Lower Spring Branch Stormwater Improvements

This is a project description and contract opportunity document from the City of St. Petersburg, Florida, involving stormwater infrastructure improvements designed to reduce flooding. The project encompasses the replacement of bridges on Springtime Avenue and Overbrook Avenue and the installation of a double concrete box culvert on Douglas Avenue. Contractors are required to submit current Florida state licenses or registrations and Pinellas County registrations (if applicable) with their bids. The contractor must provide fixed project signs as specified in Section III, Section 23 of the contract documents, with the final number of signs determined at project initiation based on the contractor's submitted work schedule. The contract period is 548 consecutive calendar days.

Additional project signs may be required at no additional cost to the city if the contractor's work schedule necessitates them. Bidders must possess valid licensing and registrations in Florida and, where applicable, Pinellas County. The project represents a comprehensive stormwater management initiative focused on infrastructure modernization and flood mitigation in the Lower Spring Branch area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v. 7.2024 Procurement Division PO Box 4748 33758-4748 Clearwater FL 727-562-4630

INVITATION TO BID

14-0048-EN

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS

INSTRUCTIONS TO BIDDERS

SECTION II INSTRUCTIONS TO BIDDERS

1. COPIES OF BIDDING DOCUMENTS

1.1. Bid Documents, any attachments and addenda are available for download at: https://procurement.opengov.com/portal/myclearwater/projects/304326. Bidding Documents may include, but are not limited to, plans, specifications, bond forms, contract form, affidavits, bid/proposal form, and addendums.

1.2. Complete sets of Bidding Documents must be used in preparing bids. Neither the City nor the

Engineer shall be liable for errors or misinterpretations resulting from the use of incomplete sets of

Bidding Documents, by Bidders, sub-bidders, or others.

2. QUALIFICATION OF BIDDERS

2. 1 Each prospective Bidder must pre-qualify to demonstrate, to the complete satisfaction of the City of Clearwater, that the Bidder has the necessary facilities, equipment, ability, financial resources and experience to perform the work in a satisfactory manner. An application package for pre-qualification may be obtained by contacting the City of Clearwater, Engineering Division by phone at (727) 562-

4750. Pre-qualification requirement information is also available on the City of Clearwater Website at address:

www.myclearwater.com/government/city-departments/engineering/construction-management.

Contractors wanting to pre-qualify to bid on a project as a General Contractor must do so two weeks (ten workdays) prior to the bid opening date. Bidders currently pre-qualified by the City do not have to make reapplication. It is the Contractor’s responsibility to confirm pre-qualification status before a Bid Opening.

The Contractor shall include copies of their current license/registration with the State of Florida and Pinellas County (if applicable) with their bid response.

3. EXAMINATION OF CONTRACT DOCUMENTS AND SITE

3.1.It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract

Documents thoroughly; (b) visit the site to become familiar with local conditions that may in any manner affect cost, progress, performance or furnishing of the work; (c) consider and abide by all applicable https://procurement.opengov.com/portal/myclearwater/projects/304326 https://www.myclearwater.com/government/city-departments/engineering/construction-management https://www.myclearwater.com/government/city-departments/engineering/construction-management

v. 7.2024 2 federal, state and local laws, ordinances, rules and regulations; and (d) study and carefully correlate

Bidder's observations with the Contract Documents, and notify Engineer in writing of all conflicts, errors or discrepancies in the Contract Documents.

3.2.For the purposes of bidding or construction, bidder may rely upon the accuracy of the technical data contained in reports of explorations and tests of subsurface conditions at the site which have been utilized by the Engineer in the preparation of the Contract Documents, but not upon non-technical data, interpretations or opinions contained therein or for the completeness thereof. Drawings relating to physical conditions of existing surface and subsurface conditions (except Underground Facilities) which are at or contiguous to the site and which have been utilized by the Engineer in preparation of the Contract Documents, may be relied upon by Bidder for accuracy of the technical data contained in such drawings but not upon the completeness thereof for the purposes of bidding or construction.

3.3.Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site are based upon information and data furnished to the City and Engineer by owners of such Underground Facilities or others, and the City does not assume responsibility for the accuracy or completeness thereof unless expressly provided in the Contract Documents.

3.4.Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Facilities, other physical conditions, possible conditions, and possible changes in the Contract Documents due to differing conditions appear in the General

Conditions.

3.5. Before submitting a Bid, each Bidder shall, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing the work in accordance with the time, price and other terms and conditions of the Contract Documents.

3.6. On request in advance, City will provide each Bidder access to the site to conduct such explorations and tests at Bidder's own expense as each Bidder deems necessary for submission of a

Bid. Bidder shall fill all holes and clean up and restore the site to its former condition upon completion of such explorations and tests.

3.7. The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by the Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by the Contractor. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by the City unless otherwise provided in the Contract Documents.

3.8. The submission of a Bid will constitute an unequivocal representation by the Bidder that the Bidder has complied with every requirement of these Instructions to Bidders and that, without exception, the

Bid is premised upon performing and furnishing the Work required by the Contract Documents by such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions of performance and furnishing of the work.

4. INTERPRETATIONS AND ADDENDA

4.1. All questions as to the meaning or intent of the Contract Documents are to be directed in writing to the Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such

v. 7.2024 3 questions will be issued by Addenda, via OpenGov. Questions received after the time frame specified on the pre-bid meeting agenda, prior to the date for opening of Bids, may not be answered. Only information provided by formal written Addenda will be binding. Oral and other interpretations of clarifications will be without legal effect.

4.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the City or

Engineer.

5. BID SECURITY OR BID BOND

5.1. Each Bid must be accompanied by Bid Security made payable to the City of Clearwater in an amount equal to ten percent (10%) of the Bidder’s maximum Bid price and in the form of a certified or cashier’s check or a Proposal/Bid Bond (on form provided in Section V) issued by a surety meeting the requirements of the General Conditions.

5.2. The Bid Security of the Successful Bidder will be retained until such Bidder has executed the

Agreement and furnished the required Payment and Performance bonds, whereupon the Bid Security will be returned. If the Successful Bidder fails to execute, deliver the Agreement and furnish the required Bonds within ten (10) days after the award of contract by the City Council, the City may annul the bid and the Bid Security of the Bidder will be forfeited. The Bid Security of any Bidder whom the

City believes to have a reasonable chance of receiving the award may be retained by the City until the successful execution of the agreement with the successful Bidder or for a period up to ninety (90) days following bid opening. Security of other Bidders will be returned approximately fourteen (14) days after the Bid Opening.

5.3. The Bid Bond shall be issued in the favor of the City of Clearwater by a surety company qualified to do business in, and having a registered agent in, the State of Florida.

6. CONTRACT TIME

6.1. The number of consecutive calendar days within which the work is to be completed is set forth in the Technical Specifications.

7. LIQUIDATED DAMAGES

7.1. Provisions for liquidated damages are set forth in the Contract Agreement, Section V.

8. SUBSTITUTE MATERIAL AND EQUIPMENT

8.1. The contract, if awarded, will be on the basis of material and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items.

Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or equal" item may be furnished or used, application for its acceptance will not be considered by the Engineer until after the effective date of the Contract Agreement. The procedure for submittal of any such application is described in the General Conditions and as supplemented in the Technical

Specifications.

9. SUBCONTRACTORS

9.1. If requested by the City or Engineer, the Successful Bidder, and any other Bidder so requested, shall, within seven (7) days after the date of the request, submit to the Engineer an experience statement with pertinent information as to similar projects and other evidence of qualification for each

Subcontractor, supplier, person and organization to be used by the Contractor in the completion of the

Work. The amount of subcontract work shall not exceed fifty percent (50%) of the Work except as may

v. 7.2024 4 be specifically approved by the Engineer. If the Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, supplier, other person or organization, he may, before recommending award of the Contract to the City Council, request the Successful Bidder to submit an acceptable substitute without an increase in Contract Price or Contract Time. If the Successful Bidder declines to make any such substitution, the City may award the contract to the next lowest and most responsive Bidder that proposes to use acceptable Subcontractors, Suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds for sacrificing the

Bid Security to the City of any Bidder. Any Subcontractor, supplier, other person or organization listed by the Contractor and to whom the Engineer does not make written objection prior to the recommendation of award to the City Council will be deemed acceptable to the City subject to revocation of such acceptance after the Effective Date of the Contract Agreement as provided in the

General Conditions.

9.2. No Contractor shall be required to employ any Subcontractor, supplier, person, or organization against whom he has reasonable objection.

10. BID/PROPOSAL FORM

10.1. The Bid/Proposal Form is included with the Contract Documents and shall be printed in ink or typewritten. All blanks on the Bid/Proposal Forms must be completed. Unit Prices shall be to no more than two decimal points in dollars and cents. The Bidder must state in the Bid/Proposal Form in words and numerals without delineation’s, alterations or erasures, the price for which they will perform the work as required by the Contract Documents. Bidders are required to bid on all items in the

Bid/Proposal form. The lump sum for each section or item shall be for furnishing all equipment, materials, and labor for completing the section or item as per the plans and contract specifications.

Should it be found that quantities or amounts shown on the plans or in the proposal, for any part of the work, are exceeded or should they be found to be less after the actual construction of the work, the amount bid for each section or item will be increased or decreased in direct proportion to the unit prices bid for the listed individual items.

10.2. Bids by corporations shall be executed in the corporate name by the president or a vice-president

(or other corporate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the Signature. If requested, the person signing a Bid for a corporation or partnership shall produce evidence satisfactory to the City of the person's authority to bind the corporation or partnership.

10.3. Bids by partnerships shall be executed in the partnership name and signed by a general partner, whose title shall appear under the signature and the official address of the partnership shall be shown below the signature.

10.4. All names shall be typed or printed below the signature.

11. SUBMISSION OF BIDS

11.1. It is recommended that bids are submitted electronically through the City's e-Procurement Portal located at https://procurement.opengov.com/portal/myclearwater. By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

Sealed Bids not submitted electronically shall be submitted at or before the time and at the place indicated in the Advertisement for Bids and shall be submitted in a sealed envelope with the project name and number on the bottom left-hand corner. If forwarded by mail, the Bid shall be enclosed in another envelope with the notation "Bid Enclosed" on the face thereof and addressed to the City of Clearwater, https://procurement.opengov.com/portal/myclearwater

v. 7.2024 5 attention Purchasing Manager. Bids will be received at the office indicated in the Advertisement until the time and date specified. Bids in any other form will not be accepted.

E-mail or fax submissions will not be accepted.

No responsibility will attach to the City of Clearwater, its employees or agents for premature opening of a bid that is not properly addressed and identified.

11.2. If submitting a hard copy, the sealed bid envelope shall contain, but not be limited to, the

Proposal/Bid Bond and corresponding Power of Attorney, Affidavit, Non-Collusion Affidavit, Proposal

(pages one and two), Addendum Sheet, Bidder’s Proposal, Scrutinized Companies and Business

Operations with Cuba and Syria Certification Form, and E-Verify form.

12. MODIFICATION AND WITHDRAWAL OF BIDS

12.1. For bids submitted electronically, vendors may use the "Unsubmit Response" button located on the

Response Details page of their submission. Responses may be resubmitted once they have been edited or modified as needed.

For mailed in or hand delivered bids, written requests to modify or withdraw the bid received by the City prior to the scheduled opening time will be accepted and will be corrected after opening. Written requests must be addressed and labeled in the same manner as the bid and marked as a MODIFICATION or

WITHDRAWAL of the bid.

No oral requests will be allowed.

Requests for withdrawal after the bid opening will only be granted upon proof of undue hardship and may result in the forfeiture of any bid security. Any withdrawal after the bid opening shall be allowed solely at the City’s discretion.

13. REJECTION OF BIDS

13.1. To the extent permitted by applicable State and Federal laws and regulations, the City reserves the right to reject any, and all Bids, and to waive any, and all informalities. Grounds for the rejection of a bid include but are not limited to a material omission, unauthorized alteration of form, unauthorized alternate bids, incomplete or unbalanced unit prices, or irregularities of any kind. Also, the City reserves the right to reject any Bid if the City believes that it would not be in the best interest of the public to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the City. The City reserves the right to decide which bid is deemed to be the lowest and best in the interest of the public.

14. DISQUALIFICATION OF BIDDER

14.1. Any or all bids will be rejected if there is any reason for believing that collusion exists among the bidders, the participants in such collusion will not be considered in future proposals for the same work.

Each bidder shall execute the Non-Collusion Affidavit contained in the Contract Documents.

15. OPENING OF BIDS

15.1. Bids will be opened and read publicly at the location and time stated in the Advertisement for

Bids. Bidders are invited to be present at the opening of bids.

16. LICENSES, PERMITS, ROYALTY FEES AND TAXES

v. 7.2024 6

16.1. The Contractor shall secure all licenses and permits (and shall pay all permit fees) except as specifically stated otherwise in the Technical Specifications. The Contractor shall comply with all

Federal and State Laws, County and Municipal Ordinances and regulations, which in any manner effect the prosecution of the work. City of Clearwater building permit fees and impact fees will be waived except as specifically stated otherwise in the Technical Specifications.

16.2. The Contractor shall assume all liability for the payment of royalty fees due to the use of any construction or operation process, which is protected by patent rights except as specifically stated otherwise in the Technical Specifications. The amount of royalty fee, if any, shall be stated by the

Contractor.

16.3. The Contractor shall pay all applicable sales, consumer, use, and other taxes required by law.

The Contractor is responsible for reviewing the pertinent State Statutes involving the sales tax and sales tax exemptions and complying with all requirements.

16.4. The City of Clearwater is exempt from state sales tax on materials purchased by the City and incorporated into the WORK. The City of Clearwater reserves the right to implement the Owner Direct

Purchase (ODP) Option, as may be indicated in the Scope of Work Description in Section IV –

Technical Specifications and as defined in Section III – General Conditions.

17. IDENTICAL TIE BIDS/VENDOR DRUG FREE WORKPLACE

17.1. In accordance with the requirements of Section 287.087 Florida Statutes regarding a Vendor

Drug Free Workplace, in the event of identical tie bids, preference shall be given to bidders with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quality, and service are received by the City for the procurement of commodities or contractual services, a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none or all of the tied bidders have a drug-free workplace program. In order to have a drug-free workplace program, a contractor shall supply the City with a certificate containing the following six statements and the accompanying certification statement:

(1)Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition.

(2) Inform employees as to the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations.

(3) Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the statement specified in subsection (1).

(4) In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893, or of any controlled substance law, of the United States, or of any state, for a violation occurring in the workplace no later than five (5) days after such conviction.

(5) Impose a sanction on or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted.

v. 7.2024 7

(6) Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.

I certify that this firm does/does not (select only one) fully comply with the above requirements.

18. AWARD OF CONTRACT

18.1. Discrepancies between words and figures will be resolved in favor of words. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices.

Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

18.2. In evaluating the Bids, the City will consider the qualifications of the Bidders, whether the Bids comply or not with the prescribed requirements, unit prices, and other data as may be requested in the Bid/Proposal form. The City may consider the qualifications and experience of Subcontractors, suppliers and other persons and organizations proposed by the Contractor for the Work. The City may conduct such investigations as the City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons, and organizations to perform and furnish the Work in accordance with the Contract Documents to the City's satisfaction within the prescribed time.

18.3. If the Contract is to be awarded, it will be awarded to the lowest responsible, responsive Bidder whose evaluation by the City indicates to the City that the award will be in the best interest of the City.

18.4. Award of contract will be made for that combination of base bid and alternate bid items in the best interest of the City, however, unless otherwise specified all work awarded will be awarded to only one Contractor.

18.5. The successful bidder/contractor will be required to comply with Section 119.0701, Florida

Statutes, specifically to:

A. Keep and maintain public records that ordinarily and necessarily would be required by the City of Clearwater in order to perform the service;

B. Provide the public with access to public records on the same terms and conditions that the City of Clearwater would provide the records and at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law;

C. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law; and

D. Meet all requirements for retaining public records and transfer, at no cost, to the City of Clearwater all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the City of

Clearwater.

19. BID PROTEST

19.1. RIGHT TO PROTEST:

Pursuant to Section 2.562(3), Clearwater Code of Ordinances, a bidder who submitted a response to a competitive solicitation and was not selected may appeal the decision through

v. 7.2024 8 the bid protest procedures, a copy of which shall be available in the Procurement Division. A protesting bidder must include a fee of one percent of the amount of the bid or proposed contract to offset the City’s additional expenses related to the protest. This fee shall not exceed

$5,000.00 nor be less than $50.00. Full refund will be provided should the protest be upheld. No partial refunds will be made.

20. TRENCH SAFETY ACT

20.1. The Bidder shall comply with the provisions of the City of Clearwater’s Ordinance related to trench digging (Ordinance No. 7918-08) along with the Florida Trench Safety Act (Sections 553.60-

553.64, Florida Statutes) and the provisions of the Occupational Safety and Health Administration's

(OSHA) excavation safety standards, 29 C.F.R.s 1926.650 Subparagraph P, or current revisions of these laws.

21. CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL MANAGEMENT

MEASURES

21.1. The Bidder shall comply with the provisions of the Environmental Protection Agency (EPA)

National Pollution Discharge Elimination System (NPDES) stormwater permit and implement stormwater pollution prevention plans (SWPPP’s) or stormwater management programs (both using best management practices (BMPs) that effectively reduce or prevent the discharge of pollutants into receiving waters.

A. The control of construction-related sediment loadings is critical to maintaining water quality.

The implementation of proper erosion and sediment control practices during the construction stage can significantly reduce sediment loadings to surface waters.

B. Prior to land disturbance, prepare and implement an approved erosion and sediment control plan or similar administrative document that contains erosion and sediment control provisions.

NPDES Management Measures available at City of Clearwater Engineering Environmental

Division and EPA websites to help address construction-related Best Management Practices.

GENERAL CONDITIONS

Section III - General Conditions can be found on the City's website at:

https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-

Construction-Bid-Information/Contract-Specifications

TECHNICAL SPECIFICATIONS

3.1 SCOPE OF WORK

Project Name: Lower Spring Branch Stormwater Improvements

Project Number: 14-0048-EN

Scope of Work:

Project consist of stormwater improvements to provide flood reduction with the replacement of bridges on

Springtime Avenue and Overbrook Avenue and a double concrete box culvert on Douglas Avenue.

https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications

v. 7.2024 9

The Contractor shall provide copies of a Current License/Registration with the state of Florida and

Pinellas County (if applicable) in the bid response.

The Contractor shall provide fixed project signs as described in Section III, Section 23 of the Contract

Documents. The final number of project signs will be determined at the beginning of the project based on the Contractor's schedule of work submitted for approval. Additional project signs may be required at no additional cost to the city due to the Contractor's schedule of work.

Contract Period: 548 Consecutive Calendar Days

3.2 Section IV - Technical Specifications

Section IV - Technical Specifications can be found on the City's website at:

https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-

Construction-Bid-Information/Contract-Specifications

3.3 Section V - Contract Documents

Section V - Contract Documents can be found on the City's website at: https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-

Construction-Bid-Information/Contract-Specifications

SUPPLEMENTAL TECHNICAL SPECIFICATIONS - Section IVA

4.1 Supplemental Technical Specifications

See Attachment A-Lower Spring Branch Stormwater Improvements-Bid Phase Supplemental Technical

Specifications

PRICING SHEET

It is the City of Clearwater's intent to award one bidder for all three locations.

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS-DOUGLAS AVENUE

Line Item Spec or

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

General

1 101-0100 Mobilization 1 LS

2 102-0100 Work Zone, Traffic

Control

1 LS

Sitework

3 104 Sediment Barrier 291 LF

4 104 Floating Turbidity

Barrier

71 LF

https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications https://www.myclearwater.com/Business-Development/Doing-Business-with-the-City/Engineering-Construction-Bid-Information/Contract-Specifications

v. 7.2024 10

Line Item Spec or

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

5 110 Clearing and

Grubbing (Includes removal of guardrail, handrail, pavement, etc.)

1 LS

6 110-3 Removal of Existing

Structures (Box

Culverts, Endwalls, and Inlet Structures)

1,624 SF

7 110-4-10 Removal of Existing

Concrete

153 SY

Materials

8 120 Regular Excavation 220 CY

9 120 Embankment 50 CY

10 400 Concrete Class IV, (Double 12' X 9'

RCBC, Wingwalls, and Headwalls)

380.4 CY

11 415 Reinforcing Steel, Roadway

64,468 LB

12 530-1000 Riprap, Sand-

Cement Bags

10 CY

13 530-2000 Riprap, Rubble, F&I, Ditch Lining

120 TN

14 530-74 Bedding Stone 87 TN

Potable and Reclaimed Water Mains, Fire Lines, and Appurtenances

15 1055-51108 Utility Fittings, DI/CI

F&I Elbow, 6"

5 EA

16 1050-51206 Ductile Iron Pipe (6"

DIP for Potable

Water Main

Restoration)

101 LF

v. 7.2024 11

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

17 1080-24106 Utility Fixture, TEAM

Valve, Furnish and

Install, 6"

2 EA

18 1080-29106 Utility Fixture, Mechanical Joint

Restraint, Furnish and Install, 6"

10 EA

Stormwater

19 425 Inlets, Curb, Type P-

6, <10' (Pinellas

County RC-4)

3 EA

20 430 Pipe Culvert, Optional Material, Round 18" S/CD

26 LF

21 455 Sheet Piling Steel, Temporary-Critical

1,000 SF

Streets and Sidewalks

22 160 Subgrade - Type B

Stabilization (12", LBR 40)

543 SY

23 200 Base - Optional Base

(8", Base Group 06, Limerock LBR 100)

492 SY

24 334 Asphaltic Concrete

(2", Type SP-12.5)

153 TN

25 380 Milling of Existing

Asphalt Pavement

893 SY

26 515 Pipe Handrail -

Guiderail, Aluminum

134 LF

27 515-4-2 Bullet Rail, Double

Rail

143 LF

28 520 Concrete Curb and

Gutter, Type F

247 LF

v. 7.2024 12

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

29 521 Shoulder Concrete

Barrier Wall, Curb and Gutter Barrier

143 LF

30 522 Concrete Sidewalk

(6' Width, 4" Thick)

165 SY

31 550 Fencing, Wood

Fence, 5.1-6.0'

30 LF

32 550 Fencing, Vinyl Fence, 5.1-6.0'

86 LF

33 550-60-412 Fence Gate, Wood, Single, 6.1-12.0'

Opening

1 EA

Traffic Signals, Signs, and Markings

34 700 Single Column

Ground Sign

Assembly, F&I

Ground Mount, Less

Than 12 SF

1 EA

35 705 Thermoplastic, Standard, Yellow, Solid 6"

0.1 GM

36 705 Thermoplastic, Standard, White, Skip 6"

0.1 GM

37 706 Raised Pavement

Marker, Type B

(Without Final

Surface Markings)

12 EA

38 806 Object Marker, Type

4 EA

Landscaping/Restoration

39 110 Tree Barricades 187 LF

40 110-22 Root Pruning 187 LF

v. 7.2024 13

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

41 110-23 Tree Removal 7 EA

42 570 Performance Turf, Sod

516 SY

43 SPECIAL Tree Mitigation 1 LS

TOTAL

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS CONTINGENCY- DOUGLAS AVENUE

This contingency is solely for the pricing table for Douglas Ave.

Line Item Description Quantity Unit of

Measure

Unit Cost Total

44 Owners Contingency-10% of the above total for Douglas Avenue

1 LS

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS-SPRINGTIME AVENUE

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

General

45 101-1 Mobilization 1 LS

46 102-1 Work Zone Traffic

Control

1 LS

Sitework

47 104-10-3 Sediment Barrier 325 LF

48 104-11 Floating Turbidity

Barrier

73 LF

v. 7.2024 14

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

49 110-1-1 Clearing and

Grubbing (Includes removal of guardrail, handrail, pavement, etc.)

1 LS

50 110-3 Removal of Existing

Structures/Bridges

(Bridge Span, Endwalls, and Inlet

Structures)

700 SF

Materials

51 201 Regular Excavation 263 CY

52 201 Embankment 99 CY

53 301 Concrete Class IV, Substructure

(Concrete Cap and

Footers)

45.6 CY

54 301 Reinforcing Steel, Roadway

4,658 LB

55 305 Riprap, Rubble, F&I, Ditch Lining

58 TN

56 305 Bedding Stone 41 TN

Sanitary Sewer

57 402 Utility Structure, Below Ground, Adjust/Modify

(Includes bypass pumping)

2 EA

58 403 Gravity Sewer Pipe

(8" DIP for Sanitary

Sewer Restoration)

141 LF

Potable and Reclaimed Water Mains, Fire Lines, and Appurtenances

v. 7.2024 15

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

59 509-2 Ductile Iron Pipe (6"

DIP for Potable Water

Main Restoration)

54 LF

60 509-3 Utility Fittings, DI/CI

F&I Elbow, 6"

4 EA

61 509-3 Utility Fixture, Mechanical Joint

Restraint, Furnish and Install, 6"

8 EA

62 509-3 Utility Fixture, TEAM

Valve, Furnish and

Install, 6"

2 EA

Stormwater

63 455133-2 Sheet Piling Steel, Temporary-Critical

600 SF

64 455133-3 Sheet Piling Steel, F&I Permanent

1,041 SF

65 601 Pipe Culvert, Optional

Material, Round 18"

S/CD

8 LF

66 604 Inlets, Curb, Type P-

6, <10' (City of

Clearwater, Wing

Inlet)

2 EA

67 SPECIAL Conspan Series

O326 Bridge 26' X

8.5' Arch (Includes

Installation and

Headwalls/Wingwalls)

1 LS

Streets and Sidewalks

68 471-1-1 Fender System, Plastic Marine

Lumber, Reinforced

3.2 MB

v. 7.2024 16

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

69 515-1-2 Pipe Handrail -

Guiderail, Aluminum

20 LF

70 550-10-212 Fencing, Vinyl Fence, 0.0-5.0'

20 LF

71 550-10-420 Fencing, Wood

Fence, 5.1-6.0'

20 LF

72 702-1 Base - Optional Base

(8", Base Group 06, Limerock LBR 100)

249 SY

73 702-2 Subgrade - Type B

Stabilization (9", LBR

40)

316 SY

74 703-1 Asphaltic Concrete

(2", Type SP-12.5)

68 TN

75 706 Concrete Curb and

Gutter, Type F

300 LF

76 707-1 Concrete Sidewalk (4'

Width, 4" Thick)

68 SY

77 708 Milling of Existing

Asphalt Pavement

370 SY

78 SPECIAL American Muscle

Docks and

Fabrication Lift

Ladder (Five step, 4" step width)

1 EA

79 SPECIAL Traffic Rail Texas

Classic - Type T411

Standard (Mod.)

74 LF

Landscaping/Restoration

80 110-23 Tree Removal 5 EA

81 903 Performance Turf, Sod

152 SY

v. 7.2024 17

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

82 910-1 Tree Barricades 67 LF

83 910-2 Root Pruning 46 LF

84 SPECIAL Tree Mitigation 1 LS

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS CONTINGENCY-SPRINGTIME

AVENUE

This contingency is solely for the pricing table for Springtime Ave.

Line Item Description Quantity Unit of

Measure

Unit Cost Total

85 Owners Contingency-10% of the above total for Springtime Avenue

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS-OVERBROOK AVENUE

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

General

86 101-1 Mobilization 1 LS

87 102-1 Work Zone Traffic

Control

1 LS

Sitework

88 104-10-3 Sediment Barrier 366 LF

89 104-11 Floating Turbidity

Barrier

100 LF

v. 7.2024 18

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

90 110-1-1 Clearing and

Grubbing (Includes removal of guardrail, handrail, pavement, etc.)

1 LS

91 110-3 Removal of Existing

Structures/Bridges

(Bridge Span, Endwalls, and Inlet

Structures)

1,100 SF

Materials

92 201 Regular Excavation 176 CY

93 201 Embankment 190 CY

94 301 Concrete Class IV, Substructure

(Concrete Footers)

69.07 CY

95 301 Reinforcing Steel, Roadway

7,288 LB

96 305 Riprap, Rubble, F&I, Ditch Lining

95 TN

97 305 Bedding Stone 69 TN

Potable and Reclaimed Water Mains, Fire Lines, and Appurtenances

98 509-2 Ductile Iron Pipe (6"

DIP for Potable Water

Main Restoration)

67 LF

99 509-3 Utility Fixture, VAC/AIR Assembly, Furnish and Install, 2"

(Air Release Valve)

1 EA

100 509-3 Utility Fittings, DI/CI

F&I Elbow, 6"

4 EA

v. 7.2024 19

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

101 509-3 Utility Fixture, Mechanical Joint

Restraint, Furnish and Install, 6"

8 EA

102 509-3 Utility Fixture, TEAM

Valve, Furnish and

Install, 6"

2 EA

Stormwater

103 455133-2 Sheet Piling Steel, Temporary-Critical

1,000 SF

104 601 Pipe Culvert, Optional

Material, Round 18"

S/CD

36 LF

105 604 Inlets, Curb, Type P-

6, <10' (City of

Clearwater, Wing

Inlet)

2 EA

106 SPECIAL Conspan Series

O224 Bridge - 24' X

11' Arch (Includes

Installation and

Headwalls/Wingwalls)

1 LS

Streets and Sidewalks

107 515-1-2 Pipe Handrail -

Guiderail, Aluminum

116 LF

108 521-72-40 Concrete Sidewalk (5'

Width, 4" Thick)

125 SY

109 702-1 Base - Optional Base

(8", Base Group 06, Limerock LBR 100)

288 SY

110 702-2 Subgrade - Type B

Stabilization (9", LBR

40)

336 SY

v. 7.2024 20

Pay Item

Description Quantity Unit of

Measure

Unit Cost Total

111 703-1 Asphaltic Concrete

(2", Type SP-12.5)

91 TN

112 706 Concrete Curb and

Gutter, Type F

221 LF

113 708 Milling of Existing

Asphalt Pavement

535 SY

114 SPECIAL Traffic Rail Texas

Classic - Type T411

Standard (Mod.)

187 LF

Landscaping/Restoration

115 110-23 Tree Removal 5 EA

116 903 Performance Turf, Sod

277 SY

117 910-1 Tree Barricades 242 LF

118 910-2 Root Pruning 168 LF

119 SPECIAL Tree Mitigation 1 LS

LOWER SPRING BRANCH STORMWATER IMPROVEMENTS CONTINGENCY- OVERBROOK

AVENUE

This contingency is solely for the pricing table for Overbrook Ave.

Line Item Description Quantity Unit of

Measure

Unit Cost Total

120 Owners Contingency-10% of the above total for Overbrook Avenue

SUBMITTAL REQUIREMENTS

1 Certified Business*

v. 7.2024 21

Are you a Certified Small Business or a Certified Minority, Woman or Disadvantaged Business

Enterprise?

☐ Yes

☐ No

*Response required

When equals "Yes"

Certified Business Type* Pick one of the following

Select all that apply

☐ Certified Small Business

☐ Certified Minority, Woman, or Disadvantaged Business Enterprise

*Response required

When equals "Yes"

Certifying Agency* List the Agency that provided your certification.

*Response required

When equals "Yes"

Certification Documentation* Provide a copy of your certification

*Response required

2 Vendor Certification* By submitting this response, the Vendor hereby certifies that:

A. It is under no legal prohibition on contracting with the City of Clearwater.

B. It has read, understands, and is in compliance with the specifications, terms and conditions stated herein, as well as its attachments, and any referenced documents.

C. It has no known, undisclosed conflicts of interest.

D. The prices offered were independently developed without consultation or collusion with any of the other vendors or potential vendors or any other anti-competitive practices.

E. No offer of gifts, payments or other consideration were made to any City employee, officer, elected official, or consultant who has or may have had a role in the procurement process for the commodities or services covered by this contract. The Vendor has not influenced or attempted to influence any City employee, officer, elected official, or consultant in connection with the award of this contract.

F. It understands the City may copy all parts of this response, including without limitation any documents or materials copyrighted by the Vendor, for internal use in evaluating respondent’s offer, or in response to a public records request under Florida’s public records law (F.S. Chapter 119) or

v. 7.2024 22 other applicable law, subpoena, or other judicial process; provided that the City agrees not to change or delete any copyright or proprietary notices.

G. It hereby warrants to the City that the Vendor and its subcontractors will comply with, and are contractually obligated to comply with, all federal, state, and local laws, rules, regulations, and executive orders.

H. It certifies that Vendor is not presently debarred, suspended, proposed for debarment, declared ineligible, voluntarily excluded, or disqualified from participation in this matter from any federal, state, or local agency.

I. It will provide the commodities or services specified in compliance with all federal, state, and local laws, rules, regulations, and executive orders if awarded by the City.

J. It is current in all obligations due to the City.

K. It will accept all terms and conditions as set forth in this solicitation if awarded by the City.

L. The signatory is an officer or duly authorized representative of the Vendor with full power and authority to submit binding offers and enter into contracts for the commodities or services as specified herein.

☐ Please confirm

*Response required

3 E-Verify System Certificattion*

PER FLORIDA STATUTE 448.095, CONTRACTORS AND SUBCONTRACTORS MUST REGISTER

WITH AND USE THE E-VERIFY SYSTEM TO VERIFY THE WORK AUTHORIZATION STATUS OF ALL

NEWLY HIRED EMPLOYEES.

The affiant, by virtue of confirming below, certifies that:

A. The Contractor and its Subcontractors are aware of the requirements of Florida Statute 448.095.

B. The Contractor and its Subcontractors are registered with and using the E-Verify system to verify the work authorization status of newly hired employees.

C. The Contractor will not enter into a contract with any Subcontractor unless each party to the contract registers with and uses the E-Verify system.

D. The Subcontractor will provide the Contractor with an affidavit stating that the Subcontractor does not employ, contract with, or subcontract with unauthorized alien.

E. The Contractor must maintain a copy of such affidavit.

F. The City may terminate this Contract on the good faith belief that the Contractor or its

Subcontractors knowingly violated Florida Statutes 448.09(1) or 448.095(2)(c).

G. If this Contract is terminated pursuant to Florida Statute 448.095(2)(c), the Contractor may not be awarded a public contract for at least 1 year after the date on which this Contract was terminated.

H. The Contractor is liable for any additional cost incurred by the City as a result of the termination of this Contract.

☐ Please confirm

v. 7.2024 23

*Response required

4 Scrutinized Company Certification* Please download the below documents, complete, notarize, and upload.

• SCRUTINIZED_COMPANIES_AND_B...

*Response required

5 Compliance with Anti-Human Trafficking Laws* Please download the below documents, complete, and upload.

• Compliance_with_787.06_form...

*Response required

6 Section V - Contract Documents* Please download the below documents, complete, and upload.

• Section_V_-_Contract_Docume...

*Response required

7 W-9* Upload your current W-9 form. (available at https://www.irs.gov/pub/irs-pdf/fw9.pdf)

*Response required https://government-project.s3.us-west-2.amazonaws.com/141070/ffa0768f-3d30-474f-827b-8a51d3c8d373_SCRUTINIZED_COMPANIES_AND_BUSINESS_OPERATIONS_CERTIFICATION_%287%29.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MFT5A6VC%2F20260930%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260930T130001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIFd3jWlVCeNhcIyrB7W%2F0xxbzvFoXcER4s4Ovu8ul9gMAiEAs4m47ZuVvbmUl6GEcB8%2FLLeXzaEAv%2BWhE%2BBRMm%2B6VXAqjAUIZBACGgw4OTIzNjQ2ODc2NzIiDN0n9LwYKMKdGgUawirpBDPKY%2Fw3nTmfcPIGuaEzzfMjZnKqIcNmHpT%2F9IdjC0Giasf9sdsP7sKMw5v8hA3ZN%2BdxURiNmzjo471dgqxH4D%2BaByihjmV4Bq2QcJYl9neiSEPHk%2Bm8D%2FGl15Is95I8ktBAi1%2Bm5BTtw1pzsZiunDzcpWHNPtQU1ZcvmO7yX4SWjdV5NyZ0siIF4j68lttO%2Bzy02Qqq2judoSttFTZTogJvDoHL7ljEJqIf2YmpoBXoFpUG43MtH6yHhv9CUttyIuewJodedfbzr0lDbzJ6QgPtt1NDbBRUzEtuf6eHw7K%2FP%2Bxg52liDBY94WKYZWPKiQQjbfr%2BHy5eZPBeP0a%2BXBl8KkvYfQtH%2FD3oChKNpcBFnnHxq6ovq%2B%2B%2BIFvUTKSGc2YXvH1CkxOkrcfMPR4BPr4sILlDG8hkWlJXvQTpb2rhaIvW4PQwWPOmwjCoP0HT24ZlLwXKm2%2F%2F6MenbuW4kAyiI3bvwDtZ6O%2B8FweY6CR1Hch2ikL%2Fk6bk5h5591J4sUvqaOBj8Os3DdXte7eoztryLWw9jzgCzoTrhzRI7flvbRZm76%2B5zwjxjTyYgF1AfvfkU9MigLBrg7idJRWseFs7vf%2B3dmJTT92EJTRcsho1iC%2BDpQvWieb0J%2BHYTr4uZGoTVdukrUNLC208i%2BQFtGd4N%2Bg%2BK%2BPhqrPD%2FSU6ZvxW2KFgbvOIhX3tBgQ3w3UHSpdqDftms%2FqfWibn3OOJD1lmjCFfLMsL88Y9uCns9dsbsBmk3N4QLkyRWm4Je0gMn9qI0tN7XccGSRlsJ9FURiRHr8ascJachRRhSF6BslUIjmTa6V3L4gXZMIXk89UGOpkBbu7h609voDlQxnNRYCZZG%2FZ1zSsiUeWcqrghJJ%2FPCW9mrZKEv%2F5V5X%2F1RRbcwM%2F09ic%2BFUNNmXNstJKU6dqCmJofZexmiNMXpsvlG7KxCdWMlMUyz2eXz8iSfbRj93%2FrUJkf83xGLaEIHSH2pw7FNkbF15HNf5ywbF8AkYO2bQtW%2F%2FbSKmwYlmYrE%2FTgtGCXOhoXNBJgMTJs&X-Amz-Signature=d1ea7c24dfebfb0fe3b634175a731aa4a945710cb0ccb5b79c2331f13f9e997f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22SCRUTINIZED_COMPANIES_AND_BUSINESS_OPERATIONS_CERTIFICATION_%287%29.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/141070/7dd6ce9f-0d96-46a4-86bc-224777c20ac4_Compliance_with_787.06_form__%284%29.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MFT5A6VC%2F20260930%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260930T130001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIFd3jWlVCeNhcIyrB7W%2F0xxbzvFoXcER4s4Ovu8ul9gMAiEAs4m47ZuVvbmUl6GEcB8%2FLLeXzaEAv%2BWhE%2BBRMm%2B6VXAqjAUIZBACGgw4OTIzNjQ2ODc2NzIiDN0n9LwYKMKdGgUawirpBDPKY%2Fw3nTmfcPIGuaEzzfMjZnKqIcNmHpT%2F9IdjC0Giasf9sdsP7sKMw5v8hA3ZN%2BdxURiNmzjo471dgqxH4D%2BaByihjmV4Bq2QcJYl9neiSEPHk%2Bm8D%2FGl15Is95I8ktBAi1%2Bm5BTtw1pzsZiunDzcpWHNPtQU1ZcvmO7yX4SWjdV5NyZ0siIF4j68lttO%2Bzy02Qqq2judoSttFTZTogJvDoHL7ljEJqIf2YmpoBXoFpUG43MtH6yHhv9CUttyIuewJodedfbzr0lDbzJ6QgPtt1NDbBRUzEtuf6eHw7K%2FP%2Bxg52liDBY94WKYZWPKiQQjbfr%2BHy5eZPBeP0a%2BXBl8KkvYfQtH%2FD3oChKNpcBFnnHxq6ovq%2B%2B%2BIFvUTKSGc2YXvH1CkxOkrcfMPR4BPr4sILlDG8hkWlJXvQTpb2rhaIvW4PQwWPOmwjCoP0HT24ZlLwXKm2%2F%2F6MenbuW4kAyiI3bvwDtZ6O%2B8FweY6CR1Hch2ikL%2Fk6bk5h5591J4sUvqaOBj8Os3DdXte7eoztryLWw9jzgCzoTrhzRI7flvbRZm76%2B5zwjxjTyYgF1AfvfkU9MigLBrg7idJRWseFs7vf%2B3dmJTT92EJTRcsho1iC%2BDpQvWieb0J%2BHYTr4uZGoTVdukrUNLC208i%2BQFtGd4N%2Bg%2BK%2BPhqrPD%2FSU6ZvxW2KFgbvOIhX3tBgQ3w3UHSpdqDftms%2FqfWibn3OOJD1lmjCFfLMsL88Y9uCns9dsbsBmk3N4QLkyRWm4Je0gMn9qI0tN7XccGSRlsJ9FURiRHr8ascJachRRhSF6BslUIjmTa6V3L4gXZMIXk89UGOpkBbu7h609voDlQxnNRYCZZG%2FZ1zSsiUeWcqrghJJ%2FPCW9mrZKEv%2F5V5X%2F1RRbcwM%2F09ic%2BFUNNmXNstJKU6dqCmJofZexmiNMXpsvlG7KxCdWMlMUyz2eXz8iSfbRj93%2FrUJkf83xGLaEIHSH2pw7FNkbF15HNf5ywbF8AkYO2bQtW%2F%2FbSKmwYlmYrE%2FTgtGCXOhoXNBJgMTJs&X-Amz-Signature=864d275c3d6ae3d18036c44ccf5b6faefaff336e349952cfbb28ded5ec009463&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Compliance_with_787.06_form__%284%29.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/141070/4af21f86-235a-4b2f-98f4-9ab4f71f1d84_Section_V_-_Contract_Documents.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MFT5A6VC%2F20260930%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260930T130001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIFd3jWlVCeNhcIyrB7W%2F0xxbzvFoXcER4s4Ovu8ul9gMAiEAs4m47ZuVvbmUl6GEcB8%2FLLeXzaEAv%2BWhE%2BBRMm%2B6VXAqjAUIZBACGgw4OTIzNjQ2ODc2NzIiDN0n9LwYKMKdGgUawirpBDPKY%2Fw3nTmfcPIGuaEzzfMjZnKqIcNmHpT%2F9IdjC0Giasf9sdsP7sKMw5v8hA3ZN%2BdxURiNmzjo471dgqxH4D%2BaByihjmV4Bq2QcJYl9neiSEPHk%2Bm8D%2FGl15Is95I8ktBAi1%2Bm5BTtw1pzsZiunDzcpWHNPtQU1ZcvmO7yX4SWjdV5NyZ0siIF4j68lttO%2Bzy02Qqq2judoSttFTZTogJvDoHL7ljEJqIf2YmpoBXoFpUG43MtH6yHhv9CUttyIuewJodedfbzr0lDbzJ6QgPtt1NDbBRUzEtuf6eHw7K%2FP%2Bxg52liDBY94WKYZWPKiQQjbfr%2BHy5eZPBeP0a%2BXBl8KkvYfQtH%2FD3oChKNpcBFnnHxq6ovq%2B%2B%2BIFvUTKSGc2YXvH1CkxOkrcfMPR4BPr4sILlDG8hkWlJXvQTpb2rhaIvW4PQwWPOmwjCoP0HT24ZlLwXKm2%2F%2F6MenbuW4kAyiI3bvwDtZ6O%2B8FweY6CR1Hch2ikL%2Fk6bk5h5591J4sUvqaOBj8Os3DdXte7eoztryLWw9jzgCzoTrhzRI7flvbRZm76%2B5zwjxjTyYgF1AfvfkU9MigLBrg7idJRWseFs7vf%2B3dmJTT92EJTRcsho1iC%2BDpQvWieb0J%2BHYTr4uZGoTVdukrUNLC208i%2BQFtGd4N%2Bg%2BK%2BPhqrPD%2FSU6ZvxW2KFgbvOIhX3tBgQ3w3UHSpdqDftms%2FqfWibn3OOJD1lmjCFfLMsL88Y9uCns9dsbsBmk3N4QLkyRWm4Je0gMn9qI0tN7XccGSRlsJ9FURiRHr8ascJachRRhSF6BslUIjmTa6V3L4gXZMIXk89UGOpkBbu7h609voDlQxnNRYCZZG%2FZ1zSsiUeWcqrghJJ%2FPCW9mrZKEv%2F5V5X%2F1RRbcwM%2F09ic%2BFUNNmXNstJKU6dqCmJofZexmiNMXpsvlG7KxCdWMlMUyz2eXz8iSfbRj93%2FrUJkf83xGLaEIHSH2pw7FNkbF15HNf5ywbF8AkYO2bQtW%2F%2FbSKmwYlmYrE%2FTgtGCXOhoXNBJgMTJs&X-Amz-Signature=e8daf6894644416db252fde7818bd546e1a9a37e74d8b5f141edc79b39f948d8&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Section_V_-_Contract_Documents.pdf%22&x-id=GetObject https://www.irs.gov/pub/irs-pdf/fw9.pdf

v. 7.2024 24

INSTRUCTIONS TO BIDDERS
GENERAL CONDITIONS
TECHNICAL SPECIFICATIONS
3.1 SCOPE OF WORK
3.2 Section IV - Technical Specifications
3.3 Section V - Contract Documents
SUPPLEMENTAL TECHNICAL SPECIFICATIONS - Section IVA
4.1 Supplemental Technical Specifications
PRICING SHEET
SUBMITTAL REQUIREMENTS
1 Certified Business*
Certified Business Type*
Certifying Agency*
Certification Documentation*
2 Vendor Certification*
3 E-Verify System Certificattion*
4 Scrutinized Company Certification*
5 Compliance with Anti-Human Trafficking Laws*
6 Section V - Contract Documents*
7 W-9*

File details come from the government source that posted it. Updated .