Summary of Lower Spring Branch Stormwater Improvements Supplemental Technical Specifications
This document is a supplemental technical specifications file prepared for the City of Clearwater Public Works Engineering Department by AtkinsRealis USA, Inc., for the Lower Spring Branch Stormwater Improvements Project (14-0048-EN). The project consists of stormwater improvements designed to provide flood reduction through the replacement of bridges on Springtime Avenue and Overbrook Avenue and the installation of a double concrete box culvert on Douglas Avenue. The supplemental specifications adopt by reference the Florida Department of Transportation Standard Specifications for Road and Bridge Construction (latest edition) and amend them with Pinellas County supplemental standard technical specifications for roadway and general construction. The contract period is 548 consecutive calendar days. The specifications incorporate requirements from FDOT standards while allowing for county-specific modifications and additional technical requirements, including sections on Team InsertValves for water main installations, specialized asphalt concrete requirements with density and pay factor adjustments, drainage structure specifications, and comprehensive erosion and stormwater pollution prevention requirements.
The technical specifications establish detailed requirements for materials, installation methods, and quality acceptance standards across multiple construction disciplines, including mobilization, maintenance of traffic, clearing and grubbing, grading, asphalt paving, drainage structures, underdrains, and performance turf installation. Pricing and payment mechanisms are structured on lump sum and unit price bases for various work categories, with pay adjustments based on quality testing results, particularly for asphalt concrete density and composition. Contractors are required to provide current state of Florida and Pinellas County licenses/registrations, maintain survey documentation signed by Florida-registered professional surveyors and mappers, provide photographic and video documentation of existing conditions, and comply with habitat permit requirements prior to commencing construction. The specifications mandate the use of specific materials such as ductile iron Team InsertValves, polyvinyl chloride or concrete pipes for drainage, and hot mix asphalt with specified performance grades, with comprehensive testing and inspection protocols throughout construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOWER SPRING BRANCH
STORMWATER IMPROVEMENTS
(14-0048-EN)
SUPPLEMENTAL TECHNICAL
SPECIFICATIONS
Prepared for
BID PHASE
AUGUST /2026
Lower Spring Branch Stormwater Improvements
Certification
Supplemental Technical Specifications
Prepared for:
City of Clearwater
Public Works - Engineering
100 S. Myrtle Ave.
Clearwater, FL 33756
(727) 562-4750
Prepared by:
AtkinsRéalis USA, Inc.
4030 W. Boy Scout Blvd. Suite 700
Tampa, FL 33607
(813) 262-8577
FLORIDA CERTIFICATE OF AUTHORIZATION NUMBER: 24
These supplemental technical specifications submitted to the City of Clearwater, titled Lower
Spring Branch Stormwater Improvements Supplemental Technical Specifications, has been prepared by or under the supervision of the undersigned:
09/02/2026 Daniel Parsons, P.E.
FL Registration No. 72731
Daniel Parsons, Professional Engineer, State of Florida, License No. 72731
This item has been digitally signed and sealed by Daniel Parsons, P.E., on
09/02/2026.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
City of Clearwater Project No.14-0048-EN
PART 1 - GENERAL
1.1 Purpose
A. The purpose of this Section is for the adoption by Reference of, The Florida Department of Transportation Standard Specifications for Road and Bridge Construction, Latest Edition (FDOT Standard Specifications), for Technical Criteria and Description of the Lower Spring Branch Stormwater Improvements Details and Materials, which are typically associated with roadway construction and related work.
B. Adoption of these FDOT Standard Specifications shall not be limited to roadway construction, but may include but not be limited to, Paving, Grading, and Drainage improvements related to Site Work/Civil Projects of the City of Clearwater as applicable.
C. Unless specifically stated otherwise, Section III and Section IV of this Project Manual, take precedence over the applicable sections of the FDOT Standard Specifications, i.e. Section III – General Conditions, Section IV – Technical Specifications.
D. The Florida Department of Transportation Standard Specifications for Road and Bridge Construction, Latest Edition (FDOT Standard Specifications) amend or supplement the General Conditions Section III and Technical Specifications Section IV of the Constitution Contract and other provisions of the Contract Documents as indicated.
1.2 Related Documents
A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Section IV Specification Sections including sustainability requirements, apply to this Section.
B. When the FDOT Standard Plans for Road Construction are referenced on the Drawings or in the
Contract Documents, the work or item shall comply with the Florida Department of Transportation Design Manual, Latest Edition, except as specifically modified elsewhere in the Contract Documents.
100A SERIES: SUPPLEMENTAL TECHNICAL
SPECIFICATIONS
101A. TEAM INSERTVALVE
101A-2. BASIS OF MEASUREMENT
The basis of measurement shall be the number of TEAM InsertValves required. Each (EA) valve size and its corresponding quantity(ies) are identified in the bid tab and construction plans.
101A-2. BASIS OF PAYMENT
The basis of payment shall be per each (EA) valve size required and in accordance with the manufacturer provided unit cost. The cost shall account for materials, furnishings, and installation.
Team Insert Valve Specification
The Ductile Iron 250 p.s.i.g. Insert Valve shall be a Resilient Wedge Gate Valve designed for use in potable water, reclaimed water, and backflow control systems. The design will allow the valve to be installed into an existing pressurized pipeline while maintaining constant pressure and service as usual. After closing the wedge and adequately restraining the valve body, the downstream pipe can be completely removed and replaced. The host pipe shall not be a permanent component of the InsertValve.
Ductile Iron Construction:
The ductile iron body, bonnet and wedge provide strength and a pressure rating that meets or exceeds the requirements of AWWA C515. Insert Valve shall be ductile iron construction meeting ASTM A536 Grade 65-45-12. Heavy-duty ductile iron construction for maximum toughness and strength.
Chemical and modularity tests shall be performed as recommended by the Ductile iron Society, on a per ladle basis. Testing for tensile, yield and elongation shall be done in accordance with ASTM E8.
Sizes 12" and smaller must be capable of working on Cast/Grey Iron or Ductile Iron Class A, B, C and D, IPS PVC, C900 and C909 PVC, Steel, AC pipe diameters without changing either top or bottom portion of split valve body.
250 psig maximum working pressure. The pressure rating markings must be cast into the body of the insert valve.
After the installation of the insert valve body on to the existing pipe, a pressure test of 1.1 times that of the contents shall be sustained for 15 minutes. Once the pressure test is effectively achieved, the insert valve body must not be moved in accordance with AWWA Standards. If the insert valve is moved, the pressure test must be completed again. The insert valve must not be moved or repositioned once the pressure test is achieved.
Resilient Wedge Gate Assembly:
The construction of the Resilient Wedge shall comply with AWWA C509 requirements.
The ductile iron wedge shall be fully encapsulated with EPDM rubber by a high pressure and high temperature compression or injection mold process. This will assure the ductile gate is fully coated with molded rubber – no exposed iron.
The resilient wedge shall seat on the valve body and not the pipe to obtain the optimum seating and flow control results. The resilient wedge shall be totally independent of the carrier pipe.
The resilient wedge shall not come into contact with the carrier pipe or depend on the carrier pipe to create a seal. Abrasion results, thus, shorting the life and quality of the shut down if the wedge contacts the pipe.
Pressure equalization on the down or upstream side of the closed wedge shall not be necessary to open the valve.
The wedge shall be symmetrical and seal equally well with flow in either direction.
The Resilient wedge must ride inside the body channels to maintain wedge alignment throughout its travel to achieve maximum fluid control regardless of high or low flow pressure or velocity.
Oversized flow way. Unobstructed to provide optimum flow.
Fusion-Bonded Epoxy:
The insert valve is fully epoxy coated on the interior and the exterior. The fusion-bonded coating is applied prior to assembly so that even the bolt holes and body-to-bonnet flange surfaces are fully epoxy coated.
Valve shall be coated with a minimum of 8 mils epoxy in compliance with AWWA C550 and certified to ANSI/NSF-61.
Gaskets and Triple O-Ring Stem Seals:
This insert valve features triple O-Ring stem seals. Two O-Rings are located above, and one O-Ring is located below the thrust collar.
The lower two O-Rings provide a permanently sealed lubrication chamber that will make the valve easier to operate over a longer period of time. The upper O-Ring ensures that sand, dirt or grit cannot enter the valve to cause damage to the lower O-Rings. This is especially important for buried and sewage service applications.
Side flange seals shall be of the O-Ring type of either round, oval, or rectangular cross-sectional shape.
Valve Stem & Thrust Washers:
The gate valve stem and wedge nut shall be copper alloy in accordance with Section
4.4.5.1 of the AWWA C515 Standard.
The non-rising stem (NRS) must have an integral thrust collar in accordance with
Section 4.4.5.3 of AWWA C515 Standard. Two-piece stem collars are not acceptable.
The wedge nut shall be independent of the wedge and held in place on three sides by the wedge to prevent possible misalignment.
Two thrust washers are used. One is located above, and one is located below the stem thrust collar. Two thrust washers ensure easy operation at all times.
NRS with AWWA standard turns.
Operated by 2” square wrench nut according to ASTM A126 CL.B – open left.
American Made Quality:
All parts and components to be exclusively and completely assembled, manufactured, machined and coated in the USA.
All physical and chemical test results shall be recorded such that they can be accessed via the identification number on the casting. These Material Traceability Records (MTR’s) are to be made available, in hard copy, to the purchaser that requests such documentation.
All components shall be manufactured and assembled in the United States. The purchaser shall, with reasonable notice, have the right to plant visitation at his/her expense.
Hardware:
Bolting materials shall develop the physical strength requirements of ASTM A307 with dimensions conforming to ANSI B18.2.1.
Extended Life Value:
The stuffing box, operating stem and resilient wedge (complete bonnet and all moving parts) shall be removable, repairable and or replaceable under pressure. In other words, even while the valve is fully pressurized in the system all moving components can be removed under pressure. In the event the valve stem is broken or damaged, the bonnet can be removed under pressure.
Internal pressure equalization system assures the safe entry and removal of the valve bonnet during initial installation as well as future maintenance. This alleviates the need for additional pipe penetration taps or foreign methods (i.e. compressed air or auxiliary water source) to equalize pressure.
Split Restraint Devices:
Shall consist of multiple gripping wedges incorporated into a follower gland meeting the applicable requirements of ANSI/AWWA C110/A21.10.
The devices shall have a working pressure rating of 350 psi for 4-12 inch. Ratings are for water pressure and must include a minimum safety factor of 2 to 1 in all sizes.
Chemical and modularity tests shall be performed as recommended by the Ductile Iron Society, on a per ladle basis. Three test bars shall be incrementally poured per production shift as per U.L. specifications and ASTM A536. Testing for tensile, yield and elongation shall be done in accordance with ASTM E8.
Gland body wedges and wedge actuating components shall be cast from grade 65-45-
12 ductile iron material in accordance with ASTM A536.
Mechanical joint restraint shall require conventional tools and installation procedures per AWWA C600, while retaining full mechanical joint deflection during assembly as well as allowing joint deflection after assembly.
Proper actuation of the gripping wedges shall be ensured with torque limiting twist off nuts. Set screw pressure point type hardware shall not be used.
Restraint devices shall be listed by Underwriters Laboratories and Approved by Factory
Mutual (3” through 12” inch size).
The insert valve shall be a Team InsertValve Patent number 6,776,187 and 7,225,827, or written approved equal.
Team Industrial Services P.O. Box 123
Alvin, TX 77512 1-800-662-8326 281-331-6154 www.teamindustrialservices.com
InsertValve™
The Team Inser tValveTM is a fully functioning, resilient wedge gate valve with a rated working pressure of 250 psig. The valve fully closes, and it provides a clear, unobstructed waterway under full rated working pressure. The valve’s superior design and engineering characteristics provide many distinct operational benef its.
Internal equalization
Corrosion-resistant surface eliminates mineral deposit buildup
True MJ connections enable downstream pipe replacement
Durable ductile iron construction maintains strength of existing infrastructure
10 mils fusion-bonded epoxy coating (NSF-61)
Wedge gate seals on valve body, not host pipe
Wedge gate never contacts host pipe, providing long elastomer life
Wedge gate fully encapsulated in rubber
2-inch operating nut (other options available)
Triple bonnet to body seal
Valve body gate wedge guides
Triple O-ring seal
Value, Reliability, Performance w w w.teamindus t r ia lse r v ices .com
Team’s patented InsertValve delivers value, reliability and performance second to none in a wide range of pipeline industries and applications, including tapping, line stopping, valve insertion and capital improvement connection. This field-proven valve installs under pressure, eliminating the need for costly system disruptions and product waste.
An InsertValve installation under full line pressure.
A Real Valve, Inserted Under Full Line Pressure
• Meets ANSI/AWWA C515 material standards
• Installs on a full range of pipe sizes and types
• Valve permanently restrained to the pipe to maintain pipe integrity
• Provides instant isolation zones for security and peace of mind
• Eliminates backflow contamination, purging and bac-t hits
• Allows for removal/replacement of downstream pipe at any time
• Enables in-line, under pressure repair of all moving parts
• Ensures clean valve seat after installation process
An InsertValve with position indicator plate. Valve can be f itted with gear or handwheel operators.
InsertValves on AC pipe for main control and hydrant replacement preventing asbestos f ibers becoming airborne.
The InsertValve can be installed in any orientation on any type of pipe material.
An Inside Look at Team’s InsertValve The Team Inser tValve is available in 4-inch thru 12-inch sizes with handwheel and gear operators. Valves and operators have been tested and proven to deliver reliable service at pressures ranging from vacuum to 250 psig and temperatures to 180°F (higher tempera-ture options available). Unlike some valves, the Inser tValve is designed to handle full water and wastewater system hydraulic forces that are typically applied. And, these rugged valves can be oriented in vir tually any position on any type of pipe, including ductile iron, cast iron, steel, PVC and AC.
Nominal Size 4” 6” 8” 10” 12”
A 21” (533) 23 1/2” (597) 28 1/4” (718) 36” (914) 41” (1041)
B 16” (406) 18” (457) 20” (508) 25” (635) 30” (762)
C 9 1/2” (241) 11 1/4” (286) 13 1/2” (343) 15 3/4” (400) 18” (457)
F 4.5-5.26 (114-134) 6.63-7.2 (168-183) 8.63-9.3 (219-236) 10.75-11.3 (273-287) 12.75-13.42 (324-341)
G 13 1/4” (337) 15 1/4” (387) 16” (406) 21” (533) 24” (610)
H 13 1/2” (343) 16” (406) 19” (483) 23 1/2” (597) 27 1/2” (699)
TEAM
G H
FC
B
A
An under-pressure look of clean valve seat.Typical pipe with internal obstructions. InsertValve gate sits on the valve body and not the host pipe.
w w w.teamindus t r ia lse r v ices .com
1. Main Body Bottom
4. Alignment Pin
17. Resilient Wedge Gate
10. Valve Bonnet
3. Main Body Top
20. Bonnet Gasket
18. Stem Nut 12. Valve Stem
37. Bonnet Retainer Ring
5. Run Stud
23. Stem Gland O-ring
33. Operator Nut*
16. Stem Gland
22. Bonnet O-ring
39. Retainer Ring Hex Bolt
40. Retainer Ring Flat Washer
*The Team InsertValve can be equipped with various operators, including gear and handwheel, as well as a post indicator.
36. Operator Nut Bolt
34. Operator Nut Washer
35. Operator Nut Lock Washer
24. Stem Gland Hex Bolt
15. Upper Stem Thrust Washer
31. Bypass Valve Plug
30. Bypass Valve
13. Lower Stem O-ring
14. Upper Stem O-ring
19. Gate Guide
9. Bonnet Plug
8. Bonnet Retainer Screws
38. Bonnet Retainer O-ring
2. Valve Body Gasket
6. Run Flat Washer
7. Run Hex Nut
11. Lower Stem Thrust Washer
32. Bonnet Alignment Pin
41. Retainer Ring Hex Nut
7. Run Hex Nut
Team offers professional installation by trained and certified technicians. Valves and complete installation packages are also sold for successful third-party
Fast, Easy Installation installation. Either way, you get a valve that meets or exceeds all recognized industry requirements.
Team’s Inser tValve installs in three easy steps.
Step 1 Tapping machine removes complete section of pipe.
Step 2 Insert bonnet into the valve body.
Step 3 Valve is now operational.
The Team InsertValve, with its permanent, resilient seat, has just been installed into the piping infrastructure without interruption or loss of pressure. A valve box is installed and the valve is ready for operation.
To view animation of the Team InsertValve installation process, simply scan the QR Code below with your SmartPhone.
necessary. This is made possible by the unique design of its integral mechanical joint connection coupled with the fact that the host pipe is not a permanent part of the CIC.
Line Stopping
Specify the Team Capital Improvement Connection (CIC) for your next capital improvement project.
Team’s CIC provides valve control today, and pipe replacement tomorrow, even upsizing of the pipe if
Capital Improvement ConnectionTM
After you’ve finished the capital improvement project, you can either leave the bonnet or remove the bonnet.
Low-prof ile bonnet used as line stop. Blind f lange installed.Internal equalization completion plug installed.
Install the InsertValve size of your choice. Restrain the valve and remove the downstream pipe. Install new downstream pipe.
The choice is yours. The infrastructure is not compro-mised with Team’s ductle iron MJ line stop fitting.
©2 0 12 Te a m I n d u s t r i a l S e r v i c e s
Corporate headquarters:
200 Hermann Drive
Alvin, Texas 77511
Phone: 800-662-8326
Phone: 281-331-6154
Fax: 281-331-4107
For more information, call:
(727) 328-7882 1363 22nd Street N
St. Petersburg, FL 33713 www.gulfcoastutility.com
C
A
B
F
H
G A
A
Nominal Size 4" 6" 8" 10" 12"
A (mm) 21 1/2" (546)
24 1/4" (616)
29" (737)
38 1/2" (978)
41 1/2" (1054)
B (mm) 16" (406)
18" (457)
20" (508)
25" (635)
30" (762)
C (mm) 9 1/2" (241)
11 1/4" (286)
13 1/2" (343)
15 3/4" (400)
18" (457)
F (mm) 4.5" - 5.26" (114 - 134)
6.63" - 7.2" (168 - 183)
8.63" - 9.3" (219 - 236)
10.75" - 11.3" (273 - 287)
12.75" - 13.42" (324 - 341)
G (mm) 13 1/4" (337)
15 1/4" (387)
17 1/2" (445)
21" (533)
24" (610)
H (mm) 13 1/2" (343)
16" (406)
19" (483)
23 1/2" (597)
27 1/2" (699)
Weight (approx.)
260 LBS
118 kg
320 LBS
145 kg
450 LBS
204kg
1000 LBS
454 kg
1300 LBS
590 kg
NO. PART MATERIAL
1 Valve Body Bottom Ductile Iron ASTM A536 65-45-12 2 Valve Body Top Ductile Iron ASTM A536 65-45-12 3 Valve Body Gasket EPDM Rubber 4 Resilient Wedge Gate Ductile Iron ASTM A536 65-45-12 * 5 Stem Nut Bronze ASTM B584 6 Valve Stem Bronze ASTM B584 7 Bonnet Gasket EPDM Rubber 8 Bonnet Retainer Ring Ductile Iron ASTM A536 65-45-12 9 Bonnet Ductile Iron ASTM A536 65-45-12
10 Stem Gland Ductile Iron ASTM A536 65-45-12 11 2" Operator Nut Ductile Iron ASTM A536 65-45-12 12 Stem O-rings EPDM Rubber 13 Bonnet O-ring EPDM Rubber 14 Bonnet Bolts/Nuts/Washers Zinc Plated Steel or 304SS (optional)
Valve Body Bolts/Nuts/Washers Zinc Plated Steel or 304SS (optional) Stem Gland Bolts Zinc Plated Steel or 304SS (optional)
*EPDM Encapsulated ASTM D429
InsertValve™ RW - Gate Sizes 4" - 12"
Alvin, TX, USA
1-800-662-TEAM
www.teamindustrialservices.com
8/2015Data subject to change without notice / Dimensions not for construction unless certified
102A. PINELLAS COUNTY SUPPLEMENTAL STANDARD
TECHNICAL SPECIFICATIONS FOR ROADWAY
AND GENERAL CONSTRUCTION
Supplemental Specifications For Roadway and General Construction
(January 2025)
To be used in conjunction with FDOT Standard Specifications for Road and Bridge Construction FY2024-25
NOTE: THESE PINELLAS COUNTY SUPPLEMENTAL
TECHNICAL SPECIFICATIONS ARE ONLY APPLICABLE FOR
THE DOUGLAS AVENUE PHASE (PROJECT STATIONING
100+00 TO 105+56.70) OF THE OVERALL PROJECT.
SECTIONS 005-0700,005-0800,005-0850,005-0900, 999-0000,
AND 999-0003 OF THESE SUPPLEMENTAL TECHNICAL
SPECIFICATIONS ARE NOT APPLICABLE FOR THIS
PROJECT.
This document has been digitally signed and sealed. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Mona R. Gabriel P.E. 90359
PW – Capital Improvements Division Director
The above named professional engineer shall be responsible for the following sheets in accordance with rule 61g15-23.004, F.A.C.
Thomas E. Washburn P.E. 50113 PW - Transportation Division Director
The above named professional engineer shall be responsible for the following sheets in accordance with rule 61g15-23.004, F.A.C.
001 MINIMUM TESTING
FREQUENCY AND SAMPLING ... 4
005 SURVEY BY CONTRACTOR
101-0100 MOBILIZATION
102-1000 MAINTENANCE OF TRAFFIC
104 PREVENTION, CONTROL AND
ABATEMENT OF EROSION
AND WATER POLLUTION
104-5000 WATER FOR DUST CONTROL 11
110 CLEARING AND GRUBBING
120-1100 GRADING…………….………………15
330 HOT MIX ASPHALT – GENERAL
CONSTRUCTION
REQUIREMENTS………………17
334 SUPERPAVE ASPHALT
CONCRETE
347 PORTLAND CEMENT CONCRETE
– CLASS NS
425 INLETS, MANHOLES AND
JUNCTION BOXES - FDOT AND
PCED TYPE STRUCTURES
430 PIPE CULVERT
440 UNDERDRAINS
520 CONCRETE GUTTER, CURB
ELEMENTS, AND TRAFFIC
SEPARATOR
527 DETECTABLE WARNINGS
570 PERFORMANCE TURF
810 WHEEL STOP
820 ARCHAEOLOGICAL AND
HUMAN REMAINS DISCOVERIES
900-0200 OFFICE FOR THE ENGINEER ... 60
999-0000 UNSPECIFIED WORK
603 GENERAL REQUIREMENTS FOR
TRAFFIC CONTROL SIGNALS
AND DEVICES
630 CONDUIT
633 COMMUNICATIONS CABLE
635 & 996 PULL, SPLICE, AND JUNCTION
BOXES
641 PRESTRESSED CONCRETE POLES
660 & 995 VEHICLE DETECTION SYSTEM 46
670 TRAFFIC CONTROLLER
ASSEMBLIES
700 HIGHWAY SIGNING
900-0100 SIGNS – PROJECT
IDENTIFICATION
TABLE OF CONTENTS
MINIMUM TESTING FREQUENCY AND SAMPLING 001
SURVEY BY CONTRACTOR 005
MOBILIZATION 101-0100
MAINTENANCE OF TRAFFIC 102-1000
PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER
POLLUTION 104
WATER FOR DUST CONTROL 104-5000
CLEARING AND GRUBBING 110
GRADING 120-1100
HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS 330
SUPERPAVE ASPHALT CONCRETE 334
PORTLAND CEMENT CONCRETE - CLASS NS 347
INLETS, MANHOLES, AND JUNCTION BOXES - FDOT AND PCED TYPE
STRUCTURES 425
PIPE CULVERT 430
UNDERDRAINS 440
CONCRETE GUTTER, CURB ELEMENTS, AND TRAFFIC
SEPARATOR 520
DETECTABLE WARNINGS 527
PERFORMANCE TURF 570
GENERAL REQUIREMENTS FOR TRAFFIC CONTROL SIGNALS AND
DEVICES 603
CONDUIT 630
COMMUNICATIONS CABLE 633
PULL, SPLICE, AND JUNCTION BOXES 635 & 996
PRESTRESSED CONCRETE POLES 641
VEHICLE DETECTION SYSTEM 660 & 995
TRAFFIC CONTROLLER ASSEMBLIES 670
HIGHWAY SIGNING 700 & 995
WHEEL STOP 810
ARCHAEOLOGICAL AND HUMAN REMAINS DISCOVERIES 820
SIGNS - PROJECT IDENTIFICATION 900-0100
OFFICE FOR THE ENGINEER 900-200
UNSPECIFIED WORK 999-000
MINIMUM TESTING FREQUENCY AND SAMPLING 001
The testing frequency and sampling procedures identified in the latest revision of the “Minimum Testing Frequency Specifications for Roads, Storm Drainage, Utilities and Sampling Procedures” as prepared by Pinellas County Public Works Construction Division supersede the testing requirements of the appropriate FDOT specification.
