Lowden State Park Eternal Plaza Renovation QUESTIONS AND ANSWERS 1.docx

DOCX document 18 KB Posted

Attached to
DNR Lowden - Renovate Eternal Indian Plaza
Solicitation number
23-422DNR-DIREC-B-35009
Issued by
Morgan County, Illinois

About this file

This document contains vendor questions and the agency's responses regarding the Lowden State Park Eternal Indian Plaza Renovation project. The Illinois Department of Natural Resources (IDNR) is seeking vendors to renovate the Eternal Indian Plaza at Lowden State Park. The project includes the removal of the existing non-historic base and stone veneer, and the installation of a new cut stone facade wall around the statue base. Specific details on the materials, installation, and engineering requirements for the stone facade wall are provided. This is part of a larger state and local contract opportunity, with the IFB and attachments available for more details. The solicitation is being conducted electronically, and paper responses will not be accepted.

Regarding pricing and funding, the document does not provide any specific details on pricing terms, set asides, incumbents, funding requirements or sources, or contract amounts. The focus is on the technical specifications and requirements for the stone facade wall portion of the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ILLINOIS DEPARTMENT OF NATURAL RESOURCES

VENDOR QUESTIONS

Date: March 9, 2023

23-422DNR-REALT-B-35009

LOCATION: Lowden State Park

PROJECT TITLE: Lowden State Park Eternal Indian Plaza Renovation

Vendor Question 1:

Can you please provide Specific Details for the (Stone Facade Wall) item; plan sheet 7 states 65 L.F.. Looking for information about: material, base/foundation, engineering, installation, etc.

IDNR Answer 1:

The “Stone Façade “Wall” – 65 L.F.” label refers to the existing non-historic base, clad with deteriorating stone veneer, of the ‘Eternal Indian’ sculpture. This non-historic base & veneer should be removed only where it conflicts with the 3” depth of ‘Rainbow’ Peagravel or construction of the top of the stone façade wall proposed there (see Façade Wall & Retaining/Seat Wall Section at Statue [Sculpture] Base Detail 1 and Detail 2 on sheet 12 of the For Bid Construction set.

Regarding the proposed stone façade wall, Landscape Note #13 on sheet 10 of the For Bid Construction set has additional detail:

“Contractor to provide all labor and materials necessary to install a cut stone façade wall around the statue base as indicated on plan and in details. Cut stone shall be 6”H x 8”D x 18-35”L cut drywall, (with a snapped façade), light gray limestone wallstone, contractor to provide stone source, and sample for approval to IDNR [PM] prior to ordering of materials. Install as detail [see Detail 1 & 2 on sheet 12].