Lossen Street. Existing Pavement & Road Investigation report.pdf
PDF 6 MB Posted
- Solicitation number
- 19WA8025Q0046
- Issued by
-
Department of State
About this file
This document is a detailed pavement investigation and road reinstatement report for a section of Lossen Street in Windhoek, Namibia, prepared by Element Consulting Engineers for the U.S. Embassy. The investigation involved six test pits to analyze the existing road layers, materials, and structural condition, with laboratory testing of soil samples from different depths.
Key findings include: the road surface consists of a 50mm Cape Seal with crocodile cracks, underlain by a 150mm G6 base layer and 150mm G6 subbase layer, sitting on an in-situ G10 material roadbed. The recommended road rehabilitation involves removing the existing 150mm G5/G6 base layer and replacing it with a new 150mm G4 base layer, applying a 19mm Cape Seal surface treatment, repairing surface cracks and potholes, and reinstating the northern sidewalk. The project scope covers approximately 80-100 meters of road surface between Feld Street and Jan Jonker Avenue, with work focused on the area near the old American Embassy building. The investigation classifies the road as a Category C road with an expected traffic volume of 0.1-0.3 million standard axles.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A FIFTH DIMENSION TO ENGINEERING
EXISTING PAVEMENT
INVESTIGATION:
REINSTATEMENT
OF ROAD
SURFACE OF A
SECTION OF
LOSSEN STREET
FINAL REPORT
For:
Embassy of the United States of America –
Namibia
Representative:
Loubser Kotze Architects
21 Nachitigal Street, Windhoek
+264 61 237 162
February 2025
1 14 Lossen Street –Pavement Investigation
Signature Date
Compiled by:
Nelson Nehason
2025-02-06
Approved by:
Dirk Kotze
2025-02-06
Amendment History
Issue Date Amendment Section / Chapter / Page Issued By: (Initial)
Rev 0 06/02/2025 FINAL REPORT N.N
Rev 01 11/03/2025 FINAL REPORT N.N
Distribution Page
Copy No Name Distribution Address
PDF COPIES TO
2 14 Lossen Street –Pavement Investigation
Table of Contents
1. Introduction
2. Methodology
2.1 Site Investigation
3. Findings
3.1 Road Layer Composition
3.2 Road Profile
4. Technical Analysis
4.1 Road Layer Composition & Condition
5. Conclusion
6. Recommendation
Table of Figures
Figure 1: Locality Plan Figure 2: Test Pit Points Figure 3: Road Profile Figure 4: Rubicon Toolbox Pavement Analysis - Existing Road Layer Works Figure 5: Work Area Figure 6:TRH4:1996 Road Catalogue Contents (Moderate or Dry Regions) Figure 7: Rubicon Toolbox Pavement Analysis - New Road Layer Works
List of Tables
Table 1: Road Layer Composition Table 2: Test Pit 01 & 03 Layer Composition Table 3: Test Pit 05 & 06 Layer Composition Table 4: Aggregated Existing Road Layers Table 5: New Road Layer Works
3 14 Lossen Street –Pavement Investigation
1. Introduction
This report presents the findings of the road centerline investigation, focusing on the road layer works and profiling. The investigation aims to determine the existing road condition for the reinstatement of road surface of a section of Lossen street between Feld Street and Jan Jonker Avenue which will determine the scope of work to be carried-out. The section to be restated is illustrated below in the locality plan.
Figure 1: Locality Plan
4 14 Lossen Street –Pavement Investigation
2. Methodology
Omamanya Laboratory Services (Pty) Ltd was appointed by Element Consulting Engineers to carry out a centerline road investigation to determine the existing road layer thickness, materials type, and road indicators.
2.1 Site Investigation
A site inspection was conducted to observe the existing road condition and identity the testing pits for sampling and profiling. Six test pits points where selected.
Figure 2: Test Pit Points
5 14 Lossen Street –Pavement Investigation
3. Findings
3.1 Road Layer Composition
A site inspection was conducted to observe the existing road condition and identity the testing pits for sampling and profiling. Collected samples were analyzed to determine the composition and thickness of each road layer.
Existing road layers:
Test
Pit No
Testing
Depth (m)
Layer
Thickness
(m)
Layer Description Materials Description
0 - 50 50 Cape Seal Cape Seal
50 - 300 250 Imported Material Reddish Brown Silty Sandy Quartz Gravel
800 500 In-Situ Material Silty Sandy Decomposed Biotite Schist
(Fault Line)
0 - 20 20 Sand Sand
20 - 400 380 Imported Material Reddish Brown Silty Sandy Quartz Gravel
800 400 In-Situ Material Silty Sandy Decomposed Biotite Schist
(Fault Line)
0 - 50 50 Cape Seal Cape Seal
50 - 350 300 Imported Material Reddish Brown Silty Sandy Quartz Gravel
800 450 In-Situ Material Silty Sandy Decomposed Biotite Schist
(Fault Line)
0 - 25 25 Sand Sand
25 - 400 375 Imported Material Reddish Brown Silty Sandy Quartz Gravel
800 400 In-Situ Material Silty Sandy Decomposed Biotite Schist
(Fault Line)
0 - 50 50 Cape Seal Cape Seal
50 - 350 300 Imported Material Reddish Brown Silty Sandy Quartz Gravel
800 450 In-Situ Material Silty Sandy Decomposed Biotite Schist
(Fault Line)
0 - 50 50 Cape Seal Cape Seal
50 - 550 500 Imported Material Reddish Brown Silty Sandy Quartz Gravel
800 250 In-Situ Material Silty Sandy Decomposed Biotite Schist
(Fault Line)
Table 1: Road Layer Composition
6 14 Lossen Street –Pavement Investigation
3.2 Road Profile
A site inspection was conducted to observe the existing road condition and identity the testing pits for sampling and profiling. Collected samples were analyzed to determine the composition and thickness of each road layer.
Summary of the road profile:
01 02 03 04 05 06 S 4 S 4 S S
S 4 S 4 S S
S 5 S 4 S S
S 5 S 6 S S
S 5 S 6 S S
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
6 5 6 6 5 6
7 5 6 6 5 6
7 5 6 6 5 6
7 5 6 6 5 6
7 5 6 6 5 6
7 5 6 6 5 6
7 5 7 6 1 0 6
7 5 7 6 1 0 6
7 5 7 6 1 0 6
7 5 7 6 1 0 6
7 5 7 6 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 6
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
7 1 0 7 1 0 1 0 7
0.80 7 1 0 7 1 0 1 0 7 0.80
LAYERS
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.05
0.10
0.15
0.00
0.05
0.10
0.15
TEST PIT NO:
D
EP
TH
m
Test Pit Profiles
0.75
0.20
0.30
0.40
0.70
0.60
0.50
0.65
0.25
0.35
0.45
0.55
0.00
Legend: Seal G5 G7
SAND G6 G10 1 0
Figure 3: Road Profile
For laboratory analysis results refer to Annexure 01.
7 14 Lossen Street –Pavement Investigation
3.3 Data Aggregation for Existing Road Layers
There is no as-built data available to state the existing road layers. Therefore, the test pits results will dictate the existing road layers. Base on the road layer composition and road profile data, the test pits results are collected using the laboratory analysis results to determine the existing road layer works. Test
Pit 2 & 4 test results are not used because there was paving work done and the layers may have been reworked or reconstructed.
LAYER
DISCRIPTION
TEST PIT 01 TEST PIT 03
THICKNESS
(mm)
MATERIALS
LAB CLASSIFICATION
THICKNESS
(mm)
MATERIALS
LAB CLASSIFICATION
Road Surface 50 Cape Seal 50 Cape Seal
Base 250 G6 300 G6
Subbase
Roadbed (In-situ) 500 G7 450 G7
Table 2: Test Pit 01 & 03 Layer Composition
TEST PIT 05 TEST PIT 06
THICKNESS
(mm)
MATERIALS
LAB CLASSIFICATION
THICKNESS
(mm)
MATERIALS
LAB CLASSIFICATION
Road Surface 50 Cape Seal 50 Cape Seal
Base 300 G5 500 G6
Subbase
Roadbed (In-situ) 450 G10 250 G7
Table 3: Test Pit 05 & 06 Layer Composition
AGGREGATED TEST PITS RESULTS AGGREGATED EXISTING ROAD
LAYERS
AVERAGE
THICKNESS
(mm)
MATERIALS
LAB CLASSIFICATION
THICKNESS
(mm)
MATERIALS
LAB CLASSIFICATION
Road Surface 50 Cape Seal 50 Cape Seal
Base 338 G6
150 G6
Subbase 150 G6
Roadbed (In-situ) 412 G10 450 G10
Table 4: Aggregated Existing Road Layers
The existing road layer works are interpolated as follow:
• Road Surface: 50mm Cape Seal
• Base: 150mm G6 Material
• Subbase: 150mm G6 Material
• Roadbed (In-situ): G10 Material
Note: Lossen Street is classified as a Road Category D according to the “Technical Recommendations for
Highways” (TRH4: 1996) with a daily traffic of less than 500 vehicles.
8 14 Lossen Street –Pavement Investigation
4. Technical Analysis
4.1 Road Layer Composition & Condition
• Cape Seal: The existing cape seal surface layer shows crocodile cracks.
o Possible cause:
▪ Lack of maintenance
▪ Lack of Traffic flow for a period of time
• Imported Materials (Base Layer & Subbase Layer): This layer consists of imported silty sandy quartz gravel with a minimum CBR value of 46 and a maximum CBR value of 81 at 98% compaction. The materials are classified as G5 and G6 in different test pits. No irregularities have been observed indicate that the material has not deteriorated and the structural integrity has not been compromised.
• In-situ Materials (Roadbed): This layer is composed of silty sandy decomposed biotite schist, with a minimum CBR value of 7 and a maximum CBR value of 17 at 93% compaction. The materials are classified as G7 and G10 in different test pits. No irregularities have been observed indicate that the material has not deteriorated and the structural integrity has not been compromised
4.2 Existing Road Layer Works Analysis
A mechanistic design analysis of the existing road layer works was conducted with Rubicon design suite.
The results indicate the structural capacity of 0.1 million standard axles as illustrated in figure 4 below.
Figure 4: Rubicon Toolbox Pavement Analysis - Existing Road Layer Works
9 14 Lossen Street –Pavement Investigation
5. Conclusion
The road centerline investigation along the section of Lossen Street, has identified several key aspects to help reinstate the road surface. The key aspects are existing road structure, surface condition, materials and CBR values in road layers. Visually, no structural defects of the existing surfaced road could be observed. Test Pit 1 (which is more likely to be affected by water seepage), 3 and 6 where visually compare to look for any colour distortions in the layers but there is no difference compare to test pit 6 which is the least acceptable to water seepage. Therefore, no evidence indicating that the road opening has cause any damages to the material of the layerworks.
6. Recommendation
Based on the findings of the road centerline investigation, the following recommendations are proposed for the reinstatement of road surface of a section of Lossen Street.
The Work Area:
Figure 5: Work Area
10 14 Lossen Street –Pavement Investigation
• Cyan Area: Surface Rehabilitation
The existing cape seal surface layer with crocodile cracks and potholes should be repaired at least
4 weeks prior to final slurry layer application. Slurry application on the existing surface required to ensure a uniform surface between the new road surface indicated in red in Figure 5 and the existing surface.
• Red Area: New Base Layer.
150mm G5/G6 materials layer of the existing base layer will be removed and replaced with a new
150mm G4 materials layer in the area where the reinstatement of road surface is to occur as indicated in Figure 5.
• Magenta Area: Sidewalk
The sidewalk will be refurbished to ensure a uniform 2% slope towards the road. All existing obstruction to be removed.
New road layers:
LAYER LAYER
THICKNESS (mm)
& MATERIAL
MINIMUM
COMPACTION OF MOD
AASHTO DENSITY (%)
MINIMUM CBR AT
MINIMUM
COMPACTION
Road Surface
Treatment
19mm Cape Seal
Base 150mm G4 98 80
Subbase (Existing) G6/G5 - -
NO REWORK OR RECONSTRUCTION
Roadbed EXISTING LAYER
Table 5: New Road Layer Works
Note: The new road layer works classify the road section of Lossen Street as a Road Category C road according to TRH4: 1996. Recommended standard axles for Category C road is ES0.3 (0.1 - 0.3 million).
Figure 6:TRH4:1996 Road Catalogue Contents (Moderate or Dry Regions)
11 14 Lossen Street –Pavement Investigation
6.1 New Road Layer Works Analysis
A mechanistic design analysis of the new road layer works indicates the structural capacity of 0.3 million standard axles which is greater than 0.1 million standard axles for the existing road layer work. The new road layer has a higher structural capacity therefore, the 150mm G4 material base layer is sufficient.
Figure 7: Rubicon Toolbox Pavement Analysis - New Road Layer Works
6.2 Scope of Work
The complete scope of work is illustrated on the drawings in Annexture 02.
The work include the following items:
• Removal of existing concrete edge beam
• Construction of 150mm G4 Base Layer
• Cape Seal Surfacing
• Existing surface rehabilitation which includes fixing of potholes and crack seal, work area as indicated in Figure 5.
• Reinstatement of the northern sidewalk and kerb line: Pavement specifications refer to drawing number 24003_009 in Annexure 02.
• Drawing attached in Annexture 02 illustrates the extend of work to be carried out.
12 14 Lossen Street –Pavement Investigation
ANNEXURE 01
ROAD CENTERLINE LAB REPORT
ROAD CENTERLINE REPORT: 24003_009
LOSSEN STREET,
KHOMAS REGION: NAMIBIA
27 January 2025
PREPARED BY:
OMAMANYA GEOTECHNICAL CONSULTANTS
6 VAN DER BIJL STREET
NORTHERN INDUSTRIAL AREA, WINDHOEK
Tel: +264 61 24 5103/6 Fax: +264 61 24 5101 E-mail: admin@omamanya.go.na
PREPARED FOR:
Element Consulting Engineers PO Box 11598, Klein Windhoek Windhoek Mobile: +264 81 036 2121|Tel: +264 61 309 412 Email: peet@element.com.na mailto:peet@element.com.na
Ref: 2025\Element Consulting Engineers\160-8627 Loosen Street \Report 22-01-2025
Report review history:
Revisio n No
Date Prepared by: Reviewed by:
1 27/01/2025
W.J.Coetzee
BSc Hons Geology
D.McDonald Reg.Eng.Tech. (MD)
Authors & Reviewers Qualifications and Affiliations:
Dennis McDonald holds a national diploma in Civil Engineering and has been trained as a Civil Engineering Technician covering project management, civil and structural design, contracts management, survey, laboratory management, investigations and testing, geotechnical investigations and report writing. He has 48 years’ combined experience, with 22 years managing his own civil SANAS Accredited Engineering Laboratories and Geotechnical Consultancy in the Southern Cape and Eastern Cape of South Africa. Dennis McDonald is registered with the Engineering Council of South Africa (ECSA) as a Registered Engineering technician # 2000 400 58, the South African Institute of Civil Engineers (SAICE), the Institute of Municipal Engineers of South Africa (IMESA), SABITA and SAT.
Willem Coetzee holds a Hons B.Sc. Degree in Geology. He is currently undergoing in-service training as a Natural Scientist practicing Engineering Geology and Laboratory Management. He has 4 years of experience in Engineering Geology and 8 years working in a Civil Laboratory.
Declaration of Independence:
The authors of this report are independent professional consultants with no vested interest in the project, other than remuneration for work associated with the compilation of this report.
General limitations:
1. The investigation has been conducted in accordance with generally accepted engineering practice, and the opinions and conclusions expressed in the report are made in good faith based on the information at hand at the time of the investigation.
2. The contents of this report are valid as of the date of preparation. However, changes in the condition of the site can occur over time as a result or either natural processes or human activity. In addition, advancements in the practice of geotechnical engineering and changes in applicable practice codes may affect the validity of this report. Consequently, this report should not be relied upon after an eclipsed period of one year without a review by this firm for verification of validity. This warranty is in lieu of all other warranties, either expressed or implied.
3. Unless otherwise stated, the investigation did not include any specialist studies, including but not limited to the evaluation or assessment of any potential environmental hazards or groundwater contamination that may be present.
4. The investigation is conducted within the constraints of the budget and time and therefore limited information was available.
Although the confidence in the information is reasonably high, some variation in the geotechnical conditions should be expected during and after construction. The nature and extent of variations across the site may not become evident until construction. If variations then become apparent this could affect the proposed project, and it may be necessary to re-evaluate recommendations in this report. Therefore, it is recommended that Omamanya Laboratory Services and Geotechnical Consultants is retained to provide specialist geotechnical engineering services during construction in order to observe compliance with the design concepts, specifications and recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to the start of construction. Any significant deviation from the expected geotechnical conditions should be brought to the author’s attention for further investigation.
5. The assessment and interpretation of the geotechnical information and the design of structures and services and the management of risk is the responsibility of the appointed engineer.
Table of Contents
1. Introduction
2. Centerline Investigation
2.1. Test Pit 01
2.2. Test Pit 02
2.3. Test Pit 03
2.4. Test Pit 04
2.5. Test Pit 05
2.6. Test Pit 6
3. Conclusions
4. References
Table 1: TP01 Sample Depth, CBR and Classification
Table 2: TP01 Grading & Atterberg Results
Table 3: TP02 Sample Depth, CBR and Classification
Table 4: TP02 Grading & Atterberg Results
Table 5: TP03 Sample Depth, CBR and Classification
Table 6: TP03 Grading & Atterberg Results
Table 7: TP04 Sample Depth, CBR and Classification
Table 8: TP04 Grading & Atterberg Results
Table 9: TP05 Sample Depth, CBR and Classification
Table 10: TP05 Grading & Atterberg Results
Table 11: TP06 Sample Depth, CBR and Classification
Table 12: TP06 Grading & Atterberg Results
Figure 1: Centerline Test Pit Positions
Appendix 1 Laboratory Results & Profiles
Appendix 2 Laboratory Results & Profiles
Appendix 3 Laboratory Results & Profiles
Appendix 4 Laboratory Results & Profiles
Appendix 5 Laboratory Results & Profiles Appendix 6 Laboratory Results & Profiles
Revision 1 27/01/2025 Tabel 11 & 12 first layer depth corrected from 190 to 50 mm
1. Introduction Omamanya Laboratory Services (Pty) Ltd was appointed by Element Consulting Engineers on the
5th of December 2024 to carry out a centreline road investigation on Lossen Street) in Windhoek
Municipal Area, Khomas Region. The site investigation was done on the 9th and 10th of December
2024 of 6 (Six) test holes to a maximum depth of 800mm. (Refer to Figure 1).
Sampling of each layer (Imported and In Situ) for every test pit was done and tested for the material quality classification. The depths of the layer works were determined and measured on distinct compaction interfaces, if possible distinction was visible, or material changes (most of the compaction interfaces was difficult to determine).
Figure 1: Centerline Test Pit Positions
2. Centerline Investigation Centerline Investigation on this report will indicate the layer thickness, material type and summary of results.
2.1. Test Pit 01
Results for Test Pit 1 is summarized in Table 1 & Table 2. Results can be found in Appendix 1
Table 1: TP01 Sample Depth, CBR and Classification
Table 2: TP01 Grading & Atterberg Results
2.2. Test Pit 02
Results for Test Pit 2 is summarized in Table 3 & Table 4. Results can be found in Appendix 2
Table 3: TP02 Sample Depth, CBR and Classification
O M
C
M D
D
S W
E
LL
0%
TP01 0 - 50 50 Seal Seal
12520 50 - 300 250 Imported Reddish Brown Silty Sandy Quartz Gravel
10.6 1886 0 78 56 34 24 14 G6
12521 300 - 800 500 In-Situ Silty Sandy Decomposed Biotite Schist (Fault Line)
5.1 2228 0.1 50 37 23 17 11 G7
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
A
N D
L O
C A
TI
N
S A
M P
LE
N
O
La ye r Th ic kn es s
Material Description
Modified CBR
LA
B
C la ss ifi ca tio n
La ye r Ty pe
D ep th (m m
75 63 53 37 .5
.5
.0
.2
4.
75 2.
0.
0.
P as si ng
.0 re ta in ed
.0
P as si ng
.2 re ta in ed
.1
P as si ng
.1 re ta in ed
.0
LL
P I (
0.
5)
LS G
M
TP01 50
12520 250 100 100 96 94 91 88 82 69 54 36 9.9 33.6 47.9 18.5 30 2 1 2.01
12521 500 96 96 92 87 83 77 71 57 46 36 11 22.1 54 23.9 25 7 3 2.07
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
A
N D
L O
C A
TI
M P
LE
N
O
La ye r Th ic kn es s Sieve Analysis (% Passing) mm Soil Mortar Atterberg
O M
C
M D
D
S W
E
LL
0%
TP02 0 - 20 20 Sand Sand
12522 20 - 400 380 Imported Reddish Brown Silty Sandy Quartz Gravel
4.8 2242 0 98 72 45 33 21 G5
12523 400 - 800 400 In-Situ Silty Sandy Decomposed Biotite Schist (Fault Line)
9.4 2004 0.1 30 20 11 7 4 G10
Material Description
Modified CBR
LA
B C la ss ifi ca tio n
TR
H
La ye r Th ic kn es s
La ye r Ty pe
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
. A
D
LO
A
TI
M P
LE
N
O
D ep th (m m
Table 4: TP02 Grading & Atterberg Results
2.3. Test Pit 03
Results for Test Pit 3 is summarized in Table 5 & Table 6. Results can be found in Appendix 3
Table 5: TP03 Sample Depth, CBR and Classification
Table 6: TP03 Grading & Atterberg Results
75 63 53 37 .5
.5
.0
.2
4.
2.
0.
0.
P as si ng
.0 re ta in ed
.0
P as si ng
.2 re ta in ed
.1
P as si ng
.1 re ta in ed
.0
LL
P I (
0.
5)
LS G
M
TP02 20
12522 380 100 100 89 88 83 78 68 52 42 32 11.9 24.3 47.6 28.1 19 5 2.5 2.14
12523 400 100 100 100 98 96 91 83 61 44 29 11.3 34.2 39.9 25.9 29 5 2.5 2.16
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S T
P
IT
R E
F . A
A
TI
M P
LE
N
O
La ye r Th ic kn es s
Sieve Analysis (% Passing) mm Soil Mortar Atterberg
O M
C
M D
D
S W
E
LL
0%
TP03 0 - 50 50 Seal Seal
12524 300 - 350 300 Imported Reddish Brown Silty Sandy Quartz Gravel
4.7 2239 0.1 64 46 28 21 13 G6
12525 350 - 800 450 In-Situ Silty Sandy Decomposed Biotite Schist (Fault Line)
8.4 1878 0 37 29 20 16 11 G7
Material Description
Modified CBR
LA
B
C la ss ifi ca tio n
TR
H
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
. A
A
TI
M P
LE
N
O
D ep th (m m
La ye r Ty pe
La ye r Th ic kn es s
75 63 53 37 .5
.5
.0
.2
4.
2.
0.
0.
P as si ng
.0 re ta in ed
.0
P as si ng
.2 re ta in ed
.1
P as si ng
.1 re ta in ed
.0
LL
P I (
0.
5)
LS G
M
TP03 50
12524 300 100 100 100 95 92 84 70 49 39 31 13.1 19.9 46.7 33.4 20 5 2.5 2.16
12525 450 100 100 100 100 99 96 89 70 55 39 15.7 29.6 42.1 28.3 30 6 3 1.9
Sieve Analysis (% Passing) mm Soil Mortar
TE
S
T P
IT
R
E F
. A
A
TI
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street Atterberg
S A
M P
LE
N
O
La ye r Th ic kn es s
2.4. Test Pit 04
Results for Test Pit 4 is summarized in Table 7 & Table 8. Results can be found in Appendix 4
Table 7: TP04 Sample Depth, CBR and Classification
Table 8: TP04 Grading & Atterberg Results
2.5. Test Pit 05
Results for Test Pit 5 is summarized in Table 9, & Table 10. Results can be found in Appendix 5
Table 9: TP05 Sample Depth, CBR and Classification
M
C
M D
D
S W
E
LL
0%
TP04 0 - 25 25 Sand Sand
12526 25 - 400 375 Imported Reddish Brown Silty Sandy Quartz Gravel
4.9 2230 0 93 67 41 30 18 G6
12527 400 - 800 400 In-Situ Silty Sandy Decomposed Biotite Schist (Fault Line)
8.5 1918 0 11 9 8 7 6 G10
TE
S
T P
IT
R
E F
. A
A
TI
M P
LE
N
O
D ep th (m m
La ye r Th ic kn es s
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
La ye r Ty pe
Material Description
Modified CBR
LA
B
C la ss ifi ca tio n
TR
H
75 63 53 37 .5
.5
.0
.2
4.
2.
0.
0.
P as si ng
.0 re ta in ed
.0
P as si ng
.2 re ta in ed
.1
P as si ng
.1 re ta in ed
.0
LL
P I (
0.
5)
LS G
M
TP04 25
12526 375 95 90 90 89 84 78 70 54 45 35 13.2 23 47.9 29.1 23 6 3 2.07
12527 400 100 100 100 97 97 96 92 78 58 34 12.1 40.6 38.5 21 31 6 3.5 1.96
TE
S
T P
IT
R
E F
. A
A
TI
M P
LE
N
O
La ye r Th ic kn es s
Sieve Analysis (% Passing) mm Soil Mortar Atterberg CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
O M
C
M D
D
S W
E
LL
0%
TP05 0 - 50 50 Seal Seal
12528 50 - 350 300 Imported Reddish Brown Silty Sandy Quartz Gravel
4.5 2271 0.1 112 81 50 37 23 G5
12529 350 - 800 450 In-Situ Silty Sandy Decomposed Biotite Schist (Fault Line)
7.9 1822 0.1 30 22 13 9 6 G10
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
. A
A
TI
M P
LE
N
O
D ep th (m m
La ye r Th ic kn es s
La ye r Ty pe
Material Description
Modified CBR
LA
B C la ss ifi ca tio n
TR
H
Table 10: TP05 Grading & Atterberg Results
2.6. Test Pit 6
Results for Test Pit 6 is summarized in Table 14, Table 15 & Table 16. Results can be found in
Appendix 6
Table 11: TP06 Sample Depth, CBR and Classification
Table 12: TP06 Grading & Atterberg Results
75 63 53 37 .5
.5
.0
.2
4.
2.
0.
0.
P as si ng
.0 re ta in ed
.0
P as si ng
.2 re ta in ed
.1
P as si ng
.1 re ta in ed
.0
LL
P I (
0.
5)
LS G
M
TP05 50
12528 300 100 97 91 88 82 72 64 44 34 27 11.3 22.2 44.9 32.9 21 6 3 2.28
12529 450 100 100 100 100 100 99 95 83 65 37 11 43.3 39.9 16.8 28 4 2 1.87
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S T
P
IT
R E
F . A
A
TI
M P
LE
N
O
La ye r Th ic kn es s
Sieve Analysis (% Passing) mm Soil Mortar Atterberg
O M
C
M D
D
S W
E
LL
0%
TP06 0 - 50 50 Seal Seal
12530 50 - 550 500 Imported Reddish Brown Silty Sandy Quartz Gravel
4.5 2267 0.1 95 68 41 30 18 G6
12531 550 - 800 250 In-Situ Silty Sandy Decomposed Biotite Schist (Fault Line)
5.8 1957 0 31 26 19 16 12 G7
La ye r Th ic kn es s
La ye r Ty pe
Material Description
Modified CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
. A
A
TI
M P
LE
N
O
D ep th (m m
CBR
LA
B
C la ss ifi ca tio n
TR
H
75 63 53 37 .5
.5
.0
.2
4.
2.
0.
0.
P as si ng
.0 re ta in ed
0.
P as si ng
.2 re ta
P as si ng
.1 re ta
LL
P I (
0.
5)
LS G
M
TP06 50
12530 500 100 100 97 94 86 82 73 53 43 35 15.4 17.9 46.4 35.7 21 7 3 2.06
12531 250 100 95 91 87 83 79 72 60 45 24 13.1 45.5 25.2 29.2 29 6 3 2.18
CENTRE LINE MATERIAL TET RESULTS: 160-8627: Lossen Street
TE
S
T P
IT
R
E F
. A
A
TI
M P
LE
N
O
La ye r Th ic kn es s
Sieve Analysis (% Passing) mm Soil Mortar Atterberg
3. Conclusions Compaction tests and representative samples from the test pits were collected for
Mod/CBR/Road Indicator tests for the individual layer works (SANS3001: Methods GR1, GR10, GR11, GR20, GR30, GR40 & TMH5:ST5) in order to determine the characteristics and quality of the base course, subbase and selected subgrade materials as classified according to the COLTO classification system.
4. References RA Materials Manual 1st Edition October 2014
Investigation Code of Practice, s.l.: South African Institution of Civil Engineering - Geotechnical
Division.
Paige-Green, P. & Du Plessis, L., 2009. The Use and Interpretation of the Dynamic Cone
Penetrometer (DCP) Test. CSIR Built Environment Pretoria.
Appendix 1
Test Pit 01
Laboratory Results, Field
Results & Profiles
Ref. DATE:
Client
Attention:
TMH5:MC1
ENVIRONMENTAL CONDITION
0 - 50
50 - 300 12520
300 - 800 12521
09-Dec-24 1/1 End Rev-01 OMA-PRO-001
DESCRIPTION SAMPLE No.
Profile done on the observation on site
Slightly Moist, Black, Medium Dense, Intact, Cape Seal. (Crocodile Cracks)
Slightly Moist, Reddish Brown, Medium Dense, Intact, Silty Sandy Quartz Gravel. Imported
Slightly Moist, Off White to Light Brown, Dense, Intact, Silty Sandy Decomposed Biotite Schist.
In-Situ. (Calsification of Schist, Fault line)
Note: Possible layering in Top Base sample but not definate.
Test Pit Photo
DEPTH
(mm)
Element Consulting Engineers
Klein Windhoek
Namibia
Nelson Nehason
Project:
Site / Road:
Stake Value:
Test Hole No:
Side Walls
24003_009 Lossen Street: Klein
Windhoek
Lossen Street
TP01
TP01
Stable
OMAMANYA GEOTECHNICAL CONSULTANTS
160-8627 E-mail: admin@omamanya.go.na
Fax: +264 61 24 5101
Tel: +264 61 24 5103
NORTHERN INDUSTRIA, WINDHOEK
6 VAN DER BIJL STREET
09 December 2024
Hot,Clear,No Rain, Calm
6 Otto - Nitzche Street
SOIL PROFILE
Sampling Method:
PROFILE
Hand Dug
None
None
Test Position Supplied
Excavation Method
Refusal
Water table
GPS Co - ordinates
Erosion Found
R-CBR-1-9 18 Sept 23
1.20 -
P
Specimens sampled by Omamanya Lab according to sampling Plan TMH 5 Methods MB1 & MC1
∙ Specimens sampled by : Arno Styn
∙ The weather conditions are such that there is no detrimental effect on the sample taken.
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
5.
6.
A-1-b / A-2-4AASTHO System
Insitu Moisture Content (%)
C B
R
@ 93%
@ 95%
12520
M ou ld
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or any erroneous conclusions drawn therefrom or for any consequence thereof.
3.
The Opinion column is an interpretation of the direct comparison between the quoted specification and the single test sample results obtained. The complaint (✓) non-complaint (×) and uncertain (🞵) opinion indicators are based on an estimation of approximate 95% level of confidence with reference to SAMM GUIDANCE 1, Issue 2 : 20 June 2017 with reference to ISO 17025:2005 (E) Items 5.4.6.2 & 5.10.3.1 (c) 4.
For Omamanya Laboratory Services (Pty) Ltd
Technical Signatory W.J. Coetzee
Unified System SP-SM
G6 Subbase Soil Classification Achieved By The Material
@ 90%
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Max Dry Density (kg/m3)
Opt Moisture Content (%)
M
1.0
10.6
Linear Shrinkage (%)
Mould Moisture Con. (%) 10.8
Swell (%)
Swell (%)
M
MDD Mould A
@ 98%
@ 100%
Mould B
0.02
Mould C
Swell (%)
94.3
0.04
Customer:
28/11/2024
Element Consulting Engineers (Pty) Ltd
Attention: Nelson Nehason No. of Pages:
Lossen Street, Luxury Hill - Windhoek 6 Otto Nitche Street Date Received:
Project:
21/01/2025Klein Windhoek Date Reported:
Namibia Req. Number: 160-8627
1/1
TEST REPORT
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
Grading Modulus*
18.5 47.9
Coarse Sand* <2.0 >0.425
9.9 0.425mm
2.01 33.6
TRH 14
14.0mm
37.5mm
G6 Subbase
TP01
12520
CALIFORNIA BEARING RATIO - (SANS 3001 Method GR1,GR10,GR11,GR20,GR30,GR40,PR5*)
Sample Position (SV) Depth (mm)
M at er ia ls cr ip tio n
50-300 12520Sample No.:
Source Colour
InsituClassification
Material Indicators
Silty Sandy Quartz Gravel
TRH 14
Insitu
O pi ni on
Reddish Brown
28.0mm
Fine Sand* <0.425 >0.075
Plasticity Index (%)
P er ce nt ag e
P as si ng
Liquid Limit (%)
50.0mm
75.0mm
0.075mm
20.0mm
Max. Stone size in hole (mm)
Methods indicated with * do not form part of Omamanya Laboratory Services (Pty) Ltd.'s accreditation schedule of SADCAS.
