Landscape_Maintenance_Area_II_(Water_Division_Site).pdf
PDF 25 MB Posted
- Attached to
- Landscape Maintenance
- Solicitation number
- 2024-IFB-LM-0582
- Issued by
- Los Angeles County, Berkeley City, California
About this file
The document is a comprehensive landscape maintenance contract file for Pasadena Water and Power, detailing maintenance requirements for multiple sites across various locations in California, including Altadena. The contract covers landscape maintenance for 15 water division sites (W-1 through W-15) and 14 reservoir sites (R-1 through R-14), with an additional 5 auxiliary sites (A-1 through A-5). The maintenance work frequency varies between monthly and bi-weekly services, with maintenance areas ranging from 150 square feet to 4.7 acres. Standard work requirements include removing trash, litter, weeds, leaves, brush, tree branches, and green waste; trimming ivy, vines, and bushes to fence lines; and maintaining clearance around access gates.
Each site has specific additional notes and unique characteristics, such as irrigation system inspections, shrub trimming requirements, and access restrictions. The maintenance sites are located in various areas, including Pasadena city boundaries and adjacent regions. Some sites require special considerations, such as security clearance, vehicle access limitations, and specific trimming instructions. The contract appears to be part of the Pasadena Water and Power's ongoing infrastructure maintenance strategy, ensuring clean, accessible, and well-maintained water division and reservoir properties.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING
BUILDING
GATE
GATE
EQUIP-
MENT
PASADENA WATER AND POWER
Date
Drawn By:
ARROYOWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-1 District Map:
Drawing No.:
Sheet No.:
PASADENA WATER AND POWER
Date
Drawn By:
William Ruano W-1
District Map:
Drawing No.:
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.04 Acres
ARROYO
May 2024
SHRUBS
SHRUBS
GATEGATE
EXISTING
MANHOLE
EX
IS
TI
N
G R.
O .W
W-2 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By: CASITASWilliam Ruano 210B
LEGEND
MAINTENANCE AREA
LOCATED IN ALTADENA, CAMay 2024
N
NTS
W-2 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano 210B
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.25 Acres
CASITAS
LOCATED IN ALTADENA, CAMay 2024
EQUIPMENT EQUIP-
MENT STORAGE
SHED
STORAGE
SHED
PLANTER
PLANTER
DRIVEWAY
GATE
PASADENA WATER AND POWER
Date
Drawn By:
CHAPMANWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-3 District Map:
Drawing No.:
Drawn By:
William Ruano W-3
District Map:
Drawing No.:
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.22 Acres
CHAPMAN
GATE
BUILDING
EQUIP-
MENT
HEDGES
HEDGES
HEDGES
HEDGES
ALLEY
PASADENA WATER AND POWER
Date
Drawn By:
CRAIGWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-4 District Map:
Drawing No.:
Drawn By:
William Ruano W-4
District Map:
Drawing No.:
Sheet No.:
Work Frequency: Bi-Weekly (every two weeks)
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.28 Acres
CRAIG
320'
'LOCATION FOR
FUTURE FACILITY
PASADENA WATER AND POWER
Date
Drawn By:
DAISYWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-5 District Map:
Drawing No.:
Drawn By:
William Ruano W-5
District Map:
Drawing No.:
Sheet No.:
Work Frequency: Bi-Weekly (every two weeks)
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.44 Acres
DAISY
FUTURE
FUTURE
EQUIPMENT
GATE
GATE
PASADENA WATER AND POWER
Date
Drawn By:
EXPLORERWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-6 District Map:
Drawing No.:
Drawn By:
William Ruano W-6
District Map:
Drawing No.:
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.04 Acres
EXPLORER
EQUIP-
MENT
GATE
GATE
GATE
GATE
STORAGE BUILDING
GATEGATE
EXISTING
MANHOLE
W-7 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
GARFIELDWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-7
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.15 Acres
GARFIELD
EQUIP-
MENT
GATE
GATE
W-8 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
JOURDANWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-8
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.10 Acres
JOURDAN
DRIVE-
WAY
GATE
EXISTING
BUILDING
EQUIP-
MENT
EQUIP-
MENT
GRASS AREA
GATE
CURB
W-9 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
MONTE VISTAWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-9
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Bi-Weekly (every two weeks)
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Mow grass area.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.15 Acres
