This document is an Amendment of Solicitation (SF 30) for SCBA Equipment Flow Testing and Hydrostatic Testing of Carbon Cylinders. The amendment modifies a solicitation for annual on-site flow testing and one-time hydrostatic testing of Self-Contained Breathing Apparatus (SCBA) equipment and carbon cylinders for Marine Corps Fire and Emergency Services departments at multiple California locations. The contract will cover testing of 313 SCBA harnesses and masks, 173 additional SCBA masks, 27 confined space escape packs, and 26 Rapid Intervention Crew drag bags, along with 711 carbon cylinders of various sizes.
Key changes include adding Over & Above (O&A) Contract Line Item Numbers (CLINs) for each contract year, incorporating an O&A section into the Performance Work Statement, and updating Sections L and M accordingly. The solicitation is a full and open competition using Lowest Price Technically Acceptable (LPTA) source selection procedures. The contract will be a firm-fixed-price single award, with a base year and four option years. Contractors must provide detailed technical approaches covering inspection protocols, testing standards, maintenance procedures, quality control, certifications, scheduling, on-site operations, and reporting plans. Past performance and pricing will also be evaluated, with the contract intended to be awarded without discussions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to:
Provide answ ers to questions received, incorporate Over & Above (O&A) CLINs, incorporate an O&A Section into the PWS, and update Sections L & M accordingly.
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M0068125R0014
X 9B. DATED (SEE ITEM 11)
02-Sep-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2025
CODE
REGIONAL CONTRACTING OFFICE-MCIWEST
BLDG 22180 REGIONAL CONTRACTS
CAMP PENDLETON CA 92055-5027
M00681 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M0068125R0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
A0001 - CLIN ADDS
The purpose of this amendment is to provide answers to questions received, incorporate Over & Above (O&A) CLINs, incorporate an O&A Section into the PWS, and update Sections L & M accordingly to account for O&A changes:
I. QUESTIONS AND ANSWERS:
a. Will there be an over and above CLIN for repairs? If not, how will repairs be charged?
i. ANSWER: Over and above (O&A) CLINs have been incorporated.
b. QUESTION: The solicitation refers to the SCBA Harnesses and Masks and then hydrostatic testing in year one only. Under which CLIN will the inspection and servicing of the cylinders be covered?
i. Hydrostatic testing will only be conducted as a portion of the services to be provided under CLINs 0001-0004.
II. The following CLINs have been created to allot for O&A Work:
a. CLIN 0005 O&A
b. CLIN 1005 O&A
c. CLIN 2005 O&A
d. CLIN 3005 O&A
e. CLIN 4005 O&A
III. The following Section has been added to the PWS:
a. C20. OVER AND ABOVE (O&A) WORK
IV. The following clauses and/or provisions have been added to the solicitation:
a. DFARS 252.217-7028, Over and Above Work.
V. The following Sections of the Solicitation have been updated:
a. Section L
b. Section M
All other solicitation terms and conditions remain the same.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0005 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Over & Above Work
FFP
Hourly labor pricing shall be provided as part of the price proposal in accordance with Section L & M of this solicitation. Authorization and procedures for Over & Above Work are in accordance with PWS Section C20.
FOB: Destination
PSC CD: J042
NET AMT
CLIN 1005 is added as follows:
OPTION Over & Above Work
FFP
Hourly labor pricing shall be provided as part of the price proposal in accordance with Section L & M of this solicitation. Authorization and procedures for Over & Above Work are in accordance with PWS Section C20.
CLIN 2005 is added as follows:
OPTION Over & Above Work
FFP
Hourly labor pricing shall be provided as part of the price proposal in accordance with Section L & M of this solicitation. Authorization and procedures for Over & Above Work are in accordance with PWS Section C20.
CLIN 3005 is added as follows:
OPTION Over & Above Work
FFP
Hourly labor pricing shall be provided as part of the price proposal in accordance with Section L & M of this solicitation. Authorization and procedures for Over & Above Work are in accordance with PWS Section C20.
CLIN 4005 is added as follows:
OPTION Over & Above Work
FFP
Hourly labor pricing shall be provided as part of the price proposal in accordance with Section L & M of this solicitation. Authorization and procedures for Over & Above Work are in accordance with PWS Section C20.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
SCBA equipment Flow Testing and Hydrostatic Testing of Carbon Cylinders
C1. BACKGROUND. MCIW F&ES Departments require on-site flow testing of SCBA equipment and hydrostatic testing of carbon cylinders for the various fire stations aboard, MCB CPEN, MCLB Barstow, MCAS Miramar, and MCAGCC 29 Palms. These services are needed for F&ES to be compliant with applicable National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA) and original equipment manufacturer (OEM) standards. Services are required on an annual schedule.
C2. APPLICABLE PUBLICATIONS. All work performed on F&ES firefighting equipment shall be done in accordance with the current version of applicable publications and standards (current edition) including, but not limited to the following:
1) NFPA 1852: Standard on Selection, Carre, and Maintenance of Open-Circuit SCBA.
2) NFPA 1404: Standard for Fire Service Respiratory Protection Training.
3) NFPA 1500: Fire Department Occupational Safety, Health and Wellness Program.
4) Specialized Firefighting Equipment Manufacturers (Scott Safety 3M).
5) Occupational Safety and Health Administration (OSHA) Standards, 29 Code of Federal Regulations (CFR), Part
1910 Occupational Safety and Health Standards.
6) Manufacturer Suggested Standards: Scott Safety 3M SCBAs and Bottles/Cylinders
C3. DESCRIPTION OF SERVICES AND PERFORMANCE REQUIREMENTS. The Contractor shall provide all management, labor, equipment, tools, materials, supplies, and services necessary to deliver scheduled on-site SCBA equipment flow testing and hydrostatic testing of carbon cylinders on Scott Safety 3M brand equipment.
Services shall be performed by certified technicians on an annual basis for SCBA equipment flow testing with a one-time hydrostatic testing of carbon cylinders occurring the base year of performance.
The Scott Safety 3M brand SCBA equipment to receive annual on-site flow testing include: three-hundred thirteen
(313) SCBA harnesses and masks (standard and modified for Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE)), one-hundred seventy-three (173) additional SCBA masks (standard and modified for CBRNE), twenty-seven (27) confined space escape packs, twenty-six (26) Rapid Intervention Crew (RIC) drag bags.
The Scott Safety 3M brand carbon cylinders to receive the one-time on-site hydrostatic testing include: one-hundred sixty-eight (168) sixty (60) minute (min.) carbon cylinders, two-hundred eight (208) forty-five (45) min. carbon cylinders, three-hundred eleven (311) thirty (30) min. carbon cylinders, and twenty-four (24) ten (10) min escape pack cylinders.
C3.1. PERFORMANCE LOCATON AND INVENTORY. The Contractor shall provide on-site SCBA equipment flow testing and hydrostatic testing of carbon cylinders at the following locations, as coordinated with the Contracting Officer Representative (COR). The quantities by location and detailed in Table 1.
Table 1 Annual Flow Testing
MCB
CPEN
MCLB
Barstow
MCAS
Miramar
MCAGCC
29 Palms
SCBA Harness and Mask (Standard and modified for
CBRNE)
159 45 75 34
Additional SCBA Masks 83 20 35 35 Confined Space Escape Packs 9 10 4 4 RIC Drag Bag 14 5 3 4
One-Time Hydrostatic Testing 60 Min. Carbon Cylinders 91 30 15 32 45 Min. Carbon Cylinders 0 75 133 0 30 Min. Carbon Cylinders 259 0 0 52 10 Min. Escape Pack Cylinders 9 10 0 5
C4. TASKS.
C4.1. ANNUAL FLOW TESTING. On-site inspection, testing, maintenance, repair, and recertification of SCBA harnesses and masks shall be completed by a certified technician. Proof of certification of each technician shall be provided to the Government point of contact (POC) prior to any work being started. Services shall be conducted in accordance with all applicable publications outlined in Section C2 of this PWS.
A breathing apparatus is a fully assembled breathing device that can be immediately used in a contaminated air environment and/or in firefighting by the operator. The components can include the following: backpack, regulator, air hoses, gauges, and valves. This includes SCBA Panther, Supplied Air Respirator (SAR)/Hip Pack and RIC Drag Bag.
1) Breathing Apparatus. Each breathing apparatus shall be thoroughly inspected visually, cleaned (if applicable), and repaired (if applicable). Each breathing apparatus shall be placed on a test bench.
a) Testing. Each breathing apparatus shall have the following tests completed: automatic positive pressure, opening pressure, positive pressure, relief valve pressure, by-pass function, and leakage test. Results shall be recorded and necessary repairs made to ensure the device passes tests.
b) Servicing. The servicing of each breathing apparatus shall include: positive pressure attachment, valve housing assembly, valve insert with breathing hose, and adjustment of breathing valve.
2) Regulator. Each regulator shall be thoroughly inspected visually, cleaned (if applicable), and repaired (if applicable). The regulator unit shall be placed on a test bench.
a) Testing. Each regulator shall have the following tests completed: secondary pressure, sealing pressure, relief valve, warning pressure, and function and sealing tightness. Results shall be recorded and necessary repairs made to ensure the regulator passes tests.
b) Servicing. The servicing of each regulator shall include: cylinder valve connection, pressure regulator mechanism, supply hose, high-pressure hose, pressure gauge, quick coupling connecting, and warning whistle.
3) Additional Servicing. Servicing of the harness and backpack shall include adjusting of the cylinder strap assembly and the cylinder bracket assembly. Servicing of the cylinder assembly shall include the hand-wheel mechanism and pressure gauge safety device.
4) Compliance. The Contractor shall utilize all manufacturer-recommended tools and equipment including breathing apparatus service kits and the PosiChek 3.
C4.2. ONE-TIME HYDROSTATIC TESTING. The US Department of Transportation (DOT) has established regulatory requirements for the re-qualification testing of compressed gas cylinders. All carbon cylinders are to be inspected and hydrostatically re-tested every five years as required in CFR Title 49 Part 180.209(a). Cylinders still with charge at the time the 5 year re-test is due, do not have to be re-tested until the charge is used, but prior to the re-filling of the cylinders.
Visual inspection, at the time of hydrostatic re-testing, must be performed on-site at the various fire stations by a DOT licensed re-test agency. Visual inspection must be performed in accordance with Compressed Gas Association, Inc. (CGA) pamphlet C-6.1; Standards for Visual Inspection of High Pressure Aluminum Compressed Gas Cylinders. Internal and external visual inspection of a cylinder should be performed prior to hydrostatic re-testing.
Hydrostatic re-testing must be performed by a DOT licensed re-test agency. Once a cylinder has successfully passed all visual inspection and hydrostatic re-test requirements, it is to be permanently marked with the re-test date, month and year, and licensed re-test agency’s number in the proximity of the previous hydrostatic test date. No cylinder is to be marked with the licensed re-test agency’s number until the cylinder has passed all visual inspection and hydrostatic re-test requirements. No cylinder is to be marked with a licensed re-test agency number by any other person or agency other than the personnel of the licensed re-test agency.
Persons performing requalification functions. No person may represent that a repair or requalification of a cylinder has been performed in accordance with the requirements in 49 CFR 180.209(a) a unless that person holds a current approval issued under the procedural requirements prescribed in 49 CFR Part 107, Subpart I. No person may mark a cylinder with a (Requalification Identification Number ) RIN and a requalification date or otherwise represent that a DOT specification or special permit cylinder has been requalified unless all applicable requirements of this subpart have been met. A person who requalifies cylinders must maintain the records prescribed in 49 CFR 180.215 at each location at which it inspects, tests, or marks cylinders.
C5. TURNAROUND TIME. The Contractor shall provide each fire station a proposed annual schedule for SCBA equipment flow testing for the service period. Prior to commencement of services in the base year of the contract, the Contractor shall also provide a one-time proposed schedule for hydrostatic testing of ALL carbon cylinders that fall within the five-year testing cycle, ensuring complete testing in the initial year. Both schedules are subject to approval by the COR.
C6. ENFORCING MANUFACTURER’S WARRANTY. Upon discovery of a defect covered by the manufacturer’s warranty, the Contractor shall notify the COR.
C7. EQUIPMENT REPLACEMENT. The Contractor shall provide notice to the Government if any or all components of the SCBA equipment or carbon cylinders cannot be repaired and need to be replaced.
C8. ACCOUNTABILITY. The Contractor is responsible for an accountability system for all equipment serviced.
The Contractor assumes responsibility of the SCBA equipment and carbon cylinders until they are returned to the appropriate MCIW F&ES Department. Until the equipment is accepted by the appropriate MCIW F&ES Department, possession rests with the Contractor. The Contractor will process all necessary documentation to ensure full replacement of any lost or damaged equipment while in the Contractor’s possession. The Contractor shall report any lost or damaged equipment to the COR within forty-eight (48) hours of being identified
C9. PARKING/EQUIPMENT. The Contractor must provide any containers if storage is necessary. The Contractor shall be responsible for ensuring all storage containers maintained on the job site are locked. Parking of equipment and vehicles will be in designated areas or authorized parking lots (not on grass or lawn. The Contractor shall be responsible for securing all material, equipment, and tools.
C10. SAFETY, HEALTH, AND ENVIRONMENTAL STANDARDS. The Contractor shall comply with all applicable Federal, State, and Local safety, health, and environment regulations, including OSHA. The Government will assume no liability or responsibility for the Contractor’s compliance or non-compliance with such responsibilities.
C11. WORK SITE. The work site shall be maintained in a sanitary condition. Upon completion of all services, the Contractor shall remove all parts, debris, trash, waste, or any other materials resulting from work under this contract at their expense.
C12. REMOVAL OF CONTAMINATION. If the Contractor contaminates Government property while performing contract services, the Contractor shall remove all contamination at their expense prior to leaving the area.
C13. WASTE DISPOSAL. The Contractor shall supply and dispose of all chemicals or substances brought onto the respective installation. All waste shall be collected, treated, and disposed of in compliance with all applicable Federal State and Local laws, ordinance, and regulations. All waste must be disposed of in accordance with applicable regulations and OFF THE INSTALLATION. The Contractor shall provide copies of all waste disposal receipts to the COR.
C14. DATA MANAGEMENT. The Contractor shall maintain data in the form of a Microsoft Excel Workbook or Adobe PDF for tracking the testing services of the SCBA equipment and carbon cylinders. The data shall include the following elements: equipment serial number, inspection results, testing results, defects found (with photos), cleaning status (if applicable), repair status (if applicable), dates of return to service, and name of the inspector. This data shall be delivered via email upon request or made available through a database to the COR. All data shall be turned over within thirty (30) calendar days following the end of each period of performance (POP).
The Contractor will provide data-entry support to enter service/maintenance and testing information into the USMC Fire and Emergency Services Records Management database (First Due). Testing will be uploaded into the appropriate areas/modules of First Due. The department First Due system administrator will provide log on and password credentials via the Common Access Card (CAC) to the system once the Contractor’s are on the installation and keep those credentials active throughout the contract.
C15. CONTRACTOR UNAUTHORIZED WORK PERFORMANCE. Deviations from contract requirements and specifications without approval of the CONTRACT ADMINISTRATOR/OFFICER shall be at the risk of the Contractor, and any related costs shall be borne by the Contractor.
C16. GOVERNMENT RESPONSIBILITIES.
1) The Government will provide the Contractor access to the work site to perform advanced cleaning and inspection services during normal working hours, 7:30 AM – 4:30 PM, Monday through Friday, weekends and holidays excluded. The Contractor shall obtain prior approval of the COR for work that is to be done on evenings, weekends, and holidays.
2) A COR will be assigned to this contract. The COR will coordinate all work efforts with the Contractor. The COR is not authorized to direct the Contractor’s performance or bind the Government financially.
3) The respective F&ES Department will conduct routine inspection in accordance with NFPA 1851 Section 6.2, Routine Inspection, before SCBA equipment and carbon cylinder turnover for respective flow and hydrostatic testing.
4) The respective F&ES Department will collect all SCBA equipment and carbon cylinders on or by the day prior to the scheduled service date.
5) The Government shall provide utilities, which include but are not limited to, water and electric.
6) The Government will not be responsible, in any way, for the Contractor’s personal supplies, equipment, materials, or belongings brought onto grounds to perform services. This includes, but is not limited to, loss or damage caused by fire, theft, accident, and natural or other disaster.
C17. SCHEDULING DEVIATIONS. To the best of the Government’s ability, the Contractor shall be notified at least seven (7) days before any scheduling changes (inclusive of rescheduling and cancellation of services).
C18. QUALITY ASSURANCE. A COR will be assigned to this contract. The Contractor is responsible for Quality Control. The Government will conduct Quality Assurance in accordance with the Quality Assurance Surveillance Plan (QASP), which describes how Government personnel will evaluate and assess contractor performance. The QASP will be revised or modified as circumstances warrant.
C19. INCREASE OR DECREASE IN REQUIREMENTS. The equipment to be serviced under this contract may change at the discretion of the Government during the time the contract is in effect. Replacement of equipment with similar equipment (equipment similar in function and appearance to the Scott Safety 3M brand SCBA equipment and carbon cylinders) shall not constitute grounds for request for equitable adjustment or claim by the Contractor. In addition, due to reorganization, restructuring, or to enhance efficiency, the Government reserves the right to add or delete requirements in this contract to include or exclude all or part of facilities being serviced. Such increased or decreased requirements may include Marine Corps installations or other Department of the Navy organizations not included herein.
C20. OVER AND ABOVE (O&A) WORK. The Contractor shall provide all items necessary such as labor, transportation, equipment, tools, supervision, management, quality control, testing equipment, materials, and parts required to perform over and above work repair, modification or replacement of equipment, parts, etc. in a timely manner. The Contractor shall substantiate the need for over and above work by describing the conditions that warrant the repair and why minor repair measures accomplished as part of regular maintenance will not suffice. The Contractor shall report the need for over and above work repairs to the COR and Contracting Officer.
C20.1. GENERAL REQUIREMENTS AND PROCEDURES FOR O&A WORK. As described in DFARS Clause 252.217-7028, Over and Above Work authorizes the Contractor to perform repairs on identified equipment that is outside of the standard of inspection requirements to ensure equipment is sustained in good working order in accordance with manufacturer’s instructions. Work performed under this requirement will be invoiced for under the appropriate Over and Above Work Contract Line Item Number (CLIN) identified for each year’s period of performance.
C20.2. RESPONSE TIME. The Contractor shall notify the COR and Contracting Officer within twenty-four (24) hours, provide a description of the work being performed and a rationale as to why minor repair measures will not suffice.
Upon notifying the COR and the Contracting Officer, the Contractor shall prepare and provide an estimate to the aforementioned parties within five (5) calendar days. The estimate shall include the labor hours, materials/parts, and estimated turnaround time for repair.
