LSS_Maple_Ola_Camp.docx

DOCX document 518 KB Posted

Attached to
2021 Wetland Tree Planting
Solicitation number
RFP 591 210000001615 1
Issued by
Clinton County, Michigan

About this file

This is a Location Specification Sheet (LSS) and Request for Proposal (RFP) issued by the Michigan Department of Transportation (MDOT) Environmental Services Section for wetland mitigation site tree and shrub planting services. The contract encompasses the installation of 500 trees and shrubs in any species combination at the Maple River Watershed Bank Site/Ola Camp, located in the northwest quadrant of the US-127/M-57 Interchange in Washington Township, Gratiot County, Michigan. The contract is estimated to begin on September 1, 2021, and conclude on November 15, 2022. The specified tree and shrub species include Acer saccharinum, Platanus occidentalis, Quercus bicolor, Quercus macrocarpa, and Quercus palustris. Beyond installation, the contractor must provide site preparation, material costs, labor, equipment, layout, tree guards, and an establishment period including all plant replacements. Additional contract requirements include wetland watering and wetland cultivation services on an as-needed basis.

The pricing schedule must be submitted in the modifiable format provided and should include all costs for materials, site preparation, labor, equipment, layout, tree guards, and the establishment period with plant replacements included in the lump sum installation fee. Contractors are encouraged to offer quick payment terms with a specified discount percentage if invoices are paid within a designated number of days of receipt. The contractor must certify that pricing was developed independently and without consultation with other bidders. Contractors are responsible for any property damage incurred during performance and must complete repairs accordingly. The RFP contact is ReChelle I. Benson at the MDOT Contract Services Division, Purchasing Unit, with the Program Manager listed as Jeremie Wilson.

View the file

Other files

File Type Posted
LSS_Isabella.docx DOCX document
LSS_Musson.docx DOCX document
Att.A.MDOT Region Map.pdf PDF
LSS_St.Joseph.docx DOCX document
LSS_Jacks Fish Farm.docx DOCX document
LSS_Maple_Stoneman.docx DOCX document
Wetland Proposal In.VQ.CT.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRETCHEN WHITMER

GOVERNOR

STATE OF MICHIGAN

DEPARTMENT OF TRANSPORTATION

LANSING

PAUL C. AJEGBA

DIRECTOR

MAINTENANCE, REPAIR & OPERATIONS (MRO)

REQUEST FOR PROPOSAL (RFP) NO. 210000001615

WETLAND MITIGATION SITE TREE/SHRUB PLANTING

LOCATION SPECIFICATION SHEET (LSS)

PART I – PLACE OF SERVICES REQUESTED

BIDDER NAME: LOCATION: MDOT BAY REGION

CONTRACT INFORMATION

ESTIMATED CONTRACT START DATE:
09/01/2021
CONTRACT END DATE:
11/15/2022
PREVIOUS BPO #:
N/A
CONTRACT INFORMATION:
N/A
CONTRACTING AGENCY NAME:
MDOT Environmental Services Section
BUILDING NAME AND NUMBER:
Van Wagoner Building
BUILDING ADDRESS:
425 West Ottawa Street, Lansing, Michigan 48909
REGION / COUNTY:
Bay Region / Gratiot County

PROCUREMENT CONTACT INFORMATION

PROCUREMENT OFFICE NAME:
MDOT CONTRACT SERVICES DIVISION, PURCHASING UNIT
PROCUREMENT OFFICE CONTACT NAME:
ReChelle I. Benson
CONTACT PHONE #:
517-335-5905
PROCUREMENT OFFICE CONTACT E-MAIL:
BensonR4@michigan.gov
CONTACT FAX #:
PROGRAM MANAGER (PM) NAME:
Jeremie Wilson
CONTACT PHONE #:
517-281-9837
PM CONTACT E-MAIL:
WilsonJ3@michigan.gov
CONTACT FAX #:

LOCATION INFORMATION

COUNTY
Gratiot
SITE LOCATION DIRECTIONS
Located in the northwest quadrant of the US-127/M-57 Interchange. Access is off Garfield Road along the north end of the site.
TOWNSHIP
Washington Township
TRS – ¼ SECTION
T09N, R02W, Sec: 08 NE

SITE LOCATION MAP AND PLANTING AREA

PART II – SCHEDULE B – PRICING

Location: Maple River Watershed Bank Site / Ola Camp

1. The Contractor must provide a pricing schedule for the proposed Contract Activities using the Location Specification Sheet for each location. The pricing schedule should be submitted in this modifiable format; however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.

1. Listed Total Cost must include, material cost, site preparation, labor, material, equipment, layout, tree guard, and establishment period including all plant replacements.

1. The listed line items will include the following cost as specified:

1. Tree/Shrub Species:

0. Cost for tree/shrub species material by species

0. Installation of 500 species total in any combination, Lump Sum

1. Wetland Watering

1. Each

1. Wetland Cultivation

2. Each

1. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.

Quick payment terms: ________ % discount off invoice if paid within ________ days after receipt of invoice.

1. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.

PART II – SCHEDULE B – PRICING

Location: Maple River Watershed Bank Site / Ola Camp

BIDDER NAME:

DESCRIPTION OF CONTRACT ITEM

QUANTITY

500 Total in Any Combination

COST
TOTAL COST

· Acer saccharinum

· Platanus occidentalis

· Quercus bicolor

· Quercus macrocarpa

· Quercus palustris

Installation of 500 Tree/Shrub Species
LUMP SUM
Wetland Watering
EACH
Wetland Cultivation
EACH

TOTAL

The State is not obligated to purchase in the quantities listed. The Contractor is responsible for any damage done to any property while performing grounds maintenance services and will be required to make repairs accordingly.