Summary of Lunenburg Middle School Baseball Field Project Documents
These are civil engineering and environmental design drawings prepared by Nitsch Engineering for the Lunenburg County Public Schools, detailing the construction of a baseball field at Lunenburg Middle School located at 573 Tomlinson Road, Victoria, Virginia 23974. The project consists of improving the existing athletic field with a new baseball field including perimeter fencing, backstop, two dugouts, two bleacher stands, a bullpen, and a scoreboard. Additional work includes installation of underground electric power for the scoreboard, a hose bib with water line connection to the existing school building, an accessible concrete walkway and stairwell providing ADA access from the parking lot to the field and bleachers, and stormwater management through proposed gravel level spreaders around the field periphery. The project disturbs 2.67 acres within the school grounds and was issued for bid on March 20, 2026. The site is located on a parcel in FEMA Flood Zone X with no floodplain concerns and no existing wetlands.
The project involves comprehensive erosion and sediment control measures in two phases, including temporary and permanent stabilization practices, inlet protection, siltation fencing, sediment traps, diversion dikes, and level spreaders to direct stormwater to the Lunenburg Beach Reservoir. The soils consist of Caroline and Appling sandy loams with hydrologic soil groups B and C. Utility coordination includes county water and sewer connections, underground electric installation, and protection of existing utilities including water lines, sanitary sewer lines, telecommunications, and overhead power lines. Construction activities must comply with Virginia Department of Environmental Quality regulations and the Virginia Erosion and Sediment Control Law, with a certified Responsible Land Disturber required throughout construction. The contractor is responsible for all site preparation, demolition, utility connections, maintenance of erosion controls, final stabilization through permanent seeding, and as-built documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LCPS MS Baseball Field Spec.pdf | ||
| 000100 - IFB LMS Baseball.pdf | ||
| State Law Addendum.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
LUNENBERG BEACH RESERVOIR
CENTRAL HIGH SCHOOL
LUNENBERG MIDDLE SCHOOL
TOWN OF VICTORIA
TOMLINSON RDMAIN ST
K-V RD
6TH ST
POORHOUSE RD
REV. COMMENTS
REVISIONS
DATE
1700 Summit Ave, Suite 100 Richmond, VA 23230 T: (804) 781-3083 F: (617) 338-6472
Civil Engineering Land Surveying Transportation Engineering Structural Engineering
Planning
GIS
Green Infrastructure
DRAFTED BY:
SCALE:
FILE:
NITSCH PROJECT #
DATE:
CHECKED BY:
PROJECT MANAGER:
SURVEYOR:
T
O M
L
IN
SO
N
R D
V
IC
T
O R
IA
V
A
KJ
IS
NYFELER, INC.
JOHN CARTY
16343
P R
EP
A
R
ED
F O
R
L U
N E N
B U
R G
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
M
A
IN
S T
K
E N
B R
ID
G
E V
A
L U
N E N
B U
R G
M
ID
D L E S
C H
O O
L B
A
SE
B A
L L F
IE
L D
3/19/2026
16343 - CCV
1 ISSUED FOR BID 3.20.26
C O
V E R
S H
E E T
C-0.0
LUNENBURG COUNTY PUBLIC SCHOOLS
LUNENBURG MIDDLE SCHOOL BASEBALL FIELD
VICTORIA, VIRGINIA 23974
VICINITY MAP
SCALE 1" = 2000'
583 TOMLINSON RD
PROJECT INFORMATION
ADDRESS: 573 TOMLINSON RD, VICTORIA, VA 23974
PARCEL NUMBER: 033-0A-0-102
ZONING: A1
EXISTING USE: MIDDLE SCHOOL MULTI-USE ATHLETIC FIELD
PROPOSED USE: MIDDLE SCHOOL BASEBALL FIELD
LIMITS OF DISTURBANCE: 2.67 AC
UTILITIES:
COUNTY WATER
COUNTY SEWER
FLOODPLAIN: NO FLOODPLAIN, ZONE X. MAP (FIRM) NO. 51111C0175C EFFECTIVE MAY
6, 2025
VA HU6 WATERSHED: CU03 BIG HOUNDS CREEK
TOPOGRAPHY: TOPOGRAPHIC INFO WAS OBTAINED FROM A SURVEY TITLED
"TOPOGRAPHIC SURVEY FOR A PORTION OF THE LUNENBURG MIDDLE SCHOOL"
DATED 05/28/2025 BY NYFELER SURVEY, VERTICAL DATUM NAVD88
JOHN CARTY, PE
1700 SUMMIT AVE, SUITE 100,
RICHMOND, VA 23230
(804) 604-4599
JCARTY@NITSCHENG.COM
LUNENBURG COUNTY PUBLIC SCHOOLS
1009 MAIN STREET, P.O. BOX 710,
KENBRIDGE, VA 23944
(434) 676-2467 EXT. 2701
PAUL.CALEY@K12LCPS.ORG
OWNERCIVIL ENGINEER
NITSCH ENGINEERING
PROJECT DESCRIPTION
THE PROJECT CONSISTS OF IMPROVING THE EXISTING LUNENBURG MIDDLE SCHOOL ATHLETIC
FIELD WITH A PROPOSED BASEBALL FIELD AND ACCESSIBLE WALKWAY. THE BASEBALL FIELD
WILL INCLUDE NEW PERIMETER FENCING, A BACKSTOP, TWO DUGOUTS, TWO BLEACHER STANDS, A BULLPEN, AND A SCOREBOARD. UNDERGROUND ELECTRIC POWER IS PROPOSED TO POWER
THE SCOREBOARD. A PROXIMATE HOSE BIB IS PROPOSED WITH A SUPPORTING WATER LINE TO
THE EXISTING SCHOOL BUILDING. AN ACCESSIBLE CONCRETE WALKWAY AND STAIRWELL WILL
PROVIDE ADA ACCESS FROM THE EXISTING PARKING LOT TO THE PROPOSED BASEBALL FIELD,
BLEACHERS, AND DUGOUTS. STORMWATER WILL BE DIRECTED INTO PROPOSED GRAVEL LEVEL
SPREADERS AROUND THE PERIPHERY OF THE BASEBALL FIELD.
N.T.S
PLUMBING DRAWING INDEX
Sheet Number Sheet Title
P-101 PARTIAL SITE PLAN - PLUMBING
ELECTRICAL DRAWING INDEX
Sheet Number Sheet Title
E-101 ELECTRICAL SITE PLAN
E-102 ELECTRICAL SPECIFICATIONS
CIVIL DRAWING INDEX
Sheet Number Sheet Title
C-0.0 COVER SHEET
C-0.1 DEQ COVER SHEET
C-1.0 NOTES, LEGEND, AND ABBREVIATIONS
C-2.0 EXISTING CONDITIONS AND DEMOLITION PLAN
C-3.0 PHASE I EROSION AND SEDIMENT CONTROL PLAN
C-3.1 PHASE II EROSION AND SEDIMENT CONTROL PLAN
C-3.2 EROSION AND SEDIMENT CONTROL NOTES
C-3.3 EROSION AND SEDIMENT CONTROL DETAILS
C-3.4 EROSION AND SEDIMENT CONTROL DETAILS
C-3.5 EROSION AND SEDIMENT CONTROL DETAILS
C-4.0 SITE LAYOUT AND MATERIALS PLAN
C-5.0 SITE UTILITY PLAN
C-5.1 WATER AND SEWER PROFILES
C-6.0 GRADING AND DRAINAGE PLAN
C-6.1 PRE-DEVELOPMENT DRAINAGE AREA MAP
C-6.2 POST-DEVELOPMENT DRAINAGE AREA MAP
C-6.3 SHEET FLOW COMPUTATIONS
C-6.4 FLOOD PROTECTION
C-7.0 DETAILS
C-7.1 DETAILS
C-7.2 DETAILS
C-7.3 DETAILS
C-7.4 SEWER SPECIFICATIONS
C-7.5 WATER SPECIFICATIONS
REV. COMMENTS
REVISIONS
DATE
1700 Summit Ave, Suite 100 Richmond, VA 23230 T: (804) 781-3083 F: (617) 338-6472
Civil Engineering Land Surveying Transportation Engineering Structural Engineering
Planning
GIS
Green Infrastructure
DRAFTED BY:
SCALE:
FILE:
NITSCH PROJECT #
DATE:
CHECKED BY:
PROJECT MANAGER:
SURVEYOR:
T
O M
L
IN
SO
N
R D
V
IC
T
O R
IA
V
A
KJ
IS
NYFELER, INC.
JOHN CARTY
16343
P R
EP
A
R
ED
F O
R
L U
N E N
B U
R G
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
M
A
IN
S T
K
E N
B R
ID
G
E V
A
L U
N E N
B U
R G
M
ID
D L E S
C H
O O
L B
A
SE
B A
L L F
IE
L D
3/19/2026
16343 - CCV
1 ISSUED FOR BID 3.20.26
D E Q
C O
V E R
S H
E E T
C-0.1
D
EQ
P
LA
N
DATE REVISIONS INITIALAPPROVAL BLOCK
DEPT. OF ENVIRONMENTAL QUALITY
DATE
A. APPLICATION TYPE
___ INITIAL SUBMISSION
___ RESUBMISSION DEQ PLAN # :________
___ MODIFICATION with ACREAGE INCREASE DEQ PLAN # :________ ___ MODIFICATION without ACREAGE INCREASE DEQ PLAN # :________
B. DESIGN PROFESSIONAL
CONTACT NAME:
MAILING ADDRESS:
TELEPHONE NO:
EMAIL ADDRESS:
C. PROJECT DEVELOPER
PROJECT DEVELOPER:
CONTACT NAME:
MAILING ADDRESS:
TELEPHONE NO:
EMAIL ADDRESS:
D. PROPERTY OWNER
PROPERTY OWNER:
CONTACT NAME:
MAILING ADDRESS:
TELEPHONE NO:
EMAIL ADDRESS:
E. PROJECT INFORMATION
PROJECT NAME: LUNENBURG MIDDLE SCHOOL BASEBALL FIELD
ADDRESS (911 ADDRESS IF AVAILABLE): 573 TOMLINSON RD, VICTORIA, VA 23974
COUNTY (IF NOT LOCATED WITHIN A CITY): LUNENBURG, VA
TAX MAP NO. (OR GPIN): 033-0A-0-102
LATITUDE (6 DIGITS, DECIMAL DEGREES): 36.9877
LONGITUDE (6 DIGITS, DECIMAL DEGREES): -78.2081
TOTAL LAND AREA OF DEVELOPMENT (1/100th ACRE): 2.67 AC ESTIMATED AREA TO BE DISTURBED (1/100th ACRE): 2.67 AC
PROJECT STATUS: ___ FEDERAL ___ STATE ___ PUBLIC ___ PRIVATE
PART OF A LARGER COMMON PLAN OF DEVELOPMENT? ___ YES ___ NO
OFFSITE IMPROVEMENTS PROPOSED? ___ YES ___ NO
F. OFFSITE SUPPORT ACTIVITY INFORMATION
OFFSITE SUPPORT ACTIVITY NAME:
ADDRESS (911 ADDRESS IF AVAILABLE):
COUNTY (IF NOT LOCATED WITHIN A CITY):
TAX MAP NO. (OR GPIN):
LATITUDE (6 DIGITS, DECIMAL DEGREES):
LONGITUDE (6 DIGITS, DECIMAL DEGREES):
ESTIMATED AREA TO BE DISTURBED (1/100th ACRE):
G. PLAN INFORMATION
SHEET NO.
1. VICINITY MAP
GENERAL PLAN INFORMATION
2. NORTH SCALE
3. PLAN LEGEND
4. PLAN SCALE
5. SHEET INDEX
PRE-DEVELOPMENT SITE INFORMATION
6. NARRATIVE OF PRE-DEVELOPMENT SITE CONDITIONS
7. EXISTING PROPERTY BOUNDARIES (INC. LEASE BOUNDARIES)
8. EXISTING TOPOGRAPHY (EXISTING CONTOURS)
9. EXISTING STREAMS, PONDS, DITCHES, WETLANDS & OTHER WATERS
10. EXISTING KARST FEATURES
11. EXISTING 100-YEAR FEMA FLOODPLAIN
12. RESOURCE PROTECTION AREAS
13. EXISTING IMPROVEMENTS (BUILDINGS, ROADS, PARKING & UTILITIES)
14. EXISTING VEGETATIVE AREAS (FOREST, OPEN SPACE & TURF)
15. EXISTING LAND COVER / USE TABULATION
16. EXISTING EASEMENTS (DEED BOOK/PAGE REF. OR INSTRUMENT #)
POST-DEVELOPMENT SITE INFORMATION
17. PRE-DEV. DRAINAGE AREAS (ACREAGE, DIVIDES & FLOW PATHS)
18. NARRATIVE OF POST-DEVELOPMENT SITE CONDITIONS
19. PROPOSED PROPERTY BOUNDARIES (INC. LEASE BOUNDARIES)
20. PROPOSED LIMITS OF LAND DISTURBANCE (CLEARING & GRADING)
21. PROPOSED GRADING (PROPOSED CONTOURS INC. SWM PRACTICES)
22. PROPOSED 100-YEAR FLOODPLAIN
23. PROPOSED IMPROVEMENTS (BLDGS, ROADS, PARKING & UTILITIES)
24. PROPOSED VEGETATIVE AREAS (FOREST, OPEN SPACE & TURF)
25. PROPOSED LAND COVER / USE TABULATION
26. PROPOSED EASEMENTS
27. POST-DEV. DRAINAGE AREAS (ACREAGE, DIVIDES & FLOW PATHS)
28. NARRATIVE OF PROP. EROSION & SEDIMENT CONTROLS
29. MINIMUM STANDARDS (9VAC25-840-40)
30. CRITICAL EROSION AREAS (VESCH, CHAPTER 6)
EROSION & SEDIMENT CONTROL INFORMATION
31. PROP. EROSION & SEDIMENT CONTROLS (VESCH, CHAPTER 3)
32. EROSION & SEDIMENT CONTROL DETAIL DRAWINGS
33. HYDROLOGIC & HYDRAULIC COMPUTATIONS
34. INSPECTION, OPERATION & MAINTENANCE REQUIREMENTS
35. NARRATIVE OF PROP. SWM FACILITIES / PRACTICES
36. PROP. SWM FACILITIES / PRACTICES
37. HYDROLOGIC & HYDRAULIC COMPUTATIONS *
38. LONG-TERM INSP., OPERATION & MAINTENANCE REQUIREMENTS
40. SOILS MAP (INC. NRCS SOIL TYPES)
41. SOILS TABULATION
POST-DEVELOPMENT WATER QUANTITY & WATER QUALITY INFO.
SOILS & GEOTECHNICAL INFORMATION
42. GEOTECHNICAL INVESTIGATION / REPORT
43. BOUNDARY SURVEY (18VAC10-20-370)
44. PHYSICAL IMPROVEMENT SURVEY (18VAC10-20-380)
45. TOPOGRAPHIC SURVEY (18VAC10-20-382)
OTHER SUPPORTING INFORMATION
EXISTING LAND COVER / USE ACRES
1. IMPERVIOUS COVER
IMPERVIOUS COVER (% OF TOTAL LAND AREA OF DEVELOPMENT)
2. MANAGED TURF
3. OPEN SPACE
4. FOREST COVER
5. PRIME FARMLAND (NRCS FARMLAND CLASSIFICATION)
1. IMPERVIOUS COVER
IMPERVIOUS COVER (% OF TOTAL LAND AREA OF DEVELOPMENT)
2. MANAGED TURF
3. OPEN SPACE
4. FOREST COVER
PROPOSED LAND COVER / USE ("SITE" TAB OF VRRM SPREADSHEET) ACRES
FACILITY
NO.
FACILITY
TYPE LAT. LONG.
REC.
WATER
TOT.
ACRES
TREATED
IMP.
ACRES
TREATED
PLAN
SHEET
NO.
MAP UNIT
SYMBOL
MAP UNIT
NAME HSG
K
FACTOR ERODIBILITY
ACRES
IN
LOD
OF
LOD
M. OWNER / DEVELOPER CERTIFICATION
I hereby certify that coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities will be obtained, if required, prior to commencing land-disturbing activities.
I hereby certify that all wetlands permits required by law will be obtained, if required, prior to commencing land disturbing activities.
I hereby certify that permission to construct any offsite improvements, if proposed, will be obtained prior to commencing land disturbing activities.
I hereby certify that all offsite nonpoint source nutrient credits will be obtained, if proposed, prior to commencing land disturbing activities.
I hereby certify that construction record drawings (as-built drawings) for all permanent stormwater management facilities/practices will be prepared and submitted to DEQ prior to project closeout. The construction record drawings will be appropriately sealed and by a professional registered in the Commonwealth of Virginia, certifying that the stormwater management facilities/practices have been constructed in accordance with the approved plan(s).
I hereby certify that a long-term maintenance agreement(s) for all permanent stormwater management facilities/practices and other techniques specified to manage the quality and quantity of runoff will be submitted to DEQ, if required, prior to project closeout. The long-term maintenance agreement(s) will be recorded in the local land records prior to termination of coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities.
OWNER / DEVELOPER NAME:
OWNER / DEVELOPER TITLE:
SIGNATURE:
DATE:
N. DESIGN PROFESSIONAL CERTIFICATION
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
I hereby certify that the plans and hydrologic & hydraulic computations herein are in compliance with the Stormwater Management Act and attendant regulations, the Erosion and Sediment Control Law and attendant regulations, and applicable DEQ guidance.
DESIGN PROFESSIONAL NAME:
LICENSE NO.:
SIGNATURE:
DATE:
O. DUAL COMBINED ADMINISTRATOR (DCA) CERTIFICATION
[ INCLUDE THIS SECTION / CERTIFICATION IF REQUESTING A STREAMLINED PLAN REVIEW IN
ACCORDANCE WITH DEQ GUIDANCE MEMO NO. 22-2011, OTHERWISE DELETE ]
I hereby certify that I have reviewed the plans and hydrologic & hydraulic computations herein for compliance with the Stormwater Management Act and attendant regulations, the Erosion and Sediment Control Law and attendant regulations, and applicable DEQ guidance, and recommend the plans and computations for DEQ approval.
DCA NAME:
DCA CERTIFICATION NO.:
SIGNATURE:
DATE:
PLAN SUBMISSION CHECKLIST
SHEET NO.
SHEET NO.
SHEET NO.
G. PLAN INFORMATION (CONT.)
SHEET NO.
SHEET NO.
SHEET NO.
H. LAND COVER TABULATION
I. SOILS TABULATION
J. EROSION & SEDIMENT CONTROL
ESC PLAN VARIANCE REQUEST: ___ YES ___ NO
IF "YES", PLEASE PROVIDE JUSTIFICATION FOR THE VARIANCE REQUEST:
K. STORMWATER MANAGEMENT
APPLICABLE DESIGN CRITERIA: ___ PART II B
___ PART II C (GRANDFATHERING)
___ PART II C (TIME LIMITS ON APPLICABILITY)
___ "SAFE HARBOR"
OFFSITE COMPLIANCE OPTION(S)? ___ YES ___ NO
IF "YES", PLEASE DESCRIBE THE OFFSITE COMPLIANCE OPTION(S):
DISCHARGE TO A KARST FEATURE(S)? ___ YES ___ NO
IF "YES", PLEASE DESCRIBE THE KARST FEATURE(S):
IF "YES", PLEASE DESCRIBE ANY KNOWN NATURAL HERITAGE RESOURCES IN THE KARST
FEATURE(S):
SWM PLAN EXCEPTION REQUEST? ___ YES ___ NO
IF "YES", PLEASE PROVIDE THE JUSTIFICATION FOR THE EXCEPTION REQUEST:
L. STORMWATER MANAGEMENT FACILITIES / PRACTICES
[ SEE DEQ GUIDANCE MEMO NO. 22-2012 FOR ADDITIONAL INSTRUCTIONS ] [ SEE DEQ GUIDANCE MEMO NO. 22-2012, SECTION 5.500. CROSS "X" OUT IF NOT APPLICABLE ]
SOLAR SPECIFIC REQUIREMENTS
I. INTERCONNECTION APPROVAL FOR SOLAR PROJECTS
___ PANELS ARE CONSIDERED "UNCONNECTED IMPERVIOUS"
___ PANELS QUALIFY AS "PERVIOUS" WITH INTERCONNECTION DOCUMENTATION AND EXPLANATION PROVIDED BELOW:
II. SOLAR PANEL ARRAY HORIZONTAL PROJECTED AREA
THE FOLLOWING EQUATION SHOULD BE USED TO DETERMINE A SOLAR PANEL'S HORIZONTAL PROJECTED AREA (HPA) WHEN PERFORMING EROSION AND SEDIMENT CONTROL, WATER QUANTITY, AND WATER QUALITY DESIGN COMPUTATIONS:
WHERE:
HPA = HORIZONTAL PROJECTED AREA (SQUARE-FEET)
L = SOLAR PANEL LENGTH (FEET)
W = SOLAR PANEL WIDTH (FEET)
q = SOLAR PANEL MINIMUM OPERATING ANGLE FROM HORIZONTAL (DEGREES) FOR NORMAL OPERATIONS WITHOUT A RAIN SENSOR, OR THE MAXIMUM ANGLE FROM HORIZONTAL (DEGREES) WHEN A RAIN SENSOR IS DEPLOYED IN ACCORDANCE
WITH DEQ GUIDANCE MEMO NO. GM 22-2012, SECTION 5.500 D
___ NO RAIN SENSOR q = ___
___ RAIN SENSOR SYSTEM PROVIDED q = ___
DOCUMENTATION OF DESIGN q PROVIDED BELOW:
DEQ PLAN # 20___ - 0___
39. OUTFALL SUMMARY TABLE WITH PRE, POST, AND ALLOWABLE
DISCHARGE RATES USED FOR QUANTITY ASSESSMENT; IDENTIFY
THE TYPE OF CONVEYANCE SYSTEM AT EACH POINT OF DISCHARGE
* STORM DRAIN DESIGN COMPUTATIONS AND HYDRAULIC GRADE LINE COMPUTATIONS
SHOULD BE PROVIDED AND SHOULD INCLUDE EACH PIPE SEGMENT. IN ADDITION, STORM
SEWER LONGITUDINAL PROFILES WITH HYDRAULIC GRADE LINE ELEVATIONS SHOULD BE
INCLUDED FOR VISUAL REPRESENTATION. DESIGN CALCULATIONS AND CROSS-SECTIONS
SHOULD BE PROVIDED FOR ALL OPEN MANMADE CHANNELS. CROSS-SECTIONS SHOULD
SHOW AND LABEL THE 1-YEAR, 2-YEAR, AND 10-YEAR WATER SURFACE ELEVATIONS.
X
KELLEN JOHNSON, PE
1700 SUMMIT AVE, SUITE 100, RICHMOND, VA 23230
(804) 781-3083
KJOHNSON@NITSCHENG.COM
LUNENBURG COUNTY PUBLIC SCHOOLS
1009 MAIN STREET, P.O. BOX 710, KENBRIDGE, VA 23944
(434) 676-2467 EXT. 2701
PAUL.CALEY@K12LCPS.ORG
PAUL CALEY
LUNENBURG COUNTY PUBLIC SCHOOLS
1009 MAIN STREET, P.O. BOX 710, KENBRIDGE, VA 23944
(434) 676-2467 EXT. 2701
PAUL.CALEY@K12LCPS.ORG
PAUL CALEY
X X X
C-0.0
C-2.0
C-1.0
C-2.0
C-0.0
C-3.2
C-2.0
C-2.0
C-2.0
N/A
N/A
N/A
C-2.0
C-2.0
C-6.1
C-2.0
C-6.1
C-3.2
N/A
C-3.0
C-6.0
N/A
C-4.0
C-6.2
C-6.2
N/A
C-6.2
C-3.2
C-3.2
N/A
C-3.1 THRU C-3.2
C-3.3 THRU C-3.4
C-3.3, C-3.5
C-3.2
APPENDIX A
C-6.2
C-6.0
APPENDIX B, C, D, F
REPORT SEC. 3
REPORT SEC. 4
REPORT SEC. 2
N/A
N/A
N/A
C-2.0
N.T.S
.03
1.1%
2.64
.76
29%
1.91
4B
1B2
1C2
CAROLINE
SANDY LOAM
APPLING SANDY
LOAM
APPLING SANDY
LOAM
C
B
B
.24 MODERATE
.28
.28
MODERATE
MODERATE
1.71 64%
0.92 35%
0.03 1.0%
X
X
X
X
1 LEVEL
SPREADER
LEVEL
SPREADER
LEVEL
SPREADER
N36.988437 W78.209022
N36.987911 W78.209264
N36.988681 W78.208656
1.28LUNENBURG BEACH
RESERVOIR
LUNENBURG BEACH
RESERVOIR
LUNENBURG BEACH
RESERVOIR
0.70
0.65
0.00
0.14
0.53
C-6.2
C-6.2
C-6.2
JOHN CARTY
039452
09/22/2025
DRAWING INDEX
Sheet
Number Sheet Title
C-0.0 COVER SHEET
C-0.1 DEQ COVER SHEET
C-1.0 NOTES, LEGEND, AND ABBREVIATIONS
C-2.0 EXISTING CONDITIONS AND DEMOLITION
PLAN
C-3.0 PHASE I EROSION AND SEDIMENT CONTROL
PLAN
C-3.1 PHASE II EROSION AND SEDIMENT CONTROL
PLAN
C-3.2 EROSION AND SEDIMENT CONTROL NOTES
C-3.3 EROSION AND SEDIMENT CONTROL DETAILS
C-3.4 EROSION AND SEDIMENT CONTROL DETAILS
C-3.5 EROSION AND SEDIMENT CONTROL DETAILS
C-4.0 SITE LAYOUT AND MATERIALS PLAN
C-5.0 SITE UTILITY PLAN
C-5.1 WATER AND SEWER PROFILES
C-6.0 GRADING AND DRAINAGE PLAN
C-6.1 PRE-DEVELOPMENT DRAINAGE AREA MAP
C-6.2 POST-DEVELOPMENT DRAINAGE AREA MAP
C-6.3 SHEET FLOW COMPUTATIONS
C-6.4 FLOOD PROTECTION
C-7.0 DETAILS
C-7.1 DETAILS
C-7.2 DETAILS
C-7.3 DETAILS
C-7.4 SEWER SPECIFICATIONS
C-7.5 WATER SPECIFICATIONS
2025-0292
GENERAL NOTES:
1. TOPOGRAPHIC DATA, PROPERTY LINE INFORMATION, AND EXISTING SITE FEATURES WERE
OBTAINED FROM A SURVEY TITLED "TOPOGRAPHIC SURVEY FOR A PORTION OF THE
LUNENBURG MIDDLE SCHOOL" DATED 05/28/2025 BY NYFELER SURVEY, PREPARED FOR
NITSCH ENGINEERING.
