Lighthouse Elementary - CD Set - MEP.pdf

PDF 16 MB Posted

Attached to
Boiler Phase 3 State and local contract opportunity
Solicitation number
RFQ ABS 260000000382 1
Issued by
Michigan

About this file

This is a mechanical, plumbing, and electrical design document for a boiler replacement project at Lighthouse Elementary School in Michigan, titled "Boiler Phase 3." The project encompasses the complete replacement of existing heating plant equipment including three boilers (B-1, B-2, B-3), associated circulation pumps (BP-1, BP-2, BP-3, P-1, P-2, P-3, P-4), piping systems, and related HVAC infrastructure. The scope includes demolition of existing equipment, installation of new gas-fired condensing boilers with direct vent systems, hydronic piping modifications, control system integration with the building automation system (BAS), and comprehensive commissioning and testing. The contract documents specify compliance with Michigan Mechanical Code, ASHRAE 90.1-2019 energy standards, and all applicable federal, state, and local codes. Shop drawings must be submitted within 30 days of contract award, with detailed specifications provided for boilers (acceptable manufacturers including AERCO and Lochinvar), in-line circulation pumps, and base-mounted end suction pumps. All work requires coordination among mechanical, electrical, and plumbing trades, with particular emphasis on field verification of existing conditions and proper system integration.

The design documents establish detailed material specifications, installation requirements, and performance standards for all mechanical systems, including piping materials (grooved mechanical-joint systems via Victaulic), insulation requirements (mineral fiber with flame spread index not exceeding 25/50), and control sequences for boiler lead-lag operation with outdoor air temperature reset from 120°F to 180°F. The electrical work includes new combination motor starters, variable frequency drive provisions as an alternate, boiler emergency stop switches, and reconnection of existing circuits to new equipment. The contract requires the mechanical contractor to maintain equipment in "new" condition throughout construction, obtain all necessary permits and inspection certificates, provide one-year guarantees on labor and materials, and deliver comprehensive operation and maintenance manuals and staff training. The project incorporates redundancy through multiple boiler and pump configurations with automatic lead-lag sequencing, freeze protection controls, and carbon monoxide detection systems, ensuring operational reliability and compliance with energy efficiency standards.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL HVAC NOTES

1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,

LATEST APPLICABLE EDITION.

2. LOCATE EXHAUST OUTLETS OF COMBUSTION EQUIPMENT

STACKS, AT LEAST 10 FEET FROM OUTDOOR AIR INTAKES.

3. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER

MANUFACTURERS WRITTEN INSTRUCTIONS.

4. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION

THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.

5. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY

CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS

NEEDED.

6. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER

DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.

7. PROVIDE MANUAL AIR VENTS WITH 3/4" HOSE CONNECTION AT

ALL HIGH POINTS.

8. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.

9. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,

ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT

MAY AFFECT THE WORK.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"

CONDITION DURING CONSTRUCTION.

11. ALL WORK SHALL BE PERFORMED BY LICENSED

CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.

12. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.

13. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA

AIR GAP.

14. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR

SPECIFICATIONS THE MORE STRINGENT AND GREATER COST

ITEM SHALL BE USED.

15. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF

TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.

IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL

NECESSARY OFFSETS. INSTALL WORK IN MANNER TO

CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE

HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.

DO NOT SCALE FROM DRAWINGS.

16. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE

SPECIFICATIONS, OR FOUND IN SPECIFICATIONS AND NOT IN

THE DRAWINGS, SHALL BE CONSTRUED AS TO BE INCLUDED IN

BOTH THE SPECIFICATIONS AND THE DRAWINGS. ANY

CONFLICT BETWEEN THE PLANS AND THE SPECIFICATIONS

WILL BE INTERPRETED BY THE ARCHITECT. IN THE EVENT OF

CONFLICT, FOR THE PURPOSE OF BIDDING, THE CONTRACTOR

SHALL PRESUME THE MOST EXPENSIVE COMBINATION OF

QUALITY AND QUANTITY OF WORK SHALL PREVAIL.

17. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,

REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE

STATUTES, ORDINANCES, CODES OR REGULATIONS OF

FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING

JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

18. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY

OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,

ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION

BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE

FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING

AND SPECIFICATIONS.

19. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF

DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH

BUILDING STRUCTURE, EQUIPMENT FURNISHED,

ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR

TO INSTALLATION. ANY CONTRACTOR INSTALLING WORK

WITHOUT PRIOR COORDINATION SHALL RELOCATE HIS WORK

AT HIS EXPENSE TO ALLOW PROPER INSTALLATION OF ANY

AND ALL TRADES WORK.

20. UNLESS OTHERWISE NOTED, ALL DUCT/PIPING SHALL BE

CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME

ESCUTCHEON OR ALUMINUM DUCT COLLAR AT EACH

PENETRATION OF A FINISHED SURFACE.

21. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN

THE SERVICE SPACE REQUIRED BY THE NATIONAL ELECTRICAL

CODE.

22. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS

REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.

CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY

LOCAL CODES OR THE SPECIFICATIONS. POWER SHALL BE

PROVIDED BY THE ELECTRICAL CONTRACTOR.

23. PROVIDE TRAP FOR CONDENSATION DRAIN LINES.

24. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A

MOTORIZED PIECE OF EQUIPMENT BY THE HVAC

CONTRACTOR.

MECHANICAL SYMBOLS LEGEND

HVAC PIPING SYMBOLSHVAC PIPING

HVAC DUCTWORK

F/S

F/S s s

TEMPERATURE CONTROL SYMBOLS

MISCELLANEOUS NOTES

HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES

MECHANICAL ABBREVIATIONS

AFF ABOVE FINISH FLOOR

AC AIR COMPRESSOR

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

A.T.C. ARCHITECTURAL TRADES CONTRACTOR

B BOILER

B.A.S. BUILDING AUTOMATION SYSTEM

CAF COMBUSTION AIR FAN

CC COOLING COIL

CFM CUBIC FEET PER MINUTE

CHLR CHILLER

CHP CONSOLE HEAT PUMP

CONV CONVECTOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONTROL VALVE

CWP CHILLED WATER PUMP

DB DRY BULB

DFU DUCT FURNACE

DIA DIAMETER

DN DOWN

DPR DAMPER

DS DUCT SILENCER

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

E.T.C. ELECTRICAL TRADES CONTRACTOR

EVR EVAPORATOR

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST EXISTING

FF FINISH FLOOR

FPM FEET PER MINUTE

FT FEET

FTR FINNED TUBE RADIATION

FU FURNACE

GAL GALLON

GFRH GAS FIRED RADIANT HEATER

GR GRILLE

H HUMIDIFIER

HC HEATING COIL

HD HEAD (FT)

HP HORSE POWER

HHP HORIZONTAL HEAT PUMP

HTG HEATING

HVAC HEATING, VENTILATION, & AIR CONDITIONING

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

ID INSIDE DIAMETER

I.E. INVERT ELEVATION

IAH INTAKE HOOD

LAT LEAVING AIR TEMPERATURE

LH LATENT HEAT (MBH)

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH BTU PER HOUR (THOUSAND)

MIN MINIMUM

M.T.C. MECHANICAL TRADES CONTRACTOR

N.C. NOISE CRITERIA

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NTS NOT TO SCALE

P PUMP

PCR PUMPED CONDENSATE RETURN

PD PRESSURE DROP

RCP RADIANT CEILING PANEL

REQ'D REQUIRED

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RLH RELIEF HOOD

RTU ROOF TOP UNIT

SD SUPPLY DIFFUSER

SF SUPPLY FAN

SG SUPPLY GRILLE

SH SENSIBLE HEAT (MBH)

SM SHEET METAL

SQ. FT. SQUARE FEET

SST SATURATED SUCTION TEMPERATURE

STR STRAINER

TC TOTAL COOLING (MBH)

TCL TEMPERATURE CONTROL

T&P TEMPERATURE & PRESSURE RELIEF VALVE

TYP TYPICAL

UH UNIT HEATER

VAV VARIABLE AIR VOLUME BOX

VRH VARIABLE AIR VOLUME REHEAT BOX

FPVAV FAN POWERED VARIABLE AIR VOLUME BOX

V.F.D VARIABLE FREQUENCY DRIVE

ZD ZONE DAMPER

X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)

ITEM

EXISTING

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

COOLING TOWER WATER SUPPLY

COOLING TOWER WATER RETURN

DIRECT EXPANSION

HEAT PUMP WATER SUPPLY

HEAT PUMP WATER RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

SUCTION (REFRIGERANT)

LIQUID (REFRIGERANT)

SUCTION (DIRECT EXPANSION)

LIQUID (DIRECT EXPANSION)

LOW PRESSURE STEAM (0-20 LBS.)

MEDIUM PRESSURE STEAM (21-75 LBS.)

HIGH PRESSURE STEAM (76 LBS. & ABV.)

STEAM CONDENSATE (GRAVITY)

PUMPED STEAM CONDENSATE

STEAM CONDENSATE BOILER FEED

GAS

GATE VALVE

GAS COCK

CHECK VALVE

BALANCE COCK

CIRCUIT SETTER

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

GLOBE VALVE

BALL VALVE

SOLENOID VALVE

EXPANSION VALVE WITH

THERMOSTATIC BULB

PLUG VALVE

BUTTERFLY VALVE

RELIEF VALVE

HOSE & DRAIN END VALVE

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

TRIPLE DUTY VALVE

GAS PRESSURE REGULATOR

STRAINER (BLOW-OFF)

FLOW DIRECTION

PIPING DROP

PIPING RISE

INLINE PIPING DROP

INLINE PIPING RISE

PIPING TEE

PIPING ELBOW

THERMOMETER

PUMP

UNION

PIPE ANCHOR

PIPE GUIDE

BACK FLOW PREVENTER

PIPE CAP

PIPE BREAK

THERMOMETER WELL

EXPANSION LOOP

EXPANSION COMPENSATOR

FLOAT & THERMOSTATIC STEAM TRAP

INVERTED BUCKET STEAM TRAP

THERMOSTAT

PROGRAMMABLE THERMOSTAT

THERMOSTAT (W/ NIGHT SETBACK)

ROOM SENSOR

HUMIDISTAT

PRESSURE GAUGE

DAMPER (ELECTRIC OPERATION)

DAMPER (PNEUMATIC OPERATION)

DAMPER BLADES

SUPPLY AIR DUCT

EXIST SUPPLY AIR DUCT

RETURN AIR DUCT

EXIST RETURN AIR DUCT

OUTSIDE AIR DUCT

EXIST OUTSIDE AIR DUCT

EXHAUST AIR DUCT

EXIST EXHAUST AIR DUCT

SUPPLY AIR DUCT RISER

RETURN AIR DUCT RISER

OUTSIDE AIR DUCT RISER (AS NOTED)

EXHAUST AIR DUCT

INSULATED DUCTWORK (AS NOTED)

SUPPLY AIR DIFFUSER (SQUARE)

SUPPLY AIR DIFFUSER (INLINE)

TURNING VANES

SURFACE MTD. GRILLE

SUPPLY AIR DIFFUSER (ROUND)

90° TEE W/45° APPROACH

CONICAL TAKE-OFF

CONICAL TAKE-OFF W/ DAMPER

BALANCE DAMPER

RETURN AIR DUCT BOOT

ECCENTRIC REDUCER

CONCENTRIC REDUCER

VERTICAL FIRE DAMPER

EXISTING VERTICAL FIRE DAMPER

HORIZONTAL FIRE DAMPER

EXISTING HORIZONTAL FIRE DAMPER

VERTICAL SMOKE DAMPER

HORIZONTAL SMOKE DAMPER

VERTICAL FIRE / SMOKE DAMPER

HORIZONTAL FIRE / SMOKE DAMPER

DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,

PROVIDED & WIRED BY E.T.C.

UNIT HEATER

CEILING EXHAUST FAN

ROOF MOUNTED EXHAUST FAN

DEMOLITION

POINT OF CONNECTION BETWEEN NEW AND

EXISTING

POINT OF EXISTING TO REMAIN AND EXISTING

TO BE REMOVED

INDICATES PLAN NOTE

INDICATES DEMOLITION NOTE

DETAIL BUBBLE

DETAIL NUMBER

PAGE LOCATION INDICATES

DIRECTION OF DETAIL SECTION

X

X

XX

XXXX

XX

XXXX

SA

OA

X-OA

X-EA

EA

X-SA

X-RA

RA

SCP

SC

DXS

DXL

HR

CR

CD

CS

DX

CTR

HPR

HS

HPS

CTS

CWR

CWS

S

L

LPS

MPS

HPS

SC (BF)

TAG CFM

NECK REMARKS

SIZE

BT

FT

SD-1 250

8"ø ---

P

H

S

T

T P

T N

M

M

SD

1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING

DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING

STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL

OTHER TRADES PRIOR TO DEMOLITION.

2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,

AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,

CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES

HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.

3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,

UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,

STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE

STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE

DRAWING AND SPECIFICATIONS.

4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.

5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY

KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.

6. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR

INCOMPLETE FROM REMOVAL OF EXISTING PARTITIONS, MILLWORK,

CASEWORK, OR OTHER FIXED ACCESSORIES AND EQUIPMENT WITH

MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE ARCHITECT.

7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL

ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE

DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE

REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR

RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE

NEW WORK AS SHOWN.

8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE

REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO

FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF

THIS WORK.

9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO

COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND

APPROVAL OF THE LOCAL CODE JURISDICTIONS.

10. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING

REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED

THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.

ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN

PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,

OR FOR CONSULTATION OF PROPER DISPOSAL.

11. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN

APPROVED MANNER IF ANY SUCH WORK WHICH BECOMES DAMAGED.

12. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED

IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE

CONTRACTOR.

13. TEMPORARY LIGHTING AND POWER SHALL BE PART OF THE SCOPE OF THIS

WORK; SEE ELECTRICAL.

14. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING

REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE

DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.

GENERAL DEMOLITION NOTES

G

M A

T R

I X

1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE

CODES, SPECIFICATIONS, LOCAL ORDINANCES, INDUSTRY STANDARDS AND

UTILITY COMPANY REGULATIONS.

2. IN CASE OF DIFFERENCE BETWEEN BUILDING CODES, SPECIFICATIONS, STATE

LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDS, UTILITY COMPANY

REGULATIONS, CONTRACT DOCUMENTS, AND AUTHORITY HAVING JURISDICTION,

THE MOST STRINGENT SHALL GOVERN. CONTRACTOR SHALL PROMPTLY NOTIFY

OWNER IN WRITING OF ANY SUCH DIFFERENCE.

3. NON-COMPLIANCE: SHOULD CONTRACTOR PERFORM ANY WORK THAT DOES NOT

COMPLY WITH REQUIREMENTS OF APPLICABLE BUILDING CODES, STATE LAWS,

LOCAL ORDINANCES, INDUSTRY STANDARDS, UTILITY COMPANY REGULATIONS,

CONTRACT DOCUMENTS, OR AUTHORITY HAVING JURISDICTION, HE SHALL BEAR

ALL COSTS ARISING IN CORRECTING THE DEFICIENCIES.

4. APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL

ORDINANCES, UTILITY COMPANY REGULATIONS AND APPLICABLE REQUIREMENTS

OF MICHIGAN BUILDING CODE, MICHIGAN PLUMBING CODE, MICHIGAN

DEPARTMENT OF FIRE AND BUILDING SERVICES.

5. EXCEPT AS OTHERWISE SPECIFIED HEREIN, ALL PIPING WORK AND MATERIAL ARE

TO CONFORM TO THE AMERICAN STANDARDS ASSOCIATION CODE FOR PRESSURE

PIPING.

6. PERMITS: CONTRACTOR SHALL PAY FOR ALL BUILDING PERMITS REQUIRED BY

WORK AND PERMITS FOR OPENING STREETS AND FOR CONNECTION TO VARIOUS

UTILITIES, INCLUDING FEES FOR WATER METER INSTALLATION AND ANY OTHER

REQUIREMENTS NECESSARY TO CARRY OUT HIS WORK. WHERE STREETS OR

SIDEWALKS ARE CUT, SAME MUST BE REPAIRED TO AT LEAST AS GOOD A

CONDITION AS THEY WERE BEFORE, ALL AT EXPENSE OF THIS CONTRACTOR.

PERMITS SHALL BE POSTED IN A PROMINENT PLACE AT THE BUILDING SITE AND BE

PROPERLY PROTECTED FROM WEATHER AND PHYSICAL DAMAGE.

GUARANTEE

1. CONTRACTOR SHALL, BY ACCEPTING THESE DRAWINGS AND SPECIFICATIONS,

GUARANTEE THE FOLLOWING:

1.1. HE WILL FURNISH ALL MATERIAL AND EQUIPMENT AS SPECIFIED EXCEPT

WHERE SPECIFIC WRITTEN APPROVAL IS GIVEN BY ENGINEER FOR

SUBSTITUTION.

1.2. ALL MATERIAL AND EQUIPMENT WILL BE INSTALLED SUBSTANTIALLY AS

SHOWN ON DRAWINGS AND AS REQUIRED WITHIN INTENT OF THESE

SPECIFICATIONS. ALL EQUIPMENT SHALL BE INSTALLED PER THE

MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS.

1.3. ALL EQUIPMENT, PIPING, ETC., WILL BE DRIPTIGHT, AIRTIGHT, FREE OF

VIBRATION, POUNDING AND OTHER OBJECTIONABLE NOISES.

1.4. ALL EQUIPMENT, ACCESSORIES AND MATERIAL FURNISHED BY THE

CONTRACTOR, INCLUDING INSTALLATION, PIPE JOINTS, ETC., FURNISHED

AND/OR DONE BY HIM FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL

ACCEPTANCE AGAINST ALL DEFECTS IN MATERIAL AND WORKMANSHIP.

1.5. IF ANY EQUIPMENT, MATERIAL AND/OR PIPE JOINTS, CONNECTIONS, ETC.,

FAILS OR DOES NOT OPERATE SATISFACTORILY OR SHOWS UNDUE WEAR,

HE WILL, UPON BEING NOTIFIED, IMMEDIATELY REMEDY DEFECT AT HIS OWN

EXPENSE.

WORK AND WORKMANSHIP

1. PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND CONTRACTOR'S

SERVICES NECESSARY FOR COMPLETE INSTALLATION OF SYSTEMS REQUIRED IN

FULL CONFORMITY WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION,

ALL AS INDICATED ON DRAWINGS AND HEREIN SPECIFIED.

2. FINISHED JOB SHALL BE FUNCTIONAL AND COMPLETE IN EVERY DETAIL,

INCLUDING ANY AND ALL SUCH ITEMS REQUIRED FOR A COMPLETE SYSTEM

WHETHER OR NOT THESE ITEMS BE SPECIFIED OR SHOWN ON DRAWINGS.

3. SPECIAL ATTENTION SHALL BE GIVEN TO ACCESSIBILITY OF WORKING PARTS AND

CONTROLLING PARTS. ADJUSTABLE PARTS SHALL BE WITHIN EASY REACH.

REMOVABLE PARTS SHALL HAVE SPACE FOR REMOVAL.

4. EACH CONTRACTOR SHALL ACQUAINT HIMSELF WITH DETAILS OF ALL WORK TO BE

PERFORMED BY OTHER TRADES AND TAKE NECESSARY STEPS TO INTEGRATE

AND COORDINATE HIS WORK WITH OTHER TRADES.

5. IT IS ASSUMED THE CONTRACTOR IS FAMILIAR WITH STANDARD 1ST CLASS

INSTALLATION PROCEDURES. THEREFORE, THESE SPECIFICATIONS DO NOT

ATTEMPT TO INCLUDE EVERY DETAIL OR OPERATION NECESSARY FOR THE

COMPLETE INSTALLATION.

6. IT SHOULD BE PARTICULARLY NOTED THAT THE TERMS "FURNISH" AND "PROVIDE"

ARE INTERCHANGEABLE AND THAT EACH OF THESE MEANS TO PROVIDE, INSTALL

AND CONNECT, UNLESS OTHERWISE STATED.

7. WHENEVER TABLES OR SCHEDULES SHOW QUANTITY OF MATERIALS, THEY SHALL

NOT BE USED AS A GUIDE TO CONTRACTOR. EACH CONTRACTOR SHALL BE

RESPONSIBLE FOR FURNISHING ALL MATERIALS NOTED ON DRAWINGS AS

SPECIFIED.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION, SAFE-KEEPING AND

CLEANLINESS OF ALL EXISTING EQUIPMENT, MATERIAL, ETC., LOCATED IN SPACES

TO BE REMODELED IN WHICH HE IS WORKING. AS PART OF HIS RESPONSIBILITY,

HE SHALL PROVIDE NECESSARY COVERS, STRUCTURES, ETC., AS REQUIRED TO

KEEP ALL DIRT, WATER, MOISTURE AND DUST FROM EQUIPMENT. METHOD THE

CONTRACTOR PROPOSES TO USE IN PROTECTING EQUIPMENT SHALL BE

COORDINATED WITH ENGINEER AND OWNER'S REPRESENTATIVE FOR APPROVAL

BEFORE ANY WORK IS STARTED. ANY DAMAGE SUSTAINED DURING

CONSTRUCTION SHALL BE CORRECTED OR REPLACED BY CONTRACTOR.

9. MECHANICAL INSTALLATIONS: COORDINATE MECHANICAL EQUIPMENT AND

MATERIALS INSTALLATION WITH OTHER BUILDING COMPONENTS. VERIFY ALL

DIMENSIONS BY FIELD MEASUREMENTS. WHERE MOUNTING HEIGHTS ARE NOT

DETAILED OR DIMENSIONED, INSTALL MECHANICAL SERVICES AND OVERHEAD

EQUIPMENT TO PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL

MECHANICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR

REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL,

CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF

INTERFERENCE WITH OTHER INSTALLATIONS. COORDINATE THE INSTALLATION OF

MECHANICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION

SYSTEM, LIGHT FIXTURES, AND OTHER INSTALLATIONS. INSTALL EQUIPMENT IN

ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTALLATION

INSTRUCTIONS.

10. OPERATION AND MAINTENANCE DATA: MANUFACTURER'S PRINTED OPERATION

PROCEDURES TO INCLUDE START-UP, BREAK-IN, ROUTINE, NORMAL, SUMMER

AND WINTER OPERATION INSTRUCTIONS, REGULATION, CONTROL, STOPPING,

SHUT-DOWN, AND EMERGENCY INSTRUCTIONS. PROCEDURES FOR ROUTINE

PREVENTATIVE MAINTENANCE AND TROUBLESHOOTING DISASSEMBLY, REPAIR,

AND REASSEMBLE, ALIGNING AND ADJUSTING INSTRUCTIONS, TRAIN OWNER'S

PERSONNEL ON PROCEDURES FOR STARTING, STOPPING, TROUBLESHOOTING,

SERVICING, AND MAINTAINING EQUIPMENT. TURN OVER TO THE OWNER.

11. RECORD DRAWINGS: THE CONTRACTOR SHALL KEEP A RUNNING RECORD OF

EACH CHANGE AND DEVIATION FROM THE DRAWINGS. UPON THE COMPLETION OF

THE PROJECT, THE CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF CLEAN

DRAWINGS NEATLY SHOWING DEVIATIONS FROM THE CONTRACT DOCUMENTS

WITH DIMENSIONS SHOWING THE EXACT LOCATION OF CONCEALED OR

INACCESSIBLE PIPING, DUCTS, ETC.

ASSIGNMENT OF MISCELLANEOUS WORK

1. PAINTING: MECHANICAL CONTRACTOR WILL PROVIDE PRIME PAINTING ON ALL

FERROUS METALS SUCH AS SUPPORT STEEL OR HANGERS FOR MECHANICAL

PIPING AND EQUIPMENT. PIPING IS NOT TO BE PRIMED. ANY FINISH PAINTING

REQUIRED, INCLUDING PAINTING OF PIPING AND STEEL EXPOSED TO OUTSIDE

ENVIRONMENT WILL BE PAINTED BY MECHANICAL CONTRACTOR.

2. PLATFORMS AND SUPPORTING STANDS: FOR MECHANICAL EQUIPMENT SHALL BE

FURNISHED BY MECHANICAL CONTRACTOR UNLESS NOTED OTHERWISE.

3. HOLES THRU STRUCTURAL: HOLES REQUIRED FOR PIPING OR DUCTWORK OF SIZE

5" OR SMALLER SHALL BE CUT IN FIELD AT EXPENSE OF MECHANICAL

CONTRACTOR WITH APPROVAL OF STRUCTURAL ENGINEER. OWNER SHALL BE

GIVEN APPROVAL PRIOR TO ANY CUTTING. ALL LARGER HOLES SHALL BE

PROVIDED BY OTHERS, WITH LOCATION APPROVAL FROM STRUCTURAL

ENGINEER.

4. CEILING AND WALL ACCESS PANELS: MECHANICAL CONTRACTOR SHALL CUT AND

PATCH FINISHED AREAS AS REQUIRED BY MECHANICAL CONTRACTOR. PROVIDE

WHERE SHOWN OR REQUIRED FOR ACCESS TO COILS, VALVES, ETC., ACCESS

PANELS AS SPECIFIED.

5. CUTTING AND PATCHING: MECHANICAL CONTRACTOR SHALL CUT AND PATCH

FINISHED AREAS AS REQUIRED BY MECHANICAL CONTRACTOR. IN ABSENCE OF

GENERAL CONTRACTOR, EACH CONTRACTOR SHALL DO HIS OWN CUTTING AND

PATCHING.

6. ROOF OPENINGS AND FLASHING REQUIRED BY MECHANICAL CONTRACTOR SHALL

BE BY MECHANICAL CONTRACTOR. MECHANICAL CONTRACTOR IS RESPONSIBLE

FOR CORRECT SIZE AND LOCATION OF SAME. COUNTER FLASHING BY

MECHANICAL CONTRACTOR. PIPE CURBS SHALL BE USED FOR ALL ROOF

PENETRATIONS CREATED BY PIPING OR CONDUIT RELATED TO MECHANICAL

EQUIPMENT.

7. PADS AND FOUNDATIONS FOR MECHANICAL EQUIPMENT SHALL BE FORMED AND

POURED BY MECHANICAL CONTRACTOR. MECHANICAL CONTRACTOR SHALL

VERIFY PADS AND ALL ANCHORING DEVICES.

8. ROOF CURBS AND BASES FOR VENTILATORS, ROOF INTAKES AND RELIEF AND

FANS SHALL BE FURNISHED BY MECHANICAL CONTRACTOR AND FLASHED

WEATHER TIGHT TO ROOF TO SATISFACTION OF ENGINEER.

SHOP DRAWING

1. COMPLETE SCHEDULE OF EQUIPMENT, ETC., PROPOSED FOR INSTALLATION

SHALL BE SUBMITTED FOR APPROVAL BEFORE ORDERS ARE PLACED.

2. ELECTRONIC SHOP DRAWINGS SHALL BE REQUIRED WITHIN 30 DAYS OF AWARD

ON CONTRACT AND SHALL INCLUDE CATALOG NUMBERS AND OTHER PERTINENT

INFORMATION.

3. THE CONTRACTOR SHALL SUBMIT EQUIPMENT SHOP DRAWINGS TO THE

ARCHITECT FOR APPROVAL PRIOR TO ORDERING OF ANY OF THE FOLLOWING:

1.1. BOILERS (B-1), (B-2), (B-3)

1.2. BOILER PUMPS (BP-1), (BP-2), (BP-3)

1.3. PUMPS (P-1), (P-2), (P-3), (P-4)

1.4. HYDRONIC PIPING

1.5. HYDRONIC SPECIALTIES

1.6. INSULATION

1.7. CONTROLS

DRAWINGS

1. MECHANICAL DRAWINGS SHOW GENERAL ARRANGEMENT OF ALL PIPING

EQUIPMENT AND APPURTENANCES. THEY SHALL BE FOLLOWED AS CLOSELY AS

ACTUAL BUILDING CONSTRUCTION AND WORK OF OTHER TRADES WILL PERMIT.

2. MECHANICAL WORK SHALL CONFORM TO REQUIREMENTS SHOWN ON ALL

DRAWINGS. GENERAL AND STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE

OVER MECHANICAL DRAWINGS.

3. BECAUSE OF SMALL SCALE OF MECHANICAL DRAWINGS IT IS NOT POSSIBLE TO

INDICATE ALL OFFSETS, FITTINGS AND ACCESSORIES WHICH MAY BE REQUIRED.

CONTRACTOR SHALL INVESTIGATE STRUCTURAL AND FINISH CONDITIONS

AFFECTING WORK AND SHALL ARRANGE HIS WORK ACCORDINGLY, PROVIDING

SUCH FITTINGS, VALVES AND ACCESSORIES AS MAY BE REQUIRED TO MEET SUCH

CONDITIONS.

COORDINATION BETWEEN CONTRACTORS

1. EACH CONTRACTOR AND SUBCONTRACTOR SHALL STUDY ALL DRAWINGS

APPLICABLE TO THIS WORK SO COMPLETE COORDINATION BETWEEN TRADES

WILL BE EFFECTED. SPECIAL ATTENTION SHALL BE GIVEN TO POINTS WHERE

DUCTS CROSS OTHER DUCTS OR PIPING, WHERE LIGHTS FIT INTO CEILINGS AND

WHERE PIPE, DUCTS AND CONDUIT PASS THRU WALLS AND COLUMNS.

2. IT IS RESPONSIBILITY OF EACH CONTRACTOR AND SUBCONTRACTOR TO LEAVE

NECESSARY ROOM FOR OTHER TRADES. NO EXTRA COMPENSATION WILL BE

ALLOWED TO COVER COST OF REMOVING PIPING, CONDUIT, DUCTS OR

EQUIPMENT FOUND ENCROACHING ON SPACE REQUIRED BY OTHERS.

MINOR DEVIATIONS

1. FOR PURPOSE OF CLARITY AND LEGIBILITY, DRAWINGS ARE ESSENTIALLY

DIAGRAMMATIC ALTHOUGH SIZE AND LOCATION OF EQUIPMENT AND PIPING ARE

DRAWN TO SCALE WHEREVER POSSIBLE. VERIFY CONTRACT DOCUMENT

INFORMATION AT SITE.

2. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES

AND DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO

INDICATE ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO CONFORM TO

STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS

AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.

ATTACHING TO BUILDING CONSTRUCTION

1. EQUIPMENT AND PIPING SUPPORTS SHALL BE ATTACHED TO STRUCTURAL

MEMBERS (BEAMS, JOISTS, ETC.) RATHER THAN TO FLOOR OR ROOF SLABS.

2. WHERE PIPING IS SUSPENDED FROM NEW CONCRETE CONSTRUCTION, FURNISH,

LOCATE AND INSTALL BLACK STEEL CHANNEL TYPE CONCRETE INSERTS WELDED

TO COVER-PLATE. INSERTS SHALL PROVIDE FOR HORIZONTAL AND VERTICAL

ADJUSTMENTS.

3. WHERE PIPING IS SUSPENDED FROM EXISTING CONCRETE OR MASONRY

CONSTRUCTION, USE EXPANSION SHIELDS TO ATTACH PIPE SUPPORTS TO

CONSTRUCTION. EXPANSION SHIELD BOLT DIAMETER SHALL BE SAME SIZE AS

SUPPORT ROD DIAMETER HEREINAFTER SPECIFIED.

4. ERECTION OF METAL SUPPORTS & ANCHORAGES: CUT, FIT, AND PLACE

MISCELLANEOUS METAL SUPPORTS ACCURATELY IN LOCATION, ALIGNMENT, AND

ELEVATION TO SUPPORT AND ANCHOR MECHANICAL MATERIALS AND EQUIPMENT.

BALANCING

1. WORK BY MECHANICAL CONTRACTOR.

2. GENERAL: BALANCE AND ADJUST SYSTEMS TO ACHIEVE COMFORT AND PROPER

OPERATION OF SYSTEMS.

2.1. USE PROCEDURES AS OUTLINED IN NATIONAL STANDARDS FOR FIELD

MEASUREMENTS AND INSTRUMENTATION, CURRENT VOLUME, AS PUBLISHED

BY ASSOCIATED AIR BALANCE COUNCIL.

2.2. IF A PIECE OF EQUIPMENT IS NOT OPERATING IN SATISFACTORY MANNER,

COORDINATE WITH MANUFACTURER TO REPAIR OR ADJUST.

2.3. SUBMIT REPORT TO ENGINEER IF SYSTEM OR PIECE OF EQUIPMENT CANNOT

BE ADJUSTED TO OPERATE SATISFACTORILY.

PIPING

1. INSTALL CHROME-PLATED PIPE ESCUTCHEONS ON EXPOSED PIPE @ FLOORS,

WALLS, AND CEILINGS.

2. 125# WROUGHT COPPER UNIONS WITH SOLDER JOINT FITTINGS, CRANE 633.

3. FURNISH AND INSTALL SUPPORTS, GUIDES AND ANCHORS REQUIRED FOR

PROPER SUPPORT OF PIPES.

4. SUPPORT VERTICAL RUNS WITH HANGER ADJACENT TO ELBOW.

5. SUPPORT HORIZONTAL PIPE WITH GALVANIZED ALL-THREAD STEEL RODS (ASTM

A107). SPACING: 1/2" - 2" PIPE, 8'-0" ON CENTERS WITH 3/8" DIA. ROD, 2 1/2" - 3" PIPE, 12'-0" ON CENTERS WITH 1/2" DIA. ROD.

6. DOMESTIC COLD WATER HARD COPPER TUBE, ASTM B88, TYPE-L WATER TUBE,

DRAWN TEMPER WITH COPPER SOLDER JOINT PRESSURE FITTINGS. JOINING

MATERIAL: SOLDER, ASTM B32, ALLOY SN95, SN94, OR E, LEAD FREE. CLEANING &

DISINFECTING: PURGE AND DISINFECT POTABLE WATER SYSTEMS AS

PRESCRIBED BY AUTHORITIES HAVING JURISDICTION.

7. GAS:

7.1. PIPING: COMPLY WITH NFPA 70 AND MPC. STEEL PIPE: ASTM A53, TYPE E OR

S, GRADE B, SCHEDULE 40, BLACK. MALLEABLE-IRON THREADED FITTINGS:

ASME B16.3, CLASS 150, STANDARD PATTERN. UNIONS: ASME B16.39, CLASS

150, MALLEABLE-IRON WITH BRASS TO IRON SEAT, GROUND JOINT, AND

THREADED ENDS.

7.2. STOPS: BRONZE BOTH WITH AGA STAMPS. PLUG TYPE WITH BRONZE PLUG

AND SQUARE HEAD. 2-PSIG MINIMUM PRESSURE RATING.

8. BALL VALVES: TWO PIECE ALLOY, BRONZE BODY WITH FULL PORT, CHROME

PLATED BALL, TFE SEATS, 600-PSIG MINIMUM CWP RATING. LEVER HANDLE WITH

EXTENDED STEM FOR INSULATION.

8.1. USE DIELECTRIC COUPLINGS WHEN JOINING DISSIMILAR PIPING MATERIALS.

PIPE HANGERS

1. ADJUSTABLE STEEL CLEVIS HANGERS, NON-METALLIC COATING FOR

ELECTROLYTIC PROTECTION WHERE ATTACHMENTS ARE IN DIRECT WITH

COPPER. COPPER U-STRAP HANGERS FOR UN-INSULATED PIPE. COMPLY WITH

MSS STANDARD PRACTICE SP-69.

INSULATION

1. PIPE INSULATION

1.1. SERVICE-DOMESTIC COLD WATER. MATERIAL: 1" MINERAL FIBER WITH ASJ

JACKET. SEAL JOINTS TO PREVENT CONDENSATION.

1.2. APPLY INSULATION ONLY AFTER PIPES HAVE BEEN TESTED AND CLEANED.

1.3. INSTALL INSULATION IN A NEAT WORKMANLIKE MANNER.

1.4. ALL INSULATION: RATING NOT TO EXCEED 25 FLAME, 50 SMOKE, RATED FOR

USE IN RETURN AIR PLENUM.

HVAC PIPING

1. ACCEPTABLE MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,

PROVIDE PRODUCTS BY ONE OF THE FOLLOWING:

2. GROOVED MECHANICAL-JOINT FITTINGS AND COUPLINGS:

2.1. VICTAULIC COMPANY OF AMERICA

3. CALIBRATED BALANCING VALVES:

3.1. FLOW DESIGN, INC.

3.2. GERAND ENGINEERING COMPANY.

3.3. GRISWOLD CONTROLS

3.4. TOUR AND ANDERSSON, VICTAULIC

4. STEEL PIPE, NPS 2 AND SMALLER: ASTM A 53/A 53M, TYPE S (SEAMLESS) OR TYPE

F (FURNACE-BUTT WELDED), GRADE B, SCHEDULE 40, BLACK STEEL, PLAIN ENDS.

5. STEEL PIPE, NPS 2-1/2 THROUGH NPS 12: ASTM A 53/A 53M, TYPE E

(ELECTRIC-RESISTANCE WELDED), GRADE B, SCHEDULE 40, BLACK STEEL, PLAN

ENDS.

6. CAST-IRON THREADED FITTINGS: ASME B16.4; CLASSES 125 AND 250.

7. MALLEABLE-IRON THREADED FITTINGS: ASME B16.3, CLASSES 150 AND 300.

8. MALLEABLE-IRON UNIONS: ASME B16.39: CLASSES 150, 250, AND 300.

9. CAST-IRON PIPE FLANGES AND FLANGED FITTINGS: ASME B16.1, CLASSES 25, 125,

AND 250; RAISED GROUND FACE, AND BOLT HOLES SPOT FACED.

10. WROUGHT-STEEL FITTINGS: ASTM A 234/A 234M, WALL THICKNESS TO MATCH

ADJOINING PIPE.

11. WROUGHT CAST- AND FORGED-STEEL FLANGES AND FLANGED FITTINGS: ASME

B16.5, INCLUDING BOLTS, NUTS, AND GASKETS OF THE FOLLOWING MATERIAL

GROUP, END CONNECTIONS, AND FACINGS:

11.1. MATERIAL GROUP: 1.1.

11.2. END CONNECTIONS: BUTT WELDING

11.3. FACINGS: RAISED FACE

12. GROOVED MECHANICAL-JOINT FITTINGS: ASTM A 536, GRADE 65-45-12 DUCTILE

IRON; ASTM A 52, TYPE F, E, OR S, GRADE B FABRICATED STEEL; OR ASTM A 106,

GRADE B STEEL FITTINGS WITH GROOVES OR SHOULDERS DESIGNED TO ACCEPT

VICTAULIC GROOVED END COUPLINGS.

13. GROOVED MECHANICAL-JOINT COUPLINGS: DUCTILE-IRON HOUSING AND

SYNTHETIC RUBBER GASKET OF CENTRAL CAVITY PRESSURE-RESPONSIVE

DESIGN; WITH NUTS, BOLTS, LOCKING PIN, LOCKING TOGGLE, OR LUGS TO

SECURE GROOVED PIPE AND FITTINGS. COMPLY WITH ASTM A 536 GRADE

65-45-12, 65,000 PSI MINIMUM TENSILE STRENGTH.

13.1. KEY SECTION DESIGNED TO ENGAGE FULLY INTO THE GROOVE TYING THE

JOINT INTEGRALLY TO THE PIPE.

13.2. GASKETS SHALL BE SUITABLE FOR THE TEMPERATURE AND FLUID USED IN

THE SYSTEM USE GRADE "EHP" EPDM GASKETS WITH UNIQUE SEALING

DESIGN, RATED FOR CONTINUOUS USE AT 250 DEG F OR GRADE "E" EPDM

GASKETS RATED FOR CONTINUOUS USE AT 230 DEG F UNLESS INDICATED

OTHERWISE.

13.3. USE RIGID "QUICKVIC" OR "ZERO-FLEX" COUPLINGS UNLESS FLEX

COUPLINGS ARE INDICATED FOR VIBRATION ISOLATION OR TO

ACCOMMODATE SEISMIC MOVEMENT.

13.4. "INSTALLATION READY" COUPLINGS, 2" THROUGH 8", SHALL BE DESIGNED

FOR DIRECT 'STAB' INSTALLATION ONTO GROOVED END PIPE WITHOUT

PRIOR FIELD DISASSEMBLY AND NO LOOSE PARTS. GASKET SHALL BE

GRADE "EHP" EPDM. VICTAULIC STYLE 107H QUICKVIC (RIGID) AND STYPE 177

(FLEXIBLE).

14. FLEXIBLE CONNECTORS: STAINLESS-STEEL BELLOWS WITH WOVEN, FLEXIBLE,

BRONZE, WIRE-REINFORCING PROTECTIVE JACKET; 150-PSIG MINIMUM WORKING

PRESSURE AND 250 DEG F MAXIMUM OPERATING TEMPERATURE. CONNECTORS

SHALL HAVE FLANGED OR THREADED-END CONNECTIONS TO MATCH EQUIPMENT

CONNECTED AND SHALL BE CAPABLE OF 3/4"-INCH MISALIGNMENT.

14.1. VICTAULIC STYLE 177, 77 OR W77 FLEXIBLE COUPLINGS MAY BE USED IN LIEU

OF FLEXIBLE CONNECTORS FOR VIBRATION ISOLATION AT EQUIPMENT

CONNECTIONS. THREE (3) COUPLINGS, FOR EACH CONNECTOR, SHALL BE

PLACED IN CLOSE PROXIMITY TO THE SOURCE OF VIBRATION.

15. HOSE KITS: EPDM TUBE WITH BRAIDED STAINLESS STEEL OUTER JACKET; BRASS

FEMALE PIPE SWIVEL, BOTH ENDS WITH CRIMP STAINLESS STEEL COLLAR; 33 TO

180 DEG F, RANGE; WITH FIBROUS FLAT WASHER; 255 PSI WORKING PRESSURE AT

70 DEG F.

16. PACKED, SLIP, EXPANSION JOINTS: 150-PSIG MINIMUM WORKING PRESSURE,

STEEL PIPE FITTING CONSISTING OF TELESCOPING BODY AND SLIP-PIPE

SECTIONS, PACKING RING, PACKING, LIMIT RODS, FLANGED ENDS, AND

CHROME-PLATED FINISH ON SLIP-PIPE TELESCOPING SECTION.

17. IN VICTAULIC GROOVED PIPING SYSTEM, EXPANSION AND CONTRACTION SHALL

BE ACCOMMODATED BY INSTALLING EXPANSION LOOPS OR BENDS CONSISTING

OF (8) VICTAULIC FLEXIBLE COUPLINGS, (4) 90 DEGREE ELBOWS, AND (3)

GROOVED END PIPE SPOOLS PROVIDED IN WATER SYSTEMS UP TO +250 DEGREES

F IN ACCORDANCE WITH VICTAULIC RECOMMENDATION FOR EXPANSION

COMPENSATION.

18. INSTALL VICTAULIC STYLE 150 OR STYLE 155 IN-LINE EXPANSION JOINTS IN

ENCLOSURES WHERE LOOPS OR BENDS CANNOT BE APPLIED.

19. WELDING MATERIALS: COMPLY WITH SECTION ll, PART C, OF THE ASME BOILER

AND PRESSURE VESSEL CODE FOR WELDING MATERIALS APPROPRIATE FOR

WALL THICKNESS AND FOR CHEMICAL ANALYSIS OF PIPE BEING WELDED.

20. GASKET MATERIAL: THICKNESS, MATERIAL, AND TYPE SUITABLE FOR FLUID TO BE

HANDLED; AND DESIGN TEMPERATURE AND PRESSURES

HVAC PIPING INSULATION

1. MAINTAIN AMBIENT CONDITIONS REQUIRED BY MANUFACTURERS OR EACH

PRODUCT. MAINTAIN TEMPERATURE BELORE, DURING, AND AFTER INSTALLATION

FOR MINIMUM OF 24 HOURS.

2. SURFACE BURNING CHARACTERISTICS: FLAME SPREAD INDEX/SMOKE DEVELOPED

INDEX OF 25/50 , MAXIMUM, WHEN TESTED IN ACCORDANCE WITH ASTM E84 OR UL

723.

3. MINERAL FIBER INSULATION THICKNESS:

3.1. PREFORMED PIPE SIZE 1.5" TO < 4": 2" THICK

3.2. PREFORMED PIPE SIZE 4" TO < 8": 2" THICK

4. SUBMITTALS:

4.1. PROVIDE PRODUCT DESCRIPTION, THERMAL CHARACTERISTICS, LIST OF

MATERIALS AND THICKNESS FOR EACH SERVICE, AND LOCATIONS.

4.2. INDICATE INSTALLATION PROCESURES THAT ENSURE ACCEPTABLE

WORKMANSHIP AND INSTALLATION STANDARDS WILL BE ACHIEVED.

5. QUALITY ASSURANCE:

5.1. MANUFACTURER QUALIFICATIONS: COMPANY SPECIALIZING IN

MANUFACTURING THE PRODUCTS SPECIFIED IN THIS SECTION WITH NOT

LESS THAN THREE YEARS OF DOCUMENTED EXPERIENCE.

BOILERS

1. ACCEPTABLE MANUFACTURERS:

1.1. AERCO

2. SYSTEM: GAS-FIRED, DIRECT HEATING BOILER, CIRCULATING PUMP, CONTROLS,

PIPING AND VALVING AS INDICATED, STORAGE TANK.

2.1. PUMP: IN-LINE CIRCULATION PUMP MOUNTED ON BOILER, CONTROLLED BY

TANK-MOUNTED IMMERSION THERMOSTAT.

2.2. THERMOSTAT SETPOINT: 180 DEGREES F (82DEGREES C).

2.3. THERMOSTATIC VALVE: THREE-WAY, SELF CONTAINED, FULL LINE SIZE,

BRONZE BODY 1/2-TO 2-INCH SIZE, IRON BODY 2-1/2 INCHES AND OVER, SET

AT 140 DEGREES F.

3. COMMERCIAL GAS-FIRED BOILERS:

3.1. TYPE: AUTOMATIC, NATURAL GAS FIRED.

3.2. MINIMUM EFFICIENCY REQUIRED: ASHRAE STD 90.1 I-P

3.3. REFER TO SCHEDULE TO ON DRAWINGS FOR BOILER PERFORMANCE AND

MODULATION.

4. COMMERCIAL GAS-FIRED CONDENSING BOILERS:

5. ACCEPTABLE MANUFACTURERS:

5.1. LOCHINVAR

6. THE BOILER SHALL BE INSTALLED AND VENTED WITH A DIRECT VENT SYSTEM.

REFER TO DRAWINGS FOR A VERTICAL OR HORIZONTAL TERMINATION FOR BOTH

THE VENT AND COMBUSTION AIR. THE FLUE SHALL BE PVC, CPVC,

POLYPROPYLENE OR STAINLESS-STEEL SEALED VENT MATERIAL TERMINATING

WITH THE MANUFACTURER'S SPECIFIED VENT TERMINATION. A SEPARATE PIPE

SHALL BE PVC, CPVC, ABS, GALVANIZED, POLYPROPYLENE OR STAINLESS-STEEL

SEALED PIPE. THE BOILER'S TOTAL COMBINED AIR INLET MUST TERMINATE WITH

THE MANUFACTURER'S SPECIFIED AIR INLET CAP. THE WATER HEATER'S TOTAL

COMBINED EXHAUST VENTING LENGTH SHALL NOT EXCEED 150 EQUIVALENT

FEET. FOAM CORE PIPE IS NOT AN APPROVED MATERIAL FOR EXHAUST PIPING.

IN-LINE PUMPS

1. ACCEPTABLE MANUFACTURERS:

1.1. BELL & GOSSETT

1.2. ARMSTRONG

2. DESCRIPTION: FACTORY-ASSEMBLED AND TESTED, CENTRIFUGAL,

OVERHUNG-IMPELLER, CLOSE-COUPLED, IN-LINE PUMP. DESIGNED FOR

INSTALLATION WITH PUMP AND MOTOR SHAFTS MOUNTED HORIZONTALLY OR

VERTICALLY.

3. PUMP CONSTRUCTION:

3.1. IMPELLER: ASTM B584, CAST BRONZE; STATICALLY AND DYNAMICALLY

BALANCED, KEYED TO SHAFT, AND SECURED WITH A LOCKING CAP SCREW.

FOR CONSTANT-SPEED PUMPS, TRIM IMPELLER TO MATCH SPECIFIED

PERFORMANCE.

3.2. PUMP SHAFT SLEEVE: BRONZE

3.3. PUMP STUB SHAFT: TYPE 304 STAINLESS STEEL.

3.4. SEAL: MECHANICAL SEAL CONSISTING OF CARBON ROTATING RING AGAINST

A CERAMIC SEAT HELD BY A STAINLESS STEEL SPRING, AND

EPR/CARBON/SILOCON-CARBIDE RUBBER BELLOWS AND GASKET. INCLUDE

WATER SLINGER ON SHAFT BETWEEN MOTOR AND SEAL.

3.5. SEAL FLUSHING: FLUSH, COOL, AND LUBRICATE PUMP SEAL BY DIRECTION

PUMP DISCHARGE WATER TO FLOW OVER THE SEAL.

4. MOTOR: COMPLY WITH NEMA DESIGNATION, TEMPERATURE RATING, SERVICE

FACTOR, AND EFFICIENCY REQUIREMENTS FOR MOTORS.

4.1. ENCLOSURE : TOTALLY ENCLOSED, FAN COOLED.

4.2. NEMA PREMIUM EFFICIENT MOTORS AS DEFINED IN NEMA MG 1.

4.3. MOTOR SIZES: MINIMUM SIZE AS INDICATED. IF NOT INDICATED, LARGE

ENOUGH SO DRIVEN LOAD WILL NOT REQUIRE MOTOR TO OPERATE IN

SERVICE FACTOR RANGE ABOCE 1.0.

4.4. CONTROLLERS, ELECTRICAL DEVICES, AND WIRING: COMPLY WITH

REQUIREMENTS FOR ELECTRICAL DEVICES AND CONNECTIONS SPECIFIED IN

ELECTRICAL SECTIONS.

4.5. VARIABLE-SPEED MOTOR.

4.6. PROVIDE INTEGRAL PUMP MOTOR VARIABLE-SPEED CONTROLLER.

4.7. BASIS OF DESIGN: BELL AND GOSSETT E-90

4.8. CAPACITIES AND CHARACTERISTICS: REFER TO DRAWINGS.

BASE-MOUNTED END SUCTION PUMPS

1. ACCEPTABLE MANUFACTURERS:

1.1. BELL & GOSSETT

2. DESCRIPTION: FACTORY-ASSEMBLED AND TESTED, CENTRIFUGAL,

OVERHUNG-IMPELLER, SEPARATELY COUPLED, END-SUCTION PUMP WITH

FLEXIBLE SHAFT COUPLING. DESIGNED FOR BASE MOUNTING, WITH PUMP AND

MOTOR SHAFTS HORIZONTAL.

3. PUMP CONSTRUCTION:

3.1. IMPELLER: ASTM B584, CAST BRONZE; STATICALLY AND DYNAMICALLY

BALANCED, KEYED TO SHAFT, AND SECURED WITH A LOCKING CAP SCREW.

FOR PUMPS THAT ARE NOT FREQUENCY-DRIVE CONTROLLED, TRIM

IMPELLER TO MATCH SPECIFIED PERFORMANCE.

3.2. PUMP SHAFT: CARBON STEEL, WITH COPPER-ALLOY SHAFT SLEEVE.

3.3. SEAL, MECHANICAL TYPE: MECHANICAL SEAL CONSISTING OF CARBON

ROTATION RING AGAINST A CERAMIC SEAT HELD BY A STAINLESS STEEL

SPRING, AND BUNA BELLOWS AND GASKET.

3.4. SEAL, PACKING TYPE: PACKING SEALCONSISTING OF STUFFING BOX WITH A

MINIMUM OF FOUR RINGS ON GRAPHITE-IMPREGNATED BRAIDED YARN WITH

BRONZE LANTERN RING BETWEEN CENTER TWO GRAPHITE RINGS, AND

BRONZE PACKING GLAND.

3.5. PUMP BEARINGS: GREASE-LUBRICATED BALL BEARINGS IN CAST-IRON

HOUSING WITH GREASE FITTINGS.

4. SHAFT COUPLING: MOLDED-RUBBER INSERT AND INTERLOCKING SPIDER CAPABLE

OF ABSORBING VICRATION. COUPLINGS SHALL BE DROP-OUT TYPE TO ALLOW

DISASSEMBLY AND REMOVAL WITHOUT REMOVING PUMP SHAFT OR MOTOR.

5. COUPLING GUARD: DUAL RATED; ANSI B15.1, SECTION 8; OSHA 1910.219

APPROVED; STEEL; REMOVABLE; ATTACHED TO MOUNTING FRAME.

6. MOTOR: COMPLY WITH NEMA DESIGNATION, TEMPERATURE RATING, SERVICE

FACTOR, AND EFFICIENCY REQUIREMENTS FOR MOTORS.

6.1. ENCLOSURE: TOTALLY ENCLOSED, FAN COOLED

6.2. NEMA PREMIUM EFFICIENT MOTORS AS DEFINED IN NEMA MG 1.

6.3. MOTOR SIZES: MINIMUM SIZE AS INDICATED. IF NOT INDICATED, LARGE

ENOUGH SO DRIVEN LOAD WILL NOT REQUIRE MOTOR TO OPERATE IN

SERVICE FACTOR RANGE ABOVE 1.0.

6.4. CONTROLLERS, ELECTRICAL DEVICES, AND WIRING: COMPLY WITH

REQUIREMENTS FOR ELECTRICAL DEVICES AND CONNECTIONS SPECIFIED IN

ELECTRICAL SECTIONS.

6.5. VARIABLE-SPEED MOTOR.

6.6. BASIS OF DESIGN: BELL AD GOSSETT E-1510.

6.7. CAPACITIES AND CHARACTERISTICS: REFER TO DRAWINGS.

MECHANICAL SPECIFICATIONSCOMMISSIONING SPECIFICATIONS

THIS SECTION INCLUDES REQUIREMENTS FOR COMMISSIONING THE HVAC SYSTEM AND ITS

SUBSYSTEMS AND EQUIPMENT.

DEFINITIONS:

1. BOD-HVAC: HVAC SYSTEMS BASIS OF DESIGN.

2. CXA: COMMISSIONING AUTHORITY.

3. SYSTEMS, SUBSYSTEMS, AND EQUIPMENT: WHERE THESE TERMS ARE USED

TOGETHER OR SEPARATELY, THEY SHALL MEAN "AS-BUILT" SYSTEMS,SUBSYSTEMS,

AND EQUIPMENT.

4. TAB: TESTING, ADJUSTING, AND BALANCING.

CONTRACTOR'S RESPONSIBILITIES:

CONTRACTOR:

1. ATTEND PROCEDURES MEETING FOR TAB WORK.

2. CERTIFY THAT TAB WORK IS COMPLETE.

3. MECHANICAL SUBCONTRACTOR:

4. COMPLETE ALL PRE-START-UP, START-UP, AND COMMISSIONING FORMS AND

PROCEDURES AS DIRECTED BY THE CXA.

5. ATTEND TAB VERIFICATION TESTING.

6. PROVIDE MEASURING INSTRUMENTS AND LOGGING DEVICES TO RECORD TEST

DATA, AND DATA ACQUISITION EQUIPMENT TO RECORD DATA FOR THECOMPLETE

RANGE OF TESTING FOR THE REQUIRED TEST PERIOD.

7. HVAC INSTRUMENTATION AND CONTROL SUBCONTRACTOR: WITH THE CXA,

REVIEW CONTROL DESIGNS FOR COMPLIANCE WITH BOD, CONTROLLABILITY WITH

RESPECT TO ACTUAL EQUIPMENT TO BE INSTALLED, AND RECOMMEND

ADJUSTMENTS TO CONTROL DESIGNS AND SEQUENCE OF OPERATION

DESCRIPTIONS.

TAB SUBCONTRACTOR:

1. CONTRACT DOCUMENTS REVIEW: WITH THE CXA, REVIEW THE CONTRACT

DOCUMENTS BEFORE DEVELOPING TAB PROCEDURES.

2. VERIFY THE FOLLOWING:

2.1. ACCESSIBILITY OF EQUIPMENT AND COMPONENTS REQUIRED FOR TAB WORK.

ADEQUATE NUMBER AND PLACEMENT OF BALANCING VALVES TO ALLOW PROPER

BALANCING AND RECORDING OF WATER FLOW.

2.2. ADEQUATE NUMBER AND PLACEMENT OF TEST PORTS AND TEST INSTRUMENTATION

TO ALLOW READING AND COMPILATION OF SYSTEM ANDEQUIPMENT

PERFORMANCE DATA NEEDED TO CONDUCT BOTH TAB AND COMMISSIONING

TESTING.

2.3. WATER FLOW RATES HAVE BEEN SPECIFIED AND COMPARED TO CENTRAL

EQUIPMENT OUTPUT CAPACITIES.

ELECTRICAL SUBCONTRACTOR:

1. WITH THE MECHANICAL SUBCONTRACTOR, COORDINATE INSTALLATIONS AND

CONNECTIONS BETWEEN AND AMONG ELECTRICAL AND HVAC SYSTEMS,

SUBSYSTEMS, AND EQUIPMENT.

2. ATTEND TAB VERIFICATION TESTING.

COMMISSIONING DOCUMENTATION

1. BOD HVAC: OWNER WILL PROVIDE BOD-HVAC DOCUMENTS, PREPARED BY

ENGINEER AND APPROVED BY OWNER, TO THE CXA AND EACH CONTRACTOR FOR

USE IN DEVELOPING THE COMMISSIONING PLAN, SYSTEMS MANUAL, AND

OPERATION AND MAINTENANCE TRAINING PLAN.

ASHRAE 90.1-2019 SPECIFIC COMPLIANCE IN COMMISSIONING

1. FUNCTIONAL PERFORMANCE TESTING AND VERIFICATION PROVIDER

1.1. THE COMMISSIONING AGENT SHALL BE OWNER'S HIRED REPRESENTATIVE. THE

COMMISSIONING AGENT IS RESPONSIBLE FOR REVIEWING, COMMISSIONING, AND

TESTING THE MECHANICAL, AND ELECTRICAL SYSTEMS AS REQUIRED BY ASHRAE

90.1-2019 (CURRENT ADOPTED MICHIGAN ENERGY CODE).

2. ITEMS TO BE REVIEWED

2.1. THE FOLLOWING ARE REQUIRED TO BE REVIEWED FOR PROPER CONTROL AND/OR

INCLUSION IN ACCORDANCE WITH ASHRAE 90.1-2019 BY THE CXA PROVIDER.

2.2. INSULATION DESIGN/INSTALLATION

2.3. MECHANICAL HVAC SYSTEMS

3. HVAC/PLUMBING/ELECTRICAL EQUIPMENT EFFICIENCY (ACCORDING TO SIMPLIFIED

APPROACH HVAC)

3.1. EQUIPMENT LABELING

3.2. OFF-HOUR CONTROLS

3.3. HYDRONIC SYSTEM CONTROLS

3.4. OCCUPIED/STANDBY CONTROLS

3.5. BOILER TURNDOWN

3.6. HYDRONIC VARIABLE FLOW SYSTEMS

3.7. BOILER ISOLATION

3.8. HOT-WATER TEMPERATURE RESET CONTROLS

4. ELECTRICAL SYSTEMS

4.1. ELECTRICAL EQUIPMENT EFFICIENCY (ACCORDING TO SIMPLIFIED APPROACH HVAC)

4.2. AUTOMATIC RECEPTACLE CONTROL

4.3. ELECTRICAL ENERGY MONITORING

4.4. INTERIOR LIGHTING CONTROL

4.5. SPECIAL APPLICATION LIGHTING CONTROL

5. OTHER BUILDING SYSTEMS:

5.1. ENERGY SYSTEMS MONITORING

5.2. ENERGY-COST BUDGET/PERFORMANCE PATHS LAID OUT IN THE PRESCRIPTIVE

PATH.

ITEMS TO BE VERIFIED AND PERFORMANCE TESTED

5. THE FOLLOWING ARE REQUIRED TO BE VERIFIED AND PERFORMANCE TESTEDIN

ACCORDANCE WITH ASHRAE 90.1-2019 BY THE CXA PROVIDER.

6. MECHANICAL SYSTEMS

6.1. OFF-HOUR CONTROLS

6.2. HVAC/PIPING INSULATION

6.3. HYDRONIC SYSTEM CONTROLS

6.4. OCCUPIED/STANDBY CONTROLS

6.5. BOILER TURNDOWN

6.6. HYDRONIC VARIABLE FLOW SYSTEMS

6.7. BOILER ISOLATION

7. ELECTRICAL SYSTEMS

7.1. AUTOMATIC RECEPTACLE CONTROL

7.2. ELECTRICAL ENERGY MONITORING

7.3. INTERIOR LIGHTING CONTROL

7.4. SPECIAL APPLICATION LIGHTING CONTROL

M A

T R

X-BX-B

X-14"ø

V DN

X-14"ø

V DN

X-26"ø VENT

X-ET

X-DWH-2

X-ET

X-GLYCOL FILL

STATION

X-DWH-1

1 1

X-CONCRETE

PAD, TYP.

X-CONCRETE

PAD, TYP.

BOILER ROOM

DEMOLITION NOTES

DISCONNECT, REMOVE, AND DEMOLISH EXISTING BOILER

AND ASSOCIATED HEATING SUPPLY/RETURN PIPING TO

EXTENTS SHOWN AND CAP. MODIFY GAS PIPING AS

REQUIRED TO CONNECT TO NEW BOILER. EXISTING

BOILER FRAME TO REMAIN.

DISCONNECT, REMOVE, AND DEMOLISH EXISTING HEATING

SUPPLY CIRCULATING PUMP AND ASSOCIATED PIPING TO

EXTENTS SHOWN. EXISTING CONCRETE PAD TO REMAIN.

DISCONNECT, REMOVE, AND DEMOLISH EXISTING HEATING

SUPPLY CIRCULATING PUMP AND ASSOCIATED PIPING TO

EXTENTS SHOWN.

DISCONNECT, REMOVE, AND DEMOLISH EXISTING 14"ø

FLUE VENT TO EXTENTS SHOWN.

X-BX-B

X-ET

X-DWH-2

X-ET

X-AS

X-CHEMICAL

SHOT FEEDER

X-GLYCOL FILL

STATION

X-4"

X-4"

X-2"

X-HS

X-HS

X-HR

X-HS

X-HR

X-HR

X-HS

X-1"

X-HR

X-HS

X-1/2"

X-P X-PX-4" G UP

X-DWH-1

X-G

X-1-1/2" G

X-1" G

UP

1 1

2 X-P

2 X-P

X-CONCRETE

PAD, TYP.

X-CONCRETE

PAD, TYP.

X-CONCRETE

PAD, TYP.

X-4" X-1/2"

X-4"

X-

HS X-2"

X-4"

X-2"

BOILER ROOM

X-B

X-B

X-14" VENT

X-UH

X-L

X-UH

X-14" VENT

BOILER ROOM4

X-AS

X-B

X-B

X-UH

X-G X-G

X-2"

X-4"

X-R

X-L

X-1/2" DN

TO X-ET

X-CHEMICAL

SHOT FEEDER

X-4" G DNX-1" G DN

X-4" G

UP

X-P

X-3" HS DN

X-3" HS DN

X-3" HR DN

X-3" HR DN

X-FD

2 X-P 2 X-P

X-6"X-5"

X-

HS

X-

HS

X-HS

X-

HR

X-6" X-4"

X-2"

X-2"

X-UH X-1/2"

X-HS

X-6"

X-6" X-2"

X-2"

X-2"

X-

HS

X-2"

X-P

BOILER ROOM

X-HS

X-CONCRETE

PAD, TYP.

X-1"

X-CONCRETE

PAD, TYP.

X-G

X-3/4"

G UP

M A

T R

I X

N KEY PLAN

NTS

AREA OF

WORK

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM LOWER LEVEL FLOOR PLAN - HVAC DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM LOWER LEVEL FLOOR PLAN - PIPING DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM UPPER LEVEL FLOOR PLAN - HVAC DEMOLITION

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM UPPER LEVEL FLOOR PLAN - PIPING DEMOLITION

X-26"ø VENT

X-ET

X-DWH-2

X-ET

X-GLYCOL FILL

STATION

X-DWH-1

X-CONCRETE

PAD, TYP.

X-CONCRETE

PAD, TYP.

BOILER ROOM

B-2B-1

8" CA &

VENT 4

8" CA &

VENT4

HVAC KEY NOTES

INSTALL BOILER ON EXISTING CONCRETE PAD. MODIFY

EXISTING HEATING SUPPLY/RETURN PIPING AS REQUIRED TO

CONNECT TO NEW HEATING SUPPLY/RETURN PIPING. MODIFY

GAS PIPING TO CONNECT TO NEW BOILER. ROUTE PRESSURE

RELIEF AND DRAIN PIPING TO NEAREST FLOOR DRAIN.

INSTALL PUMP ON EXISTING PAD AT LOCATION SHOWN. MODIFY

ASSOCIATED EXISTING HEATING SUPPLY PIPING AS REQUIRED.

INSTALL 1" DRAIN LINE UP TO BOTTOM OF VENT AND ROUTE TO

NEAREST FLOOR DRAIN. PATCH AND SEAL DRAIN LINE

CONNECTION TO DUCTWORK WATER TIGHT.

ROUTE 8"ø COMBUSTION AIR AND VENT PIPING UP THROUGH EXISTING 26"ø VENT OPENING. PATCH ROOF AS REQUIRED TO

BE WATER TIGHT AND MATCH EXISTING ALONG WITH

MAINTAINING EXISTING WARRANTY.

INSTALL BOILER E-STOP, COORDINATE EXACT LOCATION WITH

ELECTRICAL TRADES. PROVIDED BY ELECTRICAL CONTRACTOR.

INSTALL BOILER ON EXISTING METAL FRAMING IN LOCATION OF

PREVIOUS UNIT. MODIFY EXISTING HEATING SUPPLY/RETURN

AS REQUIRED FOR A COMPLETE CONNECTION. MODIFY GAS

PIPING TO CONNECT TO NEW BOILER. ROUTE PRESSURE

RELIEF DRAIN PIPING TO NEAREST FLOOR DRAIN.

CONNECT TO BOILER VENT TO EXISTING 14" VENT.

GENERAL HVAC NOTES

1. FURNISH AND INSTALL CARBON MONOXIDE SENSOR FOR

BOILER SYSTEM. CONNECT TO BAS.

ALTERNATES

ADD ALTERNATE #1: PROVIDE VARIABLE FREQUENCY DRIVE FOR

EACH OF THE FOUR (4) SYSTEM PUMPS.

BP-1

B-1

X-ET

X-DWH-2

X-ET

X-AS

X-CHEMICAL

SHOT FEEDER

X-GLYCOL FILL

STATION

X-4"

X-4"

X-2"

X-HS

X-HS

X-HR

X-HS

X-HR

X-HR

X-HS

X-1"

X-HR

X-HS

X-1/2"

X-4" G UP

X-DWH-1

X-G

X-1-1/2" G

X-1" G

UP

X-CONCRETE

PAD, TYP.

X-CONCRETE

PAD, TYP.

X-CONCRETE

PAD, TYP.

X-4" X-1/2"

X-4"

X-

HS X-2"

X-4"

X-2"

BOILER ROOM

B-2

P-12

P-221

BP-2

X-B

X-14" VENT

X-UH

X-L

X-UH

X-14" VENT

BOILER ROOM

B-3 3 6

BOILER

E-STOP 5

BOILER

E-STOP 5

X-AS

X-B

X-UH

X-G X-G

X-2"

X-4"

X-R

X-L

X-1/2" DN

TO X-ET

X-CHEMICAL

SHOT FEEDER

X-4" G DNX-1" G DN

X-4" G

UP

X-P

X-3" HS DN

X-3" HR DN

X-6"X-5"

X-

HS

X-

HS

X-HS

X-

HR

X-6" X-4"

X-2"

X-2"

X-UH X-1/2"

X-HS

X-6"

X-6" X-2"

X-2"

X-2"

X-

HS

X-2"

BOILER ROOM

X-HS

X-CONCRETE

PAD, TYP.

X-1"

X-CONCRETE

PAD, TYP.

X-G

B-3

3" HS DN

3" HR DN

BP-3

BOILER

E-STOP 5

P-4P-3 22

1 1

BOILER

E-STOP 5

M A

T R

I X

N KEY PLAN

NTS

AREA OF

WORK

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM LOWER LEVEL FLOOR PLAN - HVAC NEW

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM LOWER LEVEL FLOOR PLAN - PIPING NEW

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM UPPER LEVEL FLOOR PLAN - HVAC NEW

SCALE: 1/4" = 1'-0"

0 1 5 10N

BOILER ROOM UPPER LEVEL FLOOR PLAN - PIPING NEW

FLOW DIAGRAM: HEATING PLANT SYSTEM

OAT (AI)

CO (AI)

BP2 (BI)

BLR LVNG (AI)

BLR ENT (AI)

BP2 (BO)

BLR ESTOP (HDW)

BP1 (BO)

BP1 (BI)

HWR (AI)

B1 (BO)

B2 (BO)

B2 ALM (BI)

B2 STS (BI)

HWP1 (BO)

HWP2 (BI)

HWP1 (BI)

B1 STS (BI)

HWP2 (BO)

B1 ALM (BI)

T - 1

CO - 1

HDW - 15

P - 1

P - 2

MS - 4

CS - 8

BP - 2

MS - 2

HWS

T - 6

HDW - 23

HDW - 13

HDW - 6

BP - 1

MS - 2

HWR

MS - 1

T - 5

R - 10

SW - 1

R - 4

CS - 3

T - 2

R - 3

HDW - 21

HDW - 8

R - 8

HDW - 2

PT - 4

PT - 3

R - 2

BLR - 2

BLR - 1

CS - 6

HDW - 12

CS - 1

PT - 1

HDW - 17

R - 7

PT - 2

POINTS LIST: HEATING PLANT SYSTEM

POINT NAME POINTS ALARMS

NOTE: CONTROLS CONTRACTOR

SHALL PROVIDE ALL POINTS,

HARDWARE, AND SOFTWARE AS

REQUIRED TO THE SYSTEM TO

MEET THE SEQUENCE OF

OPERATION AND THE DESIGN

INTENT.

G R

A

PH

IC

A

N A

LO

G

H A

R D

W A

R E

IN

PU

T (A

I) B

IN

A

R Y

H A

R D

W A

R E

IN

PU

T (B

I) A

N A

LO

G

H A

R D

W A

R E

O U

TP

U

T (A

O

B

IN

A R

Y H

A R

D W

A R

E O

U

TP

U T

(B O

SO

FT

W

A R

E

PO

IN

T

(S

FT

H

A R

D W

A R

E

IN

TE

R

LO

C

K (H

D W

W

IR

EL

ES

S

(W

LS

N

ET

W

O R

K (N

ET

H

IG

H A

N A

LO

G

L

IM

IT

LO

W A

N A

LO

G

L

IM

IT

B

IN

A

R Y

LA

TC

H D

IA

G

N O

ST

IC

SE

N

SO

R

F A

IL

C

O M

M U

N

IC

A

TI

O N

F A

IL

BOILER EMERGENCY SHUTDOWN

SWITCH

BLR ESTOP

X X X

BOILER 1 ALARM

B1 ALM

X X X

BOILER 1 ENABLE COMMAND

B1

X X

BOILER 1 STATUS

B1 STS

X X

BOILER 2 ALARM

B2 ALM

X X X

BOILER 2 ENABLE COMMAND

B2

X X

BOILER 2 STATUS

B2 STS

X X

BOILER LOOP ENTERING

TEMPERATURE LOCAL

BLR ENT

X X X X X

BOILER LOOP LEAVING

TEMPERATURE LOCAL

BLR LVNG

X X X X X

BOILER PUMP 1 START STOP

OUTPUT

BP1

X X

BOILER PUMP 1 STATUS

BP1

X X

BOILER PUMP 2 START STOP

OUTPUT

BP2

X X

BOILER PUMP 2 STATUS

BP2

X X

CARBON MONOXIDE SENSOR

CO

X X X X

HOT WATER DIFFERENTIAL

PRESSURE

HW DP

X X X

HOT WATER PUMP 1 START STOP

OUTPUT

HWP1

X X

HOT WATER PUMP 1 SPEED OUTPUT

HWP1

X X

HOT WATER PUMP 1 STATUS

HWP1

X X

HOT WATER PUMP 2 START STOP

OUTPUT

HWP2

X X

HOT WATER PUMP 2 SPEED OUTPUT

HWP2

X X

HOT WATER PUMP 2 STATUS

HWP2

X X

HOT WATER RETURN TEMPERATURE

LOCAL

HWR

X X X X

HOT WATER SUPPLY TEMPERATURE

LOCAL

HWS

X X X X

OUTDOOR AIR TEMPERATURE

LOCAL

OAT

X X X

BAS COMMUNICATION STATE

BAS COM

X

BOILER LEAD

B LEAD

X X

HOT WATER PUMP 1 FAILURE

HWP1 FAIL

X X X

HOT WATER PUMP 2 FAILURE

HWP2 FAIL

X X X

HOT WATER PUMP LEAD

HWP LEAD

X X

HOT WATER RESET HIGH LIMIT

HW RES HL

X X

HOT WATER RESET LOW LIMIT

HW RES LL

X X

HOT WATER DISTRIBUTION SUPPLY

TEMP SETPOINT

HWS SP

X X

OUTSIDE AIR TEMPERATURE

ENABLE SETPOINT

OAT ENA SP

X X

HOT WATER DISTRIBUTION PUMP START/STOP:

THE SYSTEM SHALL START A HOT WATER PUMP THROUGH A CONTACT CLOSURE OF

THE PUMP'S MOTOR STARTER ENABLE CONTACTS.

HOT WATER DISTRIBUTION PUMP STATUS:

THE SYSTEM SHALL DETECT HOT WATER PUMP RUN STATUS BY A CURRENT SWITCH.

HOT WATER DISTRIBUTION PUMP LEAD/LAG:

THE HOT WATER PUMP LEAD/LAG SEQUENCE SHALL BE BASED ON A WEEKLY

SCHEDULE. FROM THE BAS CONTROLLER OR A BAS WORKSTATION, AN OPERATOR

SHALL BE ABLE TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.

HOT WATER DISTRIBUTION PUMP START/STOP:

THE SYSTEM SHALL START A HOT WATER PUMP THROUGH A CONTACT CLOSURE OF

THE PUMP'S VARIABLE FREQUENCY DRIVE (VARIABLE SPEED DRIVE) RUN-ENABLE

CONTACTS.

HOT WATER DISTRIBUTION PUMP STATUS:

THE SYSTEM SHALL DETECT HOT WATER PUMP RUN STATUS BY A VARIABLE SPEED

DRIVE CURRENT SWITCH.

HOT WATER DISTRIBUTION PUMP LEAD/LAG:

THE HOT WATER PUMP LEAD/LAG SEQUENCE SHALL BE BASED ON A WEEKLY

SCHEDULE. FROM THE BAS CONTROLLER OR A BAS WORKSTATION, AN OPERATOR

SHALL BE ABLE TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.

HOT WATER DISTRIBUTION PUMP FAILURE:

IF THE LEAD START/STOP RELAY IS ENABLED AND THE CURRENT SWITCH STATUS IS

OFF FOR MORE THAN 30 SECONDS (ADJ.), THE SYSTEM SHALL ANNUNCIATE A HOT

WATER PUMP FAILURE ALARM TO THE BAS AND START THE LAG.

HOT WATER DISTRIBUTION PUMP SPEED:

WHEN THE SYSTEM SHALL MONITOR THE HOT WATER SYSTEM DIFFERENTIAL

PRESSURE SENSOR. WHEN THE PUMP VARIABLE SPEED DRIVE IS ENABLED, THE

SYSTEM SHALL CONTROL THE ANALOG SPEED SIGNAL SENT TO THE PUMP VARIABLE

SPEED DRIVE TO MAINTAIN A HOT WATER DIFFERENTIAL PRESSURE SETPOINT OF 5.0

PSID (ADJ.).

FREEZE PROTECTION:

WHEN THE OUTDOOR AIR TEMPERATURE FALLS BELOW 35.0 DEG. F (ADJ.), THE HOT

WATER DISTRIBUTION PUMP SHALL OPERATE CONTINUOUSLY TO PROVIDE HOT

WATER CIRCULATION TO ALL ASSOCIATED HOT WATER COILS. IF THE HOT WATER

SUPPLY TEMPERATURE FALLS BELOW 130.0 DEG. F (ADJ.) DURING UNOCCUPIED

PERIODS, THE BOILER SEQUENCE SHALL BE ENABLED TO SAFEGUARD AGAINST LOW

WATER TEMPERATURE AND BOILER CONDENSATION.

IN THE EVENT THAT A HYDRONIC AIRSIDE TYPE EQUIPMENT INITIATES A LOW LIMIT

ALARM, THE HEATING SYSTEM SHALL ENABLE, IF DISABLED, AND PROVIDE HEATING

MEDIUM CIRCULATION TO THE EQUIPMENT.

CARBON MONOXIDE DETECTOR:

THE CARBON MONOXIDE DETECTOR SHALL MONITOR THE BOILER ROOM FOR HIGH

LEVELS OF CO. IF THE CO LEVEL RISES ABOVE 50 PPM (ADJ.), THEN AN ALARM SHALL

BE SIGNALED TO THE HEATING SYSTEM CONTROLLER OR BAS WORKSTATION.

BOILER EMERGENCY SHUTDOWN SWITCH:

IF THE BOILER EMERGENCY SHUTDOWN SWITCH HAS BEEN ACTIVATED, THE BOILERS

ARE TO SHUT DOWN IMMEDIATELY AND AN ALARM SHALL BE SIGNALED TO THE BAS

WORKSTATION.

SEQUENCE OF OPERATION: HEATING PLANT SYSTEM

SYSTEM GENERAL DESCRIPTION:

THE HEATING PLANT SYSTEM CONTROLLER PROVIDES STAND-ALONE CONTROL FROM

AN OPTIONAL HIGHER LEVEL BUILDING AUTOMATION SYSTEM (BAS). THE HEATING

PLANT CONTROL SYSTEM SHALL MONITOR AND CONTROL THE SYSTEM'S BOILER(S),

PUMP(S), AND CONTROL VALVES AS SHOWN ON THE HEATING PLANT FLOW DIAGRAM,

IN THE HEATING PLANT POINTS LIST AND AS DETAILED IN THE SEQUENCE OF

OPERATION LISTED BELOW.

THE HEATING PLANT SYSTEM CONSISTS OF HOT WATER BOILER(S) WITH ITS PIPING

CONFIGURATION ARRANGED AS A PRIMARY / SECONDARY LOOP SUPPLYING HOT

WATER TO THE FACILITY.

THE MANIFOLDED HOT WATER DISTRIBUTION PUMPS ARE CONFIGURED AS LEAD / LAG

CONTROL. THE FACTORY BOILER SYSTEM CONTROLLER SHALL PROVIDE

STAND-ALONE CONTROL OR BAS WORKSTATION CONTROL OF THE SUPPLY HEATING

WATER TEMPERATURE SETPOINT (ADJ.).

HEATING SYSTEM ENABLE/DISABLE:

THE HEATING SYSTEM SHALL BE ENABLED/DISABLED BY THE HEATING PLANT

CONTROLLER AS REQUESTED BY THE BUILDING AUTOMATION SYSTEM (BAS)

HUMAN-INTERFACE PANEL OR THE BAS TIME OF DAY SCHEDULE. WHEN ENABLED,

THE SYSTEM SHALL ENABLE THE LEAD BOILER, THE ASSOCIATED PRIMARY BOILER

PUMP AND ENABLE THE LEAD SECONDARY PUMP. THE HEATING PLANT IS DISABLED

WHEN ALL BOILERS ARE DISABLED AND THERE IS NOT AN ACTIVE HOT WATER

DISTRIBUTION PUMP REQUEST. WHEN THE PLANT IS DISABLED THE HOT WATER PUMP

SHALL BE COMMANDED OFF.

HOT WATER RESET:

THE HOT WATER SUPPLY TEMPERATURE SETPOINT SHALL BE LINEARLY RESET FROM

120.0 DEG. F (ADJ.) TO 180.0 DEF. F (ADJ.) AS THE OUTSIDE AIR TEMPERATURE FALLS

FORM 60.0 DEG. F (ADJ.) TO 0.0 DEG. F (ADJ.)

BOILER CONTROL:

THE BOILER LEAD/LAG SEQUENCE SHALL BE BASED ON A WEEKLY SCHEDULE. FROM

THE SYSTEM CONTROLLER OR A BAS WORKSTATION, AN OPERATOR SHALL BE ABLE

TO MANUALLY CHANGE THE LEAD/LAG SEQUENCE.

BOILER CONTROLS SHALL BE PROVIDED BY THE MANUFACTURER BOILER

SEQUENCER AND SHALL TIE TO THE…