LRWRP_Design_Report_Chapter_1.pdf

PDF 76 MB Posted

Attached to
HEADWORKS and INFLUENT METER IMPROVEMENTS PROJECT
Solicitation number
2025-RFP-015DW
Issued by
Santa Barbara County, Long Beach City, California

About this file

This is a design report supporting the City of Lompoc's solicitation for the Headworks and Influent Meter Improvements Project at its Regional Wastewater Reclamation Plant in Santa Barbara County, California. The project encompasses comprehensive design and engineering services for critical wastewater treatment infrastructure upgrades, including replacement of the 1974 influent gate and actuator, installation of three new bar screens, rehabilitation of concrete influent channels, development of a bypass pumping plan, and implementation of an odor control system. The selected consultant will be responsible for detailed assessments, hydraulic modeling, facility layout design, equipment specifications, system integration plans, preliminary and final design documents, construction documents, and an operation and maintenance manual. A mandatory pre-bid job walk is scheduled for May 14, 2025, with proposals due by June 30, 2025, at 3:00 pm. All proposals will remain valid for 90 calendar days after the bid opening. The contract will be awarded to the most responsive and responsible bidder based on comprehensive evaluation of technical capabilities and proposed approach.

Compensation for the selected consultant will be based on approved actual time and materials, not to exceed an agreed-upon "Not-to-Exceed Fee," with progress-based payments contingent on task completion. The procurement requires $1,000,000 in Errors and Omissions Professional Insurance, in addition to coverage for general liability, automobile liability, and worker's compensation. The project builds upon previous master planning efforts, including a 2002 master plan by Kennedy/Jenks Consultants and a 2005 design report by Brown and Caldwell. Previous design reports estimated total project costs for various plant improvements ranging from approximately $300,000 to over $41 million for comprehensive upgrades. The facility currently serves approximately 9,000 sewer connections and has an Average Dry Weather Flow capacity of 5.0 MGD. The contract does not explicitly specify set-aside designations for disadvantaged enterprises.

View the file

Other files

File Type Posted
HEADWORKS_and_INFLUENT_METER_IMPROVEMENTS_PROJECT_(Addendum_#2_Revision).pdf PDF
HEADWORKS_and_INFLUENT_METER_IMPROVEMENTS_PROJECT_(Addendum_#2_Revision).pdf PDF
HEADWORKS_and_INFLUENT_METER_IMPROVEMENTS_PROJECT_(Addendum_#2_Revision).pdf PDF
LRWRP_Design_Report_Chapter_5.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Chapter_7.pdf PDF
LRWRP_Design_Report_TOC.pdf PDF
LRWRP_Design_Report_Chapter_10.pdf PDF
LRWRP_Design_Report_Chapter_7.pdf PDF
LRWRP_Design_Report_Chapter_8.pdf PDF
LRWRP_Design_Report_Chapter_9.pdf PDF
Lompoc_Salts_Mgt_Plan_010611.pdf PDF
LRWRP_Design_Report_Chapter_9.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
Lompoc_Salts_Mgt_Plan_010611.pdf PDF
LRWRP_Design_Report_Chapter_10.pdf PDF
LRWRP_Design_Report_Chapter_4.pdf PDF
LRWRP_Design_Report_Chapter_5.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
LRWRP_Design_Report_Appendix_B.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_II_-_Appendices.pdf PDF
Vol.II_Appendices.pdf PDF
Vol.I_MasterPlan.pdf PDF
Lompoc_Wastewater_Master_Plan.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_II_-_Appendices.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_I_-_Report.pdf PDF
LRWRP_Design_Report_Appendix_B.pdf PDF
Lompoc_Wastewater_Master_Plan.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_I_-_Report.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_F.pdf PDF
Lompoc_Wastewater_Master_Plan.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Appendix_B.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_D.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Chapter_1.pdf PDF
LRWRP_Design_Report_Chapter_2.pdf PDF
Consultant_Services_Agreement_2025.doc DOC document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .