M00264-16-T-0156-0001.pdf
PDF 205 KB Posted
- Attached to
- Laboratory Testing Services Federal contract opportunity
- Solicitation number
- M0026416T0156
- Issued by
- United States Marine Corps
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Post questions and answ ers
2. Add attachments 5-19.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M00264-16-T-0156
X 9B. DATED (SEE ITEM 11)
29-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2016
CODE
MCINCR - RCO
2010 HENDERSON RD
MICHAEL T CURLEY
QUANTICO VA 22134
M00264 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M00264-16-T-0156
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
RFP Section Question Answers
Instructions to
Offerors
Past Performance Questionnaire –
Please clarify; Provided to Quantico
Assessors ASAP, will this be provided back to contractor to include in RFQ submittal or will it be forwarded internally.
The past performance questionnaire shall be completed by the reference and returned directly to the contracting personnel identified for internal use only. It is not to be provided back to the contractor for submittal with their quote.
PWS Drinking Water samples – are these samples required to be collected by contractor? Or are these samples collected by Quantico and contractor just picking up samples?
The samples shall be collected by MCB Quantico plant operators. Contractor is required to pick up the samples for testing.
Instructions to
Offerors
Prices – There is no pricing table included to indicate QTY and analysis required per month for the duration of the contract. Only the historical data is included. a.
Historical table – for some analysis there are no samples indicated. Also, quantities aren’t consistent.
a. (ex. Halo Acetic Acids – Q3 2014
– 11 samples, Q3 2015- 7 samples).
b. Fuel Specifications is listed in the table, but table indicates no samples performed. Is this required, if so what quantity and frequency?
c. Tank Hydrostatic Testing is listed in the table, but table indicates no samples performed. Is this required, if so what quantity and frequency?
d. Permit Renewal Testing –
Expected date of next sampling, usually every 5 years.
Contractor shall set prices based on their technical approach. Historical information was provided to allow contractors a better understanding of the requirements; however, this data is not absolute and does not replace the PWS. All information contained in the quote shall be based on addressing the services set forth under the PWS.
Contractor shall use their industry knowledge and experience to develop their technical approach to include the estimated amount of samples, frequency and testing needed for each sampling category.
PWS Page 19 of 72 – Biological Oxygen
Demand (5) and Biological Oxygen
Demand (I). I assume Biological
Oxygen Demand (5) = BOD5, what is Biological Oxygen Demand (I)?
Biological Oxygen Demand (5), should instead state Biochemical Oxygen Demand (5), and means:
5-Day Biochemical Oxygen Demand test. This name has been corrected in the PWS.
Biological Oxygen Demand (I), should instead state
Carbonaceous Biochemical Oxygen Demand
(CBOD). This has been corrected in the PWS.
PWS In section 4.3.2 Drinking Water: a.
Can you provide a list of the
Inorganic Chemicals as required per permit?
b. Can you provide a list of the Metal as required per permit?
c. Can you provide a list of the
Radiologicals as required per permit?
Also, Radiologicals are not included in table of historical data?
a. Yes, Inorganics can be found on attachment 5, Types of Inorganics, found with this amendment.
b. Yes, a list of metals can be found on attachment
20, Metals, found with this amendment.
c. Radiological testing is performed every 10 years.
The current Radiologicals required can be found on attachment 22, Consumer Confidence Report, found with this amendment.
Instructions to
Offerors
What do we provide analysis prices based on? The historical table or
Sample Parameters listed in Section
4.3 of RFP. Please clarify quantity and frequency?
This is a Performance Based Acquisition for severable services. Contractor shall provide a price for each CLIN as stated in the solicitation and pricing template. Basis for pricing is at the prerogative of the contractor based on the technical approach proposed to satisfy the Government's requirements.
PWS Permits – can they be provided for drinking water and waste/storm water to clarify permit requirements?
Permits have been attached to amendment 1 of the
RFQ.
Evaluation Factors for Award
RFP request – Past Performance
Questionnaire Attachment 3, as noted on page 63 of 72. Is this Attachment for Quantico assessors to complete?
Do you have a form for non-
Quantico assessors? If so, can you provide?
The Attachment 3- Past Performance Questionnaire is for contractors to send to their references for completion, which the reference will complete sections II through VI and send directly to the contracting personnel identified. This document is identified for all assessors.
Attachments QASP – Attachment 3, page 4 of 5, there is no Attachment provided with
RFP.
The QASP is attachment 2 as identified in the RFQ on Page 59. It has been confirmed to be submitted with the RFQ as attachment 2.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
ATTACHMENTS
Attachment
1 Historical Data
2 Quality Assurance Surveillance Plan (QASP)
3 Past Performance Questionnaire (PPQ)
4 Pricing Template
5 Types of Inorganics
6 VA0028371 - Upshur STP
7 VA0002151 - Industrial Stormwater
8 VA0028363 - Mainside STP
9 Publication CB-CCR 2015(rev)
10 Publication Upshur 2015-ccr (rev)
11 Publication1-MS-CCR-2015 (rev)
12 STFRD002 pt1
13 STFRD002 pt2
14 STFRD002 pt3
15 VAN010043 pt1
16 VAN010043 pt2
17 VAN010043 pt3
18 VAN010043 pt4
19 VAN010043 pt5
20 Metals
21 Drinking Water Sample
22 Consumer Confidence Report
PERFORMANCE WORK STATEMENT
1.0 SCOPE.
The Contractor shall provide Laboratory Testing Services for the potable (drinking) water, sewage water, storm/industrial wastewater, and hazardous waste water for Marine Corps Base, Quantico in full regulatory compliance with the Virginia Department of Environmental Quality (DEQ), Virginia Department of Health, Office of Drinking Water, and Federal, State, and Local regulations.
2.0 BACKGROUND.
Installation and Environment Division (GF), Facilities and Logistics Services, requires laboratory testing for compliance with State and Federal regulations in the operations of the sample testing for potable water, sewage water , storm/industrial wastewater and hazardous waste water for Marine Corps Base, Quantico.
3.0 APPLICABLE PERMITS AND CERTIFICATIONS.
3.1 Contractor services shall be performed by a laboratory certified to perform bacteriological and chemical analysis by the State of Virginia. Failure to provide evidence of, and to maintain, current state or federal certification shall be sufficient grounds for termination of the contract. Proof of certifications and accreditations shall be submitted with the contractor’s quote and updated annually when the options are exercised, if exercised.
3.2 The Contractor is required to be accredited by the
(a) National Environmental Laboratory Accreditation Conference (NELAC), and
(b) Virginia Environmental Laboratory Accreditation Program (VELAP).
3.3 Services provided under this contract must be in accordance with Virginia pollutant discharge elimination system requirements in the following Virginia Pollutant Discharge Elimination System (VPDES) permits:
Mainside Advanced Sewage Treatment Plant Permits VA0028363
Mainside Nutrient General Permit VAN010043
Camp Upshur Sewage Treatment Plant VA0028371
Industrial Stormwater Permit VA0002151
Municipal Separate Storm Sewer System (MS4) Permit VAR040069
Significant Industrial Discharge Permit STFRD002
Non-Significant Industrial Discharge Permit STFRD003
3.4 Services provided under this contract must be in accordance with the following Virginia Department of Health, Office of Drinking Water (VDH/ODW) permits are as follows:
Mainside WTP and Distribution System VDH/ODW Permit 6153675
Camp Barrett Distribution System VDH/ODW Permits 6153060 and 6179100
Camp Upshur Wells and Distribution System VDH/ODW Permit 6153063
3.5 Services provided under this contract must also be in accordance with Federal, State, and Local Regulations, including but not limited to:
MCB QUANTICO Base Orders
EPA Superfund Program: VA1170024722
Virginia Department of Health Drinking Water Regulations
Environmental Protection Agency Regulations
Safe Drinking Water Act
Resource Conservation and Recovery Act (RCRA, Subtitle C & D)
4.0 TASKING
4.1 Sample Containers and Collection:
4.1.1 The Contractor shall furnish all sample containers and coolers required for testing/sampling aboard Marine Corps Base (MCB), Quantico, Va. The Contractor shall provide sample containers at contract award date and no later than the 21st of each month after contract award. For compliance with permits, the contractor shall use sample containers labeled for the appropriate water system, chain of custody reports, related correspondence, verification of calibration of laboratory analytical equipment and the results of EPA
QC samples (if applicable).
4.1.2 The Contractor shall ensure sufficient inventories of sample containers are provided and maintained at each sample location. Sample locations for all waste water samples (to include Camp Upshur) is
Mainside Waste Water Treatment Plant located at Building 660, Quantico VA 22134.Sample containers for drinking water sampling shall be delivered to the Drinking Water Plant located at Water Treatment Plant, 1303
Caddy Road, Quantico, VA 22134. Sample containers for Hazardous Waste and Stormwater collection shall be delivered to the Natural Resources and Environmental Affairs office, Building 3049, MCB Quantico.
4.2 Contractor shall furnish all sample containers to accommodate sample collection.
4.2.1 Waste Water Treatment Plant
4.2.1.1 Provide sample bottles and coolers for monthly and quarterly samples no later than the
21st of each month, for example, May sample containers must arrive NLT April 21st.
4.2.2 Camp Upshur Sewage Treatment Plant
4.2.2.1 Provide sample bottles and coolers for monthly and quarterly samples no later than the
21st of each month, for example, May sample containers must arrive NLT April 21st.
4.2.3 Drinking Water Program
4.2.3.1 The Contractor shall furnish all sample containers and analyze all samples required for testing/sampling aboard Marine Corps Base (MCB), Quantico, VA. Testing shall be daily, monthly, quarterly, and/or yearly as required by the appropriate regulation.
4.2.4 Hazardous Waste Program
4.2.4.1 Provide all empty sample containers upon request to the Natural Resources and
Environmental Affairs office, Building 3049, MCB Quantico.
4.2.5 Stormwater Program
4.2.5.1 Provide all empty sample containers upon request to the Natural Resources and
Environmental Affairs office, Building 3049, MCB Quantico.
4.3 Sample Parameters
MCB Quantico requires the following parameters of analysis for the following media: wastewater, permit renewal, Drinking Water Samples, Hazardous Waste Samples, Storm Water Samples, Tank Hydrostatic Testing, Bluing
Parkerizing Operations and Fuel Specifications.
4.3.1 Waste Water Sample Collection Parameters:
Contractor shall collect all Mainside Sewage Treatment Plant samples (to include Camp Upshur and
Quarterly Sludge samples collect by Mainside Sewage Treatment Plant personnel) from the Mainside
Sewage Treatment Plant, Building 660, by 11:00 am each day, including weekends and holidays.
4.3.1.1 Mainside Wastewater Treatment Plant
a. Total Phosphorus
b. Total Suspended Solids
c. Total Suspended Solids (Volatile)
d. Total Kjeldahl Nitrogen
e. Enterococci 1
f. Biochemical Oxygen Demand (5)
g. Carbonaceous Biochemical Oxygen Demand
h. Nitrite-Nitrate
i. PCB
j. Ammonia
k. Chronic 3- Brood C. Dubia
l. Chronic 7-day P. Promelas
m. Orthophosphorus
n. Nitrite
o. Nitrate
p. Total Solids
q. Total Solids (Volatile)
r. Total Alkalinity
s. Volatile Acids
t. Composite Sampler Rental
4.3.1.2 Camp Upshur Waste Water Samples
a. Biological Oxygen Demand (5)
b. Total Suspended Solids
c. Total Phosphorus
d. Ammonia
e. E.coli
f. Total Recoverable Nickel
g. Total Recoverable Copper
h. Nitrate-Nitrite
i. Total Hardness
j. Nitrite
k. Nitrate
4.3.1.3 Sludge Sampling
a. Volatile Solids
b. Alkalinity as CaCO3
c. Nitrogen, (Nitrate)
d. Nitrogen, (Ammonium)
e. Nitrogen, (Total Kjeldahl)
f. Phosphorus, (Total)
g. Potassium, (Total)
h. Copper, (Total)
i. Nickel, (Total)
j. Zinc, (Total)
k. Molybdenum, (Total)
l. Aldrin/diekdrin (Total)
m. Benzo (a) pyrene
n. DDT/DDE/DDD (Total)
o. Dimethyl nitrosamine
p. Reactivity
q. TCLP Metals
r. Leachable TPH
s. Total Solids
t. TCLP Pesticides
u. TCLP Acid/Base Neutral Extractable
v. TCLP Herbicides
w. TCLP Voliatiles
x. Selenium, (Total)
y. Arsenic, (Total)
z. Cadmium, (Total)
aa. Lead, (Total)
bb. Corrosivity
cc. Mercury, (Total)
dd. Polychlorinated Biphenyls by GC/ECD
ee. Chlorinated Pesticides
ff. Paint Filter
4.3.1.4 Permit Renewal Effluent Testing
a. Grab Sample
b. Oil & Grease (HEM)
c. Thallium (Total)
d. Arsenic (Total)
e. Selenium (Total)
f. Antimony (Total)
g. Nickel (Total)
h. Zinc (Total)
i. Cadmium (Total)
j. Beryllium (Total)
k. Silver (Total)
l. Copper (Total)
m. Chromium (Total)
n. Lead (Total)
o. Cyanide (Total)
p. Phenolics (Total)
q. Volatile Organic Compounds
r. Semi-Volatile Organic Compounds
s. Total Ca/Mg Hardness
t. Total Dissolved Solids
u. Total Mercury
4.3.1.5 Contractor shall collect enterococci samples, following EPA protocol, from the Mainside
Sewage Treatment Plant, Building 660, by 11:00 am each day, including weekends and holidays.
4.3.1.6 Contractor shall provide thermometer and pH probe calibration support when requested by the COR.
4.3.1.7 Contractor shall set-up and collect samples for chronic and PCB analysis
4.3.1.8 Contractor shall pick up samples and collect drinking water samples from Mainside
Waste Water Treatment Plant, Laboratory, Building 1304, by 11:00 am. each day, including weekends and holidays.
4.3.2 Drinking Water Samples Collection Parameters
The Contractor shall collect the water samples from a central collection site within a 15-mile radius of
MCB, Quantico, VA, or from the Mainside Water Treatment Plant, Building 1304, MCB, Quantico, by
2:00 PM on a varying schedule to be arranged by both parties. The Contractor shall be prepared to transport and analyze bacteriological water samples within the six (6) hour hold time allowed.
4.3.2.1 Mainside Drinking Water Treatment Plant
a. Carbamate by EPA method 531 (CARB)
b. Cyanide (CYN3)
c. Diquat by EPA Method 549
d. Fluoride
e. Fumigants by EPA Method 551.3
f. Halo-Acetic Acids by EPA 552.2
g. Herbicide by EPA 515
h. Inorganic Chemicals in Drinking Water
i. Lead and Copper
j. Metal Analysis of Drinking Water
k. Nitrate-acid preserved sample(NN)
l. Radiological
m. Semi-volatiles by EPA method 525.2
n. Total coliform and E-coli by Quanti-Tray
o. Total coliform Presence absence
p. Total Organic Carbon
q. Total Organic Carbon and alkalinity
r. Trihalomethanes
s. Volatile Organics by method 524
4.3.2.2 The Contractor shall collect the water samples from a central collection site within a 15-mile radius of MCB, Quantico, VA, or from the Mainside Water Treatment Plant, Building 1304, MCB, Quantico, by 2:00 PM on a varying schedule to be arranged by both parties. The Contractor shall be prepared to transport and analyze bacteriological water samples within the six (6) hour hold time allowed.
4.3.2.3 All sample containers shall be delivered to the Water Treatment Plant, 1303 Caddy Road, MCB, Quantico, VA 22134
4.3.2.4 The contractor shall be available as required to provide sample analysis five (5) days per week, 52 weeks per year.
4.3.2.5 The Contractor shall ensure that test results are provided on time, within a seven (7) day response period. The Contractor must report test abnormalities to the Contracting
Officer’s Representative (COR) and Plant the same day the information is available to the lab.
4.3.3 Hazardous Waste/Stormwater/Tank Hydrostatic Testing/Bluing Samples Collection Parameters
Upon schedule, contractor shall pick up hazardous waste, stormwater, tank hydrostatic testing and bluing and Parkerizing samples at the main NREA office, 3049 Bordelon Street.
