Aquatic Center - CD Set - MEP.pdf
PDF 9 MB Posted
- Attached to
- Boiler Phase 3 State and local contract opportunity
- Solicitation number
- RFQ ABS 260000000382 1
- Issued by
- Michigan
About this file
This is a construction design document set for an Aquatic Center project in Michigan, specifically covering plumbing, mechanical, and electrical work for Boiler Phase 3. The document comprises detailed construction drawings and specifications prepared by design professionals for a state and local contract opportunity. The scope of work includes the installation of a new domestic water heater system, recirculation pump, associated piping and controls, condensate neutralizing equipment, and related mechanical and electrical infrastructure. The project requires coordination among multiple trades, including plumbing, HVAC, and electrical contractors, and mandates compliance with Michigan Plumbing Code, Michigan Building Code, and applicable National Electrical Code standards. All work must be performed by licensed contractors and subcontractors as required by law, with field verification of existing conditions prior to installation and proper coordination with other building systems and trades to avoid conflicts and ensure proper installation sequence.
The specifications establish detailed requirements for materials, equipment, installation procedures, testing, and commissioning of all systems. Contractors must submit shop drawings and product data for approval within 30 days of contract award before ordering equipment, including the recirculation pump, plumbing piping, and domestic water heater. The contractor bears responsibility for obtaining all necessary permits and inspection fees and must provide one-year warranties on all labor and materials following final project acceptance. Commissioning requirements per ASHRAE 90.1-2019 include functional performance testing and verification by a commissioning agent hired by the owner, covering HVAC system controls, insulation, equipment efficiency, and energy monitoring. The contract requires comprehensive record drawings showing as-built conditions, operation and maintenance manuals, and training for facility personnel on all systems prior to project completion and owner acceptance.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit I. Boiler Sampling Notice - ABSD.pdf | ||
| Lighthouse Elementary - CD Set - MEP.pdf | ||
| Lottie Schmidt Elementary - CD Set - MEP.pdf | ||
| Anchor Bay School District - Boilers & HW Pumps RFP Phase 3_July 6 2026.pdf | ||
| ABSD Boiler & HWP Phase 3 RFP Bid Notice 070626.pdf | ||
| Exhibit H. Residual Value and Disposition of Existing Boilers.pdf | ||
| Transportation & Grounds - CD Set - MEP.pdf | ||
| Exhibit A. Subcontractor Master Agreement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL
APPLICABLE LOCAL CODES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND
ACCESSORIES PER MANUFACTURERS WRITTEN
INSTRUCTIONS.
3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE WATER
SUPPLY LINES.
4. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE
SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND
SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.
5. CONTRACTOR SHALL DEMOLISH & REMOVE EXISTING
PIPING, FITTINGS, & EQUIPMENT AS REQUIRED FOR NEW
INSTALLATIONS. VALVE & CAP PIPING TO REMAIN.
6. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY
CONFLICT WITH NEW CONSTRUCTION AND RELOCATE
AS NEEDED.
7. NOTIFY OWNER OF ANY PIPING DEMOLITION THAT MAY
AFFECT NORMAL OPERATION OF OTHER AREAS.
8. PROVIDE SHOCK STOPS FOR EVERY PLUMBING GROUP.
PROVIDE SHOCK ABSORBER IN THE DOMESTIC COLD
AND HOT WATER PIPING. SHOCK ABSORBERS TO BE
LOCATED IN AN ACCESSIBLE LOCATION.
9. PROVIDE AIR ELIMINATION DEVICES FOR EACH
PLUMBING SYSTEM.
10. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
12. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
13. DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE CODES AND REGULATIONS ENFORCED BY
LOCAL BUILDING OFFICIALS.
14. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
15. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
16. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT
IN THE SPECIFICATIONS, OR FOUND IN SPECIFICATIONS
AND NOT IN THE DRAWINGS, SHALL BE CONSTRUED AS
TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND THE
DRAWINGS. ANY CONFLICT BETWEEN THE PLANS AND
THE SPECIFICATIONS WILL BE INTERPRETED BY THE
ARCHITECT. IN THE EVENT OF CONFLICT, FOR THE
PURPOSE OF BIDDING, THE CONTRACTOR SHALL
PRESUME THE MOST EXPENSIVE COMBINATION OF
QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
17. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS AND ALL OTHER TRADES
PRIOR TO INSTALLATION. ANY CONTRACTOR INSTALLING
WORK WITHOUT PRIOR COORDINATION SHALL
RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW
PROPER INSTALLATION OF ANY AND ALL TRADES WORK.
18. UNLESS OTHERWISE NOTED, ALL PIPING SHALL BE
CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME
ESCUTCHEON AT EACH PENETRATION OF A FINISHED
SURFACE.
19. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE
ELECTRICAL GEAR OR IN THE SERVICE SPACE
REQUIRED BY THE NATIONAL ELECTRICAL CODE.
20. PROVIDE ISOLATION SEPARATORS FOR COPPER PIPING
RUNNING THROUGH METAL STUDS.
21. ALL FIXTURES SHALL HAVE SHUTOFF STOP VALVES IN
AN ACCESSIBLE LOCATION. PIPING BEYOND THE STOP
VALVES AND EXPOSED IN OCCUPIED SPACES SHALL BE
CHROME-PLATED. ANY NOTED SHUTOFF VALVES ARE IN
ADDITION TO THIS REQUIREMENT.
GENERAL PLUMBING NOTES
MISCELLANEOUS NOTESPLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
SOFTENED WATER RETURN
SOFTENED WATER RETURN BELOW FINISH
SLAB
TEMPERED WATER
TEMPERED WATER BELOW FINISH SLAB
TEMPERED WATER RETURN
TEMPERED WATER RETURN BELOW FINISH
SLAB
DEIONIZED WATER
DEIONIZED WATER BELOW FINISH SLAB
REVERSE OSMOSIS WATER
REVERSE OSMOSIS WATER RETURN BELOW
FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
ACID RESISTANT
VENT ACID RESISTANT WASTE
ACID RESISTANT WASTE BELOW FINISH SLAB
RAIN CONDUCTOR
STORM BELOW FINISH SLAB
OVERFLOW RAIN CONDUCTOR
OVERFLOW RAIN CONDUCTOR BELOW FINISH
SLAB
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
COMPRESSED AIR
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
VACUUM
DEMOLITION
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
SW
SW
SWR
SWR
TW
TW
TWR
TWR
DI
DI
RO
RO
FP
G
LP
ARV
ARW
ARW
RC
ST
ORC
ORC
SAN
SAN
V
V
CA
NO
N2
MA
VAC
M
M
P
FS
FT
BT
PS
SS
1. EXISTING EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATION OF EXISTING
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH BUILDING
STRUCTURE, EQUIPMENT FURNISHED, ARCHITECTURAL DRAWINGS AND ALL
OTHER TRADES PRIOR TO DEMOLITION.
2. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS, REVISIONS,
AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, ORDINANCES,
CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL AUTHORITIES
HAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
3. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA,
UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, NEC,
STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE
STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED ON THE
DRAWING AND SPECIFICATIONS.
4. COORDINATE CUTTING AND PATCHING WITH GENERAL CONTRACTOR.
5. ALL BOLD DASHED LINES INDICATE ITEMS TO BE REMOVED UNLESS NOTED BY
KEYNOTE. ALL OTHER EXISTING SYSTEMS SHOWN FOR REFERENCE ONLY.
6. PATCH AND REPAIR ALL FLOOR AND WALL SURFACES LEFT DAMAGED OR
INCOMPLETE FROM REMOVAL OF EXISTING PARTITIONS, MILLWORK,
CASEWORK, OR OTHER FIXED ACCESSORIES AND EQUIPMENT WITH
MATERIALS TO MATCH EXISTING, AS ACCEPTABLE TO THE ARCHITECT.
7. NOTATIONS ARE MADE IN VARIOUS PLACES ON THE DRAWINGS TO CALL
ATTENTION TO DEMOLITION WHICH IS REQUIRED. HOWEVER, THESE
DRAWINGS ARE NOT INTENDED TO SHOW EACH AND EVERY ITEM TO BE
REMOVED. CONTRACTOR SHALL REMOVE ALL MATERIALS RELATED TO THEIR
RESPECTIVE TRADES AS REQUIRED TO PERMIT THE CONSTRUCTION OF THE
NEW WORK AS SHOWN.
8. THE GENERAL CONTRACTOR SHALL COORDINATE THE EXTENT OF THE
REQUIRED DEMOLITION OF THE EXISTING BUILDING AS REQUIRED TO
FACILITATE THE CONSTRUCTION OF THE PROJECT AS SHOWN AS PART OF
THIS WORK.
9. ALL DEMOLITION SHALL BE APPROVED BY THE OWNER/TENANT PRIOR TO
COMMENCEMENT AND SHALL BE PERFORMED UNDER REQUIREMENTS AND
APPROVAL OF THE LOCAL CODE JURISDICTIONS.
10. ASBESTOS ABATEMENT: CONTRACTOR SHALL NOTIFY BUILDING
REPRESENTATIVE IMMEDIATELY WHEN AND IF ANY ITEMS ARE ENCOUNTERED
THAT IN ANY WAY, SHAPE, OR FORM APPEAR TO BE HAZARDOUS OF NATURE.
