LPG Equipment Layout.pdf

PDF 514 KB Posted

Attached to
File No. 472/19087. RAA-Baraga CF-Propane Plant Upgrades
Solicitation number
RFQ-171-190000000639-3
Issued by
Baraga County, Michigan

About this file

This is a technical drawing document from Ely Energy Inc-USA showing typical LPG/Air equipment layouts and natural gas tie-in details, dated February 10, 1999. The document contains two main technical diagrams: an LPG/Air Equipment Layout and a Natural Gas to LPG/Air Tie-In Detail.

The first diagram shows a typical LPG facility layout including an LPG storage tank, truck transport unload station, emergency pull station, crash posts, LPG pumpset, LPG piping, and LPG/air blending system, all enclosed within a security fence meeting code requirements. The second diagram details a typical standby system featuring an AQUA-BLEND® LPG/Air blending skid with components including power distribution, maintenance house, LPG vaporizer, control panel, and LPG/air surge tank. It also shows a typical tie-in detail with natural gas meter, wafer check valves, and shutoff valve configuration for connecting the LPG/air system to the natural gas supply.

View the file

Other files

File Type Posted
Design Build Advertisement R10-17).pdf PDF
Gas Distribution-Shts.I--6.pdf PDF
472_19087.RAA Addendum 2.pdf PDF
Ely Energy Vaporizer.pdf PDF
Design Build Spec Final.pdf PDF
LEIN Request REV 04-2018.pdf PDF
472_19087.RAA Addendum 1.pdf PDF
Propane Standby Inspection Report.pdf PDF
Site Photos.pdf PDF
Ely Energy Mixer.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .