Line Item 25 Pricing Instructions B-54232.docx

DOCX document 79 KB Posted

Attached to
Elevator Inspections BoPM Locations
Solicitation number
27-416CMS-BOPM4-B-54232
Issued by
Illinois

About this file

This pricing instruction document pertains to Line Item 25 of a bidding package for an elevator inspection contract with the State of Illinois Bureau of Property Management. Line Item 25 functions as a placeholder line item enabling the vendor to bill the State for materials consumed during contract performance. The contract establishes a three-year engagement for inspections of elevators, escalators, chairlifts, and dumbwaiters across Illinois state facilities managed by the Bureau of Property Management.

Line Item 25 materials will be billed to the State at the vendor's actual cost with no markup or upcharge permitted. Bidders must enter $10,000 as the unit cost for evaluation purposes, with the explicit notation that this represents an estimated amount and is not guaranteed. This line item is excluded from the bid evaluation process and serves solely as a mechanism for reimbursement of actual material costs incurred during contract execution.

View the file

Other files

File Type Posted
TIN form blank~67.docx DOCX document
standard-illinois-certifications-B-54232.pdf PDF
Q and A No.2 B-54232 Elevator Inpections BoPM.docx DOCX document
Vendor Disclosure B-54232.docx DOCX document
IPG Active Registered Vendor Disclosure B-54232.docx DOCX document
Contract B-54232 Elevator Inspecitons BoPM.docx DOCX document
Q and A B-54232 Elevator Inpections BoPM.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line item 25 is a placeholder for the vendor to bill the State for any materials used in conjunction with the contract. These items will be billed at Vendor’s cost with no upcharge.

Line item 25 is not part of the evaluation and the bidder should enter $10,000 for the Unit cost.

This is an estimated amount and not guaranteed.

image1.jpeg

File details come from the government source that posted it. Updated .