The document is a Liquidated Damages Calculator for the FY 2026 Pavement Preservation Package 3 project, with a Project ID of 25-0072-REQ. The project involves pavement preservation work with a construction duration of 210 calendar days and an engineer's estimated probable construction cost of $5,021,370.74. The calculator provides a detailed breakdown of potential daily liquidated damages in the event of project delays.
The liquidated damages calculation includes $1,356.00 for construction administration/inspection, with a daily project manager/assistant project manager rate of $78.66 per hour. The total liquidated damages amount is calculated at $1,434.66 per day. No specific design consultant post-design fees are noted, and various potential cost elements such as temporary facilities, lost revenues, and insurance costs are listed as zero. The document appears to be a preparatory financial tool for managing potential project delays and associated costs.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enter Design Consultant's total post design fee -$ Enter Construction Administrator's total Fee N/A Duration of Construction (calendar days) 210 Enter Total Project Enclosed Square Footage (if applicable) N/A Enter Total Daily Department PM/APM Full time Equivalents N/A Engineer's Estimate of probable construction cost 5,021,370.74$
Elements for Liquidated Damages Determination:
Design Consultant Fees 0 Total post design fee divided by construction duration *3%
Construction Administration/Inspection 1,356.00$ Daily combined burdened rate for CA staff + Consultant CEI
Project Manager/Assistant Project Manager 78.66$ (1 hour/day burdened rate) Department Project Overhead LD Schedule Agency Administrative Costs -$ Temporary Heat/Cooling/Electric -$ Temporary Storage of Owner Provided FFE -$ Rental/Lease of Facilites for Staff, and/or Clients -$ Lost revenues -$ Lost grant revenues -$ Interest -$ Rental / moving expenses -$ Cost for Insurance Other Total Liquidated Damages Amount per day 1,434.66$
Prepared by:
Edit Highlighted Areas
LIQUIDATED DAMAGES CALCULATOR
Project Name: FY 2026 Pavement Preservation Package 3
PID No.: 25-0072-REQ