MONTE VISTA
EX
IS
TI
NG
W
AS
H
EXISTING
BUILDING
EUIPMENT
EQUIP-
MENT
GATE
GATE
GATE
W-10 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
TWOMBLYWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-10
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.15 Acres
TWOMBLY
EXIST
BLDG
GATE
GATE
BLDG
EXIST
BLDG
W-11 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
VENTURAWilliam Ruano 210A
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-11
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano 210A
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.14 Acres
VENTURA
EQUIPMENT
ENCLOSURE
EXISTING
BUILDING
SAND
PITEQUIPMENT
BUILDING
TREE
TREE
TREE
BLOCK
WALL
GATE
PARK DEPT
AREA OUTSIDE
OF FENCE AREA
GATE
W-12 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
VILLAWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-12
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
600 Sq. Ft.
1. Remove all trash and green waste from the sand pit.
VILLA
Si de w al k
EXISTING
EQUIPMENT
GATE
GATE
EX
IS
TI
N
G
EQ
U
IP
M
EN
T
EX
IS
TI
N
G
EQ
U
IP
M
EN
T
EXISTING
EQUIPMENT
EXISTING PLANTS
W-13 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
WADSWORTHWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N N
TS
W-13
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.47 Acres
WADSWORTH
EQUIP-
MENT
EXIST
BLDG
GATE
GATE
SLOPE HILL
GATE
W-14 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
52William Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-14
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.14 Acres
EQUIP-
MENT
EXISTING
BUILDING
EQUIPMENT
ROOM
EQUIPMENT
ROOM
PLANTER PLANTER
GATE
GATE
PASADENA WATER AND POWER
Date
Drawn By:
WOODBURYWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
W-15 District Map:
Drawing No.:
Drawn By:
William Ruano W-15
District Map:
Drawing No.:
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.32 Acres
1. Turn on irrigation system and inspect sprinkler heads for damage before and after completing the work.
WOODBURY
SLOPE
SLOPE
B-1 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
ANNANDALEWilliam Ruano 14B
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
B-1
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
William Ruano 14B
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
300 Sq. Ft.
ANNANDALE
STORAGE
EQUIP-
MENT
GATE
GATE
GATE
B-2 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
ATLANTAWilliam Ruano 211A
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Sheet No.:
LOCATED IN ALTADENA, CA.
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
B-2
211A
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
.25 Acres
ATLANTA
**DO NOT DRIVE
ON GOLF COURSE
ACCESS ROADTANK
TANK
EQUIPMENT
CONC.
PADS
CONC.
PADS
CONC.
PAD
PANEL
BUILDING
GATE
GATE GATE
3' AROUND
SLIDING
GATE
GATE
B-3 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
BROOKSIDEWilliam Ruano 211A
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-3
211A
.10 Acres
1. Maintain a three foot minimum clearance around the building (shed) located across the access road.
BROOKSIDE
EQ
U
IP
M
EN
T
CO
N
C.
P
AD
EXISTING
BUILDING
RETAINING WALL
EQUIPMENT
RETAINING WALL
UP
HILL
B-4 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
DEVIL'S GATEWilliam Ruano 214B
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-4
214B
800 Sq. Ft.
1. Trim shrubbery vines located near the roof and vent to a minimum of two feet away from the top structure.
DEVIL'S GATE
VAULT
BUILDING
CITY OF LA CANADA FLINTRIDGE
CITY OF PASADENA
NATIVE SHRUBS
IRRIGATION ONLY
PANELS
DOOR
VAULT
VAULT VAULT
B-5 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
FLINTRIDGEWilliam Ruano 110B
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-5
110B
800 Sq. Ft.
FLINTRIDGE
CONCRETE ROOF
4FT. ABOVE GROUND
CONC. WALKWAY
STAIRS TO
ENTRY DOOR
CABLE
GATE
PL
PL
EXISTING
EQUIPMENT
B-6 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
LIDAWilliam Ruano 111B
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-6
111B
.03 Acres
LIDA
CONC.
WALL
BLOCK
WALL
ELECTRIC
TRANS-
FORMER
GATE
GATE
GATE
CONC.
WALL
PLANTER
CHAIN
GATE
PLANTER
SHRUBS
PLANTER
PLANTER
PARKING
AREA
B-7 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
LINDA VISTAWilliam Ruano 114B
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-7
114B
.40 Acres
LINDA VISTA
ASPHALT PAVING
GRAVEL
DIRT
DIRT
BLOCK
WALL
DRIVEWAY
DRIVEWAY
EXISTING
BUILDING
EQUIP-
MENT
BLOCK
WALL
TREE
IVY
HEDGE
IVY
HEDGE
IVY
HEDGE
TREE
TREE
DIRT
GATE
GATE8' HEDGE
ROW
B-8 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
MURRAYWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Drawn By:
William Ruano
May 2024
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-8 District Map:
Drawing No.:
Sheet No.:
.25 Acres
MURRAY
TREE
BUILDING
GATE
GATE
MWD
VENTURA
PL
PL
PARKING AREA
ASPHALT PAVING
PLANTER AREA
GATE
EXISTING
EQUIPMENT
TREE
RAMP
RAMP
B-9 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
ROSSWilliam Ruano 016A
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
May 2024 Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-9
016A
.10 Acres
ROSS
EQ
U
IP
M
EN
T
VAULT
LID
MAN-
HOLE
MAN-
HOLE
ACCESS
EXISTING
STRUCTURE
B-10 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
RUTHERFORDWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-10
.03 Acres
RUTHERFORD
PL
EXISTING
BUILDING
EXISTING
EQUIPMENT
METER
CORE W
ALL
VAULT
ACCESS WAY
GATE
B-11 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
SAN RAFAELWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-11
.05 Acres
SAN RAFAEL
EXISTING
BUILDING
PL
PL
SI
DE
W
AL
K
GATE
5'
5'
B-12 District Map:
PASADENA WATER AND POWER
Date
Drawing No.:Drawn By:
WILSONWilliam Ruano
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
Date
Drawing No.:Drawn By:
William Ruano
Sheet No.:
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
B-12
500 Sq. Ft.
1. Trim ivy from building walls as shown in attached photo.
Trim ivy at approximately this height all around building. Future maintenance will be kept at same height.
WILSON
3' (TYP.)
SLOPE
SLOPE
SLOPE
SLOPE
PL
PL
PL
PL
EXISTING
BLDG.
GATE
GATE
EXISTING
EQUIPMENT
GATEWAY
TO STREET
ABANDONED
BUILDING
EXISTING STRUCTURE
ROAD AROUND STRUCTURE
A.C. ACCESS RO
AD
PASADENA WATER AND POWER
Date
Drawn By:
ALLEN
LEGEND
MAINTENANCE AREA
LOCATED IN ALTADENA, CA.
R-1 District Map:
Drawing No.:
Sheet No.:
Nelson Rodriguez
May 2024
N
NTS
Drawn By:
R-1
District Map:
Drawing No.:
Sheet No.:
Nelson Rodriguez
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.83 acres
1. Trim shrubs on east side of access road to approximately 3 feet from edge as shown on sheet 1.
ALLEN
LOCATED IN ALTADENA, CA.May 2024
STRUCTURE
GATE
GATE
ROAD
PL
PL
EXISTING
BLDG
SLOPE
SLOPE
SLOPE
EXISTING
EQUIPMENT
DIRT
ROAD
PASADENA WATER AND POWER
Date
Drawn By:
ANNANDALE
LEGEND
MAINTENANCE AREA
R-2 District Map:
Drawing No.:
014A Sheet No.:
Nelson Rodriguez
May 2024
Work Frequency: Monthly
Approximate Maintenance Area:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.37 acres
Date
Drawn By:
R-2
District Map:
Drawing No.:
014A Sheet No.:
Nelson Rodriguez ANNANDALE
WEST DRAINAGE DITCH
IVY HEDGES
SOUTH DRAINAGE DITCH
STORM DRAIN
IVY HEDGE
GATE
SIDEWALK
CURB
GATE
ACCESS ROAD
EXISTING BUILDING
GATE
EXISTING STRUCTURE
DIRT ACCESS ROAD
PASADENA WATER AND POWER
Date
Drawn By:
CALAVERAS
LEGEND
MAINTENANCE AREA
LOCATED IN ALTADENA, CA.
R-3 District Map:
Drawing No.:
Sheet No.:
Nelson Rodriguez
May 2024
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
1.63 acres
PASADENA WATER AND POWER
Date
Drawn By:
R-3
District Map:
Drawing No.:
Sheet No.:
Nelson Rodriguez CALAVERAS
PL
PRIVATE ROAD
GATE
GATE
FINISHED CUT-LINE
PASADENA WATER DEPARTMENT
PASADENA CITY BOUNDARY
GATE
STRUCTURE
#1
EXISTING
BLDG
GATE
STRUCTURE
#2
PASADENA WATER AND POWER
Date
Drawn By:
DON BENITONelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-4 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.74 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-4
District Map:
Drawing No.:
Sheet No.:
DON BENITO
SLOPE
BLOCK
WALL
EXISTING
EQUIPMENT
RETAINING
WALL
SLOPE
SLOPE
TO
E
OF
S
LO
PE
EXISTING BUILDING
GATE GATE
CEMENT
BLOCK
WALL
PLANTER
(SHRUBS)
BLOCK WALL
PL
PL
PASADENA WATER AND POWER
Date
Drawn By:
EAGLE ROCKNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
R-5 District Map:
Drawing No.:
016A Sheet No.:
N N
TS
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.86 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-5
District Map:
Drawing No.:
016A Sheet No.:
1. Trim shrubs in the planter located adjacent to entrance.
EAGLE ROCK
SLOPE
SLOPE
SLOPE
EXISTING
BLDG.
EXISTING
STRUCTURE
#1
EXISTING
STRUCTURE
#2
PASADENA WATER AND POWER
Date
Drawn By:
GOULDNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-6 District Map:
Drawing No.:
Sheet No.:
N
NT
S
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.50 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-6
District Map:
Drawing No.:
Sheet No.:
1. Site visits to Gould tank require security clearance and registration with JPL. Allow a minimum of one week advance notice.
GOULD
PAVED
ROAD
GATE
PLANTED AREA
PL
DRIVEWAYPARKWAY
STRIP PLANTER
(SHRUBS)
SLOPE
SLOPE
GATE
GATE
EXISTING
BUILDINGGATE
GATE
EXISTING BUILDING
PLANTED AREA
EXISTING
BUILDING BUILDING GATE
EXISTING
SLOPE
PL
IVY
HEDGE
PAVED
ROAD
PLANTER
(SHRUBS)
IVY
HEDGE
IVY
HEDGE
IVY
HEDGE
GATE
JONES
RESERVOIR
EXISTING EQUIPMENT
PASADENA WATER AND POWER
Date
Drawn By:
JONESNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-7 District Map:
Drawing No.:
Sheet No.:
Work Frequency: Bi-weekly (every two weeks)
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
4.7 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-7
District Map:
Drawing No.:
Sheet No.:
1. Shrubs and bushes shall be cut flush to existing grade.
JONES
BURIED
STRUCTURE
OUTFLOW FUNNEL
ORIGIN
INLET AND OUTLET
BLOCK
WALL
PAVED
ROAD
GL
EN
DA
LE
C
IT
Y
PA
SA
DE
N A
CI
TY
GATE
TO
P
O F
SL
O
PE
VAULT
PL
PLPINE TREES
NOTE:
NO VEHICLES
ON ROOF
(NOT IN SCOPE)
(PART OF
BI-ANNUAL
BRUSH
CRLEARANCE
CONTRACT)
PASADENA WATER AND POWER
Date
Drawn By:
LIDANelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-8 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.50 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-8
District Map:
Drawing No.:
Sheet No.:
1. No vehicles are allowed beyond the limits of the paved road.
LIDA
SLOPE
SLOPE
SLOPE
SLOPE
GATE
GATE
EXISTING
BLDG PA
SA
DEN
A CI
TY
BO
UNDARY
GLE
NDALE
CI
TY
BO
UNDARY
EXISTING
BUILDING
PASADENA WATER AND POWER
Date
Drawn By:
MIRADORNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-9 District Map:
Drawing No.:
014A Sheet No.:
N
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.40 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-9
District Map:
Drawing No.:
014A Sheet No.:
MIRADOR
GATE ENTRY
SLOPE
SLOPE
ELWOOD FENCE
HEDGE ROW
(OLEANDER)
PAVED
ROAD
PAVED
ROAD
EXISTING
BLDG
EXISTING
BUILDING
VACANT
BLDG
8 FT HEDGE ROW
PL
PL
EXISTING STRUCTURE
PASADENA WATER AND POWER
Date
Drawn By:
SANTA ANITANelson Rodriguez
LEGEND
MAINTENANCE AREA
LOCATED IN ALTADENA, CA.May 2024
R-10 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.45 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-10
District Map:
Drawing No.:
Sheet No.:
SANTA ANITA
GATEGATE
SLOPE
CABLE
GATE
PL
WOOD FENCE
EXISTING BUILDING
EXISTING BUILDING
(UNIT 2) (UNIT 1)
ALLEY
ENTRY
PARKWAY GRASS STRIP
GATE
EXISTING
STRUCTURE
PL
PL
EXISTING
STRUCTURE
PASADENA WATER AND POWER
Date
Drawn By:
SHELDONNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-11 District Map:
Drawing No.:
211B Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
4.0 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-11
District Map:
Drawing No.:
211B Sheet No.:
