and forwards them for inclusion in the contract file at the end of the surveillance period. However, when a specific service becomes unsatisfactory during a surveillance period, the inspection documentation supporting the contract discrepancy report is forwarded to the KO.
14. Level Of Effort Requirements Summary. The performance standards are stated in the summary below.
Objective Standard AQL Inspector Inspection, Type and
Frequency
Incentive
Required Staffing
Levels with paragraph 6
(CMS) of the
Option
Exercised
Positive
CPARS
Reporting
Qualified
Personnel
9a of the SOW.
Exercised
Positive
Maintenance
Work and
Documentation
6a-b of the
Random Inspection
Exercised
Positive
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
1001 Destination Government Destination Government
2001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 05-AUG-2014 TO
04-AUG-2015
N/A MARINE WING HEADQUARTERS
SQUADRON 2
IGNATIUS K. HICKMAN
BLDG 4464
CHERRY POINT NC 28533-0076
252-466-2222
M01053
1001 POP 05-AUG-2015 TO
04-AUG-2016
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 05-AUG-2016 TO
04-AUG-2017
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-7 System for Award Management JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013
52.212-3 Offeror Representations and Certification--Commercial Items NOV 2013
52.212-4 Contract Terms and Conditions--Commercial Items SEP 2013
52.223-6 Drug-Free Workplace MAY 2001
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.232-17 Interest OCT 2010
52.232-18 Availability Of Funds APR 1984
52.232-23 Assignment Of Claims JAN 1986
52.233-2 Service Of Protest SEP 2006
52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985
52.242-13 Bankruptcy JUL 1995
52.245-1 Government Property APR 2012
52.247-34 F.O.B. Destination NOV 1991
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A MAR 2014
252.209-7001 Disclosure of Ownership or Control by the Government of a
Terrorist Country
JAN 2009
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2012
252.225-7031 Secondary Arab Boycott Of Israel JUN 2005
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006
252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JULY 2013)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF
1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the
Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .