Solicitation Amendment M0068126Q00110003 SF 30.pdf
PDF 608 KB Posted
- Attached to
- MCAS YUMA ENCAMPMENT SERVICES
- Solicitation number
- M00681Q0011
- Issued by
-
United States Marine Corps
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): The purpose of this amendment is to:
1. Update Addendum 52.212-1.
2. Update Addendum 52.212-2.
3. Update Attachment: PWS.
4. Update Attachment: ELIN Excel Worksheet.
5. Delete Attachment: Excel PDF.
6. Upload response to the industry's questions during solicitation via the Questions and Answers (Q&A) sheet.
7. Deleted clause 52.222-42, Statement of Equivalent Rates for Federal Hires.
8. Extend the solicitation close date to 1200 PM PST, 18 February 2026.
9. Add Attachment: Standoff and Separation Distances for Expeditionary Construction.
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
Response Due Date 17 Feb 2026 18 Feb 2026
M0068126Q00110003
Contract Clauses
Additional Information/Notes
The following clauses were deleted:
FAR Clauses Incorporated by Full Text
52.222-42 Statement of Equivalent Rates for Federal Hires. (May 2014)
STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( ), this clause 29 CFR Part 4 identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage-Fringe Benefits
(End of clause)
List of Contract Documents, Exhibits, or Attachments
The following attachments were added:
A1- PWS Tent City Final D1 - ELIN Worksheet D1 - Standoff and Separation Distances for Expeditionary Construction F2 - QA Response Final
The following attachments were deleted:
A1- PWS Tent City V.1 ELIN Worksheet
Addendum to 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services
Miscellaneous text in this section has been modified to:
52.212-1 ADDENDUM
Instructions to Quoters-Commercial Items (Services)
1. SUMMARY: This solicitation is a Request for Quote (RFQ) being conducted in accordance with FAR Part 12 using Part 13.5 procedures. The resulting award will be a single award, Indefinite Delivery Indefinite Quantity (IDIQ) type contract with Firm Fixed Price (FFP) contract line items. This commercial requirement shall provide the United States Marine Corps (USMC) with Basic Life Support Services aboard Marine Corps Air Station (MCAS) Yuma to support multiple exercises occurring throughout the ordering period. The period of performance shall be a base ordering period of 12 months.
2. SUBMISSION OF QUOTES: Quotes must be received no later than the date and time specified in block #8, page #1 - Pacific Time. Quotes shall be submitted via email. All email transmissions must clearly state the solicitation number in the subject line to ensure proper receipt. The USMC email system does not accept email messages larger than 35MB, recommendation is to send multiple emails limiting attachment size to 2MB. If multiple emails are submitted, please number the emails. For example, "email 1 of 3", "email 2 of 3", and "email 3 of 3". Proposals shall be emailed to both Gunnery Sergeant (GySgt) John Duong at john.duong@usmc.mil.
*** MAILED and FAXED QUOTES WILL NOT BE ACCEPTED***
***CDs / External Media Devices WILL NOT BE ACCEPTED***
***HAND-CARRIED SUBMISSIONS WILL NOT BE ACCEPTED***
The Government office designated for receipt of the proposal is the email inbox of the addressees indicated above. Notwithstanding the provisions at FAR 52.212-1(f), delivery is not accomplished until the addressees can open the email. Delivery to a server or an email inbox on a server is not considered delivery to the designated Government office and the quote is not under the Government's control until the addressees can open the email.
The email shall not be considered to be delivered unless the entire content of the email and all attachments can be read by the addressees indicated above. Receipt of an electronic acknowledgment from the addressee establishes that a record was received but does not establish that the content sent corresponds to the content received. Quoters are specifically warned that email may be subjected to spam filters or attachment stripping.
Attention is directed to FAR 52.212-1(f), concerning late submissions. Quoters are responsible for allowing adequate time for transmission to be completed. The Quoter bears the risk of non-receipt of transmissions, and should ensure that all pages of the quote (and any authorized modifications) have been received by the designated office before the deadline indicated. Pages of a transmission that arrive after the deadline will not be considered.
The Government may make award based solely on the initial quotes received. However, pursuant to FAR 52.212-1(g), the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.
3. SYSTEM FOR AWARD MANAGEMENT (SAM): The registration must be active. For information and registration go to http://www.sam.gov. Note: The Quoter shall complete only paragraph (b) of provision 52.212- 3 if the Quoter has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Quoter has not completed the annual representations and certifications electronically, the Quoter shall complete only paragraphs (c) through (v) of provision 52.212-3.
4. PERIOD OF VALIDITY OF QUOTES: The pricing terms and conditions of the quotes should be valid for 90 days. In accordance with FAR 13.004(a), a quotation is not an offer and, consequently, cannot be accepted by the Government to form a binding contract. Therefore, issuance by the Government of an order in response to a quotation does not establish a contract. The order is an offer by the Government to buy certain supplies or services upon specified terms and conditions. A contract is established when the quoter accepts the offer.
5. COMPLETE SUBMISSION: This section specifies the format and limitations that quoters must use when submitting quotes. Submissions shall be in the form prescribed below and shall contain a response to each of the areas identified. Only complete quotes received will receive consideration.
5.1. General Requirements.
5.1.1. Quotes shall be submitted in the following format: (1) pages be single-spaced with double spacing between paragraphs; (2) Times New Roman 12-point font except for figures, tables, and diagrams where smaller point font is acceptable as long as it is readable; (3) page size of 8.5 inches x 11 inches; and (4) Adobe Acrobat ("PDF") file format for non-pricing documents [and Microsoft Excel format for pricing exhibits (with cell functions visible)]. Standard character spacing should be utilized.
5.1.2. The quoter shall prepare, written in English, the quote as set forth in Table 1 - Quotation Organization.
Table 1 - Quotation Organization
VOLUME SECTION TITLE PAGE Limitation
I 1.0 TECHNICAL PROPOSAL See Below
1.1 Cover Letter 1
1.2 Table of Contents (Master and Volume I) 2
1.3 Organizational Chart No limit
1.4 Evaluation Factor 1: Technical Approach 15
II 2.0 PAST PERFORMANCE No Limit
2.1 Table of Contents No limit
2.2 Evaluation Factor 2: Past Performance No limit
III 3.0 PRICE No Limit
3.1 Table of Contents No limit
3.2 Solicitation and all amendments - Signed No limit
3.3 Price Proposal (SF 1449 and ELIN Pricing) No limit
3.4 All applicable provisions completed No limit
5.1.3. Page Limitations: Pages shall be numbered consecutively in each volume. The page limitations for section 1.1, 1.2 and 1.4 shall be treated as the maximum number of pages allowable. If an offer exceeds the maximum number of pages, the excess quotation pages starting with page 16 of section 1.4 will not be read or considered in the evaluation of the quote. Not included in the page limitations are the following:
- Resumes
- Cover Letter
- Table of Contents
- Organizational Chart
- Past Performance
- Price
5.1.4. Markings:
5.1.4.1. All pages of the resume(s) shall be marked "PERSONALLY IDENTIFIABLE INFORMATION (PII)
SAFEGUARD IAW DOD PRIVACY PROGRAM AND PRIVACY ACT OF 1974."
5.1.4.2. All pages the quoter intends to treat as Confidential Business Information should be marked as such in accordance with the quoter's customary business practices, to include any restrictive legends or other limitations.
"Confidential Business Information," (Information) as used in this addendum, is defined as all forms and types of financial, business, economic or other types of information other than technical data or computer software /computer software documentation, whether tangible or intangible, and whether or how stored, compiled, or memorialized physically, electronically, graphically, photographically, or in writing if -- (1) the owner thereof has taken reasonable measures to keep such Information secret, and (2) the Information derives independent economic value, actual or potential from not being generally known to, and not being readily ascertainable through proper means by, the public. Information does not include technical data, as that term is defined in DFARS 252.227-7013(a)(15), 252.227-7015(a)(4), and 252.227-7018(a)(20). Similarly, Information does not include computer software/computer software documentation, as those terms are defined in DFARS 252.227- 7014(a)(4)-(5) and 252.227-7018(a)(4)-(5). The USMC may release to individuals employed by the Government information submitted by the contractor or its subcontractors, either prior to award or during performance, pursuant to the provisions of the resulting contract. Information that would ordinarily be entitled to confidential treatment may be included in the Information released to these individuals. Accordingly, by submission of a quote or execution of this contract, the quoter or contractor and its subcontractors consent to a limited release of its Information to Government personnel with a bona fide need for the Information. The USMC's responsibilities under the Freedom of Information Act (FOIA) are not affected by this provision. The quoter agrees to include, and require inclusion of, this provision in all subcontracts at any tier that requires the furnishing of Information.