4.3.3.1Hazardous Waste Samples
a. TCLP
b. Paint Filter
c. TCLP Metals (RCRA 8)
d. TCLP Volatiles
e. TCLP Semi-Volatiles
f. TCLP Pesticides
g. TCLP Herbicides
h. TCLP single metal
i. Total Single Metal - As, Cr, Ag, Cu, Ni, Cd, Pb, Se or Zn (solid)
j. Total Single Metal - Mercury (solid)
k. Total Single Metal - As, Cr, Ag, Cu, Ni, Cd, Pb, Se or Zn (liquid)
l. Total Single Metal - Mercury (liquid)
m. Total RCRA Metals - As, Cr, Hg, Ag, Cu, Ni, Cd, Pb, Se, Zn (solid)
n. Total RCRA Metals - As, Cr, Hg, Ag, Cu, Ni, Cd, Pb, Se, Zn (liquid)
o. PCB (in oil)
p. Ignitable
q. Corrosivity
r. Reactivity
s. TPH DRO/GRO
t. TCLP Creosols
u. Total Halogens
4.3.3.2 Storm Water Samples
a. Total Suspended Solids (TSS)
b. TPH by GC/FID
c. BOD5 (Total)
d. Chemical Oxygen Demand
e. Oil & Grease
f. Bioassay, Chronic Whole Effluent Toxicity, 7 day, Ceriodaphnia dubia
g. Bioassay, Chronic Whole Effluent Toxicity, 7 day, Pimephales promelas
h. Bioassay, Acute Whole Effluent Toxicity, 48 hr. Renewal, Ceriodaphnia dubia
i. Bioassay, Acute Whole Effluent Toxicity, 48 hr Renewal, Pimephales promelas
j. Total Petroleum Hydrocarbons, (TPH-GRO and TPH-GRO)
k. Total Organic Carbon
l. Solids, Total Suspended (TSS)
m. BTEX
n. Napthalene
o. Sample Delivery
4.3.3.3 Tank Hydrostatic Testing
a. BTEX
b. Naphthalene
c. Total Petroleum Hydrocarbons
4.3.3.3 Bluing Parkerizing Operation
a. TTO
b. Total Cy
c. Total As, Cr, Hg, Ag, Cu, Ni, Cd, Pb, Se, Zn
d. Benzene
e. Toluene
4.3.3.4 Fuel Specifications
a. Sulfur Content
b. Cetane #
c. Aromatic Content
4.3.3.5 The contractor shall execute functions in accordance with regulatory criteria set forth under permits and regulations.
4.3.3.6 Contractor shall ensure sample collection, laboratory analysis and results reporting are completed in accordance with regulations.
4.3.3.7 Contractor shall deliver the sample results to the Contracting Officer Representative via email, hand delivered, or USPS at Marine Corps Base Quantico P.O. Box 327 Quantico
Va.
4.3.3.8 The contractor shall posses capability to provide sample analysis five (5) days per week, 52 weeks per year, all while keeping within all sample hold times.
4.3.3.9 Contractor shall ensure proper integrity of collected samples. Handling of transportation of samples shall be conducted in approved containers and conditions, to include refrigeration.
4.4 Bench Work Sheets
4.4.1 Contractor shall email raw sample results daily to COR(s) and STP/WTP Supervisors.
WTP manager will provide contractor file to use upon contract award.
4.4.2 For compliance with permits, contractor shall provide chain of custody reports, related correspondence, raw data bench sheets, verification of calibration of laboratory analytical equipment, the results of EPA QC samples, and all sample results. Contractor shall deliver the sample results to the COR(s) via email, hand delivered, or USPS at
Marine Corps Base Quantico, P.O. Box 327, Quantico, VA 22134.
4.5 Reporting of Laboratory Analysis:
4.5.1 The Contractor shall ensure that test results are provided on time, within the regulatory response period. The Contractor must report test abnormalities to the Contracting
Officer’s Representative (COR) and Plant the same day the information is available to the lab.
4.5.2 Contractor shall provide analysis results report to the Program Managers, COR and other required personnel. Distribution list will be given to contractor once contract is awarded. Report can be provided electronically (preferred), faxed or in person.
4.5.3 The Contractor shall re-do a sample, at no additional cost to the Government, if evidence of Contractor error exists.
4.5.4 If the Contractor fails to sample or to provide test results, or if the Contractor's negligence, lack of adequate quality control or mishandling produces test or sampling results which are inaccurate or anomalous, the Contractor shall be liable for all costs associated with timely securing and analyzing another sample, i.e. resampling, etc.
The Contractor will also provide a letter explaining the error to the COR, which will be forwarded to the Virginia Department of Health Division of Water Programs.