ASBESTOS ABATEMENT IS NOT PART OF THE SCOPE OF THE DESIGN
PROFESSIONALS DOCUMENTATION OR RESPONSIBILITY TO SURVEY, IDENTIFY,
OR FOR CONSULTATION OF PROPER DISPOSAL.
11. PROTECT ALL EXISTING WORK WHICH IS TO REMAIN AND RESTORE IN AN
APPROVED MANNER IF ANY SUCH WORK WHICH BECOMES DAMAGED.
12. RUBBISH AND DEBRIS RESULTING FROM THE WORK SHALL BE REMOVED
IMMEDIATELY FROM THE SITE IN A SAFE AND LEGAL MANNER BY THE
CONTRACTOR.
13. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE TO CONTACT BUILDING
REPRESENTATIVE TO CLARIFY ANY ITEMS NOT SHOWN ON THESE
DOCUMENTS OR SHOWN NOT MATCHING FIELD CONDITIONS.
GENERAL DEMOLITION NOTES
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
FIRE HYDRANT
SPRINKLER HEAD (PENDANT)
SPRINKLER HEAD (UPRIGHT)
SPRINKLER HEAD (SIDEWALL)
FIRE DEPARTMENT CONNECTION
PIPING FLEXIBLE CONNECTOR
SIGHT GLASS
PIPE EXPANSION
COMPENSATOR FLOW SENSOR DEVICE
FLOW METER
FLOW SWITCH
PRESSURE SWITCH
SUPERVISORY SWITCH INVERTED
BUCKET TRAP
FLOAT & THERMOSTATIC TRAP
M A
T R
I X
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH ALL APPLICABLE
CODES, SPECIFICATIONS, LOCAL ORDINANCES, INDUSTRY STANDARDS AND
UTILITY COMPANY REGULATIONS.
2. IN CASE OF DIFFERENCE BETWEEN BUILDING CODES, SPECIFICATIONS, STATE
LAWS, LOCAL ORDINANCES, INDUSTRY STANDARDS, UTILITY COMPANY
REGULATIONS, CONTRACT DOCUMENTS, AND AUTHORITY HAVING JURISDICTION,
THE MOST STRINGENT SHALL GOVERN. CONTRACTOR SHALL PROMPTLY NOTIFY
OWNER IN WRITING OF ANY SUCH DIFFERENCE.
3. NON-COMPLIANCE: SHOULD CONTRACTOR PERFORM ANY WORK THAT DOES NOT
COMPLY WITH REQUIREMENTS OF APPLICABLE BUILDING CODES, STATE LAWS,
LOCAL ORDINANCES, INDUSTRY STANDARDS, UTILITY COMPANY REGULATIONS,
CONTRACT DOCUMENTS, OR AUTHORITY HAVING JURISDICTION, HE SHALL BEAR
ALL COSTS ARISING IN CORRECTING THE DEFICIENCIES.
4. APPLICABLE CODES AND STANDARDS SHALL INCLUDE ALL STATE LAWS, LOCAL
ORDINANCES, UTILITY COMPANY REGULATIONS AND APPLICABLE REQUIREMENTS
OF MICHIGAN BUILDING CODE, MICHIGAN PLUMBING CODE, MICHIGAN
DEPARTMENT OF FIRE AND BUILDING SERVICES.
5. EXCEPT AS OTHERWISE SPECIFIED HEREIN, ALL PIPING WORK AND MATERIAL ARE
TO CONFORM TO THE AMERICAN STANDARDS ASSOCIATION CODE FOR PRESSURE
PIPING.
6. PERMITS: CONTRACTOR SHALL PAY FOR ALL BUILDING PERMITS REQUIRED BY
WORK AND PERMITS FOR OPENING STREETS AND FOR CONNECTION TO VARIOUS
UTILITIES, INCLUDING FEES FOR WATER METER INSTALLATION AND ANY OTHER
REQUIREMENTS NECESSARY TO CARRY OUT HIS WORK. WHERE STREETS OR
SIDEWALKS ARE CUT, SAME MUST BE REPAIRED TO AT LEAST AS GOOD A
CONDITION AS THEY WERE BEFORE, ALL AT EXPENSE OF THIS CONTRACTOR.
PERMITS SHALL BE POSTED IN A PROMINENT PLACE AT THE BUILDING SITE AND BE
PROPERLY PROTECTED FROM WEATHER AND PHYSICAL DAMAGE.
GUARANTEE
1. CONTRACTOR SHALL, BY ACCEPTING THESE DRAWINGS AND SPECIFICATIONS,
GUARANTEE THE FOLLOWING:
1.1. HE WILL FURNISH ALL MATERIAL AND EQUIPMENT AS SPECIFIED EXCEPT
WHERE SPECIFIC WRITTEN APPROVAL IS GIVEN BY ENGINEER FOR
SUBSTITUTION.
1.2. ALL MATERIAL AND EQUIPMENT WILL BE INSTALLED SUBSTANTIALLY AS
SHOWN ON DRAWINGS AND AS REQUIRED WITHIN INTENT OF THESE
SPECIFICATIONS. ALL EQUIPMENT SHALL BE INSTALLED PER THE
MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS.
1.3. ALL EQUIPMENT, PIPING, ETC., WILL BE DRIPTIGHT, AIRTIGHT, FREE OF
VIBRATION, POUNDING AND OTHER OBJECTIONABLE NOISES.
1.4. ALL EQUIPMENT, ACCESSORIES AND MATERIAL FURNISHED BY THE
CONTRACTOR, INCLUDING INSTALLATION, PIPE JOINTS, ETC., FURNISHED
AND/OR DONE BY HIM FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL
ACCEPTANCE AGAINST ALL DEFECTS IN MATERIAL AND WORKMANSHIP.
1.5. IF ANY EQUIPMENT, MATERIAL AND/OR PIPE JOINTS, CONNECTIONS, ETC.,
FAILS OR DOES NOT OPERATE SATISFACTORILY OR SHOWS UNDUE WEAR,
HE WILL, UPON BEING NOTIFIED, IMMEDIATELY REMEDY DEFECT AT HIS OWN
EXPENSE.
WORK AND WORKMANSHIP
1. PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND CONTRACTOR'S
SERVICES NECESSARY FOR COMPLETE INSTALLATION OF SYSTEMS REQUIRED IN
FULL CONFORMITY WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION,
ALL AS INDICATED ON DRAWINGS AND HEREIN SPECIFIED.
2. FINISHED JOB SHALL BE FUNCTIONAL AND COMPLETE IN EVERY DETAIL,
INCLUDING ANY AND ALL SUCH ITEMS REQUIRED FOR A COMPLETE SYSTEM
WHETHER OR NOT THESE ITEMS BE SPECIFIED OR SHOWN ON DRAWINGS.
3. SPECIAL ATTENTION SHALL BE GIVEN TO ACCESSIBILITY OF WORKING PARTS AND
CONTROLLING PARTS. ADJUSTABLE PARTS SHALL BE WITHIN EASY REACH.
REMOVABLE PARTS SHALL HAVE SPACE FOR REMOVAL.
4. EACH CONTRACTOR SHALL ACQUAINT HIMSELF WITH DETAILS OF ALL WORK TO BE
PERFORMED BY OTHER TRADES AND TAKE NECESSARY STEPS TO INTEGRATE
AND COORDINATE HIS WORK WITH OTHER TRADES.
5. IT IS ASSUMED THE CONTRACTOR IS FAMILIAR WITH STANDARD 1ST CLASS
INSTALLATION PROCEDURES. THEREFORE, THESE SPECIFICATIONS DO NOT
ATTEMPT TO INCLUDE EVERY DETAIL OR OPERATION NECESSARY FOR THE
COMPLETE INSTALLATION.
6. IT SHOULD BE PARTICULARLY NOTED THAT THE TERMS "FURNISH" AND "PROVIDE"
ARE INTERCHANGEABLE AND THAT EACH OF THESE MEANS TO PROVIDE, INSTALL
AND CONNECT, UNLESS OTHERWISE STATED.
7. WHENEVER TABLES OR SCHEDULES SHOW QUANTITY OF MATERIALS, THEY SHALL
NOT BE USED AS A GUIDE TO CONTRACTOR. EACH CONTRACTOR SHALL BE
RESPONSIBLE FOR FURNISHING ALL MATERIALS NOTED ON DRAWINGS AS
SPECIFIED.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION, SAFE-KEEPING AND
CLEANLINESS OF ALL EXISTING EQUIPMENT, MATERIAL, ETC., LOCATED IN SPACES
TO BE REMODELED IN WHICH HE IS WORKING. AS PART OF HIS RESPONSIBILITY,
HE SHALL PROVIDE NECESSARY COVERS, STRUCTURES, ETC., AS REQUIRED TO
KEEP ALL DIRT, WATER, MOISTURE AND DUST FROM EQUIPMENT. METHOD THE
CONTRACTOR PROPOSES TO USE IN PROTECTING EQUIPMENT SHALL BE
COORDINATED WITH ENGINEER AND OWNER'S REPRESENTATIVE FOR APPROVAL
BEFORE ANY WORK IS STARTED. ANY DAMAGE SUSTAINED DURING
CONSTRUCTION SHALL BE CORRECTED OR REPLACED BY CONTRACTOR.
9. MECHANICAL INSTALLATIONS: COORDINATE MECHANICAL EQUIPMENT AND
MATERIALS INSTALLATION WITH OTHER BUILDING COMPONENTS. VERIFY ALL
DIMENSIONS BY FIELD MEASUREMENTS. WHERE MOUNTING HEIGHTS ARE NOT
DETAILED OR DIMENSIONED, INSTALL MECHANICAL SERVICES AND OVERHEAD
EQUIPMENT TO PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL
MECHANICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR
REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL,
CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF
INTERFERENCE WITH OTHER INSTALLATIONS. COORDINATE THE INSTALLATION OF
MECHANICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION
SYSTEM, LIGHT FIXTURES, AND OTHER INSTALLATIONS. INSTALL EQUIPMENT IN
ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTALLATION
INSTRUCTIONS.
10. OPERATION AND MAINTENANCE DATA: MANUFACTURER'S PRINTED OPERATION
PROCEDURES TO INCLUDE START-UP, BREAK-IN, ROUTINE, NORMAL, SUMMER
AND WINTER OPERATION INSTRUCTIONS, REGULATION, CONTROL, STOPPING,
SHUT-DOWN, AND EMERGENCY INSTRUCTIONS. PROCEDURES FOR ROUTINE
PREVENTATIVE MAINTENANCE AND TROUBLESHOOTING DISASSEMBLY, REPAIR,
AND REASSEMBLE, ALIGNING AND ADJUSTING INSTRUCTIONS, TRAIN OWNER'S
PERSONNEL ON PROCEDURES FOR STARTING, STOPPING, TROUBLESHOOTING,
SERVICING, AND MAINTAINING EQUIPMENT. TURN OVER TO THE OWNER.
11. RECORD DRAWINGS: THE CONTRACTOR SHALL KEEP A RUNNING RECORD OF
EACH CHANGE AND DEVIATION FROM THE DRAWINGS. UPON THE COMPLETION OF
THE PROJECT, THE CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF CLEAN
DRAWINGS NEATLY SHOWING DEVIATIONS FROM THE CONTRACT DOCUMENTS
WITH DIMENSIONS SHOWING THE EXACT LOCATION OF CONCEALED OR
INACCESSIBLE PIPING, DUCTS, ETC.
ASSIGNMENT OF MISCELLANEOUS WORK
1. PAINTING: MECHANICAL CONTRACTOR WILL PROVIDE PRIME PAINTING ON ALL
FERROUS METALS SUCH AS SUPPORT STEEL OR HANGERS FOR MECHANICAL
PIPING AND EQUIPMENT. PIPING IS NOT TO BE PRIMED. ANY FINISH PAINTING
REQUIRED, INCLUDING PAINTING OF PIPING AND STEEL EXPOSED TO OUTSIDE
ENVIRONMENT WILL BE PAINTED BY MECHANICAL CONTRACTOR.
2. PLATFORMS AND SUPPORTING STANDS: FOR MECHANICAL EQUIPMENT SHALL BE
FURNISHED BY MECHANICAL CONTRACTOR UNLESS NOTED OTHERWISE.
3. HOLES THRU STRUCTURAL: HOLES REQUIRED FOR PIPING OR DUCTWORK OF SIZE
5" OR SMALLER SHALL BE CUT IN FIELD AT EXPENSE OF MECHANICAL
CONTRACTOR WITH APPROVAL OF STRUCTURAL ENGINEER. OWNER SHALL BE
GIVEN APPROVAL PRIOR TO ANY CUTTING. ALL LARGER HOLES SHALL BE
PROVIDED BY OTHERS, WITH LOCATION APPROVAL FROM STRUCTURAL
ENGINEER.
4. CEILING AND WALL ACCESS PANELS: MECHANICAL CONTRACTOR SHALL CUT AND
PATCH FINISHED AREAS AS REQUIRED BY MECHANICAL CONTRACTOR. PROVIDE
WHERE SHOWN OR REQUIRED FOR ACCESS TO COILS, VALVES, ETC., ACCESS
PANELS AS SPECIFIED.
5. CUTTING AND PATCHING: MECHANICAL CONTRACTOR SHALL CUT AND PATCH
FINISHED AREAS AS REQUIRED BY MECHANICAL CONTRACTOR. IN ABSENCE OF
GENERAL CONTRACTOR, EACH CONTRACTOR SHALL DO HIS OWN CUTTING AND
PATCHING.
6. ROOF OPENINGS AND FLASHING REQUIRED BY MECHANICAL CONTRACTOR SHALL
BE BY MECHANICAL CONTRACTOR. MECHANICAL CONTRACTOR IS RESPONSIBLE
FOR CORRECT SIZE AND LOCATION OF SAME. COUNTER FLASHING BY
MECHANICAL CONTRACTOR. PIPE CURBS SHALL BE USED FOR ALL ROOF
PENETRATIONS CREATED BY PIPING OR CONDUIT RELATED TO MECHANICAL
EQUIPMENT.
7. PADS AND FOUNDATIONS FOR MECHANICAL EQUIPMENT SHALL BE FORMED AND
POURED BY MECHANICAL CONTRACTOR. MECHANICAL CONTRACTOR SHALL
VERIFY PADS AND ALL ANCHORING DEVICES.
8. ROOF CURBS AND BASES FOR VENTILATORS, ROOF INTAKES AND RELIEF AND
FANS SHALL BE FURNISHED BY MECHANICAL CONTRACTOR AND FLASHED
WEATHER TIGHT TO ROOF TO SATISFACTION OF ENGINEER.
SHOP DRAWING
1. COMPLETE SCHEDULE OF EQUIPMENT, ETC., PROPOSED FOR INSTALLATION
SHALL BE SUBMITTED FOR APPROVAL BEFORE ORDERS ARE PLACED.
2. ELECTRONIC SHOP DRAWINGS SHALL BE REQUIRED WITHIN 30 DAYS OF AWARD
ON CONTRACT AND SHALL INCLUDE CATALOG NUMBERS AND OTHER PERTINENT
INFORMATION.
3. THE CONTRACTOR SHALL SUBMIT EQUIPMENT SHOP DRAWINGS TO THE
ARCHITECT FOR APPROVAL PRIOR TO ORDERING OF ANY OF THE FOLLOWING:
1.1. RECIRCULATION PUMP, (RP-1),
1.2. PLUMBING PIPING
1.3. DOMESTIC WATER HEATER AND ACCESSORIES
DRAWINGS
1. PLUMBING DRAWINGS SHOW GENERAL ARRANGEMENT OF ALL PIPING EQUIPMENT
AND APPURTENANCES. THEY SHALL BE FOLLOWED AS CLOSELY AS ACTUAL
BUILDING CONSTRUCTION AND WORK OF OTHER TRADES WILL PERMIT.
2. PLUMBING WORK SHALL CONFORM TO REQUIREMENTS SHOWN ON ALL
DRAWINGS. GENERAL AND STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE
OVER MECHANICAL DRAWINGS.
3. BECAUSE OF SMALL SCALE OF PLUMBING DRAWINGS IT IS NOT POSSIBLE TO
INDICATE ALL OFFSETS, FITTINGS AND ACCESSORIES WHICH MAY BE REQUIRED.
CONTRACTOR SHALL INVESTIGATE STRUCTURAL AND FINISH CONDITIONS
AFFECTING WORK AND SHALL ARRANGE HIS WORK ACCORDINGLY, PROVIDING
SUCH FITTINGS, VALVES AND ACCESSORIES AS MAY BE REQUIRED TO MEET SUCH
CONDITIONS.
COORDINATION BETWEEN CONTRACTORS
1. EACH CONTRACTOR AND SUBCONTRACTOR SHALL STUDY ALL DRAWINGS
APPLICABLE TO THIS WORK SO COMPLETE COORDINATION BETWEEN TRADES
WILL BE EFFECTED. SPECIAL ATTENTION SHALL BE GIVEN TO POINTS WHERE
DUCTS CROSS OTHER DUCTS OR PIPING, WHERE LIGHTS FIT INTO CEILINGS AND
WHERE PIPE, DUCTS AND CONDUIT PASS THRU WALLS AND COLUMNS.
2. IT IS RESPONSIBILITY OF EACH CONTRACTOR AND SUBCONTRACTOR TO LEAVE
NECESSARY ROOM FOR OTHER TRADES. NO EXTRA COMPENSATION WILL BE
ALLOWED TO COVER COST OF REMOVING PIPING, CONDUIT, DUCTS OR
EQUIPMENT FOUND ENCROACHING ON SPACE REQUIRED BY OTHERS.
MINOR DEVIATIONS
1. FOR PURPOSE OF CLARITY AND LEGIBILITY, DRAWINGS ARE ESSENTIALLY
DIAGRAMMATIC ALTHOUGH SIZE AND LOCATION OF EQUIPMENT AND PIPING ARE
DRAWN TO SCALE WHEREVER POSSIBLE. VERIFY CONTRACT DOCUMENT
INFORMATION AT SITE.
2. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES
AND DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO
INDICATE ALL NECESSARY OFFSETS. INSTALL WORK IN MANNER TO CONFORM TO
STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS
AND PASSAGEWAYS CLEAR. DO NOT SCALE FROM DRAWINGS.
ATTACHING TO BUILDING CONSTRUCTION
1. EQUIPMENT AND PIPING SUPPORTS SHALL BE ATTACHED TO STRUCTURAL
MEMBERS (BEAMS, JOISTS, ETC.) RATHER THAN TO FLOOR OR ROOF SLABS.