5.1.5. Cross-Referencing: Each Volume must be separate and complete so that the evaluation may be accomplished independently for each part. Information required for quotation evaluation which is not found in its designated volume will be assumed to have been omitted from the quote.
5.2. Volume I: Technical Proposal.
5.2.1. Cover Letter: The Cover Letter shall include the following information:
- Solicitation Number
- Solicitation Title
- Prime Contractor Name, Address, Phone Number
- SAM Unique Entity ID (UEI), Cage Code
- Point of Contact Authorized to negotiate and contract on behalf of the company, their phone number and email address
- Any exceptions taken to any terms and conditions in the RFQ. The Quoter shall provide a full explanation for all exceptions taken to the solicitation. Any material exceptions to the solicitation may render the quotation ineligible for award. If the Quoter takes no exceptions to the provisions of the solicitation, the Quoter shall state their unconditional assent to all terms, conditions, and provisions included in the RFQ.
Solicitation Document Page/Paragraph Requirement/Portion Rationale & Impact e.g., section B, PWS, Addendum 52.212-1 and FAR 52.212-2, etc
Applicable Page and Paragraph Numbers
Identify the Requirement or Portion to which exception is taken
Describe the Rationale and Impact of the exception
- [Confirmation of small business size status for the NAICS identified in block 10 of the Standard Form (SF) 1449.]
5.2.2. Table of Contents: A Master table of contents for the entire quotation and a table of contents for each volume are required. The master table of contents for the entire quotation should be filed in Volume I.
5.2.3. Organizational Chart: Include an organizational chart or matrix including subcontractors, teaming partners and/or joint venture members, as well as identifying lines of authority.
5.2.4. Evaluation Factor 1: Technical Approach.
5.2.4.1. IMPORTANT: If the quoter simply restates the requirements in the sections of the Performance Work Statement (PWS), the quotation will receive a technical rating of Unacceptable. A capabilities statement alone is not an acceptable technical quote. The technical quote shall be specific, detailed, complete, and fully demonstrate that the prospective Quoter has a thorough understanding of the Government's requirements. Data previously submitted to the Government will not be considered; therefore, such data shall not be incorporated into the technical quote by reference. Statements that the Quoter understands, can, or will comply with all specifications, or statements paraphrasing the specifications or other information contained in the Solicitation will be considered inadequate. Phrases such as "Standard procedures will be employed" and "well known techniques will be used" will also be considered unacceptable.
5.2.4.2. The quoter is hereby notified that the Government may incorporate any areas of the awardee's final technical quote which were identified as strengths into the contract as an Appendix to the PWS.
5.2.4.3. Content of Technical Approach: See 52.212-2 Addendum.
5.3. Volume II: Past Performance.
5.3.1. The Quoter shall provide information on its past performance record. This information will be utilized to determine the relevancy and quality of the Quoter's past performance record to perform the proposed effort as outline in the PWS and the level of confidence the Government has for successful performance based upon the Quoter's actions under previously awarded, relevant contracts.
5.3.2. The quoter shall describe its past performance directly related to contracts it has held within the last 5 that are similar in scope, service similar to those outlined in the PWS, and complexity. Quoters shall years provide no more than 3 relevant examples.
5.3.3. The quoter shall provide relevant past performance documentation and references for services comparable to those described in the PWS. Past performance listed may include those entered into by the Federal Government, state and local government agencies, and/or commercial customers. The quoter shall provide the information using the worksheet provided in Attachment 1, "Past Performance Worksheet."
5.3.4. In addition to the information requested above, quoters shall contact their past performance references and request that each reference complete Attachment 1, "Past Performance Questionnaire" and email the completed form, before the due date of this solicitation, directly to: GySgt John Duong at john.duong@usmc.mil and Nicholas Vonbargen at nicholas.vonbargen@usmc.mil.
5.3.5. The Government may but is not required to consider Past Performance Questionnaires received after the due date of the solicitation. The Government reserves the right to contact references for verification or additional information. If a quoter has already had an evaluation completed within the Contractor Performance Assessment Report System (CPARS) for a past performance effort listed in the Past Performance Worksheet, a Past Performance Questionnaire does not need to be submitted.
5.3.6. The Government reserves the right to use past performance information obtained from sources other than those identified by the quoter. This past performance information will be used for the evaluation of past performance.
5.3.7. The Government does not assume the duty to search for data to cure the problems it finds in the information provided by the quoter. The burden of providing thorough and complete past performance information remains with the quoter.
