LMIR BPA Call Order.doc

DOC document 132 KB Posted

Attached to
USDA Forest Service LMIR BPA Call for Lolo NF Stocking Surveys AMD 0001
Solicitation number
1284LM26Q0035
Issued by

About this file

This is a BPA Call Order for reforestation stocking surveys on the Lolo National Forest in Montana. The Lolo National Forest, Missoula Ranger District is seeking contractors to conduct stocking surveys across three mandatory blocks and two optional units on the eastern side of the forest spanning Seeley Lake and Missoula Ranger Districts. The mandatory work includes 438 survey plots in Block 1, 251 plots in Block 2, and 347 plots in Block 3, with optional units available at Lolo Peak (88 plots) and Liberty 7 (414 plots). All work must be completed by November 1, 2026, with contractors required to commence work within seven calendar days of receiving the notice to proceed. The surveys will evaluate stocking density, distribution, species composition, and health of regeneration in planted and natural regeneration areas using procedures outlined in the attached Statement of Work.

This single-award call order is restricted to current LMIR BPA Award Holders as of the issue date and uses NAICS code 115310 (forestry support activities). Contractors must submit unit pricing for all mandatory blocks and any optional units they wish to bid on, along with a technical capability statement describing their qualifications, timeline, personnel, and relevant past performance in data collection and stocking surveys. Award will be made to the lowest-priced responsive bidder meeting technical requirements. A post-award conference is required within ten days of award, to be conducted virtually via Teams. The contract will incorporate recent FAR class deviations aligned with Executive Orders 14148, 14173, 14168, and 14208, and includes removal of certain sustainability and equal opportunity provisions previously required.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Land Management Integrated Resources BPA Call

Contractor:

BPA No.

12363N2__A4_____
Project Name
Lolo EZ Stocking Survey 2026

BPA RFQ or

Call No.

1284LM26F00XX
Location
Seeley Lake and Missoula RDs, Lolo NF, MT
Set-Aside
Small Business____ Unrestricted_____

This will only be sent out to the current BPA Award Holders as of Issue Date.

Contractor:
Confirm business size by NAICS code below (115310): Small___ Large___ Initial:______

NAICS Code Exception if Applicable:

Award Information
___X___This is a single award call order. Contractor must provide pricing for all items listed under Box 20.

______This is a multi-award call order. Contractor needs to only provide pricing for all items listed under the specific award(s) they are interested in.

Contractor:

UEI:

Email:

Issuing and Billing Office:

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

NAICS Code (per Scope of Work)
21.

ESTIMATED QUANTITY

22.

UNIT OF MEASURE

23.

UNIT PRICE

24.

AMOUNT

Individual Stocking Survey Plots

1
Block 1 (Mandatory)
115310
438
Plot
$
$
1a
Optional Unit Lolo Peak 58

(011603RA20170058000)

115310
88
Plot
$
$
2
Block 2 (Mandatory)
115310
251
Plot
$
$
2a
Optional Unit Liberty 7

(011603RA2017LI07001)

115310
414
Plot
$
$
3
Block 3 (Mandatory)
115310
347
Plot
$
$
Remarks: All clauses and provisions in the base BPA award are applicable to call orders, however clauses and/or provisions in BPA Call Orders take precedence. See Attachments for additional terms and conditions. The Period of Performance for this Call Order is from the Date of Award through 11/01/2026. Specific item due dates or deliverable due dates are mandatory, not arbitrary, and must be met accordingly, regardless of the final period of performance date.
Total Price:

Contractor: (Name, Signature, and Date)

Date:

Requested By: Lolo National Forest, Missoula Ranger District

Ordered By: JoAnne Meiers, Contracting Officer

1. DESCRIPTION/STATEMENT OF WORK

See attached Statement of Work (Exhibit 1).

The Forest Service is in need of Reforestation Stocking Surveys to monitor reforestation activities in planted and natural regeneration areas. The surveys are used to determine stocking density, distribution, species composition, and health of regeneration.

1.1 OPTIONAL UNITS

Bidders shall submit a unit price for the Mandatory Units for each block. Each Block contains a number of units as defined in Exhibit 2. Bidders shall submit a unit price for each Optional Unit, as shown in Block 20 above, and in Exhibit 2. Optional Units shall be awarded at the discretion of the Government.

2. SPECIFICATIONS:

See attached Statement of Work, Exhibit 1.

3. PROJECT LOCATION AND DESCRIPTION

All work located on the eastern side of the Lolo National Forest on the Seeley Lake and Missoula Ranger Districts. See Location Map, Exhibit 3.

4. INSPECTION AND ACCEPTANCE:

4.1

FAR 52.246-4: INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

e. If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

2) Reduce the contract price to reflect the reduced value of the services performed.

f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

2) Terminate the contract for default.

4.2

CONTRACTOR INSPECTION PROCEDURES

(A) General Instructions

1) The Contractor shall conduct inspections of treatment units and record the results using procedures described in Exhibit 1, Statement of Work. Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each treatment unit and will remain part of the permanent contract file.

2) By submission of inspection forms to the Government, the Contractor is considered to be certifying that the unit is satisfactorily completed and that the inspection forms reflect the work accomplished.

3) The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.

