Lakeside_Phase_2_Plans_2014-07-25_BID_plans_-_Bid_Document.pdf

PDF 22 MB Posted

Attached to
Lakeside Gravity Outfall System - Phase II State and local contract opportunity
Solicitation number
01-14
Issued by
Volusia County, Florida

About this file

This is a bid document package for the City of DeBary, Florida, containing plans and specifications for the Lakeside Gravity Outfall System - Phase II construction project (Bid No. 01-14). The document comprises 29 detailed pages including site location maps, survey data, photographs, and engineering plans covering multiple project components: Kings Lake Structure Modification, Kings Lake Wetland work, Kings Lake Force Main installation (three sheets), Florence Boulevard improvements, Terra Alta Overflow modifications (three sheets), and Cinnamon Bay construction elements, along with miscellaneous details and jurisdictional impact assessments. A mandatory pre-bid conference is scheduled for Monday, August 18, 2014, at 2:00 PM at City Hall (16 Colomba Road, DeBary, Florida 32713). Sealed proposals must be received by Monday, September 8, 2014, at 2:00 PM local time, with submissions accepted during regular business hours (8:30 AM–5:00 PM, Monday through Friday) prior to the deadline.

The estimated project cost is $646,314.00. Each proposal must be accompanied by a proposal guaranty equal to at least five percent of the bid amount, payable to the City of DeBary, with the successful bidder required to execute the contract, provide certificates of insurance in amounts and categories specified by the City, and file Performance and Payment Bonds within ten days of award if required. Bid packages are available at www.debary.org under Departments/Finance/Purchasing/Bids & RFPs. The City of DeBary reserves the right to reject any or all proposals and to waive any formality or technicality in the interest of the municipality. Accommodations for individuals requiring assistance under the Americans with Disabilities Act are available upon request to the City Clerk at least five days prior to the bid conference or opening.

View the file

Other files for this state and local contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01_Lakeside Phase 2_Cover

02_Lakeside Phase 2_Location
03_Lakeside Phase 2_Notes
04_Lakeside Phase 2_Survey Legend
05_Lakeside Phase 2_Survey and Photos
06_Lakeside Phase 2_Survey and Photos
07_Lakeside Phase 2_Survey and Photos
08_Lakeside Phase 2_Survey and Photos
09_Lakeside Phase 2_Survey and Photos
10_Lakeside Phase 2_Survey and Photos
11_Lakeside Phase 2_Survey and Photos
12_Lakeside Phase 2_Survey and Photos
13_Lakeside Phase 2_Survey and Photos
14_Lakeside Phase 2_Kings Lake Stucture Mod
15_Lakeside Phase 2_Kings Lake Wetland
16_Lakeside Phase 2_Kings Lake Force Main
17_Lakeside Phase 2_Kings Lake Force Main
18_Lakeside Phase 2_Kings Lake Force Main
19_Lakeside Phase 2_Florence Blvd
20_Lakeside Phase 2_Florence Blvd
21_Lakeside Phase 2_Terra Alta Overflow
22_Lakeside Phase 2_Terra Alta Overflow
23_Lakeside Phase 2_Terra Alta Overflow
24_Lakeside Phase 2_Cinnamon Bay
25_Lakeside Phase 2_Cinnamon Bay
26_Lakeside Phase 2_Cinnamon Bay
27_Lakeside Phase 2_Cinnamon Bay
28_Lakeside Phase 2_Misc Details
29_Lakeside Phase 2_Jurisdictional Impacts

File details come from the government source that posted it. Updated .