C20.3. AUTHOIRTY TO PERFORM O&A WORK. The Contracting Officer is the sole person(s) with the authority to authorize the Contractor to proceed with work in accordance with the O&A portion of the contract.
Work shall be negotiated and approved in advance for each work request. All work requests will be ordered and approved in writing. The Government may elect not to make repairs and instead replace items. Replacement of items may be acquired either from the Contractor or from any other source determined to be advantageous and the best value to the Government.
C20.4. ESTIMATE PREPARATION AND EVALUATION. The preparation of estimates is included in the price of the firm fixed-price portion of the contract. Following the inspection of equipment, or if identified outside of regular service by the COR, the Contractor shall provide a written work estimate that will include the following information AT MINIMUM:
1. Contractor Name and Address
2. Contract Number
3. Date inspection was performed or request received from the COR was placed
4. Itemized list of parts required to perform the repair, including quantity and price for each item
5. Estimated number of labor hours required to complete the repair
6. Estimated turnaround time for repair
C20.4.1 MATERIALS AND PARTS. Material price and parts shall be the lowest price available considering the availability of materials and the time constraints of the job. It shall include any discounts and/or rebates received by the Contractor. Parts shall be provided to the Government at the Contractor’s cost without mark up.
The Contractor shall provide quotations from three suppliers of the required materials exceeding $2,500.00 per part/material.
The Contractor shall provide the name of the material/part, manufacturer of the material/part, material/part number, size, quality, quantity (number of units), and the material/part unit price.
C20.4.2. ESTIMATE EVALUATION. The Contractor’s estimate shall be evaluated to determine if the scope has been clearly and accurately identified, if the number of labor hours has been accurately estimated, the cost of parts/materials has been properly documented, the estimated lead-time for the delivery of the materials/parts to the Contractor, and the turnaround time it will take to perform the work.
The detailed estimate shall be used to negotiate O&A work to be performed. O&A work to be performed will be accomplished via a firm fixed-price modification to the contract. The Contractor shall not assume that a modification will be issued and shall not order materials/parts or proceed with any O&A work until receipt of a finalized modification.
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0005:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 1005:
The following Acceptance/Inspection Schedule was added for CLIN 2005:
The following Acceptance/Inspection Schedule was added for CLIN 3005:
The following Acceptance/Inspection Schedule was added for CLIN 4005:
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule for CLIN 0005 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 23-SEP-2025 TO
22-SEP-2026
N/A N/A
The following Delivery Schedule for CLIN 1005 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 23-SEP-2026 TO
22-SEP-2027
The following Delivery Schedule for CLIN 2005 has been added:
CAGE
POP 23-SEP-2027 TO
22-SEP-2028
The following Delivery Schedule for CLIN 3005 has been added:
CAGE
POP 23-SEP-2028 TO
22-SEP-2029
The following Delivery Schedule for CLIN 4005 has been added:
CAGE
POP 23-SEP-2029 TO
22-SEP-2030
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
252.217-7028 Over And Above Work DEC 1991
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L
L1. TITLE. SCBA Equipment Flow Testing and Hydrostatic Testing of Carbon Cylinders
L2. PRIMARY POC. The primary POC for this procurement is Corey Slivnik, corey.slivnik@usmc.mil.
L3. SECONDARY POC. The secondary POC for this procurement is Maria Caceres, maria.caceres@usmc.mil.
L4. PROCUREMENT METHOD. This procurement is full and open competition acquisition utilizing FAR Part 12 and FAR Part 13.5, resulting in a sole source firm-fixed-price (FFP) single award contract.
L5. PROPOSAL ORGANIZATION AND FORMAT.
L5.1. SUBMISSION OF PROPOSAL. Proposals must be received no later than the date stated on Page One (1), Box (8) Pacific Time. Proposals shall be submitted via email to Mr. Corey Slivnik, corey.slivnik@usmc.mil and Ms.
Maria Caceres, maria.caceres@usmc.mil.
L5.2. GENERAL INSTRUCTIONS. This solicitation is issued in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 12 and 13.5, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Navy marine Corps Acquisition Regulation Supplement (NMCARS).
It is the Government’s intention to award without discussions.
If the Offeror believes that the requirements in these instructions contain an error, ambiguity, omission, or are otherwise deemed unsound, the Offeror shall immediately notify the Contracting Officer in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
In accordance with FAR subpart 4.8, Government Contract Files, the Government will retain a copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
mailto:corey.slivnik@usmc.mil mailto:maria.caceres@usmc.mil mailto:corey.slivnik@usmc.mil mailto:maria.caceres@usmc.mil
L5.3. PROPOSAL PREPARATION INSTRUCTIONS. The Offeror’s proposal shall contain a completed, dated, and signed, Standard From (SF) 1449.
L5.3.1. EXCEPTION. The Offeror is required to meet all solicitation requirements including, but not limited to, terms and conditions, representations and certifications, technical requirements, and acknowledgement of any and all amendments issued, in addition to requirements identified as evaluation factors. If the Offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the Offeror shall clearly identify the applicable exceptions with a complete explanation of why the explanation of why the exception was taken, what benefit accrues to the Government (if any, and its impact (if any) on the performance, schedule, cost , and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. The Offeror is cautioned that taking an exception may render the offer ineligible for award. This information shall be provided in the format below:
Solicitation Document Page & Paragraph Requirement/Portion Rationale & Impact [i.e., Section C, PWS;
Section L, Instructions to Offeror, etc.]
[Applicable page and paragraph number.]
[Identify the requirement or portion to which exception is taken.]
[Describe the rationale and impact for the exception.]
L5.3.2. PROPOSAL CONTENT.
1. General. The Offeror is required to submit a completed SF 1449 (Solicitation, Offer, and Award), acknowledgement of all Amendments, SF 1449 Continuation Sheets Supplies and Prices/Costs, and FAR 52.213-3 Alt I, Offeror Representations and Certifications. All final monetary extensions shall be in whole dollars only. Failure to follow the Contract Proposal preparation instructions may cause the Offeror’s proposal to be deemed unacceptable by the Government.
a) Confirmation of submission for VETS-4212.
b) Organizational Chart
c) Exceptions/Assumptions (if applicable) – Identification and explanation of any exceptions or deviations.
Additionally, any assumption used on the proposal preparation must be identified.
d) Vendor Information – The Offeror shall provide the name, title, telephone number, Unique Entity Identifier (UEI), and Commercial and Government Entity (CAGE) code of the company/division POC regarding decisions made with respect to the proposal and identify who can obligate the company contractually.
e) FAR 52.213-3, Offeror Representations and Certifications – The Offeror shall ensure this section is submitted complete and thoroughly answered, ensuring all blocks in each certification/representation have complete and truthful responses.
f) Other Representations or Statements of Offeror’s FAR 52.204-4, Representation Regarding Certain Telecommunications and Video Surveillance Services and Equipment, FAR 52.204-26, Covered Telecommunications Equipment or Services-Representations and other Statements of Offeror’s, and correspondence which confirms Veteran’s Employment and Training (VETS) 4214 for the 2023 filing cycle
– The Offeror shall ensure this section is submitted complete and thoroughly answered, ensuring all blocks in each certification/representation have complete and truthful responses.
g) Offeror’s intent to subcontract services (if applicable).
2) Price. The Offeror shall complete the SF 1449 and its respective Continuation Sheets – Supplies or Services and Prices/Costs section, along with the ELIN Spreadsheet (Attachment A) of this Solicitation. The Offeror is cautioned that the SF 1449 must contain an original signature in Block 30a of the form. The SF 1449 shall be submitted fully completed and error free. It shall contain the Offeror’s prices for the established Contract Line- Item Numbers (CLINs).
NOTE: The Offeror shall provide an hourly labor rate for O&A Work to be performed. This rate will be used as an estimate to aid in the Fair and Reasonableness (F&R) Determination of the offer but will not be considered as a portion of the Offeror’s overall price evaluation.
3) Technical. The Offeror shall provide clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. Legibility, clarity, and coherence are very important. Responses will be evaluated against the technical factors defined in Section M, Evaluation Factors for Award. The proposal should not simply rephrase or restate the Government’s requirements but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Statements that the Offeror understands, can, or will comply with the PWS (including referenced publications, technical data, etc.);
statements paraphrasing the PWS or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used”, etc. will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the Offeror’s proposal. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.
The Offeror’s technical approach, shall, at minimum, be prepared in a form consistent with the PWS and the evaluation criteria set forth in Section M of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the Contractor’s technical competence and ability to comply with the contract task requirements specified in the PWS. The Offeror shall address as specifically as possible the actual methodology intended for accomplishing the PWS tasks. The technical shall be organized according to the following:
a) Table of Contents
b) Inspection Protocols
c) Testing Standards
d) Corrective Maintenance Procedures
e) Quality Control Measures
f) Certifications
g) Sample Schedule
h) On-site Operation Plan
3. Reporting Plan
4. Past Performance. The past performance evaluation will be accomplished by Offeror’s submission in identifying recent performance information from no more than five (5) Federal, State, Local Government, or commercial agency task orders or contracts that the Offeror has performed. Recent is defined as within the past three (3) calendar years from the closing date of this solicitation. Each narrative shall also include a contract number or commercial equivalent and amount: the name, telephone number, and email address of the Government or commercial representative who can verify past performance. The past performance evaluation will be accomplished by reviewing aspects of an Offeror’s recent and relevant past performance, focusing on and targeting performance which is relevant to the effort as it directly relates to the work being procured under this solicitation and as defined in Section M.
Past performance information described herein is required on the Offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform 51% of the proposed effort based on the total proposed price. The Offeror shall submit, along with the information required in this paragraph, a consent letter, executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the Offeror so the Offeror can respond to such information. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror’s performance.
a. The Offeror shall submit the Past Performance Questionnaires (Exhibit B) by the scheduled due date, to the Contracting Officer at the email addresses specified in Section L2 and L3.
b. The Offeror shall include documentation regarding their past performance as it related to the work being procured under this solicitation. The Offeror shall not go back farther than five (5) years for services for the submitted data. The past performance data shall document a successful history of past contract performance.
c. In conducting the past performance evaluation, the Government reserves the right to use both the information provided by the Offeror and information obtained from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) or similar systems, Defense Contact Management Agency (DCMA), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source. Offerors are reminded that both independent data and data provided by Offerors in their proposals may be used by the Government to evaluate Offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the Offeror.
Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government. All past performance comments received will be considered and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)).
Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
d. Submission Requirements. The Offeror shall submit past performance containing the following:
i. Specific Relevant Contracts Sheet – See Exhibit A, Specific Relevant Contracts Sheet.
The Offeror shall provide documentation outlining the Offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
ii. Past Performance Questionnaire. The Offeror shall forward a copy of the Past Performance Questionnaire to the points of contract responsible for monitoring performance under such contracts. The points of contact shall return the completed questionnaires to MCIWEST RCO points of contact identified in Section L2 and L3 of this solicitation prior to the closing of the RFP. Any questionnaires not returned directly to the Contracting Specialist and Contracting Officer will not be reviewed and evaluated.
The information contained in the questionnaires will be used to evaluate the Offeror’s past performance. New entities that have no past customers shall annotate on the Summary Page that they have had no previous clients.
L5.4. PERIOD OF ACCPETANCE OF OFFERS. The pricing terms and conditions of the proposal shall be valid for ninety (90) days from receipt.
L5.5. SYSTEM FOR AWARD MANAGEMENT (SAM). The Offeror must be registered in the SAM database with current information included therein. If not, completion of the attached FAR Provision 52.212-3, Certifications and Representations is required with the submission of the respective proposal. Information on registering in SAM may be obtained from www.sam.gov or by calling 866-606-8220. Registration in SAM is free.
L5.6. WIDE AREA WORKFLOW (WAWF) RECEIPT AND ACCEPTANCE. As a condition of receipt of any resulting order, the Contractor agrees to implement Department of Defense (DoD) web-based application(s).
Information on registering in WAWF/iRAPT may be obtained from https://wawf.eb.mil/xhtml/unauth/registration/notice.xhtml or calling 866-618-5988. Registration in WAWF/iRAPT is free.
SECTION M - EVALUATION FACTORS FOR AWARD
EVAL FACTORS/BASIS OF AWARD
M1. EVALUATION PROCESS.
This acquisition is being conducted under FAR Part 12, Acquisition of Commercial items, and FAR Part 13.5 Simplified Procedures for Certain Commercial Products and Commercial Services. This acquisition is also being conducted as a full-and-open competition. Proposals will be evaluated using the Lowest Price Technically Acceptable (LPTA) source selection procedures. Proposals will be arranged from lowest to highest price and technically evaluated accordingly. The lowest-priced proposal will be forwarded for technical evaluation. All technical factors and applicable subfactors, must be rated as Acceptable before the proposal may be considered for award. In the event the lowest priced proposal is rated as Acceptable, the evaluation process will cease and proceed to award. In the event the lowest priced offer is rated as Unacceptable the next lowest priced proposal will be evaluated. The processes will continue until either all proposals have been evaluated, or the next lowest priced proposal has been determined Acceptable.
The Government will evaluate pricing to determine fair and reasonableness per FAR 13.106-3. The proposal will be evaluated to receive a rating of Acceptable or Unacceptable based on the criteria in the technical section below. In order to be rated as Acceptable, the technical proposal must meet the Government’s minimum requirements as described in the schedule.
Award for All of the Work. The Government intends to award one (1) contract as a result of this solicitation. As set forth in FAR 52.215-1(f)(4). The Government intends to evaluate the technical portion of the proposal and award a contract without discussions to the offeror with the lowest price technically acceptable proposal (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
M2. EVALUATION CRITERIA.
The offeror’s proposal will be evaluated by the following three (3) evaluation factors:
Factor 1: Price Factor 2: Technical Capability http://www.sam.gov/ https://wawf.eb.mil/xhtml/unauth/registration/notice.xhtml
Factor 3: Past Performance
Factor 1 – Price. In order to be considered for an award, the price must be determined to be fair and reasonable, and balanced (or if unbalanced pricing exists that does not pose an unacceptable risk to the Government) using one or more techniques set forth in FAR 13.106-3(a). The Government will evaluate proposed prices for reasonableness using price analysis techniques.