Certain tests (e.g., Limerock Bearing Ratio Tests) performed may require a number of days (four to six) for the test results to be obtained by the Engineer.
Link to document:
http://www.pinellascounty.org/technical/pdf/testing-frequency.pdf
SURVEY BY CONTRACTOR 005
The work specified under this Section consists of all materials and labor necessary to complete the survey effort by the Contractor to completely construct, quantify, and document the project to the satisfaction of the Engineer.
The Contractor must employ or retain the services of a Florida registered Professional Surveyor and Mapper, pursuant to Chapter 472 Florida Statutes and Chapter 5J-17 Florida Administrative Code, to satisfy all the requirements specified in this section of contract specifications. Additionally, the Contractor must be responsible to perform all efforts in acceptable standard methods.
The Contractor must thoroughly familiarize themselves with the plans, specifications, and on-site field conditions to submit a lump sum bid that will include all means and methods necessary to satisfy the survey and layout requirements of this project, any required survey for validation of earthwork quantities, and survey required to produce as-built/record drawings. All field books and calculations, related to survey efforts must be available to the Engineer upon request, for a period of one (1) year after construction completion.
005-0701 Survey and Layout This work must include providing all lines, grades, boundaries and required survey and/or layout necessary to construct and inspect the project in accordance with approved plans and specifications.
The right of way and/or easement shall be staked out with a stake or marker every 100 feet, or as approved by the Engineer, on both sides of the project boundaries. For site projects, the project boundaries and property corners shall be established. All property corners and section corners shall be protected through the contract period by the contractor, if a property corner is damaged, they will be restored by a Florida registered Professional Land Surveyor at no additional cost to the County.
005-0703 Earthwork Quantity Measurements The Contractor must provide summaries to the Engineer, signed and sealed by a Florida registered Professional Surveyor and Mapper, validating earthwork volumes, within five (5) days after receiving written request from the Engineer.
For validation of earthwork volumes, the Contractor must provide the following:
1. Collect a sufficient number of data points to accurately represent the following surfaces:
i. Pre-excavation Surface prior to clearing and grubbing.
ii. Final Surface.
2. Compute earthwork volumes using the average end area method.
3. Provide Earthwork volume in a report format signed and sealed by a Florida registered
Professional Land Surveyor.
4. Deliverables will include:
i. Digital data files of all surface data point in a standard ASCII format.
ii. Digital Terrain Model (DTM) files.
In the case of dispute in quantity measurements, the Engineer reserves the right to have Pinellas County Survey staff verify all measurements and calculations. Contractor’s Surveyor must make all field books and calculations available for review by the Engineer or his designee.
005-0705 As-Built Survey The Contractor must provide the as-built survey to the Engineer, signed and sealed by a Florida registered Professional Surveyor and Mapper, within twenty-five (25) days after receiving a written request from the Engineer. Contractor’s Surveyor must make all field books and calculations available for review by the Engineer or his designee.
The as-built survey must include all items highlighted on marked-up plans, or defined by other means, provided by the Engineer of Record as part of the construction documents. In the event a set of highlighted marked up plans were not provided as part of the bid process, the items that require as-built surveying must include:
Control structures - weir and grate elevations and dimensions Ponds - top of bank, toe of slope, and contour elevations to reflect side slopes
Other items (when specified in Technical Special Provisions or Supplemental Specifications)
Deliverables
All Survey activities and deliverables are to be in accordance with the PINELLAS COUNTY CADD STANDARDS MANUAL FOR SURVEY AND CIVIL ENGINEERING and Rule 5J-17.050 through 5J-
17.053 Florida Administrative Code, and Chapter 472 Florida Statutes and must include Signed and Sealed As-built Surveys. Deliverables will also include all Autodesk Civil 3D project files using latest edition Pinellas County CADD Kit; field book files; digital data files of all surveyed points in the standard ASCII format; and an electronic copy of the signed and sealed survey in Portable Document Format (.pdf).
The PINELLAS COUNTY CADD STANDARDS MANUAL FOR SURVEY AND CIVIL ENGINEERING can be found on the Pinellas County Website (http://www.pinellascounty.org/technical/).
Basis of Payment:
The pay quantity must consist of all materials and labor necessary to satisfy the survey and layout requirements of this project (005-0701), any required survey for validation of earthwork quantities (005-0703), and survey required to produce as-built drawings (005-0705), performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section must be in Lump Sum (LS) quantity.
Payments will be made under:
Item No. 005-0701 Survey, Construction Layout -Lump Sum
Item No. 005-0703 Survey, Earthwork Quantity Measurements -Lump Sum
Item No. 005-0705 Survey, Permitting As-built Requirements -Lump Sum
MOBILIZATION 101-0100
The work specified under this Section consists of the preparatory work and operations in mobilizing to begin work on the project, including but not limited to those operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site(s), and for the establishment of temporary offices, buildings, safety equipment and first aid supplies, sanitary and other facilities as required by these specifications, special provisions, and state and local laws and regulations.
The Contractor must furnish, install, and maintain station boards (every 100 ft) on one (1) side of the project for the duration of the project. The station boards must be 48-inches-long, 1” x 4” lumber, painted white with 3-inch black stenciled numbers. If damaged, they will be restored at no additional cost to the County. Station boards must be removed by the Contractor upon written notice from the Engineer.
Unless there is a separate pay item for Survey by Contractor, the Mobilization pay item must include the cost of maintaining a plans contract set with redlines that depict any construction deviations to dimensions, measurements, stations, offsets, etc., shown on the plans. The Contractor must provide one (1) original Record Drawing set (in color) and eight (8) additional color copies to the Engineer after construction is completed on 11” x 17” or 24” x 36” paper drawings.
The cost of bonds and any required insurance, consideration for indemnification to the County and the Engineer, and any other preconstruction expenses necessary for the start of the work, excluding the cost of construction materials, must also be included in this Section.
Pay item for Mobilization must include photographic documentation and a high-definition video (minimum1280 x 720 resolution) of the project by the Contractor, prior to construction beginning, for the purpose of documenting existing conditions. The pictures and video must be provided to the Engineer prior to beginning construction.
Unless otherwise approved by the Engineer, the pay item for Mobilization must also include the furnishing and placement of door hanger notifications on the doors of all affected residents adjacent to the project, prior to the start of construction. Notifications shall inform residents of the construction time frame and any anticipated impact to properties at least two (2) weeks prior to construction commencing. Notification content must be pre-approved by the Engineer.
Basis of Payment
The work and incidental costs specified as being covered under this Section must be paid for at the contract lump sum price (LS), for Mobilization, in accordance with Section 101-2 of the FDOT Specifications.
MAINTENANCE OF TRAFFIC 102-1000
The work specified under this Section consists of maintaining vehicular, bicycle and pedestrian traffic within the limits of the project for the duration of the construction period, in accordance with the requirements of Section 102 of the FDOT Specifications, as amended herein. The road must be kept open to two-way traffic, unless otherwise specified on the plans or the specifications, for the duration of the construction period, except that, during non-peak traffic periods, one (1) lane of traffic will be permitted provided that flagmen are used, and prior approval is obtained from the County.
The Contractor will not be permitted to isolate residences or places of business. Access must be provided to all residences and all places of business whenever construction interferes with the existing means of access. Any proposed closure of side streets to local traffic, requires County pre-approval on each occasion, and notification by Contractor to affected property owners and emergency services fourteen (14) days in advance, unless otherwise approved by the County Traffic Engineer or the County Engineer.
The Contractor must furnish, erect and maintain all necessary traffic control and safety devices, in accordance with the plans and FDOT Standard Plans, latest edition, and the Manual of Uniform Minimum Standards for Design, Construction and Maintenance (Florida Greenbook), latest edition, and must take all necessary precautions for the protection of the work and the safety of the public for the duration of the construction period.
The work specified under this Section must include all Maintenance of Traffic (MOT) pay items with prefix 102, and all work shown in the plans including, but not limited to, removal of existing pavement markings, installation and removal of pavement striping, markings and reflective markers, and all materials and construction necessary to create temporary connections for street, driveways, and pedestrian traffic. The pay item for “Maintenance of Traffic – Lump Sum” must include all work necessary for maintenance of vehicular traffic and pedestrian traffic, unless otherwise specified to be paid for under other items of work. Payment for pavement markings to be used during maintenance of traffic must be paid for and included in the Maintenance of Traffic Lump Sum pay item.
Temporary Curb (Asphaltic or Concrete) must not be used without prior approval by the Engineer.
Portable Temporary Low-Profile Barrier for Roadside Safety, in accordance with FDOT Indexes, may be used in lieu of barrier walls for design speeds of forty-five (45) mph or less, where a low profile is desired to maintain sight distance at intersections and driveways. Portable Temporary Low-Profile Barrier for Roadside Safety must be paid for under the contract unit value for Barrier Wall (Temporary) Low-Profile Concrete (Linear Foot), and will be full compensation for the furnishing, installing, maintaining, relocation and removal of the barrier wall. The contractor must not receive additional compensation for relocating the barrier wall (i.e., from one construction phase to another).
The approved "Portable Temporary Low-Profile Barrier for Roadside Safety" is a proprietary design by the University of Florida. Only those barrier units cast by producers licensed by the University of Florida will be allowed for installation. Availability of this device may be limited due to high demand;
and should be considered in establishing project schedules calling for this device. The applicable edition of the documents referenced herein must be that edition of the respective documents specified in the plans.
The Contractor may propose an alternate traffic control plan (TCP) to the one presented in the plans.
If so, the Contractor must have their Engineer be the Engineer of Record for the alternate plan and must have said Engineer sign and seal the alternate plan. Additionally, the Contractor must provide documentation showing that their Engineer has professional liability insurance and that their Engineer must indemnify and hold harmless the County and its officers and employees, same as required of the Contractor in this contract. Their Engineer must also possess Advance Temporary Traffic Control Certification.
The work specified under this Section must include all work shown in the plans including, but not limited to, installing and removing temporary inlets, temporary manholes, temporary pipes, temporary outlet structures, temporary inlet grates, and all materials and construction necessary to maintain temporary drainage during construction operations and temporary signalization. There must be no modifications to existing signalization mast arms or strain poles unless approved by the County. The pay item for "Maintenance of Traffic - Lump Sum" must include all work necessary for maintenance of drainage during construction operations. Any drainage structure or pipe that is part of the permanent drainage plan will be paid for under other items of work.
