LKT VOR NEW FENCE INSTALLATION PROJECT 100 percent DESIGN SPECS.pdf
PDF 828 KB Posted
- Attached to
- Fence Replacement project at a VOR site in Salmon, ID Federal contract opportunity
- Solicitation number
- 6973GH-23-Q-00135
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI (2) Questions.pdf | ||
| Amendment 0003 RFI and pic.pdf | ||
| NW-D-112-41889-02.pdf | ||
| RFI Salmon ID Questions.pdf | ||
| Amendment 0002 RFI and pics.pdf | ||
| IMG_0959.JPG | JPG image | |
| IMG_0964.JPG | JPG image | |
| IMG_0952.JPG | JPG image | |
| IMG_0953.JPG | JPG image | |
| IMG_1084.JPG | JPG image | |
| IMG_1082.JPG | JPG image | |
| IMG_1083.JPG | JPG image | |
| Salmon ID Amendment.pdf | ||
| IMG_0951.JPG | JPG image | |
| Wage Determination 01-20-23.pdf | ||
| 6973GH-23-Q-00135 SAM - RFP.pdf | ||
| DRAWINGS.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW FENCE INSTALLATION PROJECT JANUARY 2022
100% DESIGN REPORT LKT VOR
Page - 1
FEDERAL AVIATION ADMINISTRATION
SALMON (LKT)
VERY HIGH FREQUENCY OMNIDIRECTIONAL RANGE (VOR)
FENCE REPLACEMENT PROJECT
JCN: 701628
SPECIFICATIONS & SCOPE OF WORK
LKT VOR
SALMON, ID
DATE: JANUARY 2022
PREPARED FOR: TETON SYSTEM SUPPORT CENTER, WWT65-IDA
TOM BISHOP
SSC MANAGER
4022 PROFESSIONAL WAY
IDAHO FALLS, ID 83402
PREPARED BY: FACILITY SUPPORT GROUP, AJW-2W15D
BOBBY JALLOW
ELECTRICAL ENGINEER
2200 S 216TH ST
DES MOINES, WA 98198
Page - 2
SECTION - 000110 TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 Summary 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 60 00 Product Requirements 01 72 00 Work Place Safety and Health 01 73 00 OSHA Safety Requirements 01 77 00 Closeout Procedures FAA COVID Contractor Requirements
DIVISION 03 – CONCRETE
03 30 Miscellaneous Cast-In-Place Concrete
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 63 Exterior Rough Carpentry
END OF SECTION 00 01 10
END OF SECTION 000110
Page - 3
SECTION - 011000 - SUMMARY
PART 1. GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 DEFINITIONS
1. Federal Aviation Administration (FAA): The terms “Federal Aviation Administration” (FAA) and “government” as used herein denote the “owner”.
2. Project Engineer (PE): The term “Project Engineer” (PE) as used herein denotes the “Government’s representative”.
3. Contracting Officer’s Representative (CO): The term “Contracting Officer” (CO) as used herein denotes the person designated to act for the Government in the performance of the contract.
4. Resident Engineer (RE) / Contracting Officer’s Representative (COR): The term “Resident Engineer” (RE) as used herein denotes the representative of the Contracting Officer at the job site. The term is synonymous with the FAA terms “Contracting Officer’s Representative” (COR) and “Contracting Officer’s Technical Representative” (COTR).
5. Contractor: The term “Contractor” as used herein denotes the firm who will perform and complete the work required by the Contract. The term is synonymous with the terms General Contractor (GC), and Prime Contractor.
6. Subcontractor: The term “subcontractor” as used herein denotes the person or firm retained by the Contractor to perform a particular unit of work required by the Contractor. Subcontractors shall be required to meet all specifications required of the Contractor.
1.3 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Work by Owner.
4. Contractor-furnished products.
5. Access to site.
Page - 4
6. Coordination with occupants.
7. Work restrictions.
8. Specification and Drawing conventions.
1.4 PROJECT INFORMATION
A. Project Identification: SALMON (LKT) VHF Omnidirectional Range (VOR) Fence Replacement Project
1. Project Location: SALMON, ID Coordinates: 45.0214 / -114.08424
2. Project Engineer has been engaged for this Project to serve as an advisor to Owner and to provide assistance in administering the Contract for construction between Owner and Contractor, according to a separate contract between Owner and Construction Manager.
1.5 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
a. The selected Prime Contractor shall furnish all labor, equipment, and materials for the installation associated with the New Fence Installation Project at the Salmon Very High Frequency Omnidirectional Range (LKT VOR) located in Salmon, Idaho. The New Fence Installation project includes and not limited to the installation of fence posts, rails, gates, hardware, and footing.
b. The following items are a summary of the project and are provided solely for the purpose of describing the general nature of the work. The Contractor is responsible for accomplishing all items of work identified in the applicable drawings, specifications, and provisions of the contract.
2. General
a. The LKT VOR is an active operational facility which runs 24 hours a day, 7 days a week. Any long term outages needed to perform work shall be scheduled with the FAA at least 30 days in advance.
b. All work shall comply with OSHA safety requirements.
c. All work shall be coordinated with the FAA and be accomplished on a “Not to interfere with FAA operations” basis with the facility.
Page - 5
d. Construction material shall be stored only in FAA approved areas.
e. Construction staging shall be allowed only in the FAA approved areas.
f. The Contractor shall provide all temporary services required for construction.
g. The Contractor shall clean up and restore the site grounds to the surrounding condition after the work has been performed.
h. Contractor must be aware that summer seasons generally have a high potential for forest fires, which may affect the period for construction performance.
i. Contractors shall not drive, park, traverse or store any materials on the counterpoise construction access must be done in perimeter. Coordinate with the project engineer or resident engineer regarding access.
j. Precautions for safety plan must be given to the Project Engineer as a submittal.
3. Construction Work Description
a. Fence Replacement
1) Drawing set LKT-VOR-701628 shall be used to supplement the below scope of work.
B. Type of Contract:
1. Project will be constructed under a single prime contract.
1.6 WORK BY OWNER
A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.
1. The FAA reserves the right to inspect all work performed by the contractor.
1.7 CONTRACTOR-FURNISHED PRODUCTS
A. Contractor shall furnish products indicated. The Work includes unloading, handling, storing, and protecting Contractor-furnished products as directed and turning them over to Owner at Project closeout.
Page - 6
B. All materials must be approved by the Project Engineer or FAA representative prior to application. A materials list for submittal will be provided by the Project Engineer for this project.
1.8 ACCESS TO SITE
A. Use of Site: Limit use of Project site to roof area as indicated in project drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weather tight condition throughout construction period.
Repair damage caused by construction operations.
C. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
1.9 COORDINATION WITH OCCUPANTS
A. Owner Limited Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and limited occupancy shall not constitute acceptance of the total Work.
1. Before limited Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of Work.
2. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of Work.
3. The LKT VOR is a fully operational building in the National Airspace System (NAS). Any work that can interfere with operations can be canceled at any moment by the FAA.
Page - 7
4. Notify Owner not less than 72 hours in advance of activities that will affect Owner’s operations.
5. Notify Owner not less than 30 days in advance to schedule long-term shutdown.
1.10 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 06:00 a.m. to 4:30 p.m. Mountain Time, Monday through Thursday, unless otherwise indicated.
1. Working hours may be adjusted to meeting scheduling demands. Must receive explicit approval from FAA.
2. Weekend hours: Only if approved by the FAA.
3. Hours for Utility Shutdown: Notify FAA 72 hours in advance.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:
1. Notify COR/RE not less than three (3) days in advance of proposed utility interruptions.
2. Notify COR/RE not less than thirty (30) days in advance of proposed utility interruptions that will result in a long-term shutdown.
3. Obtain COR/RE written permission before proceeding with utility interruptions.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to FAA occupancy with FAA.
E. Restricted Substances: Use of tobacco products and other controlled substances on Project site is not permitted.
F. Employee Identification: FAA will provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times. All Contractor employees must be escorted at all times. Contractor(s) shall obtain Airport Driving Certification if applicable. Contractor shall also obtain FAA Contractor Badging for the duration of the project if applicable.
Page - 8
G. Employee Screening: Comply with Owner's requirements for drug and background screening of Contractor personnel working on Project site if requested.