2. WHERE PIPING IS SUSPENDED FROM NEW CONCRETE CONSTRUCTION, FURNISH,
LOCATE AND INSTALL BLACK STEEL CHANNEL TYPE CONCRETE INSERTS WELDED
TO COVER-PLATE. INSERTS SHALL PROVIDE FOR HORIZONTAL AND VERTICAL
ADJUSTMENTS.
3. WHERE PIPING IS SUSPENDED FROM EXISTING CONCRETE OR MASONRY
CONSTRUCTION, USE EXPANSION SHIELDS TO ATTACH PIPE SUPPORTS TO
CONSTRUCTION. EXPANSION SHIELD BOLT DIAMETER SHALL BE SAME SIZE AS
SUPPORT ROD DIAMETER HEREINAFTER SPECIFIED.
4. ERECTION OF METAL SUPPORTS & ANCHORAGES: CUT, FIT, AND PLACE
MISCELLANEOUS METAL SUPPORTS ACCURATELY IN LOCATION, ALIGNMENT, AND
ELEVATION TO SUPPORT AND ANCHOR MECHANICAL MATERIALS AND EQUIPMENT.
BALANCING
1. WORK BY PLUMBING CONTRACTOR.
2. GENERAL: BALANCE AND ADJUST SYSTEMS TO ACHIEVE PROPER OPERATION OF
SYSTEMS.
2.1. USE PROCEDURES AS OUTLINED IN NATIONAL STANDARDS FOR FIELD
MEASUREMENTS AND INSTRUMENTATION, CURRENT VOLUME, AS PUBLISHED
BY ASSOCIATED AIR BALANCE COUNCIL.
2.2. IF A PIECE OF EQUIPMENT IS NOT OPERATING IN SATISFACTORY MANNER,
COORDINATE WITH MANUFACTURER TO REPAIR OR ADJUST.
2.3. SUBMIT REPORT TO ENGINEER IF SYSTEM OR PIECE OF EQUIPMENT CANNOT
BE ADJUSTED TO OPERATE SATISFACTORILY.
PLUMBING
1. FURNISHED AND INSTALL EQUIPMENT, SPECIALTIES AND ACCESSORIES TO
PROVIDE SYSTEMS AS SHOWN ON DRAWINGS OR HEREUNDER SPECIFIED.
2. DOMESTIC HOT AND COLD WATER, HOT WATER RETURN, AND CONDENSATE DRAIN
PIPING: HARD COPPER TUBE, ASTM B88, TYPE-L WATER TUBE, DRAWN TEMPER
WITH COPPER SOLDER JOINT PRESSURE FITTINGS. JOINING MATERIAL: SOLDER,
ASTM B32, ALLOY SN95, SN94, OR E, LEAD FREE. CLEANING & DISINFECTING:
PURGE AND DISINFECT POTABLE WATER SYSTEMS AS PRESCRIBED BY
AUTHORITIES HAVING JURISDICTION.
PIPING
7. INSTALL CHROME-PLATED PIPE ESCUTCHEONS ON EXPOSED PIPE @ FLOORS,
WALLS, AND CEILINGS.
8. 125# WROUGHT COPPER UNIONS WITH SOLDER JOINT FITTINGS, CRANE 633.
9. FURNISH AND INSTALL SUPPORTS, GUIDES AND ANCHORS REQUIRED FOR
PROPER SUPPORT OF PIPES.
10. SUPPORT VERTICAL RUNS WITH HANGER ADJACENT TO ELBOW.
11. SUPPORT HORIZONTAL PIPE WITH GALVANIZED ALL-THREAD STEEL RODS (ASTM
A107). SPACING: 1/2" - 2" PIPE, 8'-0" ON CENTERS WITH 3/8" DIA. ROD, 2 1/2" - 3" PIPE, 12'-0" ON CENTERS WITH 1/2" DIA. ROD.
PIPE HANGERS
1. ADJUSTABLE STEEL CLEVIS HANGERS, NON-METALLIC COATING FOR
ELECTROLYTIC PROTECTION WHERE ATTACHMENTS ARE IN DIRECT WITH
COPPER. COPPER U-STRAP HANGERS FOR UN-INSULATED PIPE. COMPLY WITH
MSS STANDARD PRACTICE SP-69.
2. SUBMITTALS:
2.1. PROVIDE PRODUCT DESCRIPTION, THERMAL CHARACTERISTICS, LIST OF
MATERIALS AND THICKNESS FOR EACH SERVICE, AND LOCATIONS.
2.2. INDICATE INSTALLATION PROCESURES THAT ENSURE ACCEPTABLE
WORKMANSHIP AND INSTALLATION STANDARDS WILL BE ACHIEVED.
3. QUALITY ASSURANCE:
3.1. MANUFACTURER QUALIFICATIONS: COMPANY SPECIALIZING IN
MANUFACTURING THE PRODUCTS SPECIFIED IN THIS SECTION WITH NOT
LESS THAN THREE YEARS OF DOCUMENTED EXPERIENCE.
IN-LINE PUMPS
1. ACCEPTABLE MANUFACTURERS:
1.1. LOCHINVAR
2. DESCRIPTION: FACTORY-ASSEMBLED AND TESTED, CENTRIFUGAL,
OVERHUNG-IMPELLER, CLOSE-COUPLED, IN-LINE PUMP. DESIGNED FOR
INSTALLATION WITH PUMP AND MOTOR SHAFTS MOUNTED HORIZONTALLY OR
VERTICALLY.
DOMESTIC WATER HEATERS
1. ACCEPTABLE MANUFACTURERS:
1.1. LOCHINVAR
2. ACCESSORIES:
2.1. NATURAL GAS CONDENSING BOILER.
2.2. INCLUDE CONDENSATE NEUTRALIZING KIT.
2.3. INCLUDE SMART TOUCH OPERATING CONTROLS.
CONTROLS
1. WATER HEATER AND RECIRCULATION PUMP SHALL BE CAPABLE OF CONTROL VIA
EXISTING BUILDING AUTOMATION SYSTEM (BAS).
2. DOMESTIC WATER HEATER AND RECIRCULATION PUMP SHALL BE CONTROLLED
BY MANUFACTURER UNIT-MOUNTED CONTROLLERS TIED TO EXISTING BAS.
PLUMBING SPECIFICATIONSCOMMISSIONING SPECIFICATIONS
THIS SECTION INCLUDES REQUIREMENTS FOR COMMISSIONING THE HVAC SYSTEM AND ITS
SUBSYSTEMS AND EQUIPMENT.
DEFINITIONS:
1. BOD-HVAC: HVAC SYSTEMS BASIS OF DESIGN.
2. CXA: COMMISSIONING AUTHORITY.
3. SYSTEMS, SUBSYSTEMS, AND EQUIPMENT: WHERE THESE TERMS ARE USED
TOGETHER OR SEPARATELY, THEY SHALL MEAN "AS-BUILT" SYSTEMS,SUBSYSTEMS,
AND EQUIPMENT.
4. TAB: TESTING, ADJUSTING, AND BALANCING.
CONTRACTOR'S RESPONSIBILITIES:
CONTRACTOR:
1. ATTEND PROCEDURES MEETING FOR TAB WORK.
2. CERTIFY THAT TAB WORK IS COMPLETE.
3. MECHANICAL SUBCONTRACTOR:
4. COMPLETE ALL PRE-START-UP, START-UP, AND COMMISSIONING FORMS AND
PROCEDURES AS DIRECTED BY THE CXA.
5. ATTEND TAB VERIFICATION TESTING.
6. PROVIDE MEASURING INSTRUMENTS AND LOGGING DEVICES TO RECORD TEST
DATA, AND DATA ACQUISITION EQUIPMENT TO RECORD DATA FOR THECOMPLETE
RANGE OF TESTING FOR THE REQUIRED TEST PERIOD.
7. HVAC INSTRUMENTATION AND CONTROL SUBCONTRACTOR: WITH THE CXA,
REVIEW CONTROL DESIGNS FOR COMPLIANCE WITH BOD, CONTROLLABILITY WITH
RESPECT TO ACTUAL EQUIPMENT TO BE INSTALLED, AND RECOMMEND
ADJUSTMENTS TO CONTROL DESIGNS AND SEQUENCE OF OPERATION
DESCRIPTIONS.
TAB SUBCONTRACTOR:
1. CONTRACT DOCUMENTS REVIEW: WITH THE CXA, REVIEW THE CONTRACT
DOCUMENTS BEFORE DEVELOPING TAB PROCEDURES.
2. VERIFY THE FOLLOWING:
2.1. ACCESSIBILITY OF EQUIPMENT AND COMPONENTS REQUIRED FOR TAB WORK.
ADEQUATE NUMBER AND PLACEMENT OF BALANCING VALVES TO ALLOW PROPER
BALANCING AND RECORDING OF WATER FLOW.
2.2. ADEQUATE NUMBER AND PLACEMENT OF TEST PORTS AND TEST INSTRUMENTATION
TO ALLOW READING AND COMPILATION OF SYSTEM ANDEQUIPMENT
PERFORMANCE DATA NEEDED TO CONDUCT BOTH TAB AND COMMISSIONING
TESTING.
2.3. WATER FLOW RATES HAVE BEEN SPECIFIED AND COMPARED TO CENTRAL
EQUIPMENT OUTPUT CAPACITIES.
ELECTRICAL SUBCONTRACTOR:
1. WITH THE MECHANICAL SUBCONTRACTOR, COORDINATE INSTALLATIONS AND
CONNECTIONS BETWEEN AND AMONG ELECTRICAL AND HVAC SYSTEMS,
SUBSYSTEMS, AND EQUIPMENT.
2. ATTEND TAB VERIFICATION TESTING.
COMMISSIONING DOCUMENTATION
1. BOD HVAC: OWNER WILL PROVIDE BOD-HVAC DOCUMENTS, PREPARED BY
ENGINEER AND APPROVED BY OWNER, TO THE CXA AND EACH CONTRACTOR FOR
USE IN DEVELOPING THE COMMISSIONING PLAN, SYSTEMS MANUAL, AND
OPERATION AND MAINTENANCE TRAINING PLAN.
ASHRAE 90.1-2019 SPECIFIC COMPLIANCE IN COMMISSIONING
1. FUNCTIONAL PERFORMANCE TESTING AND VERIFICATION PROVIDER
1.1. THE COMMISSIONING AGENT SHALL BE OWNER'S HIRED REPRESENTATIVE. THE
COMMISSIONING AGENT IS RESPONSIBLE FOR REVIEWING, COMMISSIONING, AND
TESTING THE MECHANICAL, AND ELECTRICAL SYSTEMS AS REQUIRED BY ASHRAE
90.1-2019 (CURRENT ADOPTED MICHIGAN ENERGY CODE).
2. ITEMS TO BE REVIEWED
2.1. THE FOLLOWING ARE REQUIRED TO BE REVIEWED FOR PROPER CONTROL AND/OR
INCLUSION IN ACCORDANCE WITH ASHRAE 90.1-2019 BY THE CXA PROVIDER.
2.2. INSULATION DESIGN/INSTALLATION
2.3. MECHANICAL HVAC SYSTEMS
3. HVAC/PLUMBING/ELECTRICAL EQUIPMENT EFFICIENCY (ACCORDING TO SIMPLIFIED
APPROACH HVAC)
3.1. EQUIPMENT LABELING
3.2. OFF-HOUR CONTROLS
3.3. HYDRONIC SYSTEM CONTROLS
3.4. OCCUPIED/STANDBY CONTROLS
3.5. BOILER TURNDOWN
3.6. HYDRONIC VARIABLE FLOW SYSTEMS
3.7. BOILER ISOLATION
3.8. HOT-WATER TEMPERATURE RESET CONTROLS
4. ELECTRICAL SYSTEMS
4.1. ELECTRICAL EQUIPMENT EFFICIENCY (ACCORDING TO SIMPLIFIED APPROACH HVAC)
4.2. AUTOMATIC RECEPTACLE CONTROL
4.3. ELECTRICAL ENERGY MONITORING
4.4. INTERIOR LIGHTING CONTROL
4.5. SPECIAL APPLICATION LIGHTING CONTROL
5. OTHER BUILDING SYSTEMS:
5.1. ENERGY SYSTEMS MONITORING
5.2. ENERGY-COST BUDGET/PERFORMANCE PATHS LAID OUT IN THE PRESCRIPTIVE
PATH.
ITEMS TO BE VERIFIED AND PERFORMANCE TESTED
5. THE FOLLOWING ARE REQUIRED TO BE VERIFIED AND PERFORMANCE TESTEDIN
ACCORDANCE WITH ASHRAE 90.1-2019 BY THE CXA PROVIDER.
6. MECHANICAL SYSTEMS
6.1. OFF-HOUR CONTROLS
6.2. HVAC/PIPING INSULATION
6.3. HYDRONIC SYSTEM CONTROLS
6.4. OCCUPIED/STANDBY CONTROLS
6.5. BOILER TURNDOWN
6.6. HYDRONIC VARIABLE FLOW SYSTEMS
6.7. BOILER ISOLATION
7. ELECTRICAL SYSTEMS
7.1. AUTOMATIC RECEPTACLE CONTROL
7.2. ELECTRICAL ENERGY MONITORING
7.3. INTERIOR LIGHTING CONTROL
7.4. SPECIAL APPLICATION LIGHTING CONTROL
8. OTHER BUILDING SYSTEMS:
8.1. ENERGY SYSTEMS MONITORING
M A
T R
X-DOMESTIC WATER
STORAGE TANK
X-DWH
X-G
X-FD
X-WATER METER
ASSEMBLY
EX.
E-STOP
X-CONCRETE PAD
X-RP
X-2"
X-ET
X-2" CW UP
X-CW
X-2"2
X-1" HWR UP
X-BP
EX.
E-STOP
X-10" VENT UP
THRU ROOF 3
X- G
X-2"
X-CONCRETE PAD
(TYP.)
X-GAS COCK,
TYP.
X-2-WAY CONTROL
VALVE, TYP.
X-RP
X-2"
X-CW
X-
CW
X-2"
X-BP
X-ET
X-1"
X-3/4"
DRAIN VALVE PIPE
TO FLOOR DRAIN.
(TYP)
X-1"
X-HW
X-2"P
X-PRESSURE RELEF
VALVE, TYP.
X-THERMOMETER,
TYP. X-PRESSURE
GAUGE, TYP.
X-CHECK
VALVE, TYP.
X-10" FLUE
VENT
X-UNION, TYP.
X-CIRCUIT
SETTER, TYP.
X-STRAINER,
TYP.
X-HWR
X-DWH
X-DOMESTIC WATER
STORAGE TANK
DEMOLITION NOTES
DISCONNECT, REMOVE, AND DEMOLISH EXISTING
CIRCULATING PUMP. MODIFY ASSOCIATED PIPING AS
REQUIRED TO INSTALL NEW PUMP SHOWN ON NEW
PLANS.
DISCONNECT, REMOVE, AND DEMOLISH EXISTING
DOMESTIC WATER HEATER. MODIFY ASSOCIATED PIPING
AS REQUIRED TO INSTALL NEW DOMESTIC WATER HEATER
AT LOCATION SHOWN. EXISTING CONCRETE PAD TO
REMAIN.
DISCONNECT, REMOVE, AND DEMOLISH EXISTING 10"ø
FLUE VENT UP TO ROOF. REUSE EXISTING PENETRATION
FOR 4" VENT AND 4" COMBUSTION AIR PIPING SHOWN ON
NEW PLANS.
M A
T R
I X
SCALE: 1/4" = 1'-0"
0 1 5 10N
MECHANICAL ROOM FLOOR PLAN - PLUMBING DEMOLITION
DOMESTIC WATER HEATER PIPING
DIAGRAM - DEMOLITION
SCALE: NTS
PLUMBING KEY NOTES
INSTALL PUMP AT LOCATION SHOWN. MODIFY ASSOCIATED
PIPING AS REQUIRED.
INSTALL DOMESTIC WATER HEATER ON EXISTING CONCRETE
PAD AT LOCATION SHOWN. MODIFY ASSOCIATED PIPING AS
REQUIRED TO CONNECT TO NEW DOMESTIC WATER HEATER.
ROUTE 4" COMBUSTION AIR AND 4" VENT UP THROUGH ROOF
THROUGH EXISTING 10"ø FLUE VENT. PATCH ROOF AS
REQUIRED TO MATCH EXISTING. PATCH AND SEAL ROOF TO BE
WATER TIGHT AND MAINTAIN EXISTING WARRANTIES.
CONNECT NEW DOMESTIC WATER HEATER TO EXISTING
E-STOP.
X-DOMESTIC WATER
STORAGE TANK X-G
X-FD
X-WATER METER
ASSEMBLY
EX.
E-STOP
X-CONCRETE PAD
X-2"
X-ET
X-2" CW UP
X-CW
X-2"
X-1" HWR UP
X-BP
EX.
E-STOP
RP-1
DWH-1
1 MECHANICAL 113
4" CA & V UP
THRU ROOF
X- G
X-2"
X-CONCRETE PAD
(TYP.)
X-GAS COCK,
TYP.
X-2-WAY CONTROL
VALVE, TYP.X-2"
X-CW
X-
CW
X-2"
X-BP
X-ET
X-1"
X-3/4"
DRAIN VALVE PIPE
TO FLOOR DRAIN.
(TYP)
X-1"
X-HW
X-2"P
X-PRESSURE RELEF
VALVE, TYP.
X-THERMOMETER,
TYP. X-PRESSURE
GAUGE, TYP.
X-CHECK
VALVE, TYP.
X-UNION, TYP.
X-CIRCUIT
SETTER, TYP.
X-STRAINER,
TYP.
X-HWR
X-DOMESTIC WATER
STORAGE TANK
DWH-1
RP-1
4" CA&V
CONDENSATE
NEUTRALIZING KIT (TYP.)