Opinions and interpretations does not form part of of Omamanya Laboratory Services (Pty) Ltd's accreditation schedule of SADCAS
No deviation
Soil Type
63.0mm
90.8
0.08
CBR / Density Relationship
5.00mm
Soil Mortar & Constants
2.00mm
100.0
1.0
Silt and Clay* <0.075
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
90 92 94 96 98 100 102
C B
R
Compaction (%)
CBR Chart
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
0 2
C B
R
Compaction (%)
CBR Chart
0 4 8 12 16 20 24 28 32 36 40 44 48
Sh ri nk ag e P ro du ct (S p)
Grading Coefficient (Gc)
Wearing Course Graph (TRH 20)
Slippery
Erodible
Materials
Good
(May be Dusty)
Good
Ravels
Ravels and Corrugates
Managing Director: D C F McDonald END OF REPORT
0.75 -
∙ The weather conditions are such that there is no detrimental effect on the sample taken.
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
5.
6.
Methods indicated with * do not form part of Omamanya Laboratory Services (Pty) Ltd.'s accreditation schedule of SADCAS.
Opinions and interpretations does not form part of of Omamanya Laboratory Services (Pty) Ltd's accreditation schedule of SADCAS
No deviation
Soil Type
63.0mm
93.6
0.14
CBR / Density Relationship
5.00mm
Soil Mortar & Constants
2.00mm
100.0
3.0
Silt and Clay* <0.075
Max. Stone size in hole (mm)
28.0mm
Fine Sand* <0.425 >0.075
Plasticity Index (%)
P er ce nt ag e
P as si ng
Liquid Limit (%)
50.0mm
75.0mm
0.075mm
20.0mm
Insitu
O pi ni on
Off-white To Light Brown
12521 CALIFORNIA BEARING RATIO - (SANS 3001 Method GR1,GR10,GR11,GR20,GR30,GR40,PR5*)
Sample Position (SV) Depth (mm)
M at er cr ip tio n
300-800 12521Sample No.:
Source Colour
InsituClassification
Material Indicators
Silty Sandy Decom. Biotite Schist
TRH 14
TEST REPORT
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
23.9 54.0
Coarse Sand* <2.0 >0.425
11.0 0.425mm
2.07 22.1
TRH 14
14.0mm
37.5mm
G7 SSG
TP01
Customer:
28/11/2024
Element Consulting Engineers (Pty) Ltd
Attention: Nelson Nehason No. of Pages:
Lossen Street, Luxury Hill - Windhoek 6 Otto Nitche Street Date Received:
Project:
21/01/2025Klein Windhoek Date Reported:
Namibia Req. Number: 160-8627
1/1
Swell (%)
Swell (%)
M
@ 100%
Mould B
0.06
Mould C
Swell (%)
97.3
0.08
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Max Dry Density (kg/m3)
Opt Moisture Content (%)
M
1.5
5.1
Mould Moisture Con. (%) 5.2
12521
M
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or
3.
The Opinion column is an interpretation of the direct comparison between the quoted specification and the single test sample results obtained. The complaint (✓) non-complaint (×) and uncertain (🞵) opinion indicators are based on an estimation of approximate 95% level of confidence with reference to SAMM GUIDANCE 1, Issue 2 : 20 June 2017 with reference to ISO 17025:2005 (E) Items 5.4.6.2 & 5.10.3.1 (c) 4.
For Omamanya Laboratory Services (Pty) Ltd
Technical Signatory
Unified System SP-SC
G7 SSG
@ 90%
A-2-4AASTHO System
Insitu Moisture Content (%)
C B
R
@ 93%
@ 95%
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
92 94 96 98 100 102
C B
R
Compaction (%)
CBR Chart
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
0 2
C B
R
Compaction (%)
CBR Chart
0 4 8 12 16 20 24 28 32 36 40 44 48
Sh ri nk ag e P ro du ct (S p)
Grading Coefficient (Gc)
Wearing Course Graph (TRH 20)
Slippery
Erodible
Materials
Good
(May be Dusty)
Good
Ravels
R-DCP-1-8 05 Mar 24
1 of 1 of
∙ Bearing Capacity (kPa) is calculated according 3426.8xDN-1.0101
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
THE USE AND INTERPRETATION OF THE DYNAMIC CONE PENETROMETER (DCP) TEST P Paige-Green and L Du Plessis (2009)
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
Project:
Technical Signatory For Omamanya Laboratory Services (Pty) Ltd
DYNAMIC CONE PENETROMETER (DCP) - (TMH 6 Method ST6) TP 01Position: Datum Level: Top of Surface
Attention: Nelson Nehason No. of Test:
W.J.CoetzeeStandard TPA - DCP/CBR/Bearing Pressure relationship graph used. The engineer is responsible for acceptance of this graph relationship.
No. of Pages:
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Customer:
09-12-24 Element Consulting Engineers
Namibia Req. Number: 160-8627 11-12-24Klein Windhoek Date Reported:
Lossen Street 6 Otto - Nitzche Street Date Received:
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
3.
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or any erroneous conclusions drawn therefrom or for any consequence thereof.
-400
-350
-300
-250
-200
-150
-100
-50
0 40 80 120 160 200 240 280 320 360 400 440 480 520 560
D ep th (m m
Bearing Pressure (kPa)
-400
-350
-300
-250
-200
-150
-100
-50
D ep th (m m
CBR (%)
-400
-350
-300
-250
-200
-150
-100
-50
0 10
D ep th (m m mm/Blow
1 of 2 of
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
6 No. of Pages:
DYNAMIC CONE PENETROMETER (DCP) - (TMH 6 Method ST6) Position: TP 01 Datum Level: Top of Surface
160-8627 Attention: Nelson Nehason No. of Test:
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Customer:
Element Consulting Engineers Project: Lossen Street 6 Otto - Nitzche Street Date Received: 09-12-24 Klein Windhoek Date Reported: 11-12-24 Namibia Req. Number:
Technical Signatory For Omamanya Laboratory Services (Pty) Ltd
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
50 0 0 0
DCP
Number
(DN)
(mm/blow)
In Situ
CBR
(TMH 6)
Bearing Pressure
(kPa)
Depth (mm)
Number of Blows
75 5 55 ›500
Bearing Pressure
(kPa)
Number of Blows
85 2 110 ›500 100 3 110 ›500
120 1 110
Depth (mm)
DCP
Number
(DN)
(mm/blow)
In Situ
CBR
(TMH 6)
110 2 110 ›500 115 1 110 ›500
235 2 110 ›500
205 3 110 ›500 215 2
155 3 110 ›500 170 3 110 ›500
135 1 110 ›500 140 1 110 ›500
260 1 110 ›500 270 2 110 ›500
250 1 110 ›500
›500 130 2 110 ›500
225 2 110 ›500 110 ›500
185 3 110 ›500 190 1 110 ›500
1 110 ›500
240 1 110 ›500 245 1 110 ›500
340 5 55 ›500 355 3 110 ›500
305 3 110 ›500 315 2 110 ›500
280 2 110 ›500 290 2 110 ›500
390 2 110 ›500 390 0 110 Refusal
360 1 110 ›500 380 4 75 ›500
355175
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
3.
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or any erroneous conclusions drawn therefrom or for any consequence thereof.
Standard TPA - DCP/CBR/Bearing Pressure relationship graph used. The engineer is responsible for acceptance of this graph relationship.
W.J.Coetzee
Appendix 2
Test Pit 02
Attention:
TMH5:MC1
ENVIRONMENTAL CONDITION
0 - 20
20 - 400 12522
400 - 800 12523
09-Dec-24 1/1 End Rev-01 OMA-PRO-001
Slightly moist, Light Brown, Loose, Sandy Silty. (Bedding Material)
Slightly moist, Light Reddish Brown, Medium dense, Intact, Silty Sandy With Quartz.
Slightly Moist, Off White to Light Brown, Dense, Intact, Silty Sandy Decomposed Biotite Schist.
In-Situ. (Calsification of Schist, Fault line)
Notes: Possible layering occuring In Top Base material but not definate.
Test Pit Photo
DEPTH
(mm)
Element Consulting Engineers
Klein Windhoek
Namibia
Nelson Nehason
Project:
Site / Road:
Stake Value:
Test Hole No:
Side Walls
24003_009 Lossen Street Klein
Windhoek
Lossen Street Windhoek
TP02
TP02
Stable
OMAMANYA GEOTECHNICAL CONSULTANTS
160-8627 E-mail: admin@omamanya.go.na
Fax: +264 61 24 5101
Tel: +264 61 24 5103
NORTHERN INDUSTRIA, WINDHOEK
6 VAN DER BIJL STREET
09 December 2024
Hot,Clear,No Rain,Calm
6 Otto - Nitzche Street
SOIL PROFILE
Sampling Method:
PROFILE
Hand Dug
None
None
Test position supplied
Excavation Method
Refusal
Water table
Erosion Area
1.50 -
P
∙ The weather conditions are such that there is no detrimental effect on the sample taken.
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
Insitu Moisture Content (%)
C B
R
@ 93%
12522
M
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or
3.
The Opinion column is an interpretation of the direct comparison between the quoted specification and the single test sample results obtained. The complaint (✓) non-complaint (×) and uncertain (🞵) opinion indicators are based on an estimation of approximate 95% level of confidence with reference to SAMM GUIDANCE 1, Issue 2 : 20 June 2017 with reference to ISO 17025:2005 (E) Items 5.4.6.2 & 5.10.3.1 (c) 4.
For Omamanya Laboratory Services (Pty) Ltd
Technical Signatory
Unified System
G5 Subbase
@ 90%
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Max Dry Density (kg/m3)
Opt Moisture Content (%)
M
0.5
4.8
Linear Shrinkage (%)
Mould Moisture Con. (%) 4.8
Swell (%)
Swell (%)
M
@ 100%
Mould B
0.00
Mould C
Swell (%)
96.6
0.00
Customer:
28/11/2024
Element Consulting Engineers (Pty) Ltd
Attention: Nelson Nehason No. of Pages:
Lossen Street, Luxury Hill - Windhoek 6 Otto Nitche Street Date Received:
Project:
21/01/2025Klein Windhoek Date Reported:
Namibia Req. Number: 160-8627
1/1
TEST REPORT
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
Grading Modulus*
28.1 47.6
Coarse Sand* <2.0 >0.425
11.9 0.425mm
2.14 24.3
TRH 14
14.0mm
37.5mm
G5 Subbase
TP02
12522
CALIFORNIA BEARING RATIO - (SANS 3001 Method GR1,GR10,GR11,GR20,GR30,GR40,PR5*)
Sample Position (SV) Depth (mm)
M at er cr ip tio n
20-400 12522Sample No.:
Source Colour
InsituClassification
Material Indicators
Silty Sandy Quartz Gravel
TRH 14
Insitu
O pi ni on
Reddish Brown
28.0mm
Fine Sand* <0.425 >0.075
Plasticity Index (%)
P er ce nt ag e
P as si ng
Liquid Limit (%)
50.0mm
75.0mm
0.075mm
20.0mm
Max. Stone size in hole (mm)
Methods indicated with * do not form part of Omamanya Laboratory Services (Pty) Ltd.'s accreditation schedule of SADCAS.
Opinions and interpretations does not form part of of Omamanya Laboratory Services (Pty) Ltd's accreditation schedule of SADCAS
No deviation
Soil Type
63.0mm
92.6
0.00
CBR / Density Relationship
5.00mm
Soil Mortar & Constants
2.00mm
100.0
2.5
Silt and Clay* <0.075
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
92 94 96 98 100 102
C B
R
Compaction (%)
CBR Chart
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
0 2
C B
R
Compaction (%)
CBR Chart
0 4 8 12 16 20 24 28 32 36 40 44 48
Sh ri nk ag e P ro du ct (S p)
Grading Coefficient (Gc)
Wearing Course Graph (TRH 20)
Slippery
Erodible
Materials
Good
(May be Dusty)
Good
Ravels
∙ The weather conditions are such that there is no detrimental effect on the sample taken.
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
5.
6.
Methods indicated with * do not form part of Omamanya Laboratory Services (Pty) Ltd.'s accreditation schedule of SADCAS.
Opinions and interpretations does not form part of of Omamanya Laboratory Services (Pty) Ltd's accreditation schedule of SADCAS
No deviation
Soil Type
63.0mm
90.3
0.12
CBR / Density Relationship
5.00mm
Soil Mortar & Constants
2.00mm
100.0
2.5
Silt and Clay* <0.075
Max. Stone size in hole (mm)
28.0mm
Fine Sand* <0.425 >0.075
Plasticity Index (%)
P er ce nt ag e
P as si ng
Liquid Limit (%)
50.0mm
75.0mm
0.075mm
20.0mm
Insitu
O pi ni on
Reddish Brown & Off-white Light Brown
12523 CALIFORNIA BEARING RATIO - (SANS 3001 Method GR1,GR10,GR11,GR20,GR30,GR40,PR5*)
Sample Position (SV) Depth (mm)
M at er cr ip tio n
400-800 12523Sample No.:
Source Colour
InsituClassification
Material Indicators
Silty Sandy Decom. Biotic Schist
TRH 14
TEST REPORT
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
25.9 39.9
Coarse Sand* <2.0 >0.425
11.3 0.425mm
2.16 34.2
TRH 14
14.0mm
37.5mm
G10 Subgrade
TP02
Customer:
28/11/2024
Element Consulting Engineers (Pty) Ltd
Attention: Nelson Nehason No. of Pages:
Lossen Street, Luxury Hill - Windhoek 6 Otto Nitche Street Date Received:
Project:
21/01/2025Klein Windhoek Date Reported:
Namibia Req. Number: 160-8627
1/1
Swell (%)
Swell (%)
M
@ 100%
Mould B
0.06
Mould C
Swell (%)
94.4
0.09
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Max Dry Density (kg/m3)
Opt Moisture Content (%)
M
9.4
Mould Moisture Con. (%) 9.3
12523
M
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or
3.
The Opinion column is an interpretation of the direct comparison between the quoted specification and the single test sample results obtained. The complaint (✓) non-complaint (×) and uncertain (🞵) opinion indicators are based on an estimation of approximate 95% level of confidence with reference to SAMM GUIDANCE 1, Issue 2 : 20 June 2017 with reference to ISO 17025:2005 (E) Items 5.4.6.2 & 5.10.3.1 (c) 4.
For Omamanya Laboratory Services (Pty) Ltd
Technical Signatory W.J. Coetzee
G10 Subgrade
Insitu Moisture Content (%)
C B
R
@ 93%
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
88 90 92 94 96 98 100 102
C B
R
Compaction (%)
CBR Chart
0.0 0.1 1.0 10.0 100.0
P er ce nt ag e
P as si ng
Sieve Size
Sieve Analysis
0 2
C B
R
Compaction (%)
CBR Chart
0 4 8 12 16 20 24 28 32 36 40 44 48
Sh ri nk ag e P ro du ct (S p)
Grading Coefficient (Gc)
Wearing Course Graph (TRH 20)
Slippery
Erodible
Materials
Good
(May be Dusty)
Good
Ravels
2 of 1 of
∙ Bearing Capacity (kPa) is calculated according 3426.8xDN-1.0101
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
THE USE AND INTERPRETATION OF THE DYNAMIC CONE PENETROMETER (DCP) TEST P Paige-Green and L Du Plessis (2009)
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
Project:
Technical Signatory For Omamanya Laboratory Services (Pty) Ltd
DYNAMIC CONE PENETROMETER (DCP) - (TMH 6 Method ST6) TP 02Position: Datum Level: Top of Surface
Attention: Nelson Nehason No. of Test:
W.J.CoetzeeStandard TPA - DCP/CBR/Bearing Pressure relationship graph used. The engineer is responsible for acceptance of this graph relationship.
No. of Pages:
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Customer:
09-12-24 Element Consulting Engineers
Namibia Req. Number: 160-8627 11-12-24Klein Windhoek Date Reported:
Lossen Street 6 Otto - Nitzche Street Date Received:
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or any erroneous conclusions drawn therefrom or for any consequence thereof.
-70
-60
-50
-40
-30
-20
-10
0 40 80 120 160 200 240 280 320 360 400 440 480 520 560
D ep th (m m
Bearing Pressure (kPa)
-70
-60
-50
-40
-30
-20
-10
D ep th (m m
CBR (%)
-70
-60
-50
-40
-30
-20
-10
0 10
D ep th (m m
2 of 2 of
Copyright © 2014 Omamanya Laboratory Services (Pty) Ltd All Rights Reserved 1.
2.
6 No. of Pages:
DYNAMIC CONE PENETROMETER (DCP) - (TMH 6 Method ST6) Position: TP 02 Datum Level: Top of Surface
160-8627 Attention: Nelson Nehason No. of Test:
Omamanya Laboratory Services (Pty) Ltd Geotechnical Consultants & Laboratory Services
Reg No.: 2007/0158
6 Van Der Bijl Street Windhoek Namibia | Tel: +264 61 245 103/6 | Fax: +264 61 245 101 | E-mail: admin@omamanya.go.na
Customer:
Element Consulting Engineers Project: Lossen Street 6 Otto - Nitzche Street Date Received: 09-12-24 Klein Windhoek Date Reported: 11-12-24 Namibia Req. Number:
Technical Signatory For Omamanya Laboratory Services (Pty) Ltd
This report (with attachments) is the correct record of all measurements made, and may not be reproduced other than with full written approval from the Members of Omamanya Laboratory Services (Pty) Ltd.
0 0 0
DCP
Number
(DN)
(mm/blow)
In Situ
CBR
(TMH 6)
Bearing Pressure
(kPa)
Depth (mm)
Number of Blows
30 6 45 ›500
Bearing Pressure
(kPa)
Number of Blows
40 2 110 ›500 50 2 110 ›500
70 0 110
Depth (mm)
DCP
Number
(DN)
(mm/blow)
In Situ
CBR
(TMH 6)
60 2 110 ›500 70 2 110 ›500
Refusal
355175
Measuring Equipment, traceable to National Standards is used where applicable. Results reported in this Test Report relate only to the items tested and are an indication only of the sample provided and / or taken.
3.
While every care is taken to ensure the correctness of all tests and reports, neither Omamanya Laboratory Services (Pty) Ltd nor its employees shall be liable in any way whatever for any error made in the execution or reporting of tests or any erroneous conclusions drawn therefrom or for any consequence thereof.
Standard TPA - DCP/CBR/Bearing Pressure relationship graph used. The engineer is responsible for acceptance of this graph relationship.
W.J.Coetzee
Appendix 3
Test Pit 03
Attention:
TMH5:MC1
ENVIRONMENTAL CONDITION
0 - 50
50 - 350 12524
350 - 800 12525
10-Dec-24 1/1 End Rev-01 OMA-PRO-001
Hot,Clear,No Rain, Calm
6 Otto - Nitzche Street
SOIL PROFILE
Sampling Method:
PROFILE
Hand Dug
None
None
Test Position Supplied
Excavation Method
Refusal
Water table
GPS Co - ordinates
OMAMANYA GEOTECHNICAL CONSULTANTS
160-8627 E-mail: admin@omamanya.go.na
Fax: +264 61 24 5101
Tel: +264 61 24 5103
NORTHERN INDUSTRIA, WINDHOEK
6 VAN DER BIJL STREET
10 December 2024
24003_009 Lossen Street Klein
Windhoek
Lossen Street
TP03
TP03
Stable
Element Consulting Engineers
Klein Windhoek
Namibia
Nelson Nehason
Project:
Site / Road:
Stake Value:
Test Hole No:
Side Walls
Slightly Moist, Reddish Brown, Medium Dense, Intact, Silty Sandy With Quartz. Imported
Slightly Moist, Off White to Light Brown, Dense, Intact, Silty Sandy Decomposed Biotite Schist.
In-Situ. (Calsification of Schist, Fault line)
Note: Possible layering In Top…
This is the start of the file's text. The full file is on GovTribe.