LPS - Shingle Project - 2026.pdf
PDF 3 MB Posted
- Attached to
- Shingle Roof Replacement
- Solicitation number
- RFP LAMP 260000002568 3
- Issued by
- Berrien County, Mcbride Village, Michigan
About this file
This is a specification package and bid proposal form for a roof replacement project issued by Lamphere Public Schools, a public school district located in Madison Heights, Michigan. The project involves complete replacement of the asphalt shingle roofing system on the Little League Baseball Facility, including removal of existing shingles, underlayment, and flashings down to the wood decking, repair or replacement of defective deck substrate, installation of ice and water shield at eave edges, synthetic underlayment, new sheet metal and penetration flashings per NRCA standards, and installation of 25-year workmanship and 40-year (lifetime) material warranted asphalt shingles. The contractor must commence work on or after October 14, 2026, and fully complete the project by December 1, 2026. Work is restricted to normal business hours of 8:30 a.m. to 7:00 p.m., Monday through Friday, with weekend work permitted under the same parameters. The project site remains occupied by the school, and contractors must coordinate with school operations, maintain access to facilities, and provide 72 hours' notice before activities affecting operations. Contractor parking, dumpster placement, and material storage are designated on the west side of the building.
Bidders must submit a base bid for the complete roof replacement work and provide unit prices for potential additional deck material repairs determined necessary during construction, to be billed on a per-board basis. The specification requires use of approved shingle manufacturers including GAF Timberline HDZ, Certainteed Landmark Pro, or Owens Corning Duration, with installer qualifications including manufacturer certification and minimum five years' experience. Contractors must furnish certificates of insurance before commencing work, including property damage coverage of $1,000,000 per accident, bodily injury coverage of $1,000,000 per person, workers' compensation, and completed operations insurance of $500,000. The roofing installer provides a three-year warranty against defective workmanship and materials following project completion. Bids may not be withdrawn for 60 days after opening, and the school board reserves the right to accept or reject any bid or award to other than the low bidder. Unit prices for labor and materials on a time-and-material basis for unforeseen repairs must also be provided by the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LPS LLBB Roof 4 - Inst. to Bidders.doc | DOC document | |
| Addendum 1 - LPS Shingles 9.15.26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lamphere Public Schools
2026 Roof Replacement
Project Specification Package Volume 1 of 1
Prepared For:
31201 Dorchester
Madison Heights, MI 48071
Joe Vitali MOT Director joe.vitali@lamphereschools.org
SECTION 00010
TABLE OF CONTENTS
DIVISION 00-INTRODUCTORY INFORMATION, PROCUREMENT AND CONTRACTING
REQUIREMENTS
00001 Title Page 00010 Table of Contents 00002 Aerial Overviews & Roof Drawings & Core Data
DIVISION 01 - GENERAL REQUIRMENTS
011000 Summary 012200 Unit Prices
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
073113 Asphalt Shingles
SECTION 00002
Aerial Photos
Little League Baseball Facility
END DOCUMENT 00002
011000 - Page 1 of 5
SUMMARY
SECTION 011000
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Access to site.
4. Coordination with occupants.
5. Work restrictions.
6. Specification and drawing conventions.
1.2 PROJECT INFORMATION
A. Facility Owner Information:
1. Owner Name: Lamphere Public Schools – Little League Baseball Facility
2. Owner: Joe Vitali
3. Owner's Consultant:
a. Roof Consultant: Dustin Fremion; Senior Field Advisor; 260-494-2665
b. Direct all questions to Owner.
c. Where individual specification sections refer to Owner, Owner may elect to delegate submittal and response responsibilities to Owner's Consultant.
B. Project Information:
1. Project Name: Little League Baseball/Lamphere PS 2026 Roofing Projects.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
011000 - Page 2 of 5
1. Little League Baseball Facility: Asphalt Shingles:
a. Description of Work:
1) Replacement roofing Division 07 Asphalt Shingles.
b. Scope of Work:
1) Remove all existing asphalt shingles, underlayment, and related flashings down to wood decking.
2) Replace and/or repair sloped wood deck substrate as necessary.
3) Install new ice & water shield at all eave edge locations (extend minimum 6 feet into occupied building space).
4) Install synthetic underlayment throughout the remainder of the roofing substrate.
5) Protect and salvage existing gutters and downspouts where possible.
6) Install new sheet metal and penetration flashings and trims per NRCA details and recommendations.
7) Furnish and install new 25-year workmanship and 40-year (lifetime) material warranted asphalt shingles as specified.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.4 ACCESS TO SITE
A. Use of Site, Limited: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
1. Use of Site: Limit use of Project site to work in areas indicated and as directed by Owner. Do not disturb portions of Project site beyond areas in which the Work is indicated, including designated lay-down areas.
2. Driveways, Walkways and Entrances: Keep driveways, facility loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
011000 - Page 3 of 5
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period.
Repair damage caused by construction operations.
1.5 COORDINATION WITH OCCUPANTS
A. Owner Occupancy: Owner will occupy site including existing and adjacent building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.
2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.
1.6 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 8:30 a.m. to 7:00 p.m., Monday through Friday, unless otherwise indicated.
1. Weekend Hours: Acceptable under the same On-Site Work Hours parameters listed in this section.
2. Early Morning Hours: Crews may arrive to prep to begin work at 8:00 am.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others
011000 - Page 4 of 5
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two days in advance of proposed disruptive operations.
2. Obtain Owner's written permission before proceeding with disruptive operations.
E. Nonsmoking Project: Use of tobacco products on the Project site is not permitted.
F. Controlled Substances: Use of other controlled substances on the Project site is not permitted.
1.7 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled on Drawings.
1.8 MISCELLANEOUS PROVISIONS
A. Contractor Parking: Contractors to park along dirt drive on West side of the building.
B. Dumpster Location: Dumpster to be set along the dirt drive on the West side of the building adjacent to the contractor parking location.
011000 - Page 5 of 5
C. Restroom Location: Porta-Potty to be located near contractor parking.
D. Material Storage: Materials can be stored onsite. Location TBD by owner.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
012200 - Page 1 of 1
UNIT PRICES
SECTION 012200
UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for unit prices.
1.2 DEFINITIONS
A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.3 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor.
D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
PART 2 - EXECUTION
2.1 SCHEDULE OF UNIT PRICES
A. Unit Price No. 1: Deck material repair (wood/metal/concrete) and/or replacement (wood and metal only):
1. Description: Remove existing deck material and replace with new material according to Divison 07 Section "Asphalt Shingles" – unit of measure: 1 board.
END OF SECTION 012200
073113 - Page 1 of 14
ASPHALT SHINGLES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and contract documents, including Section 011000 Summary, apply to this section.
1.2 SECTION INCLUDES
A. The replacement of existing shingle roofing systems and related metal flashings.
1.3 SUBMITTALS
A. Product Data: Submit manufacturer’s catalog sheets, specifications, installation instructions for underlayment, shingles, and accessories.
1.4 DELIVERY, STORAGE AND HANDLING
A. Deliver materials to job site in original, new unopened packages and containers bearing manufacturer’s name and label including expiration date, packaging date or batch number and federal specification number if applicable.
B. Shingle bundle wrapping shall bear the label of Underwriters Laboratories, Inc.
C. Store shingles in accordance with manufacturer’s printed instructions. Store roll goods on end in an upright position on pallets and tarped with canvas tarpaulin.
D. Keep materials dry, covered completely, and protected from weather.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of five years' experience installing products comparable to those specified, able to communicate verbally with Contractor, Owner's Consultant, and employees, and the following:
1. Qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified.
B. Manufacturer Qualifications: Approved manufacturer listed in this Section, with minimum five years' experience in manufacture of specified products in successful use in similar applications.
C. Comply with quality control, references, specifications, and manufacturer’s data. Products containing asbestos are prohibited on this project. Use only asbestos free products.
073113 - Page 2 of 14
D. All shingle products shall come from one source shingle manufacturer.
1.6 VENTILATION REQUIREMENTS
A. Existing ventilation:
1. Upgrade existing attic ventilation as required to meet local building code and shingle manufacturer’s requirements.
B. No existing ventilation:
1. Install attic ventilation as required to meet local building code and shingle manufacturer’s requirements.
2. Install soffit and ridge ventilation system when possible.
a. Ensure Net Free Area (NFA) of each meet local building code requirements and provide a balanced ventilation system.
C. Install insulation baffles where missing, damaged, or not functional to ensure unobstructed air flow.
D. NOTE: Installer shall confirm that existing attic ventilation meets building code requirements. Notify WTI Construction Manager if existing ventilation system provides less than the minimum requirements as listed below.
1. Minimum net free ventilation area of 1 square foot per 150 square feet of ceiling area is required.
2. Exception: The net free cross-ventilation area shall be permitted to be reduced to 1 square foot per 300 square feet of ceiling area provided both of the following conditions are met:
a. In climate zones 6, 7, and 8, a Class I or Class II vapor retarder is installed on the warm-in-winter side of the ceiling.
b. At least 40 percent and not more than 50 percent of the required venting area is provided by ventilators located in the upper portion of the attic or rafter space. Upper ventilators shall be located not more than 3 feet (914
mm) below the ridge or highest point of the space, measured vertically, with the balance of the ventilation provided by eave or cornice vents.
E. Per the shingle manufacturer and roofing industry standards, roof structures must be provided with thorough ventilation to prevent entrapment of moisture-laden air behind roof sheathing. Proper ventilation is also necessary to prevent mold growth and ice dams. Ventilation provisions must at least meet or exceed current local building code minimum requirements. Improper ventilation may cause premature aging of your roofing system and possibly void the shingle manufacturer’s warranty.