4) In the event the Contractor falsifies inspection results, as determined by the Contracting Officer, the Government may declare the Contractor to be in default of the contract. Additionally, the Government may refer such falsifications to the US Attorney’s Office for possible prosecution pursuant to 18 U.S.C. 1001 (Falsification of Government Documents) or 18 U.S.C. 287 (Fraud).

4.3

GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:

See Exhibit 1, Statement of Work - Quality Assurance Section

Work will be accepted based on a comparison of the Contractor’s inspection and the Government inspection, as described in Attachment 02 – Performance Work Statement.

5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 11/01/2026.

6. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at virtually via TEAMS.

7.

EVALUATION CRITERIA:

Contractor must send a technical capability statement briefly explaining:

How they intend to complete this contract as far as time frame, personnel, and deliverables; and explaining experience in data collection work including stocking surveys in Region 1 and elsewhere, stand exams, fixed-area plots, tree identification, and/or related experience. Include a general plan with approximate anticipated dates when work is expected to be performed and relevant past performance information with your technical proposal.

The Government will consider the relevance of past performance information obtained in relation to the scope of this procurement with respect to both similar efforts, and the length, scope, number, complexity, and diversity of contracts completed by the firm. Past performance, either positive or negative, which is considered by the Government to be more closely related to the scope of this effort will be given additional weight in the evaluation process.

Government evaluators may avail themselves of various federal, state, and local past performance databases. The Government may research offeror performance on any federal, state, local, and commercial contract performance of the offeror that is known to the Government, but not included on the submitted performance information. Additionally, the personal experience and evaluator knowledge of offeror performance may be utilized.

Quotes will be evaluated as follows:

• Only the lowest quote will be evaluated to determine if their technical capability statement/submittal meets the requirements of the call order. If the lowest priced quote does not meet the technical requirements, the next lowest quote will be evaluated. Quotes must be signed. Those that do not meet the requirements will be marked unresponsive. The lowest priced quote with an acceptable rating will receive the award.

8.

CONTRACTING OFFICER’S REPRESENTATIVE: Jacob Person 9.

LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract.

Title
Pages
Exhibit 1 Statement of Work
16
Exhibit 2 Unit Table and Silvicultural Certification Standards
1
Exhibit 3 Map Package
91
Exhibit 4 Regeneration Quick Plot Form
2
Exhibit 5 Digital Plot Form
1
Exhibit 6 Stocking Survey Cover Sheet
1
Exhibit 7 Stocking Survey Scoring Sheet
2

FAR Class Deviations and Updates (at end of this document)

Notice for Filing Agency Protests (at end of this document)

March 2025 Class Deviation

This Call Order incorporates two FAR class deviations to ensure compliance with Executive Orders 14148, 14173, 14168, and 14208, issued since January 20, 2025. It also removes references to AGAR clauses and provisions that have been rescinded. These updates reflect recent policy changes and remove outdated requirements, as detailed below.

The following FAR provisions and clauses are hereby removed in their entirety from the LMIR BPA:

· 52.222-21 Prohibition of Segregated Facilities

· 52.222-26 Equal Opportunity

· 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026/1 1/This provision was removed to comply with the Executive Order 14236 titled "Additional Rescissions of Harmful Executive Orders and Actions," dated March 14, 2025.

The following FAR clauses now include deviations to align with recent Executive Orders:

· 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services (MAY 2024) (DEVIATION FEB 2025)

· 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)

· 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025)

· 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024) (DEVIATION FEB 2025)

Ther following references to AGAR Clauses and provisions are hereby removed to comply with AGAR Rule 2024-22463 (89 FR 81014):

· AGAR 452.211-74 Period of Performance (FEB 1988)/2

· AGAR 452.215-73 Post Award Conference (NOV 1996) /2

· AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001) /2

· AGAR 452.236-72 Use of Premises (NOV 1996) /2

· AGAR 452.236-77 Emergency Response (NOV 1996)

· AGAR 452.236-78 Fire Suppression and Liability (MAY 2014)

· AGAR 452.237-74 Key Personnel (FEB 1988) /2 2/AGAR clauses and provisions that were included in full text have been retained, with only the AGAR reference removed.

The following AGAR clauses is hereby included:

· AGAR 452.236-70 Emergency Response, Fire Suppression and Liability (NOV 2024)

All call orders will incorporate these changes by reference at award.

Disclaimer: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

In advancement of Section 2 of Executive Order 14208, the removal of requirements related to Executive Order 14057 eliminates all non-statutory sustainability requirements or preferences in purchases of food service wares, including paper straws. In addition to removing requirements related to Executive Order 14057, the attachment also reflects recent updates to Code of Federal Regulation citations for the U.S. Department of Agriculture’s BioPreferred® Program, a statutory purchasing preference program.

These class deviations will remain in effect until rescinded or incorporated into the FAR.

As prescribed in AGAR 433.104-4 (a)(5)(ii), the following Notice for Filing Agency Protests shall be included in every solicitation.

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Ombudsman Program

The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner. The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.

Informal Forum with the Ombudsman

1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.

2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.

3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman

1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.

2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.

3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.

4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3). Failure to submit the required information may result in a delay or dismissal of the protest.

5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.

Page last modified on October 15, 2025

PAGE

Revised 04-02-2025

File details come from the government source that posted it. Updated .