4.5.5 Contractor shall include trip blanks and equipment rinses when required for all test method.
4.5.6 The Contractor shall ensure that test results are provided on time, within the response period given.
4.6 Tooling:
4.6.1 Contractor shall ensure composite sampling is provided to the Government up to 6 times a year. Usage of Composite Sampler will be coordinated by the Contracting
Officer Representative in writing 5 days prior need date.
4.7 Integration Services
4.7.1 Personnel Management: The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the Government assign personal or out of scope tasks to, or prepare work schedules for, individual contractor employee, to include team members. It will be the responsibility of the contractor to provide a
Program/Contract Manager to directly manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it will be the contractor's responsibility to notify the
COR or contracting officer immediately.
4.7.2 Personnel Administration: The contractor shall provide guidance for their employees during designated Government non-work days or other periods where
Government offices are closed. The contractor will be responsible for maintaining the currency of their employees by providing initial and refresher training, as required, to meet the PWS requirements and/or qualifications. The contractor will provide administrative support to employees in a timely fashion (time keeping, leave processing, pay and labor relations, emergency needs).
4.7.3 Program/Contract Manager: The contractor shall provide a Program/Contract
Manager (PM) who will be responsible for the overall contract performance. The name of this person, and an alternate who will act for the contractor when the PM is absent, will be designated in writing to the contracting officer. The PM or alternate will have full authority to act for the contractor on all contract matters relating to daily operation of this contract. It is not anticipated or desired that a full time on-site
PM be provided.
4.7.4 Primary Duties: The PM is the primary point of contact for the COR with regard to contract performance, and will be the single point of accountability for accomplishing performance objectives; the PM will interface with the COR and/or designated representatives as required. In addition, the PM is expected to effectively communicate all progress, identify problems, and provide corrective action, address issues, and risks to the COR. This requires the PM to be proactive in terms of identifying possible quality improvements across all areas of the service provided.
The PM will also ensure that the Quality Control procedures are implemented and followed. The contractor shall provide qualified personnel with the administrative, managerial, and supervisory capabilities to ensure effective performance of the contract.
4.7.5 Business Relations: The PM will integrate and coordinate all activity needed to execute the requirement successfully. This is accomplished by properly managing timeliness, completeness, and qualities of work performed by their employees, as well as, if applicable, effective management of subcontractors.
4.7.6 Contract Management: The PM will establish clear organizational lines of communication, authority, and responsibility to ensure effective management of the resources assigned to the requirement. The PM must maintain continuity between the support operations and the contractor's corporate offices. The PM will not be directly involved in the transmittal or receipt of official correspondence with the Contracting
Officer/Contracts Specialist. The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor will respond to Government requests for contractual actions in a timely fashion. The contractor will have a single point of contact between the Government and contractor personnel assigned to support the requirements of this contract (PM). The contractor will assign all work effort while maintaining proper and accurate time keeping records of personnel assigned to work on the requirement. The PM will not be directly involved in the transmittal or receipt of official correspondence with the
Contracting Officer/Contracts Specialist. The PM will not be authorized to make any legally binding commitments between the contractor and the Government.
4.7.7 Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting
Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action will be taken to resolve outstanding issues. These meetings will be at no additional cost to the government.
4.7.8 Problem/Issue Identification and Resolution: The PM will identify and report to the
COR any present or potential problems/issues with their employees or the performance thereof. If any problems/issues are identified, the PM will provide corrective action plans, quote submittals, timely identification of cures, and, if applicable, qualifications of possible replacements of key personnel. The contractor will seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel at all times.
5.0 FAILURE TO COMPLY WITH FEDERAL AND STATE COMPLIANCE REGULATIONS.
If the Contractor fails to sample or to provide test results, or if the Contractor's negligence, lack of adequate quality control or mishandling produces test or sampling results which are inaccurate or anomalous, the Contractor shall be liable for all costs associated with timely securing and analyzing another sample, i.e. resampling, etc. The
Contractor will also provide a letter explaining the error to the Government, which will be forwarded to the Virginia
Department of Environmental Quality or Virginia Department of Health, Office of Drinking Water, as applicable.
6.0. PERFORMANCE SITE INSPECTION
The Government may conduct laboratory visits with 24 hours advance notice to Contractor.
7.0 PACKAGING AND MARKING
Packaging and shipping shall conform to current federal, state and local regulations.
8.0 TRAVEL.
No travel will be required for this effort.
9.0 TRAINING AND CERTIFICATIONS
Contractor shall possess required training and certifications prior to commencement of work.
10.0 PERIOD OF PERFORMANCE.
The period of performance will be for one (1) Base Period of 12 months and four (4) Option Periods of 12 months each and one (1) 6 months option period in accordance with FAR 52.217-8. The Period of Performance reads as follows:
Base Year 30 September 2016 – 29 September 2017
Option Period 1 30 September 2017 – 29 September 2018
Option Period 2 30 September 2018 – 29 September 2019
Option Period 3 30 September 2019 – 29 September 2020
Option Period 4 30 September 2020 – 29 September 2021
6 months option period 30 September 2021 – 29 March 2022
11.0 QUALITY ASSURANCE
11.1 The laboratory shall be under the supervision of a Chemist, qualified under Virginia State certifications, and capable of interpreting and directing the analysis to be performed under this contract. The Chemist shall review and certify, by a signed statement on the report form, the adequacy and accuracy of procedures, analytical results, and reports. Laboratory personnel, test equipment, consumable chemicals, etc. for the performance of the specified analytical test are the responsibility of the Contractor, and shall be suitable to satisfy the quality of the data required;
all equipment and procedures used for the performance of the laboratory analysis shall be in conformance with the guidelines established by EPA. The Contractor shall follow the quality control and assurance requirements for the performance of the analytical tests as stated by the EPA.
a. CONTRACT SUBMISSION REQUIREMENT: As part of the quote package, the Contractor shall submit to the KO for approval, a written description of the Quality Assurance and Control (QA/QC) program that is to be followed by the laboratory throughout the contract period. The QA/QC program should cover laboratory equipment, facilities, and personnel, calibration plans, reagent quality, test methods, sample handling, method of verification, evaluation and documentation of data quality and any other policies and plans that will be used by the Contractor to ensure the reliability of the laboratory test results.
b. LABORATORY CERTIFICATION: All work and services shall be performed by a laboratory, which is certified to perform bacteriological and chemical analysis by the State of Virginia. (A copy of State certification shall be furnished with technical quote). Loss of state or federal certification shall be sufficient reason for termination of the contract for default. State certification shall be kept up to date at the cost of the contractor and shall be provided to the COR upon request.
c. QUALITY CONTROL ANALYSIS: The Contractor shall maintain a Quality Assurance and Control
(QA/QC) program to be followed by the laboratory throughout the contract period. The QA/QC program should cover laboratory equipment, facilities, and personnel, calibration plans, reagent quality, test methods, sample handling, method of verification, evaluation and documentation of data quality and any other policies and plans that will be used by the Contractor to ensure the reliability of the laboratory test results. Quality control samples required to be analyzed under this contract by the EPA or other regulatory agency will be considered part of the Contractor's quality control program. Laboratory analysis for these samples shall be the responsibility of the Contractor and the Government shall not be billed for them.
11.2 The Government shall monitor Contractor’s performance in accordance with the Quality Assurance Plan.
12.0 PLACE OF PERFORMANCE.
All activities other than sample collection will be performed at contractor location. Sample collection shall be performed at Marine Corps Base, Quantico.
13.0 SECURITY REQUIREMENT.
13.1 Performance under this PWS does not require a clearance; nevertheless, a background check is required to access the Government facilities.
13.2 The contractor will provide the Contracting officer with a list of all contractor personnel working at the site, at least three days before the commencement of work
14.0 GOVERNMENT FURNISHED EQUIPMENT (GFE).
The Government will not provide any government owned property.
15.0 CONTRACTING OFFICER REPRESENTATIVE (COR).
15.1 Inspection and Acceptance of contract deliverables is the responsibility of the COR. The COR serves in a supporting role to the Contracting Officer, providing advice and expertise on technical issues. However, only the
Contracting Officer has authority to authorize deviations from the terms and conditions of this contract, including deviations from specification requirements and approval of OCDs or related charges not previously identified in the Contractor’s quote. In the event the Contractor does deviate without written approval of the
Contracting Officer, such deviation shall be at the risk of, and all costs relating thereto shall be borne of the
Contractor.
16.0 WORKING ON A GOVERNMENT INSTALLATION.
16.1. The Contractor and his employees shall be subject to all traffic, security, and registration regulations for personnel and vehicles.
16.2. The Contractor will provide his own mode of transportation on government installation when performing their duties, at the expense of the contractor.
16.3. All Contractor personnel attending meetings, working on site, where their Contractor status is not known to third parties, must identify themselves as Contractors.
17.0 ORGANIZATIONAL CONFLICT OF INTEREST (OCI)
Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) which may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. The Contractor will notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and will promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the
Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the
Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
18.0 DATA RIGHTS.
18.1. General. All reports, materials (including training materials, computer software and hardware, source code, interfaces, Tools, Works, and related items) and information, in whatever form, created, generated, or produced under this contract shall become the property of the Marine Corps; therefore, the Marine Corps shall have the right to use, modify, reproduce, perform, display, release, or disclose such reports, materials, and information in whole or in part, in any manner, and for any purpose whatsoever, and to have or authorize others to do so.
18.2. No data, materials, or other items created or provided expressly for this contract shall be used by the contractor for any purpose other than the support and performance under this contract without the prior written permission of the Contracting Officer. The contractor is obligated to protect from unauthorized use or disclosure all government confidential or classified material and government owned proprietary data obtained in the course of performance of services under government contract as long as such data remains proprietary, confidential, or classified. Any information obtained in the course of duties or the performance of services under this contract including, but not limited to, information that may be made available for use which relates to the technical data, trade secrets, processes, operations, style of work, or apparatus, or to the technical data, statistical data, amount or source of any income, profits, losses, or expenditures of any person, firm, partnership, corporation, or association is included in this clause. Contract personnel shall not publish, divulge, disclose or make known this information in any manner or to any extent not authorized by Commanding General, Marine Corps Combat Development Center.
19.0 DELIVERABLES
19.1 Methods and Frequency:
(a) Surveillance will be accomplished on continual basis. The method used for evaluation will be based on schedules for pickup of sample, and reports of sample results. These deliverables will be monitored by Plant
Supervisors, Environmental Program Managers, and COR(s) for content and timeliness.
(b) Timely feedback to the Contractor on unacceptable performance will be provided by the COR(s), through the
Contracting Officer.
(c) A summary of any item that does not meet the terms and conditions of the contract shall be prepared by the
COR(s) and forwarded to the Contracting Officer.
(d) A checklist and summary of performance shall be prepared by the COR(s) and submitted in support of unacceptable performance if identified during the performance period.
19.2. Performance Areas:
(a) Management Responsiveness. Contractor’s responsiveness will be evaluated on timeliness of deliverables, informing Government of work progress, and identification of problems and effective corrective action.
(b) Contract Management/Administration. Contractor management/administration will be evaluated on the quality and effectiveness of the Contractor’s management of the contract. The Contractor shall provide support throughout the period of performance. The Contractor will be evaluated in the successful control of resources. The
COR(s) shall:
Ensure that test results are provided on time. Report test abnormalities to the Plant Supervisor immediately.
Ensure chain of custody is adhered to.
(c) Performance. The Contractor will be evaluated as to the quality of output of their work. The Contractor’s personnel should be technically competent in the functional area(s) identified in the task order. Included in the technical performance are the quality of the Contractor’s technical reports, Contractor’s productivity, and the overall quality of the technical support provided to the Government.
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance
Objective Standard
Performance
Threshold Method of Surveillance
Sample Containers and Collection
The contractor shall provide sample containers as required per applicable permits.
The contractor shall maintain adequate quantity sample of containers at MCBQ.
Contractor shall collect, store, and transport samples per regulatory criteria and within schedule.
100% compliance in collecting, storing, and transporting samples per regulatory criteria
Regulatory compliance
Adequate inventory of sample containers at
MCBQ
Proper handling of samples.
Laboratory Analysis As required per applicable regulatory criteria.
100% compliance
Timeliness and accuracy of analysis.
Regulatory compliance
Reporting of
Laboratory Analysis
As required per applicable regulations.
100% compliance
Timeliness and accuracy of reports.
No more than 5 typographical errors
Regulatory compliance
Integration Services
The contractor shall maintain adequate program management support to ensure quality and timely service.
No more than two substantiated complaints per year.
Monthly status report
Responsiveness
(End of Summary of Changes)
File details come from the government source that posted it. Updated .