About this file

These documents represent the final engineering design plans for the Lift Station #60 Bypass Design project for New Smyrna Beach Utilities (NSBU), prepared by Kimley-Horn and Associates in October 2024. The comprehensive set of engineering drawings covers civil, structural, and electrical aspects of installing a bypass pumping system, including site plans, demolition details, proposed site configurations, structural foundations, wetwell sections, and electrical schematics. The plans detail the installation of a 175-gallon diesel bypass pump, associated piping, concrete foundations, electrical connections, and site infrastructure modifications at the lift station located at 1555 Canal Street in New Smyrna Beach, Florida.

The design documents specify technical requirements for the bypass system, including precise specifications for concrete pad dimensions, piping configurations, electrical connections, grounding details, and equipment placement. The project involves removing existing site elements, installing new bypass connections, constructing concrete pads for diesel fuel tanks and pumps, and integrating new electrical and control systems. The drawings provide detailed technical specifications for contractors, including pipe sizes, material requirements, electrical conduit installations, grounding procedures, and specific construction notes that outline expectations for site preparation, utility protection, erosion control, and as-built documentation. The plans are marked as "Final" and represent the 90% submittal stage of the engineering design process, indicating they are near-complete technical documents ready for bid and construction.

View the file

Other files

File Type Posted
ITB_03-25_Bid_Tab.pdf PDF
ITB_03-25_Addendum_1.pdf PDF
LS60_Bypass_Plans_2024.10.18.pdf PDF
LS60_Bypass_Specs_2024.10.18.pdf PDF
ITB_03-25_Lifstation_60_Bypass_Pump.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Know what'sbelow.

Callbefore you dig.

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

FINAL

C O

VE

R

S H

EE

T

G-01

OCTOBER 2024

PROJECT

LOCATION

LIFT STATION #60 BYPASS DESIGN

OWNER/APPLICANT:

NEW SMYRNA BEACH UTILITIES

200 CANAL STREET

NEW SMYRNA BEACH, FL 32168

(386) 427-1361

CIVIL/MECHANICAL ENGINEERING CONSULTANT:

KIMLEY-HORN AND ASSOCIATES, INC.

12740 GRAN BAY PARKWAY WEST, SUITE 2350

JACKSONVILLE, FLORIDA 32258

(904) 828-3900

ELECTRICAL ENGINEERING CONSULTANT:

BAILEY ENGINEERING CONSULTANTS, INC.

10620 GRIFFIN ROAD, STE 202

COOPER CITY, FL 33326

(954) 448-7930

SURVEYOR:

DRMP, INC.

100 PARNELL STREET, SUITE A

MERRITT ISLAND, FL 32953

(321) 453-0010

PROJECT OWNER AND CONSULTANTS

LOCATION MAP

NSBU MASTER PUMP STATION 60

1555 CANAL STREET

NEW SMYRNA BEACH, FLORIDA 32168

N.T.S.

NSBU PROJECT #RSQ 05-21 TASK NO. 6

NEW SMYRNA BEACH UTILITIES

FINAL PLAN

MR. JAMES DAVENPORT, CHAIRMAN

MR. RICHARD HAWES, VICE CHAIRMAN

MS. LILLIAN CONRAD

MR. LARRY KELLY JR.

MR. JAMES N. SMITH

COMMISSION MEMBERS:

I-95

NOTES:

CONTRACTOR SHALL NOTIFY NSBU

ENGINEERING DEPARTMENT 48 HOURS

BEFORE STARTING WORK ON THIS PROJECT.

DRAWING INDEX

SHEET NO. SHEET TITLE

G-01 COVER SHEET

C-01 C-02

EXISTING SITE PLAN & DEMOLITION PLAN

PROPOSED SITE PLAN

G-02 SITE LOCATION AND GENERAL NOTES

C-03 S-01

CIVIL DETAILS

STRUCTURAL PLAN AND NOTES

M-01 PROPOSED WETWELL SECTION

S-02 STRUCTURAL DETAILS

SR-44

WWTP

LS60

S DIXIE FREEWAY

CANAL STREET

MS. DANA HALE

DIRECTOR OF WATER RESOURCES:

MR. EFREN CHAVEZ

GENERAL MANAGER & CHIEF EXECUTIVE OFFICER:

E-01 ELECTRICAL NOTES, SYMBOLS, & ABBREVIATIONS

E-02 E-03

LIFT STATION #60 ELECTRICAL PLAN

EXISTING MCC-1 & MCC-2 SINGLE LINE DIAGRAM

E-05 EXISTING ELECTRICAL BUILDING POWER PLAN

E-04 CONTROL RISER DIAGRAM

E-06 PANEL SCHEDULE & ELECTRICAL DETAILS

E-07 ELECTRICAL DETAILS

MULTICORELINK:C-01 EXISTING SITE PLAN-C-01 EXISTING SITE PLAN & DEMOLITION PLAN

MULTICORELINK:C-02 PROPOSED SITE PLAN-C-02 PROPOSED SITE PLAN

MULTICORELINK:C-01 EXISTING SITE PLAN-C-01 EXISTING SITE PLAN & DEMOLITION PLAN

MULTICORELINK:C-02 PROPOSED SITE PLAN-C-02 PROPOSED SITE PLAN

MULTICORELINK:G-02 SITE LOCATION AND GENERAL NOTES-G-02 SITE LOCATION AND GENERAL NOTES MULTICORELINK:G-02 SITE LOCATION AND GENERAL NOTES-G-02 SITE LOCATION AND GENERAL NOTES

MULTICORELINK:C-03 CIVIL DETAILS-C-03 CIVIL DETAILS

MULTICORELINK:S-01 STRUCTURAL NOTES-S-01 STRUCTURAL NOTES

MULTICORELINK:C-03 CIVIL DETAILS-C-03 CIVIL DETAILS

MULTICORELINK:S-01 STRUCTURAL NOTES-S-01 STRUCTURAL NOTES

MULTICORELINK:M-01 EXISTING SECTION-M-01 PROPOSED WETWELL SECTION

MULTICORELINK:M-01 EXISTING SECTION-M-01 PROPOSED WETWELL SECTION

MULTICORELINK:S-02 STRUCTURAL DETAILS-S-02 STRUCTURAL DETAILS

MULTICORELINK:S-02 STRUCTURAL DETAILS-S-02 STRUCTURAL DETAILS

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

FINAL

NORTH

SI

TE

L O

C

AT

IO

N

AN

D

G

EN

ER

AL

N O

TE

S

G-02

GENERAL NOTES:

1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH ALL RELATIVE NEW SMYRNA BEACH UTILITY STANDARDS AND THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), EXCEPT AS MODIFIED HEREIN.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND INSURANCE REQUIRED FOR THE WORK.

3. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A PRE-CONSTRUCTION INSPECTION OF THE SITE PRIOR TO THE BEGINNING OF THE WORK. CONTRACTOR SHALL INFORM THE OWNER AT LEAST 48 HOURS PRIOR TO THE SCHEDULED INSPECTION.

4. CONTRACTOR SHALL LOCATE, VERIFY AND IDENTIFY ALL EXISTING UNDERGROUND UTILITIES SHOWN, OR NOT SHOWN, ON THE PLANS PRIOR TO ANY EXCAVATING ACTIVITIES.

5. CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT EXISTING AND NEWLY CONSTRUCTED UTILITIES DURING THE CONSTRUCTION. SHOULD ANY UTILITY LINE OR COMPONENT BECOME DAMAGED OR REQUIRE RELOCATION, THE CONTRACTOR SHALL

IMMEDIATELY NOTIFY THE OWNER.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES CAUSED BY THEIR OPERATIONS.

7. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION WITH OTHER WORK WHICH MAY BE ONGOING ADJACENT TO, OR AFFECTING, THIS CONSTRUCTION. CONTRACTOR SHALL COOPERATE WITH OTHER CONTRACTORS AND ALL AFFECTED UTILITY COMPANIES.

8. CONTRACTOR SHALL NOTIFY ALL APPLICABLE UTILITY COMPANIES, OR THE COMPANY REPRESENTATIVE 48 HOURS PRIOR TO THE INITIATING OF ANY EXCAVATION ACTIVITIES, OR AS SPECIFIED BY THE UTILITY COMPANY AND ANY PERMITS REQUIRED FOR THE WORK.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL/DISPOSAL OF ANY UNSUITABLE MATERIAL FROM THE CONSTRUCTION OPERATION, FURNISHING AND COMPACTING SUITABLE REPLACEMENT BACKFILL MATERIAL. DISPOSAL OF UNSUITABLE MATERIAL SHALL BE IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS.

10. THE EXISTING STORMWATER DRAINAGE SYSTEM SHALL REMAIN FUNCTIONAL AND BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE EROSION AND SEDIMENT CONTROL AND SHALL SUBMIT THE EROSION AND SEDIMENT

CONTROL PLAN TO THE ENGINEER.

11. CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE EROSION AND TURBIDITY CONTROLS IN ACCORDANCE WITH FDEP DURING AND FOLLOWING CONSTRUCTION, UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED TO AVOID ADVERSE ENVIRONMENTAL IMPACTS TO

OFF-SITE PROPERTY AND DRAINAGE SYSTEMS.

12. CONSTRUCTION WARNING SIGNS SHALL BE MOUNTED AND ERECTED BEFORE CONSTRUCTION CAN COMMENCE. THESE, AND ALL TRAFFIC CONTROL DEVICES, SHALL FOLLOW THE STANDARDS SET FORTH BY THE MANUAL OF FLORIDA DEPARTMENT OF TRANSPORTATION

(FDOT) STANDARD INDEX.

13. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARLY IDENTIFYING THE AREA OF CONSTRUCTION AND SAFELY ROUTING ALL VEHICULAR AND PEDESTRIAN TRAFFIC AROUND THE CONSTRUCTION AREA. THE CONSTRUCTION AREA SHALL BE CLEARLY MARKED AT ALL TIMES.

14. CONTRACTOR SHALL SEED AND MULCH ALL AREAS DISTURBED BY THE CONSTRUCTION ACCORDING TO LOCAL REGULATIONS. USE SOD ON ANY AREAS WITH SLOPES GREATER THAN 6:1.

15. CONTRACTOR SHALL MAINTAIN "AS-BUILT" INFORMATION ON A REGULAR BASIS. CONTRACTOR SHALL EMPLOY THE SERVICES OF A SURVEYOR REGISTERED IN THE STATE OF FLORIDA TO DETERMINE ALL "AS-BUILT" INFORMATION. WITHIN 14 DAYS OF THE COMPLETION OF THE WORK, CONTRACTOR SHALL PROVIDE SIGNED AND SEALED COPIES AND THE DIGITAL CAD FILE OF THE "AS-BUILT" DRAWINGS AND SUPPORTING SURVEY RECORDS TO THE COMPANY REPRESENTATIVE. CAD FILES SHALL BE IN THE AUTOCAD FORMAT.

16. CONTRACTOR SHALL HAVE RED LINED AS-BUILT PLANS AND SPECIFICATIONS AVAILABLE ON SITE DURING CONSTRUCTION. RED LINE DRAWINGS SHALL BE UPDATED DAILY.

17. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PRODUCE, SUBMIT, AND OBTAIN APPROVAL OF THE REPRODUCIBLE AS-BUILT DRAWINGS FOR ANY JURISDICTIONAL AGENCIES AS MAY BE REQUIRED.

18. CONTRACTOR SHALL GIVE THE ENGINEER A MINIMUM OF 48 HOURS NOTICE OF ALL MEETINGS OR TESTING MEASURES REQUIRED TO BE WITNESSED BY THE ENGINEER ACTIVITIES RELATED TO THE WORK.

19. CONTRACTOR SHALL GIVE THE ENGINEER A MINIMUM OF THREE (3) BUSINESS DAYS NOTICE FOR ANY FINAL INSPECTION. THE ENGINEER WILL SCHEDULE INSPECTIONS FOR SUBSTANTIAL AND FINAL COMPLETION.

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

FINAL

EX

IS

TI

N

G S

IT

E

PL

AN

D

EM

O

LI

TI

O N

P

LA

N

C-01

NORTH

D

B

A

C

NOTES:

1) ALL DIMENSIONS ARE APPROXIMATE AND TO BE FIELD VERIFIED.

2) EXISTING WETWELL, PUMPS, AND PIPING TO REMAIN AND BE PROTECTED.

DEMO HATCH

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

FINAL

PR

O

PO

SE

D

SI

TE

P

LA

N

C-02

NORTH

E I XPERIENCE NNOVATION

SCADA INTERFACE BOX

Know what'sbelow.

Callbefore you dig.

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

FINAL C-03BYPASS PUMP CURVE

C

IV

IL

D

ET

AI

LS

BYPASS PUMP DETAIL

BYPASS CONNECTION DETAIL

NTS

NSBU PIPE RESTRAINT DETAIL - WASTEWATER BYPASS PUMP MANUFACTURER'S DATA

CHAIN-LINK FENCE DETAIL

Callbefore you dig.

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

FINAL

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

ST

R

U C

TU

R

AL

PL

AN

A

N D

N O

TE

S

S-01

5'-0"

SAW-CUT CONTROL JOINT

9'-0"

4'-6"4'-6"

5'-0"

9'-0"

4'-6"4'-6"

5'-0"

9'-0"

4'-6"4'-6"

Know what'sbelow.

Callbefore you dig.

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

FINAL

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

ST

R

U C

TU

R

AL

D

ET

AI

LS

S-02

20' - 0"

10' - 0"

CALL 2 BUSINESS

DAYS BEFORE

YOU DIG

IT'S THE LAW!

DIAL 811

SUNSHINE STATE ONE CALL OF FLORIDA, INC.

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

FINAL

PR

O

PO

SE

D W

ET

W

EL

L

SE

C

TI

O

N

M-01

NORTH

90% SUBMITTAL

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

EL

EC

TR

IC

AL

N

O

TE

S, SY

M

BO

LS

AB

BR

EV

IA

TI

O

N S

E-01

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

N

O

TE

S.

dw g, X

, 8

/9 /2

3:

:3

PM

, T

M ee ks

FINAL

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

LI

FT

S

TA

TI

O

N

EL

EC

TR

IC

AL

P

LA

N

E-02

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

W

ET

W

EL

L

EL

EC

P

LA

N .d w g, X

, 8 /9

/2

3:

:4

PM

, T M ee ɸ

90% SUBMITTAL

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

EX

IS

TI

N

G M

C C

-1

M C

C -2

S

IN

G

LE

L

IN

E D

IA

G

R

AM

E-03

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

SL

D .d w g, X

, 8 /9

/2

3:

:4

PM

, T M ee

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

C O

N

TR

O L

R

IS

ER

D

IA

G

R

AM

E-04

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

C

TR

L

R

IS

ER

.d w g, X

, 8 /9

/2

3:

:5

PM

, T M ee

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

EX

IS

TI

N

G E

LE

C

TR

IC

AL

BU

IL

D

IN

G

P O

W

ER

PL

AN

E-05

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

EL

EC

B

LD

G.

dw g, /1

6/

:1 5:

P

M , k gr an t

90% SUBMITTALFINAL

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

PA

N

EL

S

C H

ED

U

LE

EL

EC

TR

AI

C

AL

D

ET

AI

LS

E-06

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

PN

L

SC

H D

.d w g, X

, 8

/9 /2

3:

:0

PM

, T

M ee

FINISHED GRADE

LI

FT

S

TA

TI

O

N

BY

PA

SS

D

ES

IG

N

PR

EP

AR

ED

F O

R N

SB

U

EL

EC

TR

IC

AL

D

ET

AI

LS

E-07

X:

\A ct iv e Pr oj ec ts \K im le y H or n\

N ew

S m yr na

L S

\0

2.

_1

S ub m itt al \D w gs

\E -0

EL

EC

D

TL

S.

dw g, X

, 8 /9

/2

3:

:0

PM

, T M ee

C-01 EXISTING SITE PLAN & DEMOLITION PLAN
C-01 EXISTING SITE PLAN & DEMOLITION PLAN
C-02 PROPOSED SITE PLAN
C-02 PROPOSED SITE PLAN
C-03 CIVIL DETAILS
C-03 CIVIL DETAILS
G-01 COVER SHEET
G-01 COVER SHEET
G-02 SITE LOCATION AND GENERAL NOTES
G-02 SITE LOCATION AND GENERAL NOTES
M-01 PROPOSED WETWELL SECTION
M-01 PROPOSED WETWELL SECTION
S-01 STRUCTURAL PLAN AND NOTES
S-01 STRUCTURAL PLAN AND NOTES
S-02 STRUCTURAL DETAILS
S-02 STRUCTURAL DETAILS

File details come from the government source that posted it. Updated .