1. Turn on irrigation system and inspect sprinkler heads for damage before and after completing the work.
SHELDON
(UNIT 1)
EXISTING
STRUCTURE
(UNIT 2)
EXISITNG
BUILDING
EXISTING
BUILDING
PLANTER
A-BASIN
PED
BRIDGE
EXISTING
BUILDING
GATE
EXISTING
BUILDING
GATE
GATE
PARKING
AREA
EXISTING
EQUIPMENT
PASADENA WATER AND POWER
Date
Drawn By:
SUNSETNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
N
R-12 District Map:
Drawing No.:
314A Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
1.2 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-12
District Map:
Drawing No.:
314A Sheet No.:
SUNSET
May 2024
1. Demolition of the existing structures will begin in April of 2026 and construction will run through approximately July of 2028.
SLOPE
BUILDING
PRESSURE
REGULATOR
IVY
HEDGE
METAL
HATCH
EXISTING
BLDG.
STEPS
NOTE:
NO VEHICLES
ON ROOF
METAL
HATCH
EXISTING BURIED
STRUCTURE
GATE
GATEPL
PL
PARKWAY STRIP AND SIDEWALK
20'
PARKING
LIMITS
PASADENA WATER AND POWER
Date
Drawn By:
THOMASNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
R-13 District Map:
Drawing No.:
Sheet No.:
N
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
1.1 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-13
District Map:
Drawing No.:
Sheet No.:
1. No vehicles are allowed beyond the 20 foot limit as shown on sheet 1.
THOMAS
GATE
CONCRETE SWALE
GATE
PASADENA WATER AND POWER
Date
Drawn By:
WINDSORNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
R-14 District Map:
Drawing No.:
210A-X Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
4. Drains located along the reservoir perimeter shall be kept clear of all trash, litter, weeds, leaves, brush, tree branches, and other green waste.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
4.2 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez R-14
District Map:
Drawing No.:
210A-X Sheet No.:
1. Turn on irrigation system and inspect sprinkler heads for damage before and after completing the work.
WINDSOR
HORSE TRAIL
TOP OF SLOPE
TOE OF SLOPE
PASADENA WATER AND POWER
Date
Drawn By:
BEHNERNelson Rodriguez
LEGEND
MAINTENANCE AREA
LOCATED IN ALTADENA, CA.May 2024
A-1 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
1.1 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez A-1
District Map:
Drawing No.:
Sheet No.:
BEHNER
EASEM
EN
T
GATE
PASADENA WATER AND POWER
Date
Drawn By:
EASEMENTNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
A-2 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.18 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez A-2
District Map:
Drawing No.:
Sheet No.:
EASEMENT
GATE
PASADENA WATER AND POWER
Date
Drawn By:
FIGUEROANelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
N
NTS
A-3 District Map:
Drawing No.:
210B Sheet No.:
N
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.80 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez A-3
District Map:
Drawing No.:
210B Sheet No.:
May 2024
FIGUEROA
DRIVEWAY
W
AL
KW
AY
EXISTING
EQUIPMENT
PASADENA WATER AND POWER
Date
Drawn By:
SIERRA MADRE VILLANelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
A-4 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
150 sq. ft.
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez A-4
District Map:
Drawing No.:
Sheet No.:
SIERRA MADRE VILLA
Drawn By:
EXISTING LOTNelson Rodriguez
LEGEND
MAINTENANCE AREA
May 2024
A-5 District Map:
Drawing No.:
Sheet No.:
Work Requirements:
1. Remove all trash, litter, weeds, leaves, brush, tree branches, palm fronds, and other green waste within the maintenance area.
2. Trim ivy, vines, and bushes to fence line.
3. Cut and trim brush, shrubs, and bushes adjacent to access gates. Maintain clearance around gates to allow gates to open freely and without obstruction.
Additional Notes:
MAINTENANCE AREA
(as indicated on drawing)
0.88 acres
PASADENA WATER AND POWER
Date
Drawn By:
Nelson Rodriguez A-5
District Map:
Drawing No.:
Sheet No.:
EXISTING LOT
| Sheets and Views |
| Layout1 |
| vmap |
File details come from the government source that posted it. Updated .