The work and incidental costs specified as being covered under this Section must be paid for at the contract unit price per Lump Sum (LS), on a pro-rated monthly amount based on the contract time.
If the bid sheets include a specific pay item from the list provided in FDOT Section 102-13.26 Payment Items, then the work must be paid for at the contract unit price.
Note: If a pay item is not provided in the bid sheets from FDOT Section 102-13.26 Payment Items, then the cost for said item/work must be included in the “Maintenance of Traffic” (Lump Sum) pay item.
PREVENTION, CONTROL AND ABATEMENT OF EROSION AND
WATER POLLUTION 104
The work specified under this Section consists of the furnishing and application of Best Management Practices (BMPs) required to control erosion to the maximum extent practicable for the duration of the construction period, in accordance with the requirements of Section 104 of the FDOT Specifications, as amended herein.
At the pre-construction conference or prior to any construction activity, the Contractor must submit a completed and signed Pinellas County Habitat Permit application, and supporting documents, the Contractor-generated project specific Prevention, Control and Abatement of Erosion and Water Pollution plan (which includes the proposed construction phasing and erosion control lay out for phasing), the Stormwater Pollution Prevention Plan (SWPPP), and the dewatering plan for inclusion in the Pinellas County Habitat Permit (Land Development Code Ch. 166 Environmental and Natural Resource Protection Article II Habitat Management & Landscaping Division 2: Permits). The Contractor must not commence earth-moving or land clearing prior to a habitat permit being issued.
Commencement of any construction activity prior to issuance of a habitat permit is a violation of the Pinellas County Land Development Code and is subject to enforcement action.
The Engineer will meet with the Contractor in the field during erosion control abatement system installation to review the field conditions and employed Best Management Practices (BMPs) that address the field conditions. A preconstruction field meeting must be conducted jointly with the pre-barricade meeting to discuss habitat permitting requirements, dewatering, and other outstanding issues.
104-10 Basis of Payment The work and incidental costs specified as being covered under this Section must be paid for the unit price per Lump Sum (LS), for Prevention, Control and Abatement of Erosion and Water Pollution. If the bid sheets include a specific pay item from the list provided in FDOT Section 104- 10 Basis of Payment, then the work must be paid for at the contract unit price.
Prices and payments will be full compensation for all work specified in this Section, including construction, routine maintenance, replacement, and removal of temporary erosion control devices, and not included in the contract unit price for a related item.
If a pay item is not provided in the bid sheets from FDOT Section 104-10 Basis of Payment, then the cost for said item/work must be included in the “Prevention, Control and Abatement of Erosion and Water Pollution” (Lump Sum) pay item.
Payment will be made under:
Item No. 104-99 Prevention, control and Abatement of Erosion and Water Pollution -Lump Sum
NOTE: The Contractor will be fully responsible for maintaining compliance with all National Pollutant Discharge Elimination System (NPDES) standards. Failure to maintain erosion and/or sedimentation control measures or an illicit discharge may result in fines. Section 58-239 of the Pinellas County Code authorizes penalties of up to $10,000.00 for each offense.
WATER FOR DUST CONTROL 104-5000
The work specified under this Section consists of the furnishing and application of Water on the construction area including but not limited to sub-grade, un-surfaced base, or other un-surfaced traveled ways, or areas of cleared vegetation, in order to control dust resulting from construction operations. The locations and frequency of application must be as directed by the Engineer.
Water used for controlling moisture content of surfaces to meet compaction requirements, mixture and/or working of material, etc. is at the expense of the contractor, included in the work being performed and not paid as “Water For Dust Control”.
The water used may be obtained from any approved source that meets Federal, State and local requirements.
The work specified under this Section must be paid for at the contract unit price per thousand gallons of Water for Dust Control.
Payments will be made under:
Item No. 104-5000 WATER, for Dust Control -Thousand Gallons
CLEARING AND GRUBBING 110
The work specified under this Section consists of the clearing and preparation of sites for proposed construction, in accordance with the requirements of Section 110 of the FDOT Specifications, as amended herein. The work specified under this Section must include the removal and off-site disposal of all trees indicated on the plans to be removed, the removal and off-site disposal of all brush, stumps, roots, rubbish and debris, and all obstructions resting on or protruding through the surface of the existing ground and the surface of excavated areas, the removal and off-site disposal of all existing facilities, drainage structures, culverts, pipes, and pavement indicated on the plans to be removed, and the removal and off-site disposal of all buildings, structures, appurtenances, and other facilities necessary to prepare the area for the proposed construction.
No stock piling of material on the roadway, within tree protection zones (TPZ), or on the sidewalk is allowed. All extra dirt and/or debris must be removed daily as part of the daily clean-up process. The roadway and the sidewalks must be swept daily. All costs associated with daily clean-up process and sweeping must be included in the Lump Sum bid for Clearing and Grubbing. All buildings, structures, utilities, and other obstructions indicated on the plans to remain, must be carefully protected against displacement or damage. Materials and labor for this protection must be included in the Lump Sum cost of Clearing and Grubbing.
Except as otherwise provided for in these specifications, the work to be performed under this Section must also include the clearing and grubbing necessary for the excavation of detention ponds, borrow pits, and the like, and the clearing and grubbing necessary for the construction of designated haul routes, and including the removal and off-site disposal of all product and debris except that which is to be salvaged or which is required to complete the construction of the project.
Where possible, all trenching or excavation within tree protection zones (TPZ) shall be done by hand or an air spade. After excavation, all tree roots greater than one inch (1”) in diameter must be cleanly pruned or saw cut, not crushed or torn. Where it is not possible to hand trench, mechanical excavation may be approved by the Engineer. Trunk/root flare and soil/root protection measures in accordance with Pinellas County Standard Detail Index 1111 must be employed to prevent tree damage from mechanical excavation equipment. The Contractor must not cut tree roots greater than three inches (3”) in diameter within the critical root zone (CRZ) without prior approval of the Engineer, after the inspection of an International Society of Arborists (ISA) Certified Arborist, preferably ISA Tree Risk Assessment Qualified (TRAQ). All root pruning must conform to ANSI A300 (Part 8) Standard Practices (Root Management). After root pruning, cut roots should be covered and kept moist until final grade is established. Cutting tree roots greater than 3” in diameter in the critical root zone (CRZ) or tree roots greater than six inches (6”) in diameter within the TPZ shall be reviewed by a County Arborist to determine if a tree designated to remain may need to be removed to prevent future liability.
The Contractor must make his own inspection to determine the character, density and extent of trees, vegetation, and other items subject to removal and disposal under these provisions. The attention of the Contractor is directed to the fact that the burning of debris resulting from clearing and grubbing operations will not be permitted within County-owned lands or rights-of-way. Nothing in these provisions must be construed to authorize the removal or disturbance of any tree or other form of vegetation, or any marine, land or air creatures’ natural habitat, which may be subject to the jurisdiction of regulatory agencies. This Section must also include the cost for trimming of trees and disposal of the trimmings, as shown on the plans and/or required for construction of project. All tree trimming must be performed by or under the supervision of an ISA Certified Arborist and conform to ANSI A300 (Part 1) Standard Practices (Pruning), cost of which is included in the Clearing and Grubbing pay item.
This Section must also include the temporary relocation of mailboxes during construction and permanent relocation after construction has been completed. The work must also include the relocation of the mailbox foundation. The Contractor must coordinate with the Post Office to confirm the mailbox locations. Mailboxes must be restored to equal or better condition that existed prior to the commencement of construction activities, location of which must meet roadway clear zone requirements found in the FDOT Florida Green Book. Work related to mailboxes must be included in the Lump Sum pay item for Clearing and Grubbing
A. Ownership of Removals:
i. All removed materials not claimed by the County must become the property of the Contractor and must be disposed of by the Contractor in areas provided by the Contractor.
This work must be included in the pay item Clearing and Grubbing.
ii. Transporting and placement of removed material must be paid for under and included in the pay item of Clearing and Grubbing.
B. Items in County Right-of-Way:
The Contractor must notify in writing all property owners to remove any items (landscaping, signs, irrigation systems, lighting, etc.) from the County Right-of-Way that owners wish to salvage a minimum of fourteen (14) calendar days in advance of construction activities. After the notification period, it is the Contractor’s responsibility to remove said items that conflict with construction activities prior to construction. For irrigation systems that the owners wish to salvage, the contractor must place a temporary cap on the pipe that feeds into the irrigation system conflicting with construction activities within County Right of Way. The price and payment for capping and removal of irrigation systems shall be paid for under Pay Item No. 110-9-1 IRRIGATION SYSTEM, CUT AND CAP of the irrigation feed in the Right-of-Way for a non-single family irrigation system. The price and payment for removal of other items must be included in the payment item of Clearing and Grubbing.
C. Irrigation/Sprinkler Systems for single family residential units: The Contractor shall repair or replace irrigation components in the public Right-of-Way, including fittings, sprinkler heads, and minor related appurtenances adjacent to single family residential properties. The Contractor must verify the proper working order of sprinkler systems affected by Construction, both prior to and after construction. The limit of the repair shall be as directed by the Engineer. Repair or replacement and verification efforts shall be paid for under Pay Item No. 110-9-2 IRRIGATION SYSTEM, INSTALLATION.
D. Tree Protection: Trees not within the Clearing and Grubbing area and those specified to remain within County property/right of way, must be protected during construction with Tree Protection Barricades, in accordance with Pinellas County Standard Detail Index 1111. The payment for Tree Protection must be included in the Lump Sum pay item, “Clearing and Grubbing”.
E. Tree and Stump Removal: Unless otherwise indicated by the Engineer in the construction documents, all trees deemed in conflict with the construction activities must be marked by the Contractor for removal, and field validated by the Engineer and a County Arborist in advance of construction. The Contractor must not remove any trees without authorization from the Engineer, after inspection by an ISA Certified Arborist.
F. Subterranean Item Removal: Included in clearing and grubbing. Tree stumps, roots, debris, and other abandoned items must be removed from proposed sidewalk, drainage, roadway, and driveway areas to a minimum depth of four (4) feet. Where proposed items, such as underground drainage, that are deeper than three feet six inches, an additional six (6) inches below those proposed elements shall be clear of debris. All backfill must be A-1 or A-3 soil material. The excavation and backfilling must be included in the Lump Sum cost of Clearing and Grubbing.
Basis of Payment
The work and incidental costs specified as being covered under this Section must be paid for at the contract unit price per Lump Sum (LS), for Clearing and Grubbing, except Irrigation. If the Schedule of Values includes a specific pay item from the list provided in FDOT Section 110-12.8, then the work must be paid for at the contract unit price.
IRRIGATION SYSTEM, TEMPORARY CAP work shall include all labor and material required as specified under the above Section B and must be paid for at the contract unit price per Each (EA) temporary cap installed and satisfactorily completed and accepted.
IRRIGATION SYSTEM, INSTALLATION work shall include all labor and material required as specified under the above Section C and must be paid for at the contract unit price per Linear Foot (LF) measured along the center line of the road installed and satisfactorily completed and accepted.
If a pay item is not provided in the bid sheets from Section 110, then the cost for said item/work must be included in the “Clearing and Grubbing” (Lump Sum) pay item.
Payments will be made under:
Item No. 110-0100 Clearing and Grubbing - Lump Sum
Item No. 110-9-1 IRRIGATION SYSTEM, Temporary Cap - Each
Item No. 110-9-2 IRRIGATION SYSTEM, Installation - Linear Foot
GRADING 120-1100
All work specified under this Section must conform to the requirements of Sections 110 and 120 of the FDOT Specifications, except as amended herein.
Except for that work excluded under other provisions of this Section, and except as provided for under other Sections of these…