1. Maintain list of approved screened personnel with Owner's representative.
1.11 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
Page - 9
SECTION - 012500 - SUBSTITUTION PROCEDURES
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
1.3 Related Requirements:
A. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.
1.4 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner.
1.5 ACTION SUBMITTALS
A. Substitution Requests: Submit three copies of each request for consideration.
Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Substitution Request Form: Use facsimile of form provided in Project Manual.
2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.
Page - 10
b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.
d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of FAAs and owners.
h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.
i. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.
j. Cost information, including a proposal of change, if any, in the Contract Sum.
k. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.
l. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
Page - 11
3. FAA's Action: If necessary, FAA will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. FAA will notify Contractor, through Construction Manager, of acceptance or rejection of proposed substitution within 15 days of receipt of request, or 7 days of receipt of additional information or documentation, whichever is later.
a. Forms of Acceptance: Change Order, Construction Change Directive, or FAA's Supplemental Instructions for minor changes in the Work.
b. Use product specified if FAA does not issue a decision on use of a proposed substitution within time allocated.
1.6 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.7 PROCEDURES
A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.
1.8 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
1. Conditions: FAA will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, FAA will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. Requested substitution will not adversely affect Contractor's construction schedule.
d. Requested substitution has received necessary approvals of authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
Page - 12
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
B. Substitutions for Convenience: Not allowed, unless otherwise indicated.
C. Substitutions for Convenience: FAA will consider requests for substitution if received within 60 days after the Notice of Award. Requests received after that time may be considered or rejected at discretion of FAA.
1. Conditions: FAA will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, FAA will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to FAA for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.
b. Requested substitution does not require extensive revisions to the Contract Documents.
c. Requested substitution is consistent with the Contract Documents and will produce indicated results.
d. Substitution request is fully documented and properly submitted.
e. Requested substitution will not adversely affect Contractor's construction schedule.
f. Requested substitution has received necessary approvals of authorities having jurisdiction.
g. Requested substitution is compatible with other portions of the Work.
h. Requested substitution has been coordinated with other portions of the Work.
i. Requested substitution provides specified warranty.
Page - 13
j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.
PART 2. PRODUCTS (Not Used)
PART 3. EXECUTION (Not Used)
END OF SECTION 012500
Page - 14
SECTION - 012600 - CONTRACT MODIFICATION PROCEDURES
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for handling and processing Contract modifications.
1.3 MINOR CHANGES IN THE WORK
A. COR/RE will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.
1.4 PROPOSAL REQUESTS
A. FAA Proposal Requests: FAA representative will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
1. Work Change Proposal Requests issued by FAA are not instructions either to stop work in progress or to execute the proposed change.
2. Within 7 day after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
Page - 15
B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to the CO and COR/RE.
1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change.
Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
PART 2. PRODUCTS (Not Used)
END OF SECTION 012600
Page - 16
SECTION - 013100 - PROJECT MANAGEMENT AND COORDINATION
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. General coordination procedures.
2. RFIs.
3. Project meetings.
B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.
1.3 DEFINITIONS
A. RFI: Request for Information. Request from FAA or Contractor seeking information required by or clarifications of the Contract Documents.
1.4 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.
2. Number and title of related Specification Section(s) covered by subcontract.
3. Drawing number and detail references, as appropriate, covered by subcontract.
B. Key Personnel Names: Within 1 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and cellular telephone numbers and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.
1. Submit a copy to the COR/RE. Keep list current at all times
Page - 17
1.5 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Coordination: Each contractor shall cooperate with COR/RE who shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
C. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for FAA and separate contractors if coordination of their Work is required.
D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and direction of COR/RE to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's construction schedule.
2. Preparation of the schedule of values.
3. Installation and removal of temporary facilities and controls.
Page - 18
4. Delivery and processing of submittals.
5. Progress meetings.
6. Pre-installation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
E. RFI Forms:
1. Attachments shall be electronic files in PDF format.
F. COR/RE Action: COR/RE will review each RFI, determine action required, and respond. Allow seven working days for COR/RE's response for each RFI. RFIs received by COR/RE after 1:00 p.m. will be considered as received the following working day.
1. The following Contractor-generated RFIs will be returned without action:
a. Requests for approval of Contractor's means and methods.
b. Requests for coordination information already indicated in the Contract Documents.
c. Incomplete RFIs or inaccurately prepared RFIs.
2. COR/RE action may include a request for additional information, in which case COR/RE's time for response will date from time of receipt by COR/RE of additional information.
3. COR/RE's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Section 012600 "Contract Modification Procedures."
a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, COR/RE in writing within 3 days of receipt of the RFI response. A meeting will then be scheduled between the COR/RE, the CO and the contractor to discuss the changes.
G. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly
1. Project name.
2. Name and address of Contractor.
3. Name and address of COR/RE
4. RFI number including RFIs that were returned without action or withdrawn.
Page - 19
5. RFI description.
6. Date the RFI was submitted.
7. Date COR/RE response was received.
8. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate.
9. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.
H. On receipt of COR/RE action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify COR/RE within seven days if Contractor disagrees with response.
1.6 PROJECT MEETINGS
A. General: COR/RE will schedule and conduct meetings and conferences at Project site unless otherwise indicated.
1. Attendees: Inform COR/RE who will inform FAA participants and other contractors. The contractor will inform their all others involved, and individuals whose presence is required, of date and time of each meeting.
Notify FAA and COR/RE of scheduled meeting dates and times a minimum of 10 working days prior to meeting.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, 3 days of the meeting.
B. Preconstruction Conference: COR/RE will schedule and conduct a preconstruction conference before starting construction, at a time convenient to FAA and COR/RE, but no later than one day after execution of the Agreement.
1. Attendees: Authorized representatives of FAA and their consultants;
Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Responsibilities and personnel assignments.
Page - 20
b. Tentative construction schedule.
c. Phasing.
d. Critical work sequencing and long lead items.
e. Designation of key personnel and their duties.
f. Lines of communications.
g. Procedures for processing field decisions and Change Orders.
h. Procedures for RFIs.
i. Procedures for testing and inspecting.
j. Procedures for processing Applications for Payment.
k. Distribution of the Contract Documents.
l. Submittal procedures.
m. Preparation of Record Documents.
n. Use of the premises and existing building.
o. Work restrictions.
p. Working hours.
q. FAA's occupancy requirements.
r. Responsibility for temporary facilities and controls.
s. Procedures for moisture and mold control.
t. Procedures for disruptions and shutdowns.
u. Construction waste management and recycling.
v. Parking availability.
w. Office, work, and storage areas.
x. Equipment deliveries and priorities.
y. First aid.
z. Security.
aa. Progress cleaning.
3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.
Page - 21
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity when required by other sections and when required for coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise COR/RE of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:
a. Contract Documents.
b. Options.
c. Related RFIs.
d. Related Change Orders.
e. Purchases.
f. Deliveries.
g. Submittals.
h. Possible conflicts.
i. Compatibility requirements.
j. Time schedules.
k. Weather limitations.
l. Manufacturer's written instructions.
m. Warranty requirements.
n. Compatibility of materials.
o. Acceptability of substrates.
p. Temporary facilities and controls.
q. Space and access limitations.
r. Regulations of authorities having jurisdiction.
s. Testing and inspecting requirements.
t. Installation procedures.
Page - 22
u. Coordination with other work.
v. Required performance results.
w. Protection of adjacent work.
x. Protection of construction and personnel.
3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.
4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.
5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
D. Project Closeout Conference: Schedule and conduct a project closeout conference, at a time convenient to FAA, but no later than 1 day prior to the scheduled date of Substantial Completion.
1. Conduct the conference to review requirements and responsibilities related to Project closeout.
2. Attendees: Authorized representatives of FAA, COR/RE, Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the meeting. Participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.
3. Agenda: Discuss items of significance that could affect or delay Project closeout, including the following:
a. Preparation of Record Documents.
b. Procedures required prior to inspection for Substantial Completion and for final inspection for acceptance.
c. Procedures for completing and archiving web-based Project software site data files.
d. Submittal of written warranties.
e. Requirements for preparing operations and maintenance data.
f. Requirements for delivery of material samples, attic stock, and spare parts.
g. Requirements for demonstration and training.
h. Preparation of Contractor's punch list.
Page - 23
i. Procedures for processing Applications for Payment at Substantial Completion and for final payment.
j. Submittal procedures.
k. Coordination of separate contracts.
l. FAA's partial occupancy requirements.
m. Installation of FAA's furniture, fixtures, and equipment.
n. Responsibility for removing temporary facilities and controls.
o. Review and fill out CAI Documents
PART 2. PRODUCTS (Not Used)
END OF SECTION 013100
Page - 24
SECTION - 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:
1. Contractor's Construction Schedule.
2. Site condition reports.
3. Unusual event reports.
1.3 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction Project. Activities included in a construction schedule consume time and resources.
1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.
2. Predecessor Activity: An activity that precedes another activity in the network.
3. Successor Activity: An activity that follows another activity in the network.
B. Cost Loading: The allocation of the schedule of values for completing an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum.
C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships.
Network calculations determine when activities can be performed and the critical path of Project.
D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.
Page - 25
E. Event: The starting or ending point of an activity.
F. Float: The measure of leeway in starting and completing an activity.
1. Float time belongs to FAA
2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.
3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.
G. Resource Loading: The allocation of manpower and equipment necessary for completing an activity as scheduled.
1.4 INFORMATIONAL SUBMITTALS
A. Format for Submittals: Submit required submittals in the following format:
1. Working electronic copy of schedule file, where indicated.
2. PDF file.
B. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.
1. Submit a working digital copy of schedule, using software indicated, and labeled to comply with requirements for submittals.
C. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.
1. Activity Report: List of activities sorted by activity number and then early start date, or actual start date if known.
2. Logic Report: List of preceding and succeeding activities for each activity, sorted in ascending order by activity number and then by early start date, or actual start date if known.
3. Total Float Report: List of activities sorted in ascending order of total float.
D. Site Condition Reports: Submit at time of discovery of differing conditions.
E. Unusual Event Reports: Submit at time of unusual event.
1.5 QUALITY ASSURANCE
Page - 26
A. Scheduling Consultant Qualifications: An experienced specialist in CPM scheduling and reporting, with capability of producing CPM reports and diagrams within 24 hours of FAA's request.
B. Prescheduling Conference: Conduct conference at Project site to comply with requirements in Section 013100 "Project Management and Coordination." Review methods and procedures related to the preliminary construction schedule and Contractor's Construction Schedule, including, but not limited to, the following:
1. Verify availability of qualified personnel needed to develop and update schedule.
2. Review delivery dates for FAA-furnished products.
3. Review schedule for work of FAA's separate contracts.
4. Review submittal requirements and procedures.
5. Review time required for review of submittals and resubmittals.
6. Review requirements for tests and inspections LKTndependent testing and inspecting agencies.
7. Review time required for Project closeout and FAA startup procedures, including commissioning activities.
8. Review and finalize list of construction activities to be included in schedule.
9. Review procedures for updating schedule.
1.6 COORDINATION
A. Coordinate Contractor's Construction Schedule with the schedule of values, list of subcontracts, submittal schedule, progress reports, payment requests, and other required schedules and reports.
1. Secure time commitments for performing critical elements of the Work from entities involved.
2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.
1.7 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of final completion.
1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.
Page - 27
B. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion, and the following interim milestones:
C. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update.
Summarize the following issues:
1. Unresolved issues.
2. Unanswered Requests for Information.
3. Rejected or unreturned submittals.
4. Notations on returned submittals.
5. Pending modifications affecting the Work and the Contract Time.
1.8 REPORTS
A. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report.
Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.
B. Unusual Event Reports: When an event of an unusual and significant nature occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, responses by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise the FAA in advance when these events are known or predictable.
1. Submit unusual event reports directly to FAA within one day of an occurrence. Distribute copies of report to parties affected by the occurrence.
PART 2. PRODUCTS (Not Used)
END OF SECTION 013200
Page - 28
SECTION - 013300 - SUBMITTAL PROCEDURES
1.1 SUMMARY
A. This section includes administrative and procedural requirements for submitting, product data and other submittals
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires COR responsive action.
B. Informational Submittals: Written and graphic information and physical samples that do not require COR’s responsive action. Submittals may be rejected for not complying with requirements.
1.3 SUBMITTAL PROCEDURES
A. Prepare and submit submittals required LKT individual Specification Sections.
Types of submittals are indicated in individual Specification Sections.
1. Email: Prepare submittals as PDF package, and transmit to the COR by sending via email. Include PDF transmittal form. Include information in email subject line as requested by the FAA.
a. The COR/RE will return annotated file. Annotate and retain one copy of file as a digital Project Record Document file.
B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of submittals for related parts of the Work specified in different Sections so processing will not be delayed because of need to review submittals concurrently for coordination.
a. COR/RE reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on COR’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
Page - 29
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
COR/RE will advise Contractor when a submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Resubmittal Review: Allow 7 days for review of each resubmittal.
4. Sequential Review: If sequential review of submittals by COR’s consultants, FAA, or other parties is indicated, allow 14 days for initial review of each submittal.
D. Identification Place a permanent label or title black on each submittal for identification.
1. Indicate name of firm of entity that prepared each submittal on label or title black.
2. Provide a space approximately 3 by 4 inches on label or beside title black to record Contractor’s review and approval markings and action taken by
COR/RE.
3. Include the following information on label for processing and recording action taken
a. Project name
b. JCN
c. Date
d. Name and address of Contractor
e. Name and address of subcontractor
f. Name and address of supplier
g. Name of manufacturer
h. Submittal number of other unique identifier, including revision identifier
1) Submittal number shall use Specification section number followed by decimal pint and then a sequential number (e.g., 061000.01).
Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06000.01.A)
i. Number and title of appropriate Specification Section
j. Drawing number and detail references, as appropriate
Page - 30
k. Location(s) where product is to be installed, as appropriate
E. Deviations: Encircle or otherwise specifically identify deviations from the Contract Documents on submittals. Indication must be reproducible when copied on black and white copier.
F. Additional Copies: Unless additional copies are required for final submittal, and unless COR observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.
1. Submit on copy of submittal to concurrent reviewer in addition to specified number of copies to COR/RE.
2. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned.
G. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Transmittal form associated with submittals received from sources other than Contractor will be returned without review. Submittal itself may be returned at COR discretion.
1. Transmittal Form: Provide locations on form for the following information:
a. Project name
b. JCN
c. Date
d. Destination (To:).
e. Source (From:).
f. Names of subcontractor, manufacturer, and supplier
g. Category and type of submittal.
h. Submittal purpose and description.
i. Specification Section number and title.
j. Drawing number and detail references, as appropriate.
k. Transmittal number, numbered consecutively.
l. Submittal and transmittal distribution record.
m. Remarks.
n. Signature of transmitter.
Page - 31
2. On an attached separate sheet, prepared on Contractor’s letterhead, record relevant information, requests for data, revisions other than those requested by COR on previous submittals, and deviations from requirements on the Contract Documents, including minor variations and limitations. Include same label information as related submittal.
H. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title black and clearly indicate extent of revision.
3. Resubmit submittals until they are masked as being accepted.
I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
1.4 SUBMITTAL REQUIREMENTS
A. General: Prepare and submit Action Submittals required LKT individual Specification Sections
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer’s safety data sheets.
d. Manufacturer’s installation instructions
e. Standard color charts.
f. Manufacturer’s catalog cuts.
g. Wiring diagrams showing factory-installed wiring.
Page - 32
h. Printed performance curves.
i. Operational range diagrams
j. Mill reports
k. Standard product operation and maintenance manuals
l. Compliance with specified referenced standards.
m. Testing by recognized testing agency.
n. Application of testing agency labels and seals.
o. Notation of coordination requirements.
4. Submit Product Data before or concurrent with Samples.
C. Certificates:
1. Certificates and Certifications Submittals: Submit a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. Provide a notarized signature where indicated.
2. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.
3. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.
4. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.
5. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.
6. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on AWS forms. Include names of firms and personnel certified.
D. Testing Reports:
Page - 33
1. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product.