Options. In accordance with the provision at FAR 52.217-5, the Government will evaluate offer for award purposes by adding the total price for all options. Evaluation of options will not obligate the Government to exercise options.
The Government may determine that an offer is Unacceptable if the option prices are significantly unbalanced.
The Government assumes that any price proposed for base and option periods reflects the possibility that a period of performance may be extended.
NOTE: The Offeror shall provide an hourly labor rate for O&A Work to be performed. This rate will be used as an estimate to aid in the Fair and Reasonableness (F&R) Determination of the offer but will not be considered as a portion of the Offeror’s overall price evaluation.
Factor 2 – Technical Capability. The Offeror shall submit a detailed narrative of how they will accomplish the services required outlined in the PWS.
1) Technical Approach. The offeror shall provide a narrative demonstrating the ability to perform the requirements of the PWS. The narrative shall include the following:
a) Inspection Protocols. Detail the specific procedures for inspecting SCBA equipment and carbon cylinders including inspection criteria and frequency in accordance with PWS Section C4.1.
b) Testing Standards. Describe the standards and methodologies that will be employed for conducting flow and hydrostatic testing in accordance with PWS Sections C4.1 and C4.2.
c) Corrective Maintenance Procedures. Describe the steps for addressing equipment failures or deficiencies, including response times and repair methods in accordance with PWS Sections C4.1, C6, and C7.
RATING DESCRIPTION
ACCEPTABLE Based on the proposal, the Government has determined that the Contractor has provided inspection protocols for SCBA equipment and carbon cylinders;
inspection protocols receive acceptable rating.
UNACCEPTABLE Based on the proposal, the Government has determined that the Contractor has not provided inspection protocols for SCBA equipment and carbon cylinders;
inspection protocols receive unacceptable rating.
RATING DESCRIPTION
ACCEPTABLE Based on the proposal, the Government has determined that the Contractor has provided testing standards for flow and hydrostatic testing; testing standards receives acceptable rating.
UNACCEPTABLE Based on the proposal, the Government has determined that the Contractor has not provided testing standards for flow and hydrostatic testing; testing standards receives unacceptable rating.
RATING DESCRIPTION
ACCEPTABLE Based on the proposal, the Government has determined that the Contractor has provided corrective maintenance procedures for equipment failures or deficiencies; corrective maintenance procedures receive acceptable rating.
d) Quality Control Measures. Specify the quality assurance processes that will be in place to ensure all maintenance activities meet regulatory and safety standards in accordance with PWS Section C18.
e) Certifications. The Offeror shall possess up-to-date certifications issued by recognized certifying bodies, such as: Scott Safety 3M Air Pack Certified Technician and NFPA Certified Technician in accordance with PWS Sections C3 and C4.
f) Sample Schedule. The Offeror shall provide a detailed proposed work schedule that outlines the timeline and specific activities planned to ensure timely and effective service to the F&ES departments. The work schedule shall demonstrate the Offeror’s ability to manage resources and adhere to deadlines while meeting the requirements set forth in PWS Sections C3 and C4.
i) Detailed Maintenance Schedule. The Offeror shall provide a schedule that outlines all planned activities for inspection, testing, repair (if applicable), and maintaining equipment throughout the year.
ii) Resource Management Timeline. Describe how labor and supplies will be managed to ensure timely service delivery.
g) On-site Operation Plan. The Offeror shall provide a plan that outlines the proposed on-site operations for performing all work required by the PWS at the four (4) F&ES departments. The on-site operation plan shall include staffing, operational procedures, resource allocation, and any necessary logistical considerations to ensure efficient and effective service delivery in compliance with PWS Sections C3 and
UNACCEPTABLE Based on the proposal, the Government has determined that the Contractor has not provided corrective maintenance procedures for equipment failures or deficiencies; corrective maintenance procedures receive unacceptable rating.
RATING DESCRIPTION
ACCEPTABLE Based on the proposal, the Government has determined that the Contractor has provided quality control measures ensuring maintenance activities meet regulatory and safety standards; quality control measures receive acceptable rating.
UNACCEPTABLE Based on the proposal, the Government has determined that the Contractor has not provided quality control measures ensuring maintenance activities meet regulatory and safety standards; quality control measures receive unacceptable rating.
RATING DESCRIPTION
ACCEPTABLE Based on the proposal, the Government has determined that the Contractor has provided certifications by recognized certifying bodies; certifications receive acceptable rating.
UNACCEPTABLE Based on the proposal, the Government has determined that the Contractor has not provided certifications by recognized certifying bodies; certifications receive unacceptable rating.
RATING DESCRIPTION
ACCEPTABLE Based on the proposal, the Government has determined that the Contractor has provided a work schedule plan including a maintenance schedule and resource management timeline; work schedule plan receives acceptable rating.