5.4. Volume III: Price.
5.4.1. No pricing information shall be included in Volume I - Technical Proposal. A complete price volume shall include the completed schedule of supplies/services on the SF 1449, including any solicitation amendments and completion of Attachment 2 - Exhibit Line Item Numbers Sheet.
5.4.2. The total summation of each period shall be annotated on the respective CLIN of the SF 1449, to include the respective Option Periods (1001, 2001, etc.).
5.4.3. Blocks 17a, 30b, and 30c of page 1 of the SF 1449 shall be completed by quoters and Block 30a shall be signed by an authorized agent to confirm that the quoter has read and agrees to comply with all the terms, conditions and instructions provided in this solicitation document. The SF30 (amendments) shall be signed by an authorized agent to confirm that the quoter has read and agrees to comply with all the terms, conditions and instructions provided in the amendment(s). The quoter must complete the unit price and total price for each CLIN as well as a summation of the total contract price to include the base and option periods in the SF 1449 and ELIN excel attachment. All pricing shall be stated in no more than two (2) decimal places. (For example:
$10.10 not $10.009).
6. QUESTIONS CONCERNING THE SOLICITATION: Questions shall be submitted by email no later than 1630 Pacific Time 12 calendar days from the date identified in block #6, page #1 to GySgt John Duong at john.
duong@usmc.mil and Nicholas Vonbargen at nicholas.vonbargen@usmc.mil. No phone questions will be accepted. The deadline is necessary to ensure timely award and the Government may, in its sole discretion, choose not to respond to questions received after the deadline. The Government will review and respond to all timely questions; where the answers to questions necessitate changes to the solicitation, the Government will respond by an amendment to the solicitation.
Questions should be submitted in the following format:
Solicitation Section Solicitation Page Paragraph Question
Example: PWS 22 1.0 What does XX mean?
7. AGENCY-LEVEL PROTESTS: In accordance with FAR 33.103(d)(4), interested parties may request an independent review of an Agency-level protest at a level above the Contracting Officer. This independent review is available as an appeal of a Contracting Officer decision on an Agency-level protest.
8. WIDE-AREA WORKFLOW - RECEIPT AND ACCEPTANCE. As a condition of receipt of any resulting contract, the Offeror agrees to implement the Department of Defense (DOD) web-based application in accordance with DFARS 252.232-7006. Information on registering in WAWF/iRAPT may be obtained from https://wawf.eb.mil/xhtml/unauth/registration/notice.xhtml or calling 866-618-5988. Registration in WAWF /iRAPT is free.
(End of provision addendum)
Addendum to Evaluation - Commercial Product and Commercial Services
Miscellaneous text in this section has been modified to:
52.212-2 ADDENDUM
Evaluation-Commercial Services Process
The Government will award a contract resulting from the RFQ to the responsible quoter whose conformance to the solicitation will be most advantageous to the Government utilizing a Lowest Price Technically Acceptable (LPTA) source selection process.
First, in order to be evaluated, contractor must submit responsive quotes containing all the documentation identified above by the RFQ close date/time shown in block 8 of the SF1449 (see addendum to FAR 52.212-1).
A quote may be eliminated from the competition without further consideration if it does not meet the responsiveness requirements.
Second, responsive quotes will be placed in price order from lowest to highest base on the Total Price Proposed (TPP) for all required Contract Line Item Numbers. The quote with the lowest TPP shall be reviewed to ensure the price is fair and reasonable and does not pose an unacceptable risk to the Government. If the quote with the lowest TPP is determined to be fair and reasonable and does not pose an unacceptable risk, the quoter's technical quote will then be evaluated and receive a rating of Acceptable or Unacceptable in accordance with the below technical capability criteria.
Third, the lowest price, technically acceptable quote will be evaluated for the past performance in accordance with the criteria below. If the lowest price, technically acceptable quote is determined to have "Acceptable" or " Neutral" past performance, and is deemed responsible, then the quote represents the best value for the Government and the evaluation process stops at this point.
Award shall be made to that quoter without further consideration of any other quotes. If the lowest TPP quoter's technical quote is assigned an Unacceptable rating or if the price is determined not fair and reasonable or poses an unacceptable risk to the Government, or if the quote is found to be non-responsible, the quote with the next lowest TPP will then be evaluated. This process will continue (in order of ascending TPP) until a quoter is evaluated to have an acceptable technical rating, acceptable past performance, fair and reasonable pricing, and the quoter is deemed responsible or until all quotes have been evaluated.
Factor 1: Technical Approach
When evaluating the Quoter's technical approach, the Government will determine if the quoter has met the Factor 1, Technical Approach requirement based on the following elements:
1. Element 1.1: PWS Requirements - The quoter shall clearly demonstrate how it will accomplish all requirements described in the PWS, to include PWS section 3 (Scope).
2. Element 1.2: Management Approach - Quoter will be evaluated on whether their Mobilization and Demobilization approach and quality control plan addressed the requirements in the PWS and through these approaches demonstrated how they will manage the contract properly, staff with qualified personnel, and communicate effectively with the Government.
a. Mobilization and Demobilization plan - Quoters shall describe their plan to mobilize and demobilize after every task order. If they are able to meet the maximum 09-day mobilization period to be Fully Operation Capable with in the PWS. Address how the
Quoters will effectively manage personnel, equipment, and if applicable, interface with subcontractors.
b. Quality Control Plan - Quoters shall provide a Quality Control Plan (QCP) in accordance with the PWS Section 5.0 that describes their approach toward providing quality control and quality assurance, including how they will ensure successful accomplishment of contract requirement and delivery of all contract deliverables at a high-quality level and what steps they will take to resolve quality issues/unsatisfactory deliverables.
The technical quote will be evaluated as Acceptable or Unacceptable as defined below:
Rating Description
Acceptable Quote meets the requirements of the solicitation and PWS
Unacceptable Quote does not meet the requirements of the solicitation and PWS
To be rated , the technical quote must clearly demonstrate how the Quoter will accomplish all Acceptable requirements described in the PWS and must show that the quoter is fully capable of performing the services described in the PWS. The technical quote shall also address the additional elements listed above in this addendum.
IMPORTANT: If the quoter simply restates the requirements in the section of the PWS, the quoter's quote will receive a technical rating of Unacceptable. A capabilities statement alone is not an acceptable technical quote.
Factor 2: Past Performance
Past performance will be evaluated by reviewing the past performance information provided by the Quoter and determine the quality and usefulness as it applies to performance confidence assessment.
Quoters should provide no more than a total of three (3) past performance references. These references can be from work performed as the prime or subcontractor. The past performance evaluation will consider the quoter's demonstrated recent (within the past years from date of this solicitation) and relevant (same or similar Five (5) support services for Encampment Support Services as provided in the Performance Work Statement) record of performance in supplying services that meet the solicitation's requirements. Quoters are advised that in conducting the past performance assessment, the Government may use data provided in the quoter's quote and data obtained from other sources. The quoter shall provide the information using the worksheet provided in Attachment 1 - Past Performance Worksheet.
The Government may use Past Performance information obtained from sources other than those identified by the quoter (e.g. CPARS).
Past Performance will be evaluated as or as defined below:Acceptable Unacceptable
Rating Description
Accep table
Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown.
Una ccep table
Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort.
Note: In the case of quoter without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown (or "neutral") past performance. In the context of acceptability /unacceptability, a neutral rating shall be considered "acceptable."
Factor 3: Price
In order to be considered for an award, the price must be determined to be fair and reasonable, and balanced (or if unbalanced pricing exists it must not pose an unacceptable risk to the government) using one or more techniques set forth in FAR 13.106-3(a). The Quoter shall input a unit price and total in all Contract Line Items Numbers (CLINs) present in the SF1449 (except CLIN 0002), and Attachment 2 - Exhibit Line Item worksheet, to include all respective ordering period items in the solicitation. The total Numbers (ELIN) evaluated price is calculated using the prices proposed for all line items for 1 base year.
(End of provision addendum)
| IDCode: J |
| Page: 1 |
| Pages: 15 |
| AmendNo: 0003 |
| EffDate: 14 Feb 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: M00681 |
| AdmCode: |
| IssuedBy: COMMANDING GENERAL |
MARINE CORPS BASE, BOX 555013
CAMP PENDLETON, CA 92055-5001
UNITED STATES
Alejandro Osoriozenil, Email: alejandr.osoriozenil@usmc.mil Telephone: 760-725-8449 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: M0068126Q0011 |
| SolDate: 29 Jan 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Continuation |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: John Duong |
| ContDate: |
| CODate: 13 Feb 2026 |
File details come from the government source that posted it. Updated .