1-1/2" DRAIN VALVE PIPE
TO FLOOR DRAIN. (TYP)
M A
T R
I X
SCALE: 1/4" = 1'-0"
0 1 5 10N
MECHANICAL ROOM FLOOR PLAN - PLUMBING NEW
DOMESTIC WATER HEATER PIPING
DIAGRAM - NEW
SCALE: NTS
FCPS
V
M C
X
X
X
TVSS
VFD
TRANSIENT VOLTAGE SURGE SUPPRESSION
VARIABLE FREQUENCY DRIVE
DUPLEX RECEPTACLE
CARBON MONOXIDE DETECTOR
H
DOCK LIGHT FIXTURE
CONTROL MODULE
S
TELEPHONE / DATA OUTLET
ADDENDUM NOTE
PLAN NOTE
DEMOLITION NOTE
THREE PHASE MOTOR
MONITOR MODULE
FIRE CONTROL POWER SUPPLY
VISUAL ONLY UNIT
ELECTRICAL SYMBOLS LEGEND
DH
J
SINGLE RECEPTACLE (120 VOLT)
EMERGENCY RECEPTACLE
DOUBLE DUPLEX RECEPTACLE
FLUSH FLOOR BOX
SURFACE FLOOR BOX
SPECIAL EQUIPMENT RECEPTACLE
TELEPHONE OUTLET
DATA OUTLET
POWER POLE
JUNCTION BOX
WALL JUNCTION BOX
PULL (JUNCTION) BOX
UNDERFLOOR JUNCTION BOX
OUTLETS
LIGHT FIXTURE
STRIP FIXTURE
IN-GRADE LIGHT FIXTURE
SPOTLIGHT (number of heads shown) EXIT SIGN (face & direction as shown)
WALL MOUNT LIGHT FIXTURE
CEILING LIGHT FIXTURE
TRACK & FIXTURE
STREET TYPE POLE FIXTURE
POLE MOUNTED LIGHT FIXTURE
EXTERIOR WALL MOUNT LIGHT FIXTURE
WALLPACK LIGHT FIXTURE
SPECIAL PURPOSE LIGHT FIXTURE
HIGH BAY LIGHT FIXTURE
EMERGENCY EGRESS LIGHT FIXTURE
(number of heads shown)
EMERGENCY LIGHT FIXTURE
FIXTURES
SWITCHES
SINGLE-POLE SWITCH
DIMMER SWITCH
TIME SWITCH
KEY SWITCH
MANUAL MOTOR SWITCH
THERMAL OVERLOAD SWITCH
SWITCH WITH PILOT LIGHT
FOUR-WAY SWITCH
THREE-WAY SWITCH
CIRCUITRY and RACEWAYS
UNDERFLOOR DUCT
BUS DUCT
PLUGMOLD AS SPECIFIED
WIREMOLD AS SPECIFIED
FLEXIBLE PIGTAILS/CONNECTIONS
"CONDUIT RUN CONTINUES" INDICATION
END OF CONDUIT RUN, CAP AND STAKE
END OF CONDUIT RUN
HOME RUN (with circuit numbers)
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT INSTALLED
CONDUIT INSTALLED
MECHANICAL
ELECTRIC WATER HEATER
ELECTRIC UNIT HEATER
PIPE TRACE HEATER
RESISTANCE HEATER, KW SHOWN
SINGLE PHASE MOTOR
SERVICE and EQUIPMENT
CAPACITOR
ENCLOSED CIRCUIT BREAKER
TRANSFER SWITCH
WIREWAY
GROUND CONNECTION PER N.E.C.
TELEPHONE TERMINAL BOARD
GENERATOR, KW SHOWN
CURRENT TRANSFORMERS
UTILITY METER, AS REQUIRED
WEATHERHEAD
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
COMB. STARTER
MAGNETIC STARTER
FUSED DISCONNECT SWITCH
TRANSFORMER
FIRE ALARM
TAMPER SWITCH (furnished by FP/C) FLOW SWITCH (furnished by FP/C)
FIREFIGHTER COMMUNICATION JACK
MAGNETIC DOOR HOLDER
REMOTE INDICATING LIGHT, CLG. MTD.
REMOTE INDICATING LIGHT, WALL MTD.
END OF LINE DEVICE
ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
PULL STATION
SPEAKER & LIGHT
SPEAKER
HORN
DUCT SMOKE DETECTOR
HEAT DETECTOR
SMOKE DETECTOR
HORN & LIGHT
DESIGNATIONS
(by E.C.)
(by others)
TT
FACP
ANN
EOL
G
WW
CT
TS
F
FC
F
T
1,3
OR
PM
WM
BD
UFD
F S
J
J
D
WH
PP
J
DUCT SMOKE DETECTORF/S
CEILING MOUNTED WIFI
DIGITAL EQUIPMENT METER, AS REQUIRED
POLE
PUMP
PANEL
P
PNL
PVC
PRV-
P-
PB
POLY VINYL CLORIDE
POWER ROOF VENTILATOR
PULL BOX
GENERAL CONTRACTOR
GROUND
HUMIDIFIERH-
GND
GFI
GC
GROUND FAULT INTERRUPTER
ABBREVIATIONS LEGEND
POWER
SWITCH
RECEPT
SF-
SWBD
TCC
SPEC
SW
RGC
RTU-
PWR
VOLTS
WATTS
UF
V
W
UL
VL
UNO
UH-
TS
TYP
TR
ROOF TOP UNIT
RECEPTACLE
SWITCHBOARD
UNDER FLOOR
SPECIFICATIONS
RIGID GALVANIZED STEEL CONDUIT
UNLESS NOTED OTHERWISE
UNDERWRITERS' LABORATORIES, INC.
TAMPER PROOF RECEPTACLE
TAMPER PROOF SWITCH
TEMPERATURE CONTROL CONTRACTOR
VERIFY LOCATION WITH OWNER
TYPICAL
UNIT HEATER
SUPPLY FAN
WITH
WITHOUT
W/
XFMR
W/O
WP
TRANSFORMER
WEATHER PROOF
HOUR
LIGHT
JUNCTION BOX
LIGHT CONTROL
ISOLATED GROUND
HORSEPOWER
MINIMUM
MOUNT
MAKE-UP AIR UNIT
MOTOR CONTROL CENTER
MAIN LUG ONLY
MOUNTED
MOUNTING
MAXIMUM
LIGHTING
LT FLEX
MTD
MUAU-
MTG
MLO
MIN
MT
MC
MAX
MCC
LTG
IG
LC
LT
IMC
JB
HR
HVAC
HOA
HP
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NIGHT LIGHTNL
NTS
NO
NIC
NC
HAND-OFF-AUTO SELECTOR SWITCH
HEATING/VENTILATING/AIR CONDITIONING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METAL CONDUIT
MECHANICAL CONTRACTOR
HID HIGH INTENSITY DISCHARGE
A
AC
AFF
ACU-
AHJ
AHU-
AS
B-
BC
AIC
ATS
BLDG
CHLR-
CND (C)
CKT BKR
CKT
CUH-
CU-
DISC
DFU-
EF-
EC
DWH-
EBB-
DWG
CT-
EXIST./EX.
EWC
FLEX
FLA
FLR
FSES
FLUOR
EMT
ABOVE FINISHED FLOOR
AIR CONDITIONING UNIT
AMPS
ABOVE COUNTER
AIR HANDLING UNIT
AUTOMATIC TRANSFER SWITCH
AMPS INTERRUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE SHELF
BOILER
BUILDING
BELOW COUNTER
CHILLER
DOMESTIC WATER HEATER
CABINET UNIT HEATER
CIRCUIT
CIRCUIT BREAKER
CONDUIT
CONDENSING UNIT
COOLING TOWER
DUCT FURNACE
DRAWING
DISCONNECT
FOOD SERVICE EQUIP. SUPPLIER
ELECTRIC WATER COOLER
ELECTRICAL CONTRACTOR
ELECTRIC BASEBOARD
ELECTRICAL METALLIC TUBING
EXISTING
EXHAUST FAN
FLOOR
FLUORESCENT
FLEXIBLE CONDUIT
FULL LOAD AMPS
EM EMERGENCY
F/S FIRE/SMOKE
FU- FURNACE
1. ALL WALL AND FLOOR PENETRATIONS ARE TO BE SEALED TO MAINTAIN
ORIGINAL RATING.
2. ALL CONDUITS TO BE FIELD ROUTED ALONG EXISTING PIPING AND
STRUCTURAL STEEL.
3. THE DIVISION 26 CONTRACTORS SHALL VISIT THE PROJECT AND DETERMINE
THE EXACT EXTENT OF THE DEMOLITION WORK REQUIRED BEFORE BIDDING
THE PROJECT.
4. REMOVE ALL EXISTING OBSOLETE EXPOSED CONDUIT, WIRE AND UNUSED
EQUIPMENT WHERE WORK IS BEING DONE EXCEPT ITEMS NOTED
OTHERWISE.
5. WHERE BUILDING SURFACES ARE DAMAGED BY THE REMOVAL OF OLD
WORK, SURFACES SHALL BE PATCHED TO MATCH ADJACENT.
6. EXISTING WORK WHICH IS PRESENTLY CONCEALED AND WHICH WILL
REMAIN CONCEALED AND DOES NOT INTERFERE WITH ANY NEW WORK OF
ANY TRADE NEED NOT BE REMOVED. HOWEVER, ALL CONDUIT SHALL BE
CAPPED BELOW FINISH SURFACE AND THEN PATCHED TO MATCH, OR AS
NOTED.
7. EXISTING OPENINGS, WHICH ARE TO BE REUSED, SHALL BE MODIFIED OR
ENLARGED TO SUIT THE NEW SYSTEMS AS REQUIRED. PROVIDE ALL
REQUIRED CUTTING AND PATCHING.
8. IF ASBESTOS IS PRESENT, IT WILL BE REMOVED OR RENDERED HARMLESS
UNDER SEPARATE CONTRACT BY THE OWNER.
9. THE DIVISION 26 CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING THE
EXISTING WALLS TO MATCH THE ADJACENT SURFACES BEHIND ALL
SURFACE MOUNTED EQUIPMENT.
10. CONTRACTOR SHALL FIELD VERIFY ALL EQUIPMENT VOLTAGES AND LOADS
PRIOR TO INSTALLING SERVICE TO EQUIPMENT.
11. DRAWINGS ARE BASED ON EXISTING RECORD DOCUMENT AND CASUAL
FIELD OBSERVATION. REPORT ANY DISCREPANCIES TO ENGINEER FOR
CLARIFICATION.
GENERAL ELECTRICAL NOTES
DIVISION 26
ELECTRICAL SPECIFICATIONS
M
DIVISION 26 - ELECTRICAL SPECIFICATIONS
DESCRIPTION OF WORK
WORK SHALL INCLUDE, BUT IS NOT NECESSARILY LIMITED TO, THE FOLLOWING:
1. DEMOLITION
2. CONDUIT AND RACEWAYS
3. CONDUCTORS
4. GROUNDING
5. SAFETY DISCONNECT SWITCHES
6. MOTOR STARTERS AND CONTROLS
STANDARDS
ELECTRICAL MATERIALS AND EQUIPMENT SHALL CONFORM TO THE REQUIREMENTS LISTED BELOW. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER. IN THE ABSENCE OF SPECIFIC INSTRUCTION IN THE TECHNICAL SPECIFICATIONS, EQUIPMENT AND INSTALLATION SHALL CONFORM
TO THE FOLLOWING APPLICABLE CODES, STANDARDS AND REGULATIONS, LATEST EDITIONS:
6. AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM).
7. AMERICAN NATIONAL STANDARD INSTITUTE (ANSI).
8. UNDERWRITER'S LABORATORIES, INC. (UL).
9. AMERICAN WELDING SOCIETY CODE (AWSC).
10.LOCAL BUILDING, ELECTRICAL, AND FIRE CODES.
11.NATIONAL ELECTRICAL CODE (NEC).
12.SERVICE RULES AND REGULATIONS OF LOCAL ELECTRICAL UTILITY COMPANY.
13.NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA).
14.U.S. DEPARTMENT OF HEALTH & HUMAN SERVICES “HRS-M-HF” 84_1.
15.OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA).
16.NATIONAL FIRE PROTECTION ASSOCIATION (NFPA).
17.AMERICANS WITH DISABILITIES ACT (ADA).
CODES AND ORDINANCES
COMPLY WITH ALL LOCAL, STATE AND NATIONAL CODES AND ORDINANCES. COMPLY WITH OWNER'S SPECIFICATIONS, GUIDELINES AND REQUIREMENTS. BIDDERS SHALL FAMILIARIZE THEMSELVES WITH CODE REQUIREMENTS FOR THE TYPE OF FACILITY WHERE THE WORK IS BEING PERFORMED.
PERMITS AND INSPECTION FEES
THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND INSPECTION FEES. FINAL INSPECTION CERTIFICATES BY THE AUTHORITIES HAVING JURISDICTION, INCLUDING THE LOCAL ELECTRICAL INSPECTOR AND FIRE MARSHAL, SHALL BE OBTAINED BY THE CONTRACTOR. COPIES SHALL BE SUBMITTED IN DUPLICATE TO THE OWNER.
SUBMITTALS
SUBMIT PRODUCT DATA, SHOP DRAWINGS, WIRING DIAGRAMS, AND DESCRIPTIVE LITERATURE FOR ALL ELECTRICAL MATERIALS AND EQUIPMENT TO BE INSTALLED UNDER THIS CONTRACT.
MAKE SUBMITTALS WITHIN THIRTY (30) DAYS AFTER THE SIGNING OF THE CONTRACT. PRODUCT SHIPMENTS ARE NOT PERMITTED UNTIL SUBMITTALS HAVE RECEIVED FINAL APPROVAL.
AS-CONSTRUCTED DOCUMENTS
UPON PROJECT COMPLETION, THE CONTRACTOR SHALL PROVIDE A MARKED-UP COPY OF THE ORIGINAL CONTRACT DOCUMENTS TO THE OWNER, INDICATING CHANGES, ADDITIONS AND
MODIFICATIONS TO THE ORIGINAL DESIGN. DRAWINGS SHALL BE MANUALLY-PREPARED.
OPERATION & MAINTENANCE MANUALS
PROVIDE OPERATING INSTRUCTIONS AND MAINTENANCE INFORMATION, FOR EACH SYSTEM AND EQUIPMENT SPECIFIED, FOR USE BY FACILITY OPERATION AND MAINTENANCE PERSONNEL. MANUALS SHALL BE PROVIDED IN 3-RING BINDERS OR ELECTRONIC COPIES. THE MANUALS SHALL INCLUDE:
1. WIRING DIAGRAMS, CONTROL DIAGRAMS, AND CONTROL SEQUENCE FOR EACH SYSTEM AND ITEM OF EQUIPMENT.
2. START-UP, PROPER ADJUSTMENT, OPERATING, LUBRICATION, AND SHUTDOWN PROCEDURES.
3. SAFETY PRECAUTIONS.
4. THE PROCEDURE TO BE FOLLOWED IN THE EVENT OF EQUIPMENT FAILURE.
5. OTHER ITEMS OF INSTRUCTION AS RECOMMENDED BY THE MANUFACTURER OF EACH SYSTEM OR ITEM OF EQUIPMENT.
TRAINING
DURING OR UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL PROVIDE TRAINING OF OPERATION AND MAINTENANCE PERSONNEL FOR ALL REQUIRED ELECTRICAL COMPONENTS AND SYSTEMS. TRAINING SHALL BE CONDUCTED AT THE OWNER'S FACILITY. COORDINATE WITH THE OWNER FOR SCHEDULE.
SIGNAGE AND IDENTIFICATION OF SYSTEMS AND EQUIPMENT
1. OPERATING INSTRUCTIONS: PRINT OR ENGRAVE INSTRUCTIONS AND FRAME UNDER GLASS OR APPROVED LAMINATED PLASTIC. POST INSTRUCTIONS IN VIEW OF EQUIPMENT.
PROVIDE WEATHER-RESISTANT MATERIALS FOR EXTERIOR APPLICATIONS.
2. EQUIPMENT: PROVIDE NAMEPLATES FOR ALL EQUIPMENT AND DEVICES. NAMEPLATES SHALL BE SELF-ADHESIVE WITH ENGRAVED, LAMINATED ACRYLIC OR MELAMINE LABELS.
PROVIDE NAMEPLATES WITH WHITE LETTERS ON A BLACK BACKGROUND. MINIMUM LETTER HEIGHT SHALL BE 1/8-INCH.
3. WARNING SIGNS: PROVIDE A SELF-ADHESIVE WARNING LABEL THAT IS FACTORY PRINTED AND MULTI-COLOR. COMPLY WITH N.E.C. 70 AND 29 CFR 1910.145. LABELS FOR MULTIPLE
POWER SOURCES SHALL READ: “DANGER - ELECTRICAL SHOCK HAZARD - EQUIPMENT HAS MULTIPLE POWER SOURCES”. LABELS FOR OTHER EQUIPMENT REQUIRING WORK SPACE CLEARANCES SHALL READ: “WARNING - OSHA REGULATION - AREA IN FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36-INCHES”.
4. ARC-FLASH WARNING SIGNS: PROVIDE A SELF-ADHESIVE ARC-FLASH WARNING LABEL ON ALL SAFETY SWITCHES, STARTERS, SWITCHBOARDS, PANELBOARDS AND OTHER REQUIRED EQUIPMENT. LABEL SHALL READ: “WARNING. ARC FLASH AND SHOCK HAZARD. APPROPRIATE PPE AND TOOLS REQUIRED WHEN WORKING ON THIS EQUIPMENT.”
GUARANTEE
PROVIDE WRITTEN GUARANTEE FOR ALL LABOR AND MATERIALS FOR ONE (1) YEAR AFTER OWNER'S WRITTEN ACCEPTANCE OF THE PROJECT.
LAYOUT OF THE WORK
THE CONTRACTOR SHALL EXAMINE THE AREA OF WORK, AND ALL OTHER DISCIPLINE DRAWINGS, BEFORE PROCEEDING WITH THE LAYOUT AND INSTALLATION OF THE ELECTRICAL WORK.
LOCATE ELECTRICAL EQUIPMENT ESSENTIALLY AS SHOWN ON THE DRAWINGS. EXACT LOCATION OF EQUIPMENT SHALL BE DETERMINED AT THE JOB SITE, TO SUIT ACTUAL CONDITIONS.
THE CONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO INSTALLATION, SO THAT ALL COMPONENTS WILL BE INSTALLED IN PROPER RELATIONSHIP AND SEQUENCE.
DEMOLITION
CONTRACTOR SHALL REMOVE ALL EQUIPMENT AND MATERIAL INDICATED ON THE DEMOLITION PLANS OR AS REQUIRED TO INSTALL THE EQUIPMENT THAT IS PART OF THIS CONTRACT.
LIGHT FIXTURES INDICATED TO BE REUSED SHALL BE REMOVED, CLEANED AND RE-LAMPED BEFORE REINSTALLING. REMOVED LIGHT FIXTURES TO BE DEMOLISHED SHALL BE TURNED OVER TO THE OWNER UNLESS OTHERWISE SPECIFIED. ALL OTHER ELECTRICAL DEMOLITION ITEMS SHALL BE REMOVED FROM THE SITE. EXISTING CONDUITS MAY BE REUSED WHEN PRACTICAL.
CONTRACTOR SHALL PATCH EXISTING WALL AND CEILING OPENINGS IN FINISHED AREAS UPON REMOVAL OF ELECTRICAL EQUIPMENT. CONTRACTOR SHALL PROTECT ALL EXISTING
ELECTRICAL EQUIPMENT, INDICATED TO REMAIN, DURING CONSTRUCTION PERIOD.
CUTTING AND PATCHING
ALL NECESSARY CUTTING AND PATCHING OF THE BUILDING WALLS, FLOORS AND CEILINGS REQUIRED FOR REMOVAL OR INSTALLATION OF THE NEW WORK, SHALL BE FURNISHED BY THE CONTRACTOR. NO STRUCTURAL MEMBERS OF THE BUILDING SHALL BE CUT WITHOUT PRIOR APPROVAL OF THE ENGINEER. ALL NECESSARY PATCHING AND PAINTING OF SURFACES SHALL
BE BY CONTRACTOR. PAINT SHALL MATCH EXISTING.
GROUNDING
ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED IN A MANNER APPROVED BY THE AUTHORITY HAVING JURISDICTION. PROVIDE GROUND RODS AND BARE COPPER GROUND CONDUCTORS AT UTILITY TRANSFORMER PAD. PROVIDE A GROUND ROD AND GROUND CONDUCTOR AT THE BUILDING MAIN DISCONNECT SWITCH. PROVIDE A GROUND CONDUCTOR IN ALL POWER RACEWAYS. GROUND ELECTRICAL SYSTEMS PER NEC ARTICLE 250 OR AS DETAILED ON THE DRAWINGS.
WIRE AND CABLE
SECONDARY FEEDERS SHALL BE TYPE THWN-2 or XHHW-2, 600V RATED, COLORED BLACK OR COLOR CODED. BRANCH CIRCUIT WIRING SHALL BE TYPE THWN-2 OR XHHW-2, 600V RATED, 7 STRAND, #12 AWG MINIMUM, COLORED HOT-BLACK, NEUTRAL-WHITE AND GROUND-GREEN. BARE COPPER GROUND WIRE SHALL BE STRANDED TYPE.
ALL BRANCH CIRCUIT WIRING SHALL BE CONTINUOUS BETWEEN JUNCTION BOXES, WITH SPLICES MADE ONLY WITHIN BOXES. SOLDERLESS PRESSURE-TYPE CONNECTORS, PROPERLY INSULATED, SHALL BE USED FOR ALL SPLICES. NO POWER WIRE SMALLER THAN #12 AWG MAY BE USED UNLESS SPECIFIED UNDER DESCRIPTIONS OF SPECIAL SYSTEMS.
LABEL ALL CONDUCTORS WITH CIRCUIT NUMBERS AT BOTH ENDS, MINIMUM.
CONDUIT AND BOXES
CONDUIT SHALL BE 3/4” MINIMUM. EXPOSED OUTDOOR CONDUIT SHALL BE RGC. BELOW GRADE CONDUIT SHALL BE SCHEDULE 40 PVC OR HDPE. EXPOSED INTERIOR CONDUIT SHALL BE EMT. CONDUIT INSTALLED IN INDUSTRIAL FACILITIES SHALL BE RGC. CONDUIT FOR CONDUCTORS GREATER THAN 480-VOLTS SHALL BE RGC. CONCEALED INTERIOR CONDUIT SHALL BE EMT. CONDUIT AND BOXES IN CORROSIVE ENVIRONMENTS SHALL BE PVC-COATED RGC. BELOW GRADE, NON-METALLIC CONDUIT CONTAINING DATA AND COMMUNICATIONS WIRING, SHALL BE INSTALLED WITH A TRACER WIRE.
WHERE FLEXIBLE CONNECTIONS ARE REQUIRED, SUCH AS CONNECTIONS TO MOTORS AND LIGHT FIXTURES, LIQUID-TIGHT, FLEXIBLE METAL CONDUIT SHALL BE USED, WHERE PERMITTED
BY THE NEC.
EXTERIOR RGC CONDUIT JOINTS SHALL BE MADE WATERTIGHT BY COATING THREADS WITH A ZINC PAINT.
EXTERIOR-MOUNTED DEVICE BOXES AND BOXES INSTALLED IN INDUSTRIAL FACILITIES SHALL BE CAST TYPE. INTERIOR OUTLET BOXES SHALL BE PRESSED STEEL, COMPLETE WITH PLASTER RING IF NECESSARY, FOR EACH SWITCH, RECEPTACLE OR DEVICE SHOWN. CEILING OUTLET BOXES SHALL BE 4-INCH OCTAGON, 1-1/2-INCH DEEP. EACH OUTLET SHALL BE RIGIDLY SUPPORTED FROM THE BUILDING CONSTRUCTION (INDEPENDENT OF THE RACEWAY SYSTEM). LIGHT FIXTURE BOXES SHALL BE SUPPLIED WITH FIXTURE SUPPORT HARDWARE AND
SUPPORTED TO WITHSTAND 80 LBS.
SUPPORTS AND HANGERS
PROVIDE AND INSTALL NECESSARY STEEL BRACKETS, RODS, CHANNELS, CLAMPS, ETC., FOR SUPPORT OF ALL WORK UNDER THIS CONTRACT. MOUNT SECURELY TO CEILING OR WALL.
SAFETY DISCONNECT SWITCHES
SAFETY DISCONNECT SWITCHES SHALL BE CIRCUIT BREAKER OR FUSED TYPE, 250VAC OR 480VAC, CLASS A, HEAVY DUTY, DUAL HORSEPOWER RATED IN NEMA 1 ENCLOSURE OR WEATHER-PROOF AS INDICATED ON DRAWINGS. BUILDING SAFETY DISCONNECT SWITCHES SHALL BE RATED FOR “SERVICE ENTRANCE.”. VOLTAGE, CURRENT RATING, NUMBER OF POLES, CIRCUIT BREAKER OR FUSES AS INDICATED. CONSTRUCTION SHALL BE SUCH THAT, WHEN THE SWITCH HANDLE IS IN THE “ON” POSITION, THE COVER CANNOT BE OPENED. SWITCHES FOR
30-AMPERE TO 200-AMPERE LOADING SHALL BE SQUARE D TYPE HD OR EQUAL.
MOTOR STARTERS
THREE-PHASE MOTOR STARTERS SHALL BE COMBINATION TYPE, 250VAC OR 480VAC AS REQUIRED, CLASS A, HEAVY DUTY, DUAL HORSEPOWER RATED WITH OVERLOADS AND TIME DELAY
SWITCH. UNITS SHALL BE SQUARE D OR EQUAL.
FRACTIONAL HORSEPOWER MOTOR STARTERS SHALL BE TOGGLE TYPE, 120VAC WITH RED PILOT LIGHT.
END OF DIVISION 26
M A
T R
DISCONNECT MECHANICAL EQUIPMENT. CONDUIT AND WIRING TO REMAIN
FOR RECONNECTION TO NEW PUMP.
DEMOLITION NOTES
2 DISCONNECT MECHANICAL EQUIPMENT. REMOVE CONDUIT AND WIRING
BACK TO NEAREST J-BOX HOMERUN.
3 EXISTING EQUIPMENT TO REMAIN.
EX. MDP
EX. LP-A
EX. RP-A EX. RP-BEX. XFMR
EX.
E-STOP
EX.
E-STOP
EX.
E-STOP
X-DWH
X-RP
MECHANICAL 113
X-BP
ELECTRICAL KEY NOTES
PROVIDE NEW 120V, 20A CIRCUIT FROM SPARE CIRCUIT BREAKER IN PANEL
RP-B. TIE BOILER CIRCUIT INTO EXISTING E-STOP SYSTEM.
CONTRACTOR SHALL RE-USE EXISTING FEEDERS. EXTEND CONDUIT AND
WIRE AS REQUIRED.
EX. MDP
EX. LP-A
EX. RP-A EX. RP-BEX. XFMR
EX.
E-STOP
EX.
E-STOP
EX.
E-STOP
RP-1
120V - 1Ø,
9.8 FLA
DWH-1
120V - 1Ø,
9.8 FLA
MECHANICAL 113
X-BP
M A
T R
I X
SCALE: 1/4" = 1'-0"
0 1 5 10N
MECHANICAL ROOM FLOOR PLAN - ELECTRICAL DEMOLITION
SCALE: 1/4" = 1'-0"
0 1 5 10N
MECHANICAL ROOM FLOOR PLAN - POWER
| Aquatic Center - CD Set - Mechanical and Plumbing |
| P100-25096300-Layout1 |
| P101-25096300-Layout1 |
| P300-25096300-Layout1 |
| P400-25096300-Layout1 |
| Aquatic Center - CD Set - Electrical |
| E100-25096300-24x36 |
| E500-25096300-24x36 |
File details come from the government source that posted it. Updated .