1.7 WARRANTIES
A. Shingle Manufacturer’s Warranty:
a. Upon project completion and Owner acceptance, effective upon complete payment
073113 - Page 3 of 14 the Shingle Manufacturer shall issue Owner a guarantee against defective materials for the period specified.
b. Workmanship Warranty Period: 25 years from date of completion.
c. Material Warranty Period: 40 years (lifetime) from date of completion.
B. Roofing Installer’s Guarantee:
a. Upon project completion and Owner acceptance, effective upon complete payment the Roofing Installer shall issue Lamphere Public Schools a guarantee against defective workmanship and materials.
b. Warranty Period: Three (3) years from date of completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design Manufacturer: The shingle roof system specified in this Section is based upon products of the following:
1. GAF Materials Corporation, 1 Campus Drive, Parsippany, NJ 07054. Tel: 1-973-628-
3000.
a. GAF Timberline HDZ
2. Certainteed Corporation, Tel: 800-782-8777, www.certainteed.com.
a. Certainteed Landmark Pro
3. Owens Corning, Tel: 1-800-766-3464, www.owenscorning.com.
a. Owens Corning Duration
4. Approved equal.
B. Source Limitations: Obtain components for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.
C. Submit manufacturer’s written installation manual at pre-construction meeting.
2.2 ROOFING MATERIALS
A. Shingle Underlayment:
1. Manufacturer’s Self-Adhering Underlayment
a. Self-adhering, self-sealing, bituminous leak barrier. Approved by UL, Dade County, ICC and State of Florida.
(1) Meets the requirements of the following:
(a) ASTM D 1970
(b) ICC ESR-1322
(c) UL 790: Classified
2. Field underlayment:
a. Manufacturer’s Synthetic Underlayment.
073113 - Page 4 of 14
(1) Non-asphaltic, UV-stabilized polypropylene, for use with asphaltic shingles. Approved by UL, Dade County, ICC and State of Florida.
(2) Meets the requirements of the following:
(a) ASTM D 226
(b) ICC ESR-3286
(c) UL 790: Classified
B. Laminated Asphalt Shingles:
1. Approved self-sealing, granule surfaced, laminated asphalt shingle.
a. Meets UL 790 Class A rated with UL 997 Wind Resistance, ASTM D 7158, Class H, ASTM D 3161, Class F, ASTM D 3018, Type 1, ASTM D 3462;
AC438 compliant, CSA 123.5, Dade County Approved, Florida Building Code Approved, ICC Report Approval.
2. Shingle Color: Shingle color to be determined by the Owner from manufacturer’s standard color chart.
C. Starter Course Shingles:
1. Manufacturer’s recommended Starter Shingles.
a. Self-sealing starter shingle designed for all roof shingles.
D. Hip and Ridge Cap:
1. Manufacturer’s recommended Hip and Ridge Cap Shingles.
a. Self-sealing hip and ridge cap shingle complementing the color of selected roof shingle.
b. Color shall match field shingles.
E. Ridge Vent:
1. Manufacturer’s Ridge Vent.
a. Rigid plastic ridge ventilator designed to allow the passage of hot air out of attics. For use in conjunction with eave/ soffit intake ventilation products.
b. Approved Ridge Vent shall provide required Net Free Ventilation Area per linear foot.
F. Fasteners:
1. Shingle Fasteners:
a. Roofing nails: Federal specification FF-N-105; Type II, Style 20, Hot dipped galvanized, 0.120-inch diameter deformed shanks, with heads 3/8 inch to 7/16 inch diameter.
(1) Length to penetrate 3/4 inch into solid decking, minimum 1-1/4 inch.
b. At exposed eaves and soffits, fasteners must not fully penetrate wood where deck is exposed to view from below.
c. Where nails are in contact with flashing, prevent galvanic action by
073113 - Page 5 of 14 providing nails made from the same metal as that of the flashing.
2. Underlayment nails:
a. Standard round wire, zinc-coated steel or aluminum, minimum 12 gauge, smooth, barbed or deformed shank, with 1 inch round plastic caps.
Length must be sufficient to penetrate into solid wood at least 3/4 inch (19 mm) or through roof deck by at least 1/8 inch (3.18 mm).
b. Simplex stainless steel Cap Nails for attachment into wood.
c. Length: 1 inch
2.3 METAL FLASHINGS
A. Fabricate and install all new metal flashing details per NRCA, SMACNA, ARMA and shingle manufacturer’s specifications, recommendations and detail drawings.
1. The minimum requirements for sheet metal work material are commercial quality, Kynar Pre-finished metal as specified.
a. Install gutters when specified.
b. Fabricate and install new pre-finished metal cricket pan flashings as required.
