472_19087.RAA Addendum 2.pdf

PDF 233 KB Posted

Attached to
File No. 472/19087. RAA-Baraga CF-Propane Plant Upgrades
Solicitation number
RFQ-171-190000000639-3
Issued by
Baraga County, Michigan

About this file

This is Construction Bid Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget's State Facilities Administration, Design and Construction Division for the Baraga Correctional Facility Replace and Repair Back Up Fuel System Blender project (File #472/19087.RAA). The addendum was issued on September 18, 2019, with a bid opening date of September 25, 2019. The project involves a Design Build A/E contractor and is directed by Jeff Barsch.

The addendum provides six key technical clarifications: 1) Natural gas load data for the past 12 months is attached, showing monthly usage patterns from October 2017 through June 2019; 2) 480V 3 Phase service is available at the site; 3) Current pumps operate on 480V 3 Phase power; 4) Natural gas supply pressure on the prison side of the gas meter is 5 PSI; 5) The Design Build Contractor must review fence enclosure setbacks and egress for code compliance; and 6) The bid date remains unchanged. The natural gas usage data shows peak consumption during winter months, with the highest usage typically occurring between December and March.

View the file

Other files

File Type Posted
Design Build Advertisement R10-17).pdf PDF
Gas Distribution-Shts.I--6.pdf PDF
Ely Energy Vaporizer.pdf PDF
Design Build Spec Final.pdf PDF
LEIN Request REV 04-2018.pdf PDF
472_19087.RAA Addendum 1.pdf PDF
Propane Standby Inspection Report.pdf PDF
Site Photos.pdf PDF
Ely Energy Mixer.pdf PDF
LPG Equipment Layout.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 12/17)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 2

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

9/18/2019

PROJECT NAME

Baraga Correctional Facility Replace and Repair Back Up Fuel System Blender

FILE NUMBER

472/19087.RAA

PROFESSIONAL

Design Build A/E TBD

PROJECT DIRECTOR

Jeff Barsch

BID OPENING DATE:

9/25/2019

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Item 1-The natural gas load over the last 12 months is attached

Item 2-480V 3 Phase service is available at the site

Item 3-The voltage and phase of the current pumps are 480Volt 3 Phase

Item 4-The Natural Gas supply pressure on the prison side of the gas meter is 5 PSI

Item 5-The Design Build Contractor will be responsible to review the Fence Enclosure to determine if setbacks and egress meet code and design the project to meet the current code requirements.

Item 6-This addendum does not revise the bid date

End of Addendum No. 2

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: N/A DATE: Click to enter date

APPROVED BY:

PROJECT DIRECTOR: Jeff Barsch DATE: 9/18/2019 http://www.michigan.gov/SIGMAVSS

C U

ST

O

M

ER

R

AT

E

LP

, L P

Ea st

O ct

-1

N ov

-1

D ec

-1

Ja n-

Fe b-

M ar

-1

Ap r-1

M ay -1

Ju n-

Ju l-1

Au g-

Se p-

To ta l

N or m al iz ed

Av er ag e

M C

F C

LA

SS

U P, U P

Ea st

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

To ta l D

TH

D ai ly D

TH

Pe ak D ay Ba ra ga

C or re ct io na l

TR

-1 U

P 1, 3, 4, 4, 4, 3, 3, 1, ,3

,8

O ct

-1

N ov

-1

D ec

-1

Ja n-

Fe b-

M ar

-1

Ap r-1

M ay -1

Ju n-

Ju l-1

Au g-

Se p-

To ta l

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

D

TH

9/

9/

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/1

- 9 /1

/0

- 0 9/

/0

- 9 /0

/0

- 9 /0

/0

- 9 /0

PR

IO

R P

EA

K

D

AY

M C

F U

SA

G

E

Baraga Correctional Nat. Gas Usage History.pdf
Sheet1

File details come from the government source that posted it. Updated .