LS_#62_Reference_Package.pdf

PDF 114 KB Posted

Attached to
2623ITB - Lift Station #62 Replacement
Solicitation number
2623ITB
Issued by
Volusia County, Florida

About this file

Lift Station #62 Replacement Reference Package

This is a reference package document for the City of Daytona Beach, Florida, supporting an Invitation to Bid for the comprehensive replacement of Master Wastewater Lift Station #62. The project encompasses complete demolition and reconstruction of an existing wastewater treatment facility, including construction of a new submersible pump station with a 16-foot inner diameter circular wet well, four pumps (three duty and one standby) equipped with variable frequency drives, an air-conditioned electrical building, pad-mounted transformer, standby generator, pole barn storage structure, new sanitary and rehabilitated existing manholes, gravity sewer pipeline rehabilitation, stainless steel and ductile iron discharge piping, erosion controls, site grading, fencing, and landscaping. The solicitation comprises 20 lump-sum line items with a $10,000 owners allowance for permit fees. The non-mandatory pre-bid conference is scheduled for January 13, 2026, at 10:00 a.m. via Microsoft Teams, with a question submission deadline of January 27, 2026, at 5:00 p.m. Bid proposals must be submitted electronically through the OpenGov Procurement Platform by February 3, 2026, at 2:00 p.m., with virtual bid opening participation available. Bidders must possess a current Florida General Contractor's License and provide three verifiable references from projects completed within the last ten years, including at least one wastewater lift station project with a 16-foot or greater diameter and one demonstrating complex wetwell excavation techniques.

Bid security equal to 10 percent of the bid amount is required and may be submitted as a bid bond, certified check, cashier's check, irrevocable letter of credit, or money order. Successful bidders will be required to furnish 100 percent Performance and Payment Bonds if the contract price exceeds $100,000. The City offers a 10 percent price advantage to qualified local vendors but does not specify set-aside designations for disadvantaged businesses. No incumbent vendor is identified for this project. The facility must maintain continuous operation of the existing lift station throughout construction, indicating complex project phasing and minimal service disruption requirements. The project is designed to serve a flow of 2,400 gallons per minute and includes comprehensive technical specifications for site construction, concrete work, mechanical systems, electrical systems, and instrumentation and controls. All bid submissions and communications, including question submissions and addenda reviews, must be conducted through the City's OpenGov Procurement Platform.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFERENCE PACKAGE

MINIMUM QUALIFICATIONS OF PROSPECTIVE BIDDER

CITY CONTRACT NUMBER:

PROJECT TITLE: LIFT STATION 62 REPLACEMENT

CONTRACTOR FIRM NAME:

BUSINESS ADDRESS:

CITY, STATE, ZIP CODE:

PHONE NUMBER: _________________ FAX NUMBER: ________________

EMAIL ADDRESS:

TASK: Master Lift Station Replacement and New Electrical Building

Reference No. 1

Bidder:

Name of Project:

Location of Project:

Duration of Project:

Date of Completion:

Project Components:

a. List method used to support excavation (e.g., sinking caisson, secant pile, etc.):

b. List the dimensions of the new or rehabilitated wet well (ft):

c. List the peak capacity of the facility (mgd):

d. List all other similar components of project installed:

e. Bidder’s responsibilities:

f. Original contract price:

g. Final contract price:

Work Completion:

a. Did the Bidder perform at least 50% of the work described for that project? (Yes/No) _______

b. Did Project achieve final acceptance or was the project deemed substantially complete and available for beneficial use by the Facility Owner? (Yes/No)

c. List any OSHA safety violations or significant injuries during the course of the work:

Contact Information:

a. Owner/Representative Name:

b. Phone Number:

c. Email Address:

Reference No. 2

Location of Project:

b. Did Project achieve final acceptance or was the project deemed substantially complete and

Reference No. 3

Location of Project:

b. Did Project achieve final acceptance or was the project deemed substantially complete and

File details come from the government source that posted it. Updated .