B. Fasteners to be compatible with material being installed.
1. Length to penetrate minimum 3/4 inch into substrate.
C. Heat Stack Flashings:
1. Match existing metal flashing type and gauge.
D. Skylight Flashings:
1. Match existing metal flashing type and gauge.
E. Metal Drip Edge Trim:
1. .032 inch Mill finished aluminum (T-style)
2. Match existing.
F. Counterflashings, Apron Flashings, and Step Flashings:
1. .032 inch Kynar pre-finished aluminum
2. Fascia width: match existing.
a. Step flashing to extend minimum 4 inches up wall and 4 inches onto roof.
G. Plumbing Stack Flashings
1. Prefabricated 4 lb. sheet lead.
a. ASTM B 29-92, 4 lb. sheet lead.
2. Approved equal.
H. Valley flashing:
1. .032 inch Kynar pre-finished aluminum
2. Width: 24 inches minimum with 1 inch splash diverter.
3. Flashing shall extend 11 inches both sides of centerline after forming.
I. Details not addressed in specification shall be in accordance with Architectural Sheet
073113 - Page 6 of 14
Metal Manual, as issued by Sheet Metal and Air Conditioning Contractors' National Association, Inc., (SMACNA).
2.4 ACCESSORY MATERIALS
A. Sealant:
1. TremSEAL Pro.
B. Asphaltic mastic:
1. ELS Asphalt Roof Cement.
2. Approved equal.
C. Metal cleaner:
1. Mineral spirits.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Prior to starting work contractor shall verify all roof decks on which work is to be applied, are sound and free of defects in materials and workmanship that may be detrimental to the proper installation and long term performance of the roofing system.
B. Do not begin work until all unsatisfactory conditions are corrected. Beginning work constitutes acceptance of conditions.
C. Minimum slope of 2 inch rise per 12 inch run (2:12) is required for shingle application.
3.2 GENERAL WORKMANSHIP
A. Work shall conform to this specification.
B. The presence and activity of the Owner’s representative shall in no way relieve contractor of contract responsibilities or duties.
C. Substrate shall be free of foreign particles prior to installing roof.
D. Wrapper and packaging materials: Not to be included in roofing system.
E. Fasten shingles in accordance with manufacturer’s written instructions. Install minimum of six (6) fasteners per full shingle.
3.3 DEMOLITION
A. Complete removal of existing shingle roofing system including roof shingles, roofing felts, metal flashings, and accessories down to the underlying wood roof deck sheathing.
1. Carefully remove siding as required to install specified flashings and store for reinstallation.
2. Gutters and Downspouts to remain for re-use. Replace as necessary.
B. Remove all roof debris from the site and transport to an approved landfill. Provide
073113 - Page 7 of 14
Waste Manifest to owner in project close out documents. Roof removal will have to be worked around the owner’s operations.
C. Fully protect existing adjacent low slope roof and flashing areas with insulation board and plywood. Remove roof related debris from drainage systems daily including roof drains on adjacent lower roof areas.
3.4 PREPARATION
A. Prepare existing roof substrate.
1. Replace or repair existing defective decking on an additional approved per square foot cost.
2. Install new decking to match existing deck thickness and type.
3. Attach boards to roof decking using manufacturer’s recommended fasteners and attachment criteria.
4. Deck replacement to span a minimum of three (3) structural supports.
5. Reattach existing roof decking where found loose or not adequately attached.
B. Roof surfaces shall be sound reasonably smooth and free from defects that would interfere with roofing installation.
C. Sweep deck clean; remove any sharp items from deck, prior to new roof installation.
3.5 INSTALLATION
A. General:
1. Installation of new Asphalt Shingle Roof System and related accessories shall comply with manufacturer’s instructions and recommendations but not less than those recommended by ARMA’s “Residential Asphalt Roofing Manual” or “The NRCA Steep Roofing Manual”.
2. Cut, remove, and repair existing wall covering as needed to install specified metal flashing system.
3. Remove and reinstall j-vent curbs as needed to accommodate the new roofing system and metal flashing applications.
4. Clean roof deck surfaces of dust, debris, and other substances detrimental to roofing installation according to roofing system manufacturer’s written instructions. Remove sharp projections.
5. At project completion, Verify all downspouts are full flowing and fully functional.
Inspect all joints, connections, and hangers. Repair or replace defective items.
B. Install new static vents:
1. Exhaust vent with insect guard and external baffles.
a. Color Chosen by Owner from manufacturer’s standard colors.
073113 - Page 8 of 14
b. Metal Roof Vents by Air Vent Inc.
(1) SLA Slant Aluminum.
c. Approved equal.
C. Install self-adhering underlayment.
1. Sweep deck clean prior to roof underlayment installations.
2. Install self-adhering underlayment membrane directly to clean roof deck surface per manufacturer’s instruction and as specified.
3. Install products and accessories in accordance with manufacturer’s installation instructions.
4. Install specified self-adhering membrane.
a. Install membrane directly to clean roof deck surface in accordance with manufacturer’s written instructions.
b. Self-adhering underlayment shall be installed prior to installing metal flashings.
(1) Where applicable, remove siding and install underlayment 8 inches onto vertical substrate.
(2) Turn underlayment down onto fascia, behind gutter, 4 inches.
(3) Turn underlayment down onto rake edge fascia 1 inch.
(a) Do not allow underlayment to extend beyond vertical flange of drip edge.
(4) Lap sheets shingle fashion to shed water.
(5) Side laps: 2 inches.
(6) End laps: 6 inches.
c. At roof slopes with less than 4 inch rise per 12 inch run (4:12):
(1) Install self-adhering membrane over entire roof deck.
d. At roof slopes with 4 inch rise per 12 inch run (4:12) or greater:
(1) Eaves: Extend self-adhering underlayment from lowest roof edge to a point not less than 36 inches from the inside surface of exterior walls.
(2) Valleys: Install self-adhering membrane on both sides of valley extending 30 inches from valley center line providing 12 inch overlap.
(3) Side wall transitions: Extend self-adhering membrane 12 inches up wall. Install step flashings and counter flash as specified.
(4) Penetrations: Install target piece of self-adhering underlayment extending 18 inches on all sides of opening and turned up 4 inches
073113 - Page 9 of 14 onto penetration.
(5) Install target sheets at all plumbing vents and heat stack vent openings prior to underlayment felt and metal flashing installation.
D. Install field underlayment.
1. Install specified field underlayment over roof decks with slope of 4 inch rise per 12 inch run (4:12) or greater.
2. Mechanically attach one (1) layer of underlayment using minimum 1 inch Stainless Steel roofing nails or plastic cap nails as specified.
a. Attach per Manufacturer’s specifications.
b. Lap sheets shingle fashion to shed water.
c. Side laps: 2 inches, End laps: 6 inches.
d. Run field underlayment through valley over self-adhering underlayment.
e. Overlap self-adhering underlayment 12 inches at eaves.
f. Overlap high side of curb and penetration self-adhering underlayment.
g. Install under self-adhering underlayment at low side of curb and penetrations.
E. Install metal flashing details per NRCA, SMACNA, ARMA and shingle manufacturer’s specifications, recommendations, and detail drawings.
1. Install step flashings, apron flashings, counterflashings, drip edge, and miscellaneous flashing details and accessories.
a. Install metal edging onto the underlayment along the rake edges and below the underlayment along the eave edges, fasten four inches on center, staggered.
(1) Install with no rise.
b. Strip-in metal flanges with 6 inch wide strip of specified self-adhering underlayment prior to shingle installation.
c. Color to be selected by owner from manufacturer’s standard color chart.
2. Install approved gutters with downspouts.
a. Gutters: Minimum 6 inch by .040 inch Kynar pre-finished aluminum.
b. Downspouts: Minimum 3 by 4 inch by .032 inch Kynar pre-finished aluminum.
(1) Install downspouts at existing locations.
(2) Include outlet tubes and accessories.
(3) Install gutter brackets and gutter straps.
073113 - Page 10 of 14
(a) Space 32 inches o.c. and stagger.
c. Color: Chosen by owner from manufacturer’s standard color chart.
d. Terminate downspouts to match existing, install concrete splash blocks where needed, replace existing.
(1) Install slip sheet under splash blocks.
3. Install plumbing stack flashing.
a. Install 4 lb. lead pipe flashings.
(1) Apply a cant of roofing cement around the pipe, sealing it to the underlayment prior to installing the metal pipe flashing. Install and secure the specified pipe flashing so that the bottom flange laps over onto the shingles. Side and top flanges shall have shingles lapping onto the flange.
(2) Shingles that lap onto metal shall be laid into a bed of roof cement. A bead of urethane sealant shall be applied where the pipe penetrates the cone of the flashing.
b. Install approved plumbing stack flashing in accordance with manufacturer’s written instructions.
4. At vertical side walls, install metal apron flashing or step flashing and surfaced mounted counter flashing.
a. Counterflash apron flashing and step flashings 3 inches.
b. Where needed reinstall siding to counterflash flashings.
5. Fabricate and install new 24 gauge Kynar pre-finished metal cricket pan flashings as required.
6. Install miscellaneous flashings as required.
F. Install new asphalt shingle roof system.
1. Do NOT install shingles using racking method.
2. Install specified shingles and related accessories.
a. Fasten shingles to substrate using number of fasteners per shingle as required by manufacturer and per local building codes but not less than six (6) nails per full shingle.
3. Install approved starter shingles to perimeter of all roof areas.
4. Install hip and ridge cap shingles to match asphalt shingles.
a. Color shall match field shingles.
5. Install valleys per manufacturer’s recommended installation instructions.
G. Shingle installation:
073113 - Page 11 of 14
1. Install asphalt shingles, beginning at roof’s lower edge with manufacturer’s prefabricated starter shingles. Fasten asphalt shingles in the desired weather exposure pattern. Use vertical and horizontal chalk lines to ensure straight coursing.
2. Nails must be placed within the nailing zone, 1 inch in from each edge of the shingle, with the remaining four nails evenly spaced on the same line as the end nails. When fastening, butt shingle ends loosely to prevent buckling. Fasteners shall not be overdriven to cut into the shingle or under driven. Fasteners shall be seated flush to shingle as illustrated on shingle wrapper.
H. Install approved ridge vent in accordance with manufacturer’s written instructions.
1. Ridge vent shall provide Net Free Area (NFA) required to meet local building code requirements.
2. Provide balanced ventilation system meeting local building code and manufacturer’s requirements.
3. Upgrade intake ventilation as required.
I. Ridge and Hips:
1. Install manufacturer’s prefabricated ridge cap shingles over ridge. Bend each shingle lengthwise down center to provide equal exposure on each side of ridge or hip. Position shingle to provide manufacturer’s recommended exposure, fasten per manufacturer’s recommendations (minimum 2 fasteners per shingle).
J. Valley Installation:
1. Only those valley installations listed in the manufacturer's written installation manual shall be permitted.
2. Open metal valley installation:
a. Install specified metal valley flashing.
(1) Beginning at the low point of the roof, install metal flashing.
(2) Fasten through metal at high side only, do not penetrate metal along sides.
(3) Install clips along sides or install fasteners along both sides of metal flashing to hold flashing in place.
(4) Over lap next section of metal flashing 12 inches onto the first, set in full application of specified asphalt mastic, repeat fastening procedure.
(5) Repeat installation for additional metal flashing sections.
b. Prior to installation of shingles, snap two chalk lines along the full length of the metal valley. Snap one chalk line on each side of the valley center line, so that the lines diverge (separate, widen apart) as they progress downslope.
c. When the shingles are installed to the lines, the resultant valley will gradually become wider toward the bottom than it is at the top. Set the
073113 - Page 12 of 14 top of the valley cut 3 inches from center of the valley on each side;
diverge at a rate of 1/8 inch per foot downslope.
d. Trim the last shingle along the chalked line.
3. Closed-cut valley installation:
a. Install first course of shingles on the roof area with the lowest slope, or if slopes are equivalent, on the side with the shortest distance to the ridge (or side that will receive the lowest volume of runoff. The intent is for the shingles on the side of the valley that will be cut not to buck water. Run shingles through valley, extending onto adjoining roof area 12 inches minimum. Install first course of shingles through valley, extending onto adjoining roof area 12 inches minimum.
b. Continue to apply the second and succeeding courses, extending full shingles through the valley in the same manner as the first course.
c. Press shingles firmly into valley to conform smoothly to substrate. Nail each shingle in normal manner (along manufacturer’s specified “nail zone”) with correct number and placement of fasteners. Do not nail closer than 6 inches to the center of valley. Two nails shall be placed at end of each terminating shingle.
d. Prior to applying shingles on the intersecting roof area, snap a chalk line a minimum 2 inches beyond the center of the valley (the first roof area where shingles have been installed.
e. Install first course of shingles to opposing side. Shingles shall extend over previously installed shingles and beyond the chalk line, so when trimmed, a clean cut edge or line is created. Use care when cutting not to damage underlying shingles.
f. Cut top corner of shingle nearest valley center line 1 inch by 45 degrees prior to installing next shingle course.
g. Set shingle in 3 inch wide troweled application of specified roof cement.
h. Succeeding courses shall be installed as first course.
3.6 METAL FLASHING INSTALLATION
A. General Requirements:
1. Fabricate and install all new metal flashing details per NRCA, SMACNA, ARMA’s and shingle manufacturer’s specifications, recommendations, and detail drawings.
B. Cut, remove, and repair existing wall covering as needed to install metal flashing system.
1. Remove existing metal flashings and discard.
2. Install specified step flashings.
3. Metal flashing heights at rising walls to meet the shingle manufacturer’s recommended flashing height requirement and as instructed at the pre-bid walk.
4. Ensure wall is maintained in a water-tight condition.
5. Reinstall, repair, or replace removed wall coverings to counter flash step
073113 - Page 13 of 14 flashings providing 1 inch clearance above shingle level.
C. Install new specified metal apron flashing, step flashings, counterflashings and miscellaneous flashing details and accessories including the following:
1. Install eave, rake, and gable metal flashings.
2. Install step flashing, apron flashing, and counterflashing.
3. Install metal flashings at existing j-vent curbs.
a. Remove and reinstall curbs as needed to properly flash.
4. Install plumbing stack flashing at pipe penetration locations.
a. Install lead caps over lead pipe flashings.
D. Metal Drip Edge Application:
1. Mechanically attach drip edge at eave and rake edges 4 inches on center through underlayment and into wood decking. Stagger nails to prevent splitting the underlying wood substrate. Bend eave drip edge at corners to form closure.
E. Step flashings:
1. Install individual step flashings per shingle course at wall intersections.
2. Install step flashing over top half of shingle so that step flashing extends above top of shingle. Each step flashing shall be placed just upslope from the exposed edge of shingle that will overlap it. Nail step flashing near the upper corner of the flange. Fasten through the flange into the wood deck, do not fasten step flashings to both deck and wall.
3. Install the first course of shingle, and butt end of shingle that intersects the wall firmly against the step flashing. Fasten shingle in place, move the nail that would be driven near the edge of the shingle nearest the wall (that would be driven through the step flashing) over slightly so metal flange is not punctured by nail.
4. Adhere shingle to step flashing with specified asphalt mastic.
5. Install second step flashing, being sure to overlap the first a minimum 2 inches.
Fasten this step flashing to the deck through the upper corner.
6. Install the second shingle course, and butt end of shingle that intersects the wall firmly against the second step flashing. Fasten this second shingle in the same manner as the first shingle.
7. Install the succeeding step flashing and shingle courses in the same manner as the first and second step flashing and shingle courses.
8. Install metal counterflashing into reglet joint if wall is masonry or counter flash with existing siding.
F. Counterflashing:
1. Install metal counterflashing into reglet joint if wall is masonry.
2. Fabricate and install new counterflashing.
073113 - Page 14 of 14
3. Install counterflashing into reglet joints or behind wall covering and secure 8 inches o.c. maximum.
4. Wipe clean metal surfaces of flashing reglet joint with metal cleaner. Prime metal joint surfaces with metal primer. Allow to dry.
5. Caulk flashing reglet joint. Provide watershed. Tool neatly.
G. Pipe flashing:
1. Install shingles up to the bottom edge of the pipe. Notch the shingle or cut a hole in the shingle and slip it over pipe. Install the vent flashing over pipe and underlying shingle and embed the flange and overlying shingle in roofing cement. Install a full length shingle over the pipe. Insert a single tab along the shingle course to the-arrange and offset the joint from the pipe. Continue roofing around and above the pipe. Adhere shingles to metal flange in a bed of specified roof cement. Do not fasten shingles through the metal flashing flange.
H. Roof Edge with Gutter Application:
1. Extend self-adhering membrane from roof surface edge down onto vertical face behind where gutter will be placed.
2. Install gutter and downspout assemblies.
3. Lap gutter section joints 1-inch minimum and lap in the direction of flow so as not to impede the flow of water.
4. Apply metal sealant to all rivets and tool to a coved bead.
5. Install gutter expansion joints spaced 50-feet maximum.
6. Install outlet tubes and downspouts.
a. Install downspouts at existing locations.
3.7 PROTECTING AND CLEANING
A. Protect shingle roofing from damage and wear during remainder of construction period.
When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to WTI project superintendent.
B. Correct deficiencies in shingles that do not comply with requirements, repair substrates, reinstall roofing and repair flashings to a condition free of damage and deterioration at the time of Substantial Completion and according to warranty requirements.
END OF SECTION 073113
Madison Heights, Michigan 48071 Telephone: (248) 589-1990 Fax: (248) 589-2618
BID PROPOSAL FORM
Name of Bidder
FIRM NAME AND ADDRESS OF BIDDER – This bid is submitted in the name of:
FIRM NAME
BUSINESS ADDRESS
TELEPHONE NUMBER
BY
[SIGNATURE]
TITLE
SIGNED THIS _____ DAY OF ________________________, 20_____
Madison Heights, Michigan 48071
The undersigned in submitting this proposal agrees as follows:
The entire work shall subject to the requirements of the General Conditions of the Contract contained in and forming a part of AIA Documents A-101, (April 1997 Edition) Standard Form of Agreement between Owner and Contractor – Stipulated Sum.
Prior to execution of the Agreement for this work, the Contractor shall furnish the Owner with copies of Certificates of Insurance.
Time of Completion
The undersigned agrees to commence work on or after October 14th , 2026 and to fully complete the total project by December 1st, 2026.
Withdrawal of Bid
The undersigned agrees that this bid may not be withdrawn for a period of sixty (60) days after the bid opening date or receipt thereof.
Rejection of Bid
The Board of Education reserves the right to accept or reject any total bid, or part thereof, and to award the total contract of part thereof to other than the low bidder. All decisions regarding contract awards will be final.
Liability
The Contractor shall and does assume liability under the terms of the Workmen’s
Compensation Law of the State in which the work is being performed.
Contractor assumes all liability for injury to persons or damage to, or loss of property of (a)
Contractor, his agents or employees, (b) Owner, its agents or employees, and (c) any other person, firm or corporation arising in any way directly or indirectly out of the performance of this Contract whether or not such injury, damage, or loss is due to the negligence of the Contractor, its agents or employees. This foregoing assumption of liability by Contractor shall include, without limiting the generality of the foregoing, any injury, damage, or loss arising out of the operation motor vehicles. This assumption of liability by Contractor shall also include, without limiting the generality of the foregoing, any injury damage or loss (1) arising out of the negligence of Contractor, (2) arising out of the joint or combined negligence of Contractor and Owner, (3) arising out of the negligence of a third party or parties and Contractor, or (4) without limiting in any way the foregoing, arising in any way, directly or indirectly out of the conduct or occurrence not fully limited to the separate sole negligence of the Owner as proven by Contractor or third party.
Should the Owner or an agent or employee of the Owner be made a party to any suit or proceeding, even though such suit or proceeding is groundless, false, or fraudulent, arising out of injury, damage, or loss for which the Contractor assumes liability under this Contractor, the Contractor will defend such suit or proceeding and shall indemnify and save harmless the Owner, its agents or employees, of and from all liability loss, expenses, judgments (including interest thereon), including Attorney’s fees.
Since Contractor hereunder shall be an independent Contractor and not agent, servant, or employee of Owner, Contractor assumes full responsibility for compliance with any and all Federal, State, or municipal laws, ordinances, and regulations, including (but not limited to) those having to do with labor, wages and benefits, or taxes and duties collectible from employees under all applicable provision of the law.
Insurance
Unless otherwise specified, the Contractor shall, before commencing work hereunder, procure and thereafter maintain policies of insurance satisfactory to the Owner covering the liabilities assumed above in the following minimum amounts.
Property Damage $1,000,000 (each accident)
Bodily Injury $1,000,000 (each person)
Workmen’s Compensation Insurance all liabilities imposed by Workmen’s Compensation
Statues.
Employer’s Liability Insurance $100,000
Contractual Liability Insurance $1,000,000
Completed Operations Insurance $500,000
Owned, Hired and Non-Ownership Vehicle Bodily Injury and Property Damage to the following limits:
Bodily injury $500,000 (each person) Accidental Death $1,000,000 (each accident) Property Damage $1,000,000 (each accident)
The Contractor agrees to file with the Owner before commencing work hereunder, copies of policies of such insurance which shall contain by endorsement, the specific liabilities assumed above, together with certificates of insurance which shall contain a provision that no change in the amount of said insurance, or termination thereof, shall take place without previous 10 days written notice to the Owner and its written consent to such change or termination.
Madison Heights, Michigan 48071
TO: LAMPHERE PUBLIC SCHOOLS
31201 Dorchester Madison Heights, MI 48071 Attn: Mr. Joe Vitali
PROPOSAL FOR: Roof Replacement Project Little League Baseball Facility Madison Heights, MI 48071
The undersigned, having examined the Bidding Documents including the Project Identification, Instructions to Bidders, General Conditions, Technical Specifications and Plans, and being familiar with all conditions affecting this proposed Project, hereby proposed to furnish all labor, materials, tools, equipment, utilities, transportation or other facilities and services necessary to perform and complete the construction of the proposed project in accordance with the Bidding Documents, for the sums and under the conditions as follows:
BASE BID – Little League Baseball Facility - The undersigned agrees to the performance of the Work as Stated for the Base Bid Sum of:
Dollars ($ )
ADDENDA – If addenda(s) are issued during the bidding period, the Bidder shall fill in their numbers and dates, as an acknowledgement of having received and included them in their Bid Proposal. Lack of acknowledgement of Addendum(s) may be cause to disqualify the Bidder’s Bid Proposal.
Addendum No. __________ Dated: __________________
Addendum No. __________ Dated: __________________
Estimated number of working days to complete projects:
1) Little League Baseball Facility – Roof Replacement _________
UNIT PRICE PROPOSAL
1. Written approval must be received from the Owner before initiating Unit Prices.
2. Billing then to be computed on and submitted on the basis of the Unit Price for the area and operation affected.
3. Unit prices will be used to determine the cost to be added to the base bid for unknown items that are determined by the Owner to require replacement.
4. Unit Prices shall be stated in the Contractor’s Proposal as to the amount to be added to or deducted from the base bid as specified, including labor, material, overhead, profit, and taxed to remove and dispose of existing and providing and installing the following:
A. Removal and replacement of deteriorated and/or defective decking, insulation, nailers, cants & curbs:
Decking/underlayment – per board $__________
Should additional repairs, not covered in these specifications or addendums, be required during the project, work will be directed by Lamphere Public Schools on a time and material basis at the rates of:
Labor/Hour $__________ Materials, cost plus %__________
Contractor Signature: ______________________________________
Date:____________________________________________________