LRWRP_Design_Report_Chapter_2.pdf
PDF 4 MB Posted
- Solicitation number
- 2025-RFP-015DW
- Issued by
- Santa Barbara County, Long Beach City, California
About this file
This is a preliminary design report for the Lompoc Regional Water Reclamation Plant (LRWRP) Upgrade Project, prepared by the City of Lompoc in California. The document details a comprehensive wastewater treatment infrastructure modernization initiative that includes headworks improvements, secondary treatment facilities, metals removal capabilities, effluent filters, ultraviolet disinfection systems, solids handling facilities, instrumentation and controls, and miscellaneous yard piping improvements. The project encompasses multiple treatment process areas designated as TM01 through TM10, with construction planned for a two-year period with an estimated completion date of May 2008. A mandatory pre-bid job walk is scheduled for May 14, 2025, with engineering proposals due by June 30, 2025, at 3:00 pm, and all proposals remaining valid for 90 calendar days after bid opening.
The anticipated construction bid price for the project is $41,836,000, with an additional $6,000,000 allocation for engineering and construction management services, bringing the total project cost to $47,836,000. This represents a 24 percent cost reduction compared to the September 2002 Master Plan alternative, yielding potential savings of approximately $15 million. The cost estimate includes labor at 3.75 percent, materials and subcontractors at 83.15 percent, with additional provisions for markups, escalation to mid-point construction, contractor general conditions, construction contingency, insurance coverage, and performance bonds. The project builds upon previous master planning efforts and is part of a phased modernization approach for the facility, which currently serves approximately 9,000 sewer connections with an average dry weather flow capacity of 5.0 MGD. Compensation for the selected consulting firm will be based on approved actual time and materials costs not to exceed the agreed-upon fee, with progress-based payments contingent upon task completion.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHAPTER 2
PROJECT COST AND SCHEDULE
Preliminary Estimate of Probable Construction Cost
Table 2.1-1 presents a preliminary estimate of the probable construction cost for the LRWRP Upgrade Project. At this time, the anticipated bid price is $41,836,000.
Table 2.1-1. Preliminary Estimate of Probable Construction Cost
Category Percent Amount, $ Labor 3.75% 1,001,430 Material Subcontractor Equipment o h e r 83.15% 22,178,815 Net Costs 26,672,801
Labor Mark-up Material Mark-up Subcontractor Mark-up Equipment Mark-up Sales tax (material) Sales tax (equipment) Building Permits hiaterial Shipping & Handling Worker's Travel/Subsistence Subtotal
Escalation to midpoint Labor Escalation to midpoint Material Escalation to midpoint Subs, equip. 8.71% 2,018,332 Subtotal 2,323,202
Contractor General Conditions Start-up, training, 08ch.I Subtotal Construction Contingency Subtotal Earthquake Insurance Bldg Risk, Liability Auto Ins.
Subtotal Performance Bond Payment Bond 1 .0O0/o 3011802 Subtotal 11,655,587
Total Estimate
P:\-l'rolects\126517 - LOWOC\\XP\Project-Report\1033979 Preliminary D e s i p Report Final.doc February 2005
Project Cost and Schedule 2-2 r Table 2.1-2 presents a summary breakdown of the anticipated bid price by process area. A detailed breakdown of the anticipated bid price by process area and the basis of the estimate are included in Appendix B.
Table 2.1-2. Summary Breakdown of Anticipated Bid Price by Process Area
Item
TMOl
TM02
TM03
'I'M04
TM05
TM06
TM07
'TM09
TMlO
Headworks Improvements (Alt "B") Secondary Treatment Facilities Metals Removal Facilities Effluent Filters Ultraviolet Disinfection Solids Handling Facilities (Base Option) Instrumentation and Controls Miscellaneous Improvements/Boiler Allowances Yard Piping
Grand Total
Total
Recommended Project Cost
The cost of the recommended project includes the construction cost and an allowance of $6,000,000 for engineering and construction management. The total project cost therefore, is $47,836,000 as summarized below:
Anticipated Bid Price:
Engineering & Construction Management Costs:
Project Cost
Cost Comparison
Table 2.3-1 presents a comparison of the cost of the project recommended in this report with the cost of the project recommended in the September 2002 Master Plan.
P:\-Projects\126517 - LOhPOC\\XP\Project-Report\Iil33979 Preliminar). Desgn Report Find.doc February 2005
Project Cost and Schedule 2-3
Table 2.3-1. Cost Comparison
Recommended Master Plan Description Project Cost, 9/2002 (ENR: 6589) ENR Adjustment, 12/2004 (ENR: 7312) Project Cost at mid-construction point, 5/2007
Station. Slud~e Lapoons and Dred~e) I 1
(8.71 '10 escalation projected by ENR) Additional Improvements (Influent Pumping
Project ($)
N/A N/A
47,836,000
The project recommended in this report can be constructed for 24 percent less than the project recommended in the Master Plan. This represents a potential savings of about $1 5 million.
9/2002 ($) 50,279,333 55,796,400 60,656,000
Included Above ppppp --
Project Cost
Project Schedule
2,000,000
The project schedule for the design and construction of the L R W Upgrade Project is included in Chapter 2. This schedule is slightly modified to reflect changes in scope of work since June 23, 2004. This schedule still assumes construction period of two years. The project completion date has been moved from April to May 2008.
47,836,000
I?\-l'rojects\l26517 - LOhfl'OC\\T'P\Project~RePort\1Il.33979 Preliminary Design Report Finaldoc
62,656,000
February 2005