This document is an Additional Work Pricing Schedule for Landscape Maintenance Area No. 07 for the City of Palm Desert, California. The form is a required submission with proposal documents for a landscape maintenance contract, with a project number MLS00013. The pricing schedule outlines rates and costs for additional labor, plant material replacement, turf maintenance, and irrigation system repairs, providing a comprehensive framework for potential supplemental work beyond the base contract.
The pricing schedule allows for additional work to be compensated at contractual hourly rates with a 15% markup on materials. Specific pricing categories include labor rates for laborers, irrigators, and foremen, as well as unit pricing for plant material replacements such as 1-gallon and 5-gallon shrubs, and 15-gallon and 24"-box trees. The document specifies that tree installation includes comprehensive services like hole digging, tree setting, backfilling, watering, staking, and irrigation adjustments. For trees larger than 24" box size, payment will be at the contractual hourly labor rate plus 15% markup on materials. Mowing and irrigation system repairs are also covered with specific pricing guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Landscape_Maintenance_Area_(LMA)_No._7_(Addendum_#1_Revision).pdf | ||
| Maintenance_Services_Agreement.docx | DOCX document | |
| LMA_07_Contractor_Cost_Proposal_by_Location.pdf | ||
| LMA_7_Map.pdf | ||
| LMA_7_ATTACHMENT_1_FREQUENCY_SCHEDULE.xls | XLS spreadsheet | |
| LMA_Frequency_Schedule_Legend.pdf | ||
| Payment_and_Performance_Bonds.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No. __________________
Revised 11-2-20 BBK 72500.00001\32374943.1 Exhibit C - 14
CITY OF PALM DESERT
LANDSCAPE MAINTENANCE AREA NO. 07
Contract No.
Project No. MLS00013
THIS IS A REQUIRED FORM TO BE SUBMITTED WITH PROPOSAL
ADDITIONAL WORK PRICING SCHEDULE
LABOR
Additional Laborer $ per hour Additional Irrigator $ per hour Additional Foreman $ per hour
At City of Palm Desert’s discretion, additional work may be paid for using the contractual hourly rate for labor listed above with a 15% mark up on materials or by using the unit pricing listed below.
PLANT MATERIAL REPLACEMENT
Unless otherwise described, replacement plant material will be whatever is normal and customary for the City of Palm Desert.
1-Gallon Shrub Installed $
5-Gallon Shrub Installed $
15-Gallon Tree Installed* $
24”-Box Tree Installed* $
Note: Anything over 24” box size will be paid at the contractual hourly rate for labor, and materials at cost plus a 15% mark-up.
*Includes the following: digging of hole, setting of tree, backfilling, watering-in of tree, staking (if needed), securing with cinch ties, and adjusting repairing, or retrofitting irrigation
TURF MAINTENANCE
Mowing: Labor & Equipment $ per 1,000 sq. ft.
IRRIGATION SYSTEM REPAIR
Irrigation repairs will be paid at the hourly rate indicated above and with a 15% mark-up on materials.