2. FLOODPLAIN INFORMATION WAS OBTAINED FROM THE FLOOD INSURANCE RATE MAP (FIRM)
NO. 51111C0175C EFFECTIVE MAY 6, 2025. THE SITE IS IN ZONE X.
3. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, RULES, REGULATIONS AND SAFETY CODES IN THE CONSTRUCTION OF ALL IMPROVEMENTS.
4. THE LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES ARE APPROXIMATE AND ALL
UTILITIES MAY NOT BE SHOWN. PRESENCE AND LOCATIONS OF ALL UTILITIES WITHIN THE
LIMIT OF WORK MUST BE DETERMINED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF
CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING AND
CONTACTING THE CONTROLLING AUTHORITIES AND/OR UTILITY COMPANIES RELATIVE TO THE
LOCATIONS AND ELEVATIONS OF THEIR LINES. THE CONTRACTOR SHALL KEEP A RECORD OF
ANY DISCREPANCIES OR CHANGES IN THE LOCATIONS OF ANY UTILITIES SHOWN OR
ENCOUNTERED DURING CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE
OWNER AND NITSCH ENGINEERING. ANY DAMAGE RESULTING FROM THE FAILURE OF THE
CONTRACTOR TO MAKE THESE DETERMINATIONS AND CONTACTS SHALL BE BORNE BY THE
CONTRACTOR.
5. THE CONTRACTOR SHALL, THROUGHOUT CONSTRUCTION, TAKE ADEQUATE PRECAUTIONS TO
PROTECT ALL WALKS, GRADING, SIDEWALKS AND SITE DETAILS OUTSIDE OF THE LIMIT OF
DISTURBANCE AS DEFINED ON THE DRAWINGS AND SHALL REPAIR AND REPLACE OR
OTHERWISE MAKE GOOD AS DIRECTED BY THE ENGINEER OR OWNER'S DESIGNATED
REPRESENTATIVE ANY SUCH OR OTHER DAMAGE SO CAUSED.
6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY AND ALL
CONSTRUCTION MEANS AND METHODS.
7. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE
SITE AND CONSTRUCTION DOCUMENTS TO DEVELOP A THOROUGH UNDERSTANDING OF THE
PROJECT, INCLUDING ANY SPECIAL CONDITIONS AND CONSTRAINTS.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PROJECT SITE
AND TO VERIFY ALL CONDITIONS IN THE FIELD AND REPORT DISCREPANCIES BETWEEN PLANS
AND ACTUAL CONDITIONS TO THE OWNER OR OWNER'S REPRESENTATION IMMEDIATELY.
9. THE CONTRACTOR SHALL CONDUCT ALL NECESSARY CONSTRUCTION NOTIFICATIONS AND
APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTION PERMITS.
10. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE ESTABLISHMENT AND USE OF ALL
VERTICAL AND HORIZONTAL CONSTRUCTION CONTROLS.
11. ELEVATIONS REFER TO DATUM NAVD 88.
DEMOLITION NOTES:
1. SITE PREPARATION AND DEMOLITION SHALL INCLUDE THOSE AREAS WITHIN THE LIMITS OF
DISTURBANCE LINE AS SHOWN ON THE CONTRACT DOCUMENTS.
2. ANY AREA OUTSIDE OF THE LIMITS OF DISTURBANCE THAT IS DISTURBED SHALL BE
RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.
3. CONSULT ALL OF THE DRAWINGS AND SPECIFICATIONS FOR COORDINATION
REQUIREMENTS BEFORE COMMENCING DEMOLITION.
4. THE CONTRACTOR SHALL COORDINATE SITE DEMOLITION EFFORTS WITH ALL TRADES THAT
MAY BE AFFECTED BY THE WORK.
5. ALL ITEMS REQUIRING REMOVAL SHALL BE REMOVED TO FULL DEPTH TO INCLUDE BASE
MATERIAL AND FOOTINGS OR FOUNDATIONS AS REQUIRED TO FACILITATE CONSTRUCTION,
AND LEGALLY DISPOSED OF OFFSITE BY CONTRACTOR.
6. UTILITY PIPES DESIGNATED TO BE ABANDONED IN PLACE SHALL BE PLUGGED AT THEIR
ENDS WITH WATERTIGHT BRICK MASONRY OR CEMENT MORTAR WITH A MINIMUM
THICKNESS OF 8 INCHES.
7. UTILITY PIPES DESIGNATED TO BE REMOVED SHALL CONSIST OF THE COMPLETE REMOVAL
AND DISPOSAL OF THE ENTIRE LENGTH OF PIPE AND BACKFILL AND 95% COMPACTION OF
THE VOID WITH ORDINARY BORROW. WHEN THE VOID IS WITHIN THE FOOTPRINT OF THE
NEW BUILDING, GRAVEL BORROW SHALL BE USED TO BACKFILL THE VOID.
8. UTILITY STRUCTURES DESIGNATED TO BE ABANDONED IN PLACE SHALL HAVE THEIR CAST
IRON CASTINGS REMOVED AND DISPOSED, INLET AND OUTLET PIPES PLUGGED, THE
BOTTOM OF THE STRUCTURES SHALL BE BROKEN, THE VOID OF THE STRUCTURES SHALL
BE BACKFILLED AND COMPACTED TO 95% WITH ORDINARY BORROW OR FLOWABLE FILL,
AND THE TOP OF THE STRUCTURE SHALL BE REMOVED SO THAT IT IS AT LEAST 36 INCHES
BELOW FINISH GRADE.
9. UTILITY STRUCTURES DESIGNATED TO BE REMOVED SHALL CONSIST OF THE REMOVAL AND
DISPOSAL OF CAST IRON CASTINGS, PLUGGING OF INLET AND OUTLET PIPES, REMOVAL OF
THE STRUCTURE, AND BACKFILL AND 95% COMPACTION OF THE VOID WITH ORDINARY
BORROW. WHEN HE VOID IS WITHIN THE FOOTPRINT OF THE NEW BUILDING, GRAVEL
BORROW SHALL BE USED TO BACKFILL THE VOID.
10. ALL DEBRIS GENERATED DURING SITE PREPARATION ACTIVITIES SHALL BE LEGALLY
DISPOSED OF OFFSITE.
11. AT ALL LOCATIONS WHERE EXISTING CURBING, CONCRETE PAVEMENT OR BITUMINOUS
CONCRETE ROADWAY ABUTS NEW CONSTRUCTION, THE EDGE OF THE EXISTING CURB OR
PAVEMENT SHALL BE SAW CUT TO A CLEAN, SMOOTH EDGE.
12. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO ANY EXPANSION OF
THE LIMITS OF DISTURBANCE. IF IT IS DEEMED NECESSARY TO EXTEND THE DESIGNATED
LIMITS OF DISTURBANCE TO ACCOMPLISH ROUGH GRADING, EROSION CONTROL, AND SITE
WORK AS REQUIRED BY THESE DRAWINGS AND SPECIFICATIONS. ADDITIONAL PERMITTING
WILL BE REQUIRED FOR ANY EXPANSION OF THE LIMITS OF DISTURBANCE.
13. THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL RUBBISH AND DEBRIS FOUND
THEREON. STORAGE OF SUCH MATERIALS ON THE PROJECT SITE WILL NOT BE PERMITTED.
THE CONTRACTOR SHALL LEAVE THE SITE IN SAFE, CLEAN, AND LEVEL CONDITION UPON
COMPLETION OF THE SITE DEMOLITION WORK.
14. REMOVE AND STOCKPILE ALL EXISTING SITE LIGHTS, BENCHES, TRASH RECEPTACLES,
TRAFFIC SIGNS, GRANITE CURB, AND OTHER SITE IMPROVEMENTS WITHIN LIMIT OF WORK
LINE UNLESS OTHERWISE NOTED.
15. ALL EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED AND MAINTAINED
THROUGHOUT THE TIME OF CONSTRUCTION, AS SPECIFIED AND DIRECTED BY THE
EROSION AND SEDIMENT CONTROL PLANS.
16. BEFORE ANY TREES OR SHRUBS ARE REMOVED, THE CONTRACTOR SHALL ARRANGE A
CONFERENCE ON THE SITE WITH THE OWNER OR OWNER'S REPRESENTATIVE TO IDENTIFY
TREES AND SHRUBS THAT ARE TO BE REMOVED, AS WELL AS THOSE WHICH ARE TO BE
PROTECTED. DO NOT COMMENCE CLEARING OPERATIONS WITHOUT A CLEAR
UNDERSTANDING OF EXISTING CONDITIONS TO BE PRESERVED.
17. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO REMOVAL FROM
THE AREA OF CONSTRUCTION PAVEMENT, CONCRETE, CURBING, POLES AND
FOUNDATIONS, ISLANDS, TREE BERMS AND OTHER FEATURES WITHIN THE LIMITS OF
CONSTRUCTION THAT ARE NOT INDICATED TO BE REMOVED ON SHEET C-1.0 AS REQUIRED
TO ACCOMMODATE NEW CONSTRUCTION.
EROSION AND SEDIMENT CONTROL NOTES:
1. PRIOR TO STARTING ANY OTHER WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY
APPROPRIATE AGENCIES AND SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON
THE PLANS AND AS IDENTIFIED IN FEDERAL, STATE, AND LOCAL APPROVAL DOCUMENTS
PERTAINING TO THIS PROJECT.
2. SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE
OR UPON SUSPENSION OF GRADING OPERATIONS FOR ANTICIPATED DURATION OF GREATER
THAN 14 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA.
3. CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES AND REMOVE
SEDIMENT THEREFROM ON A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH
STORM EVENT. CONTRACTOR SHALL DISPOSE OF ANY SEDIMENTS REMOVED FROM EROSION
CONTROL MEASURES IN AN UPLAND AREA SUCH THAT THEY DO NOT ENCUMBER OTHER
DRAINAGE STRUCTURES AND PROTECTED AREAS.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT
OF DUST FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY
PROBLEMS, OR HARM ANIMAL OR PLANT LIFE.
6. CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT
SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS WHETHER SUCH
SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.
7. CONTRACTOR SHALL SEQUENCE CONSTRUCTION SUCH THAT EARTH MATERIALS ARE
EXPOSED FOR THE MINIMUM LENGTH OF TIME BEFORE THEY ARE COVERED, SEEDED, OR
OTHERWISE STABILIZED TO PREVENT EROSION.
8. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OF PERMANENT GROUND
COVER, CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND
CLEAN SEDIMENT AND DEBRIS FROM ALL DRAINAGE AND SEWER SYSTEMS.
EARTH MOVING AND GRADING NOTES:
1. ALL TOPSOIL ENCOUNTERED WITHIN THE WORK AREA SHALL BE STRIPPED TO ITS FULL
DEPTH AND STOCKPILED FOR REUSE. EXCESS TOPSOIL SHALL BE SPREAD UNIFORMLY ON
THE SITE IN AREAS DIRECTED BY THE OWNER UNLESS OTHERWISE DIRECTED BY THE
OWNER. TOPSOIL PILES SHALL REMAIN SEGREGATED FROM EXCAVATED SUBSURFACE SOIL
MATERIALS.
2. CROSS SLOPES OF ALL PEDESTRIAN WALKS SHALL NOT EXCEED 1.5%.
3. RUNNING SLOPE OF ALL PEDESTRIAN WALKS SHALL NOT EXCEED 4.5%, UNLESS OTHERWISE
NOTED.
4. THE CONTRACTOR SHALL EXERCISE CAUTION IN ALL EXCAVATION ACTIVITY DUE TO POSSIBLE
EXISTENCE OF UNRECORDED UTILITY LINES.
5. ALL PAVED AREAS MUST PITCH TO DRAIN AT A MINIMUM OF 1% UNLESS OTHERWISE NOTED.
6. PROVIDE POSITIVE DRAINAGE AWAY FROM FACE OF BUILDINGS AT ALL LOCATIONS.
7. PITCH EVENLY BETWEEN CONTOUR LINES AND BETWEEN SPOT GRADES. SPOT GRADE
ELEVATIONS TAKE PRECEDENCE OVER CONTOUR LINES.
8. THE CONTRACTOR SHALL BLEND NEW GRADING SMOOTHLY INTO EXISTING GRADING AT
LIMITS OF GRADING.
9. WHERE NEW PAVING MEETS EXISTING PAVING, MEET LINE AND GRADE OF EXISTING PAVING
WITH SMOOTH TRANSITION BETWEEN EXISTING AND NEW SURFACES.
10. THE CONTRACTOR SHALL VERIFY EXISTING GRADES IN THE FIELD AND REPORT ANY
DISCREPANCIES IMMEDIATELY TO THE ARCHITECT OR OWNER'S REPRESENTATIVE PRIOR TO
STARTING WORK.
11. PITCH TOPS OF ALL WALLS AT ONE-EIGHTH INCH (1/8") PER FOOT FROM BACK OF WALL TO
FACE OF WALL.
12. SURPLUS MATERIALS SHALL BE REMOVED FROM THE SITE UNLESS DIRECTED BY THE OWNER
OR OWNER'S REPRESENTATIVE TO REMAIN. REFER TO EARTHWORK SPECIFICATIONS.
13. ANY AREAS OUTSIDE OF THE LIMIT OF WORK THAT ARE DISTURBED SHALL BE RESTORED BY
THE CONTRACTOR TO THE PRE-CONSTRUCTION CONDITION/GRADE AT NO COST TO THE
OWNER.
14. EXCAVATION REQUIRED WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY
HAND. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR
STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT NO ADDITIONAL COST TO
OWNER.
ABBREVIATIONS
PROPOSED LEGEND
LOD
CPP
PVC
TYP
DMH
CO
PERF
CB
AD
RD
BC
FFE
TC
LIMITS OF DISTURBANCE (2.67 AC)
ELEVATION CONTOURS
CLEANOUT
AREA DRAIN
BOTTOM OF CURB ELEVATION
CATCH BASIN
CLEANOUT
CORRUGATED POLYETHYLENE PIPE
DRAIN MANHOLE
FINISHED FLOOR ELEVATION
INVERT ELEVATION
LINEAR FEET
LIMIT OF DISTURBANCE
PERFORATED
POLYVINYL CHLORIDE PIPE
ROOF DRAIN
RIM ELEVATION
TOP OF CURB ELEVATION
TYPICAL
RIM
LOD
LF
INV
CO
BW BOTTOM OF WALL ELEVATION
TW TOP OF WALL ELEVATION
PROPERTY LINE
EXISTING SITE FEATURE TO BE
DEMOLISHED
BS BOTTOM OF STAIR ELEVATION
DRAIN PIPE
SAWCUT LINE
LAYOUT AND MATERIALS NOTES:
1. DIMENSIONS ARE FROM THE FACE OF CURB, FACE OF BUILDING, FACE OF WALL, AND CENTER
LINE OF PAVEMENT MARKINGS, UNLESS OTHERWISE NOTED.
2. ANY EXISTING PROPERTY LINE MONUMENTS DISTURBED DURING CONSTRUCTION SHALL BE
SET OR RESET BY A PROFESSIONAL LAND SURVEYOR.
3. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING PAVEMENT
ELEVATIONS AT INTERFACE WITH PROPOSED PAVEMENTS, AND EXISTING GROUND
ELEVATIONS ADJACENT TO DRAINAGE OUTLETS TO ASSURE PROPER TRANSITIONS BETWEEN
EXISTING AND PROPOSED FACILITIES.
4. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE
NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE
DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS,
MANUFACTURERS' LITERATURE, SHOP DRAWINGS AND FIELD MEASUREMENTS OF SUPPLIED
PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
5. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF THE PLANS,
SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL
VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE
PLANS AND SPECIFICATIONS THAT ARE SUPPLIED AS A PART OF THE CONTRACT DOCUMENTS.
RIP-RAP
MG MATCH EXISTING GRADE
EXISTING LEGEND
UTILITY NOTES:
1. ALL UTILITY CONNECTIONS ARE SUBJECT TO THE APPROVAL OF, AND GRANTING OF PERMITS
BY, THE LOCAL MUNICIPALITY. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR
TO OBTAIN ALL PERMITS AND APPROVALS RELATED TO UTILITY WORK PRIOR TO
COMMENCEMENT OF CONSTRUCTION.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR OBTAINING ALL PERMISSIONS FOR,
AND FOR CONDUCTING ALL PREPARATIONS RELATED TO, WORK AFFECTING ANY UTILITIES
WITHIN THE JURISDICTION OF ANY NON-MUNICIPAL UTILITY COMPANY, INCLUDING BUT NOT
LIMITED TO ELECTRIC, TELEPHONE, AND/OR GAS. THE CONTRACTOR SHALL NOTIFY ALL
APPROPRIATE AGENCIES, DEPARTMENTS, AND UTILITY COMPANIES, IN WRITING, AT LEAST 7
DAYS (OR PER UTILITY COMPANY REQUIREMENT) AND NOT MORE THAN 30 DAYS PRIOR TO
ANY CONSTRUCTION.
3. THE CONTRACTOR SHALL MAINTAIN UTILITIES SERVICING BUILDINGS AND FACILITIES WITHIN
OR OUTSIDE THE PROJECT LIMIT UNLESS THE INTERRUPTION OF SERVICE IS COORDINATED
WITH THE OWNER.
4. ALL WATER, SEWER, AND DRAIN WORK SHALL BE PERFORMED ACCORDING TO THE
REQUIREMENTS AND STANDARD SPECIFICATIONS OF THE LOCAL MUNICIPALITY.
5. GAS, TELECOMMUNICATIONS AND ELECTRIC SERVICES ARE TO BE DESIGNED BY EACH UTILITY
COMPANY IN COORDINATION WITH THE MECHANICAL, ELECTRIC, AND PLUMBING
CONSULTANTS.
6. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES OF NEW UTILITIES WITH
GAS, TELECOMMUNICATION AND ELECTRICAL SERVICES.
7. INSTALL WATER LINES WITH A MINIMUM OF 3.5 FEET OF COVER AND A MAXIMUM OF SEVEN
FEET COVER FROM THE FINAL DESIGN GRADES.
8. MAINTAIN 10 FEET HORIZONTAL SEPARATION AND 18 INCHES VERTICAL SEPARATION (WATER
OVER SEWER) BETWEEN SEWER AND WATER LINES. WHEREVER THERE IS LESS THAN 10
FEET OF HORIZONTAL SEPARATION AND 18 INCHES OF VERTICAL SEPARATION BETWEEN A
PROPOSED OR EXISTING SEWER LINE TO REMAIN AND A PROPOSED OR EXISTING WATER LINE
TO REMAIN BOTH WATER MAIN AND SEWER MAIN SHALL BE CONSTRUCTED OF MECHANICAL
JOINT CEMENT LINED DUCTILE IRON PIPE FOR A DISTANCE OF 10-FEET ON EITHER SIDE OF
THE CROSSING. ONE (1) FULL LENGTH OF WATER PIPE SHALL BE CENTERED OVER THE
SEWER AT THE CROSSING.
9. THE CONTRACTOR SHALL MAINTAIN ALL EXISTING UTILITIES EXCEPT THOSE NOTED TO BE
ABANDONED AND/OR REMOVED & DISPOSED.
10. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR TRENCHING, BACKFILLING, AND SURFACE
RESTORATION FOR GAS UTILITY SYSTEMS.
11. ALL ONSITE UTILITIES SHALL BE INSTALLED UNDERGROUND UNLESS OTHERWISE NOTED.
12. ALL EXISTING AND PROPOSED MANHOLE FRAMES, COVERS, VALVES, CLEANOUTS, CASTINGS, ETC. SHALL BE RAISED TO FINISHED GRADE PRIOR TO FINAL GRADING AND PAVING
CONSTRUCTION.
13. ALL GRATES IN WALKWAYS SHALL BE ADA COMPLIANT.
14. THE CONTRACTOR SHALL NOT STOCKPILE MATERIALS OR STAGE CONSTRUCTION EQUIPMENT
ON TOP OF INFILTRATION SYSTEMS. INFILTRATION SYSTEMS SHALL BE PROTECTED AND
MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION. INFILTRATION SYSTEM
FOOTPRINT SHALL BE PROTECTED FROM COMPACTION AND SEDIMENTATION.
15. CONTRACTOR TO LOCATE AND VERIFY THE RIM AND INVERT ELEVATIONS OF THE EXISTING
SEWER SYSTEM THROUGH THE PROPERTY FROM COUNTY ROAD TO ORANGE STREET AND
REPORT TO THE DESIGN TEAM PRIOR TO INSTALLATION OF ANY SEWER SYSTEM
LINES/CONNECTIONS.
16. PRIOR TO THE ACCEPTANCE OF ALL OF THE UTILITY SYSTEMS, THE CONTRACTOR SHALL
SUBMIT TO THE ENGINEERS, FOR REVIEW AND APPROVAL, AS-BUILT DRAWINGS THAT
INDICATE THE TRUE MEASUREMENT AND LOCATION, HORIZONTAL AND VERTICAL, OF ALL NEW
CONSTRUCTION. AS-BUILT DRAWINGS SHALL BE STAMPED AND SIGNED BY A
MASSACHUSETTS LICENSED LAND SURVEYOR OR LICENSED PROFESSIONAL ENGINEER. THE
AS-BUILT PLANS SHALL ALSO BE SUBMITTED ELECTRONICALLY AS AN AUTOCAD DRAWING FILE
(RELEASE 2018 OR HIGHER).
EXISTING UTILITY TO BE ABANDONED,
REMOVED AND DISPOSED
DOMESTIC WATER PIPE
UNDERGROUND ELECTRIC
WATER VALVEWV
CONCRETE
ASPHALT
IN-FIELD MIX
W DATR
SS DATR
D DATR
DATR DATA AVAILABLE THROUGH RECORDS
1" MILL AND OVERLAY
COMPACTED STONE DUST
EXISTING CONTOURS
IRON ROD FOUND
SURVEY CONTROL POINT
STORM SEWER MANHOLE
STORM SEWER LINE
OVERHEAD UTILITY LINE
OVERHEAD UTILITY POLE
GUY WIRE
ELECTRIC METER
LIGHT POLE
CONCRETE
ASPHALT
GRAVEL
FENCE GATE POST
FENCE
SIGN
COMMUNICATIONS PEDESTAL
BOLLARD
ADA MARKED PARKING
SANITARY SEWER MANHOLE
SANITARY SEWER LINE
FIRE HYDRANT
WATER VALVE
WATERLINE
BURIED ELECTRIC
WATER, SEWER, AND DRAINAGE LINES (DATA
AVAILABLE THROUGH RECORD DRAWINGS)
SANITARY SEWER MANHOLE (DATA AVAILABLE
THROUGH RECORD DRAWINGS)
TELECOM HANDHOLE LOCATED VIA FIELD
OBSERVATIONS
VDOT DRAINAGE INLETS (DATA AVAILABLE
THROUGH RECORD DRAWINGS)
D
X
SD
E
T
S
SS
W
E
DETECTABLE WARNING STRIP
REV. COMMENTS
REVISIONS
DATE
1700 Summit Ave, Suite 100 Richmond, VA 23230 T: (804) 781-3083 F: (617) 338-6472
Civil Engineering Land Surveying Transportation Engineering Structural Engineering
Planning
GIS
Green Infrastructure
DRAFTED BY:
SCALE:
FILE:
NITSCH PROJECT #
DATE:
CHECKED BY:
PROJECT MANAGER:
SURVEYOR:
T
O M
L
IN
SO
N
R D
V
IC
T
O R
IA
V
A
KJ
IS
NYFELER, INC.
JOHN CARTY
16343
P R
EP
A
R
ED
F O
R
L U
N E N
B U
R G
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
M
A
IN
S T
K
E N
B R
ID
G
E V
A
L U
N E N
B U
R G
M
ID
D L E S
C H
O O
L B
A
SE
B A
L L F
IE
L D
3/19/2026
16343 CDT
1 ISSUED FOR BID 3.20.26
N O
T E S, L E G
E N
D A
N D
A B
B R
E V
IA
T
IO
N
S
C-1.0
N.T.S
SSSSSSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
T
D
D E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SD SD SD
S
E E E E E E E E
E
E E
E E
E E
E E
EE
W W
W W
W W
W W
W W
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD
LODLODLODLODLOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LODLO
D
LOD
0'
F R
O N
T
SE
TB
AC
K (T
YP
REMOVE AND DISPOSE OF EXISTING
RIP-RAP APRON WITHIN LOD
MAINTAIN AND PROTECT EXISTING
TRANSFORMER AND GENERATOR
PAD AND EQIUPMENT
MAINTAIN AND PROTECT
EXISTING CURB INLET
LIMITS OF DISTURBANCE (TYP.)
MAINTAIN AND PROTECT
EXISTING UTILITY POLE
MAINTAIN AND PROTECT EXISTING
OVERHEAD POWER LINE
MAINTAIN AND PROTECT
EXISTING WATER METER VAULT
MAINTAIN AND PROTECT
EXISTING OUTLET
SAWCUT LINE (TYP.)
MAINTAIN AND PROTECT EXISTING
SANITARY SEWER MANHOLE
APPROXIMATE 6" PVC WATER
LINE AS PROVIDED BY RECORD
DRAWINGS (TYP.)
APPROXIMATE 8" SANITARY
SEWER LINE AS INDICATED
BY RECORD DRAWINGS (TYP.)
APPROXIMATE TELECOM
HANDHOLE BASED ON FIELD
OBSERVATIONS (TYP.)
MAINTAIN AND PROTECT APPROXIMATE
6" PVC WATER LINE AS INDICATED BY
RECORD DRAWINGS (TYP.)
APPROXIMATE DRAIN PIPE AS
INDICATED BY RECORD
DRAWINGS (TYP.)
APPROXIMATE CURB
INLET AS INDICATED
BY RECORD
DRAWINGS (TYP.)
APPROXIMATE CULVERT
LOCATION BASED ON FIELD
OBSERVATIONS
APPROXIMATE CULVERT
LOCATION AS INDICATED BY
RECORD DRAWINGS (TYP.)
MAINTAIN AND PROTECT
EXISTING FIRE HYDRANT
ASSEMBLY
LIMITS OF FIELD RUN SURVEY. SURVEY
TOPOGRAPHY SUPPLEMENTED BY GIS
OUTSIDE OF THIS AREA
REPLACE IN KIND EXISTING CURB
AND GUTTER AS NEEDED
PROPERTY LINE (TYP.)
UTILITY CUT PAVEMENT
REPLACEMENT
MAINTAIN AND PROTECT
EXISTING 8" PVC PIPE (TYP.)
MAINTAIN AND PROTECT
EXISTING 12" RCP
MAINTAIN AND PROTECT EXISTING BURIED
ELECTRICAL CONDUIT (TYP.)
CONTRACTOR TO DETERMINE ACTUAL DEPTH
AND CONTACT ENGINEER IF DEPTH DIFFERS
FROM THAT SHOWN ON SHEET C-5.1.
MAINTAIN AND PROTECT EXISTING
BURIED ELECTRICAL CONDUIT
MAINTAIN AND PROTECT EXISTING
6" PVC WATER LINE (TYP.)
R/W ACCORDING TO
RECORD DRAWINGS
(TYP.)
CONTRACTOR TO TEST PIT WATERLINE AT THE
BEGINNING OF CONSTRUCTION AND DETERMINE
ACTUAL DEPTH. CONTACT ENGINEER IF FIELD
VERIFIED DEPTH DIFFERS FROM DEPTH SHOWN
ON SHEET C-5.1.
CONTRACTOR TO TEST PIT WATERLINE AT THE
BEGINNING OF CONSTRUCTION AND DETERMINE
ACTUAL DEPTH. CONTACT ENGINEER IF FIELD
VERIFIED DEPTH DIFFERS FROM DEPTH SHOWN
ON SHEET C-5.1.
REMOVE AND DISPOSE OF
EXISTING CONCRETE CURB
AND GUTTER
SAWCUT LINE (TYP.)
MAINTAIN AND PROTECT
EXISTING LIGHT POLE
REMOVE AND DISPOSE OF
EXISTING CONCRETE SIDEWALK
APPROXIMATE ROAD
CENTERLINE BASED ON
AERIAL IMAGERY
REV. COMMENTS
REVISIONS
DATE
1700 Summit Ave, Suite 100 Richmond, VA 23230 T: (804) 781-3083 F: (617) 338-6472
Civil Engineering Land Surveying Transportation Engineering Structural Engineering
Planning
GIS
Green Infrastructure
DRAFTED BY:
SCALE:
FILE:
NITSCH PROJECT #
DATE:
CHECKED BY:
PROJECT MANAGER:
SURVEYOR:
T
O M
L
IN
SO
N
R D
V
IC
T
O R
IA
V
A
KJ
IS
NYFELER, INC.
JOHN CARTY
16343
P R
EP
A
R
ED
F O
R
L U
N E N
B U
R G
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
M
A
IN
S T
K
E N
B R
ID
G
E V
A
L U
N E N
B U
R G
M
ID
D L E S
C H
O O
L B
A
SE
B A
L L F
IE
L D
3/19/2026
AS SHOWN
16343 CDM
1 ISSUED FOR BID 3.20.26
E X
IS
T
IN
G
C O
N D
IT
IO
N S
A N
D D
E M
O L
IT
IO
N
P L A
N
C-2.0
NA
D8
VA
SO
UT
H
ZO
NE
NOTES:
1.THIS TOPOGRAPHIC SURVEY IN LUNENBURG COUNTY,
VA WAS COMPLETED UNDER THE DIRECT SUPERVISION
AND RESPONSIBLE CHARGE OF KAREN A. HUBBARD
FROM AN ACTUAL GROUND SURVEY MADE UNDER MY
SUPERVISION;THE IMAGERY AND DATA WAS OBTAINED
BETWEEN 5/12/2025 AND 5/15/2025;AND THIS MAP MEETS
MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE
NOTED.
2. VERTICAL DATUM: NAVD88
3. HORIZONTAL AND VERTICAL DATUM ESTABLISHED
WITH VRS NETWORK RTK SOLUTIONS FOR GPS
OBSERVED POINTS.
4. UTILITIES SHOWN ARE FROM FIELD LOCATED
EVIDENCE OF SURFACE UTILITIES AND VIRGINIA UTILITY
PROTECTION SERVICES TICKET NUMBER A516801073.
UTILITY LOCATIONS ARE NOT WARRANTED TO BE
EXACTLY LOCATED NOR IS IT WARRANTED THAT ALL
UNDERGROUND UTILITIES OR OTHER STRUCTURES ARE
SHOWN ON THIS SURVEY
5. THIS MAP WAS PREPARED WITHOUT THE BENEFIT OF A
TITLE REPORT. EASEMENTS MAY EXIST THAT ARE NOT
SHOWN.
6. THIS MAP IS NOT A BOUNDARY SURVEY. BOUNDARY
SHOWN FROM LIMITED FIELD WORK AND COURTHOUSE
RESEARCH.
7. THIS MAP WAS PREPARED FOR:
NITSCH ENGINEERING
1700 SUMMIT AVE
SUITE 100
RICHMOND, VA 23230
SSSSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
T
D
D E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SD SD SD
S
E E E E E E E E
E
E E
E E
E E
E E
EE
W W
W W
W W
W W
W W
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAFSAF
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF SAF SAF SAF SAF
SSFSSFSSFSSFSSF
SSF
SS
F
SS
F
SS
F
SS
F
SS
F
DD
DD
DD
DD
D D
D D
D D
D D
D D
D D
DD
DD
DD
DD
DD
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
D V
DV
SAF
SAF
TS
TS
SSF
12'
70'
R10' R10'
CE
WASH RACK
LIMITS OF DISTURBANCE (TYP.)
LIMITS OF DISTURBANCE (TYP.)
ST
SAF
DD
DD
2.40 AC TO SEDIMENT TRAP
SEDIMENT TRAP - SEE DETAIL
SHEET C-3.3
BOTTOM OF TRAP: 537.0
BASE OF STONE OUTLET: 541.0
TOP OF STONE OUTLET: 543.5
TOP OF EMBANKMENT: 544.5
SSF
0.05 AC TO 139 LF
SUPER SILT FENCE
DV
.56 AC TO LEVEL SPREADER
COARSE AGGREGATE
CLASS 1 RIP-RAP 14.4'
3'
CIP
IP
56'
27'
TEMPORARY SOIL STOCKPILE
SSF
CONSTRUCTION MATERIALS
LAYDOWN AREA
6" CPP CULVERT
INV IN: 560.96
INV OUT: 560.90
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD
LODLODLODLODLOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LODLO
D
LOD
LS
CONSTRUCTION TRAILER
AND RAIN GAUGE LOCATION
TS
CW
LOD (2.67 AC)
PROPERTY LINE
SUBCATCHMENT DIVIDE
DIVERSION DIKE
DIVERSION
LEVEL SPREADER
SAFTEY FENCE
SUPER SILT FENCE
TEMPORARY SEEDING
CONSTRUCTION ENTRANCE
INLET PROTECTION
CULVERT INLET PROTECTION
SEDIMENT TRAP
CONCRETE WASHOUT PIT
LOD
EROSION AND SEDIMENT
CONTROL PHASE I LEGEND
C-ECM-04
C-ECM-05
C-ECM-14
C-PCM-01
C-PCM-04
C-SSM-09
C-SCM-03
C-SCM-04
C-SCM-05
C-SCM-11
C-SCM-13
SAF
SSF
SAF
SSF
TS
CE
DV
ST ST
DV
DDDD
IP
CIP
LS
CW
REV. COMMENTS
REVISIONS
DATE
1700 Summit Ave, Suite 100 Richmond, VA 23230 T: (804) 781-3083 F: (617) 338-6472
Civil Engineering Land Surveying Transportation Engineering Structural Engineering
Planning
GIS
Green Infrastructure
DRAFTED BY:
SCALE:
FILE:
NITSCH PROJECT #
DATE:
CHECKED BY:
PROJECT MANAGER:
SURVEYOR:
T
O M
L
IN
SO
N
R D
V
IC
T
O R
IA
V
A
KJ
IS
NYFELER, INC.
JOHN CARTY
16343
P R
EP
A
R
ED
F O
R
L U
N E N
B U
R G
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
M
A
IN
S T
K
E N
B R
ID
G
E V
A
L U
N E N
B U
R G
M
ID
D L E S
C H
O O
L B
A
SE
B A
L L F
IE
L D
3/19/2026
AS SHOWN
16343 CEC
1 ISSUED FOR BID 3.20.26
SCALE:
0 30 6030 15 1" = 30'
P H
A
SE
I E
R O
SI
O
N A
N D
S E D
IM
E N
T C
O N
T R
O L P
L A
N
C-3.0
NA
D8
VA
SO
UT
H
ZO
NE
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAFSAF
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SAF
SAF
SAF
SA
F
SAF
SAF
SAF
SAF
SAF
SAF
SAF
SAF SAF SAF SAF SAF
SSFSSFSSFSSFSSF
SSF
SS
F
SS
F
SS
F
SS
F
SS
F
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSSSSSSSSSSSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
T
D
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SD SD SD
S
E E E E E E E E
E
E E
E E
E E
E E
EE
W W
W W
W W
W W
W W
LIMITS OF DISTURBANCE (TYP.)
LIMITS OF DISTURBANCE (TYP.)
PS
PS
PS
BM
BM
BM
PS
PS
PS
PS
PS
PS
PS
UPON REMOVAL OF SEDIMENT TRAP WITH
APPROVAL FROM THE E&S INSPECTOR
AFTER FINAL STABILIZATION, RETURN
SLOPE TO EXISTING GRADES
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD
LODLODLODLODLOD
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LODLO
D
LOD
PERMANENT LEVEL SPREADER
SEE DETAIL SHEET C-7.3
PERMANENT LEVEL SPREADER
SEE DETAIL SHEET C-7.3
PERMANENT LEVEL SPREADER
SEE DETAIL SHEET C-7.3
CLASS I RIP-RAP TO
REPLACE EXISTING
RIP-RAP OUTFALL
PS
PS
PS
LOD (2.67 AC)
PROPERTY LINE
DIVERSION DIKE
DIVERSION
LEVEL SPREADER
SAFTEY FENCE
SUPER SILT FENCE
BLANKETS AND MATTING
PERMANENT SEEDING
CONSTRUCTION ENTRANCE
INLET PROTECTION
CULVERT INLET PROTECTION
SEDIMENT TRAP
LOD
EROSION AND SEDIMENT
CONTROLPHASE II LEGEND
C-ECM-04
C-ECM-05
C-ECM-14
C-PCM-01
C-PCM-04
C-SSM-05
C-SSM-10
C-SCM-03
C-SCM-04
C-SCM-05
C-SCM-11
SAF
SSF
SAF
SSF
BM
PS
CE
IP
CIP
DV
DD
DV
DD
LS
ST
REV. COMMENTS
REVISIONS
DATE
1700 Summit Ave, Suite 100 Richmond, VA 23230 T: (804) 781-3083 F: (617) 338-6472
Civil Engineering Land Surveying Transportation Engineering Structural Engineering
Planning
GIS
Green Infrastructure
DRAFTED BY:
SCALE:
FILE:
NITSCH PROJECT #
DATE:
CHECKED BY:
PROJECT MANAGER:
SURVEYOR:
T
O M
L
IN
SO
N
R D
V
IC
T
O R
IA
V
A
KJ
IS
NYFELER, INC.
JOHN CARTY
16343
P R
EP
A
R
ED
F O
R
L U
N E N
B U
R G
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
M
A
IN
S T
K
E N
B R
ID
G
E V
A
L U
N E N
B U
R G
M
ID
D L E S
C H
O O
L B
A
SE
B A
L L F
IE
L D
3/19/2026
AS SHOWN
16343 CEC 2
1 ISSUED FOR BID 3.20.26
SCALE:
0 30 6030 15 1" = 30'
P H
A
SE
I I E R
O
SI
O N
A N
D S
E D
IM
E N
T C
O N
T R
O L P
L A
N
C-3.1
NA
D8
VA
SO
UT
H
9VAC25-875-560. EROSION AND SEDIMENT CONTROL CRITERIA,
TECHNIQUES, AND METHODS: MINIMUM STANDARDS.
AN EROSION AND SEDIMENT CONTROL PLAN CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES, AND METHODS SHALL BE SUBMITTED TO THE VESMP AUTHORITY OR VESCP AUTHORITY FOR REVIEW AND APPROVAL:
1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS.
PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY
TRANSPORTED FROM THE PROJECT SITE.
3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT
IS UNIFORM, IS MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT EROSION.
4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL
BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE
AREA TO BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND
THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST
WHILE THE SEDIMENT BASIN IS UTILIZED.
7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH
ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE.
9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.
10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE
TREATED TO REMOVE SEDIMENT.
11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE
CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT, AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS.
EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED.
14. ALL APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS
COMPLETED.
16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO
OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR
OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND
PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING
ACTIVITIES.
18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE VESCP OR VESMP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION, AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MANMADE CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY
REQUIREMENTS FOR NATURAL OR MANMADE CHANNELS:
a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MANMADE RECEIVING CHANNEL, PIPE, OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR
PIPE SYSTEM SHALL BE PERFORMED.
b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS 100 TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL
NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(b) ALL PREVIOUSLY CONSTRUCTED MANMADE CHANNELS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP THE STORMWATER'S BANKS AND BY THE USE OF A TWO-YEAR STORM TO
DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(c) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A 10-YEAR STORM TO VERIFY THAT
STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
c. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MANMADE CHANNELS OR PIPES ARE NOT
ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A 10-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR
STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS;
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE 10-YEAR STORM IS CONTAINED WITHIN THE
APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PREDEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PREDEVELOPMENT PEAK RUNOFF RATE FROM A 10-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MANMADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION, OR OTHER MEASURES THAT IS
SATISFACTORY TO THE VESCP OR VESMP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
e. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE
DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, THE APPLICANT SHALL OBTAIN APPROVAL FROM THE VESCP OR VESMP AUTHORITY FOR A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR
PERFORMING THE MAINTENANCE.
g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .