Lakeland Correctional Facility - Water Softener & Salt Storage Upgrades - Addendum 1.pdf

PDF 4 MB Posted

Attached to
472/26279. JLM; Lakeland C.F. - Softener & Salt Storage Upgrd
Solicitation number
RFQ 171 270000000025 2
Issued by
Bay County, Michigan

About this file

This Construction Bid Addendum No. 1, issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, pertains to water softener and salt storage upgrades at Lakeland Correctional Facility. The project involves the installation of new triplex domestic water softener systems, brine silos, brine pump systems, reverse osmosis systems, associated piping, valves, controls, and electrical components in the facility's power plant basement. The bid due date has been extended to November 25, 2026, with bids to be uploaded to SIGMA by 2:00 PM. An additional mandatory pre-bid meeting is scheduled for Tuesday, November 10, 2026, at 10:00 AM at Lakeland Correctional Facility, 141 1st Street, Coldwater, Michigan 49036; contractors who attended the initial October 27, 2026 meeting are not required to attend but remain eligible to bid. Final questions must be submitted to Devon Pung no later than 5:00 PM on November 18, 2026. The addendum includes re-issued mechanical drawings (P-400, E-500, and E-900) incorporating updates for a new Reverse Osmosis Direct Digital Control (DDC) panel and associated controls, along with new specification sections for instrumentation and control for HVAC systems and sequence of operations for HVAC controls.

The addendum establishes technical requirements for a BACnet standalone control system that will operate independently without connection to existing building networks or exterior communication. The control system specifications require Direct Digital Control (DDC) technology with performance standards including graphic display capabilities, alarm response times not exceeding 45 seconds, and object command response within 10 seconds. Acceptable manufacturers are limited to Trane (Tracer Summit SC+), Johnson Controls (Corporate), Honeywell (Corporate), and Siemens (Corporate). The system must include operator interface workstations, building controllers, custom application controllers, and comprehensive monitoring and trending capabilities. Installation requirements mandate compliance with all applicable codes and standards including NEC, ASHRAE/ANSI 135-1995 (BACnet), and local jurisdictional requirements. The contractor must provide 12 months of warranty coverage, with a 24-hour response requirement for warranty service calls during business hours, and must conduct a minimum of one 8-hour training session for owner personnel. The existing softened domestic cold water service and reverse osmosis systems must remain operational throughout the project duration, with any necessary shutdowns coordinated and approved by the Michigan Department of Corrections at least 10 days in advance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

10/28/2026

PROJECT NAME

Lakeland Correctional Facility - Water Softener & Salt Storage Upgrades

FILE NUMBER

472/26279.JLM

PROFESSIONAL

Matrix Consulting Engineers

PROJECT DIRECTOR

Josiah Meyers

BID OPENING DATE:

11/25/2026

ADDENDUM ITEMS:

1. The bid due date is extended to November 25, 2026. Bids are to be uploaded to SIGMA by 2:00pm.

Final questions shall be submitted to Devon Pung no later than 5:00pm November 18, 2026.

2. Clarification: Additional Mandatory pre-bid meeting, Tuesday, November 10, 2026, at 10:00 am will be held at Lakeland Correctional Facility, 141 1st St, Coldwater, MI 49036. Contractors who attended the initial mandatory pre-bid meeting on October 27, 2026, do not need to attend the November 10, 2026, meeting and are still eligible to bid as a prime contractor.

3. Attached is the 11/27/26 mandatory pre-bid meeting attendance sign-in sheet.

4. Re-issued drawings P-400, E-500, and E-900 (attached). Drawings include updates for new Reverse

Osmosis DDC control panel and associated controls.

5. Issued specification section 230900 – Instrumentation and Control for HVAC (attached).

6. Issued specification section 230993 – Sequence of Operations for HVAC Controls (attached).

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Devon Pung, Matrix DATE: 10/28/2026

APPROVED BY: Josiah Meyers PROJECT DIRECTOR: Josiah Meyers

DATE: 10/28/2026

http://www.michigan.gov/SIGMAVSS

X-6"

X-CW

X-

CW

X-5"

X-SW

X-SUMP DRAIN

X-5"

X-6"

OPENING TO

MAIN FLOOR

X-PUMP VFD

X-P

X-TRANSFER

SWITCH

X-TRANSFORMER

X-RO WATER

STORAGE TANK

X-2"

2" RO UP

TO DA-1

X-2"

X- P

M

X-WATER

METER

X-2"

X-

RO

X-2" BD UP

TO X-DA-1

X-

BD

X-2"

X-

RE

CI

RC

X-4" OVERFLOW

UP TO X-DA-1

X-3" PSC UP

TO X-DA-1

X-4" BF UP

X-2" RECIRC UP

X-OVERFLOW

NO

X-2"

X-4" HPS UP X-3/4" DRAIN

X-CARBON

FILTER

X-2"

X-

SC

W

X-RO-1

X-

RO

X-8" LPS UP

X-LPS

X-8" LPS

NC

X-2"

NO

NO

X-

PS

C

X-3/4" SULFITE UP

TO NEW DA TANK

X-

HP

S

5#

X-1/2"

CHEMICAL

FEED

X-3/4" DRAIN UP TO

SAMPLE COOLER

X-2"

CW

1-1/4" (BURIED)

1-1/4"

CW

SW

SW

SW

3" WS-1

3" WS-1

3" WS-1

6"

CW

CW

CW

DR

AI

N

BRINE

3" (BURIED)

BP-1CONCRETE

PAD

BR

IN

E

BR

IN

E

6"

6"

5"

5"

CW

1-1/4" (BURIED)

BRINE

3" (BURIED)

BS-1

1-1/2"

1-1/2"

1-1/2"

2"

1-1/2"

SIZE PER

WS-1 MANU.

SIZE PER

WS-1 MANU.

BRINE

BR

IN

E

BRINE

BR

IN

E

3"

SIDE MANHOLE

ACCESS DUST COLLECTION

ACCESS

SALT FILL TUBE

TOP ACCESS

HATCH

BRINE LEVEL

INDICATOR

BRINE SILO FILL

CONTROLLER

ACCESS LADDER

WITH CAGE

BRINE LEVEL

INDICATOR

CONCRETE PAD2

4 4

8 8

PIPE

SUPPORT

BS-1 FILL ASSEMBLY

2" DRAIN DN

TO X-SUMP

7 NC

CONCRETE

PAD

RO-2

2"

RO

2"

CARBON

FILTER

REVERSE

OSMOSIS

SYSTEM

2" 11

RO CONTROL

PANEL

S

TDS

SENSOR

1 1

14 15

FROM CW MAIN

NC

1-1/4"

1-1/4"

1-1/4"

BURIED 1-1/4"

CW TO BS-1

SOLENOID VALVE

(TIED TO BRINE SILO

FILL CONTROLLER)

PRESSURE SWITCH

(TIED TO BRINE SILO

FILL CONTROLLER)

1 BS-1 FILL PIPING CONFIGURATION

SCALE: NTS

BASEMENT

EXTERIOR WALL

BFP

CW CW

3 WATER SOFTENER PIPING CONFIGURATION

SCALE: NTS

WS-1

FROM CW MAIN

3"3"

3"

WS-1

3"3"

3"

WS-1

3"3"

3"

1-1/2" 1-1/2" 1-1/2"

2" 2"

2" TO X-SUMP

1-1/2"

DR

AI

N

DR

AI

N

DR

AI

N

6"6"6"

CW CW CW

SW SW SW

5" SW5"5"3"

BRINEBRINE

BRINE FROM BP-1 3"

SIZE PER

WS-1 MANU.

SIZE PER

WS-1 MANU.

SIZE PER

WS-1 MANU.

SIZE PER

WS-1 MANU.

1 1 1

PLUMBING KEY NOTES

INSTALL NEW TRIPLEX DOMESTIC WATER SOFTENER SYSTEM, PIPING, VALVES,

FITTINGS, CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN

THE LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.

ROUTE NEW TRIPLEX DOMESTIC SOFTENING STATION BACK WASH DRAIN PIPING

TO EXISTING SUMP DRAIN.

INSTALL NEW BRINE SILO, CONCRETE PAD, PIPING, VALVES, FITTINGS, CONTROLS,

CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN

PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO

REFER TO CIVIL DRAWINGS FOR DETAILS FOR THE NEW CONCRETE PAD.

INSTALL NEW DUPLEX BRINE PUMP, CONCRETE PAD, PIPING, VALVES, FITTINGS,

CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES IN THE

LOCATION SHOWN PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.

NEW CONCRETE PAD IS TO BE 4" THICK AND HAVE 4" OVERLAP IN ALL

DIRECTIONS. CONTRACTOR TO PROVIDE ALL NEW CONTROLS, CONTROLS

ACCESSORIES, AND CONTROLS WIRING REQUIRED TO CONNECT THE NEW

WATER SOFTENERS AND BRINE SILO.

INSTALL NEW BRINE SILO FILL CONTROL PANEL, BRINE LEVEL INDICATOR

CONTROL PANEL, WATER SOFTENER CONTROLS, BRINE SILO CONTROLS, BRINE

PUMP CONTROLS, CONTROL WIRING, AND ALL ASSOCIATED ACCESSORIES

REQUIRED FOR A COMPLETE STANDALONE SYSTEM. CONTRACTOR TO PROVIDE

ALL CONTROLS ACCESSORIES AS REQUIRED TO HAVE NEW WATER SOFTENING

SYSTEM OPERATE PER THE MANUFACTURER'S INSTRUCTIONS AND PROJECT

SEQUENCE OF OPERATIONS.

INSTALL NEW DOMESTIC COLD WATER PIPING, VALVES, FITTINGS, HANGERS,

SUPPORTS AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN.

CONTRACTOR TO CONNECT NEW DOMESTIC COLD WATER PIPING TO EXISTING

DOMESTIC COLD WATER PIPING IN THE LOCATION SHOWN. MODIFY EXISTING

PIPING AS REQUIRED FOR NEW CONNECTION.

INSTALL NEW SOFTENED DOMESTIC COLD WATER PIPING, VALVES, FITTINGS,

HANGERS, SUPPORTS AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION

SHOWN. CONTRACTOR TO CONNECT NEW SOFTENED DOMESTIC COLD WATER

PIPING TO EXISTING SOFTENED DOMESTIC COLD WATER PIPING IN THE LOCATION

SHOWN. MODIFY EXISTING PIPING AS REQUIRED FOR NEW CONNECTION.

INSTALL NEW BYPASS SHUTOFF VALVE BETWEEN THE COLD WATER MAIN AND

SOFTEN COLD WATER MAIN IN THE LOCATION SHOWN TO ALL MAINTENANCE

STAFF TO REGENERATE THE X-WS-3 WHILE THE NEW DOMESTIC WATER

SOFTENENING SYSTEM IS BEING INSTALLED.

INSTALL NEW DIRECT BURIED DOMESTIC COLD WATER PIPING, BRINE PIPING,

FITTINGS, AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN.

CONTRACTOR TO COORDINATE WITH CIVIL DRAWINGS DETAILS AND EXACT

LOCATION OF NEW DIRECT BURIED PIPING.

SUPPORT PIPING WITH PIPE SUPPORTS BASED ON MIRO #5-RAH-7 OR APPROVED

EQUIVALENT. SPACE PIPING SUPPORTS PER MANUFACTURER'S

RECOMMENDATIONS. INSTALL PIPE SUPPORT PAD OR MANUFACTURER

APPROVED EQUIVALENT.

NEW EXTERIOR/ABOVE GRADE DOMESTIC COLD WATER PIPING AND BRINE PIPING

TO BE HEAT TRACED AND INSULATED FROM THE CONCRETE PAD TO THE BRINE

SILO. INSULATION IS TO BE WRAPPED IN METAL JACKET PER PROJECT

SPECIFICATIONS. HEAT TRACE BASED ON NVENT RAYCHEM MODEL: XL-TRACE

EDGE 5XLE1 (120V / 1 PHASE). HEAT TRACE TO BE HARD WIRED, REFER TO

ELECTRICAL DRAWINGS.

INSTALL NEW REVERSE OSMOSIS SYSTEM, PUMP, CARBON FILTER, PIPING,

VALVES, FITTINGS, CONCRETE PAD, CONTROLS, CONTROL WIRING, AND ALL

ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE

MANUFACTURER'S INSTALLATION INSTRUCTIONS. NEW CONCRETE PAD IS TO BE

4" THICK AND HAVE 4" OVERLAP IN ALL DIRECTIONS. CONTRACTOR TO PROVIDE

AND INSTALL ALL NEW CONTROLLERS, CONTROLS, CONTROL WIRING, AND

COMPONENTS FOR COMPLETE AND OPERABLE REVERSE OSMOSIS SYSTEM.

CONTRACTOR TO PROVIDE ALL CONTROL WIRING, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES TO CONNECT NEW REVERSE OSMOSIS SYSTEM TO

NEW TOUCHSCREEN DDC CONTROL PANEL.

CONTRACTOR TO PROVIDE ALL CONTROL WIRING, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES TO CONNECT EXISTING REVERSE OSMOSIS SYSTEM

(X-RO-1) TO NEW TOUCHSCREEN DDC CONTROL PANEL.

INSTALL NEW TOUCHSCREEN RO SYSTEM DDC CONTROL PANEL, CONTROLLER,

CONTROL WIRING, CONTROLS, TDS SENSOR (BASED ON HYDRO-CHECK MODEL:

414TDS), AND ALL ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN PER THE

MANUFACTURER'S INSTALLATION INSTRUCTIONS. CONTRACTOR TO PROVIDE ALL

CONTROLS COMPONENTS/DEVICES REQUIRED TO HAVE X-RO-1 AND RO-2

SYSTEMS OPERATE PER THE PROJECT SEQUENCE OF OPERATIONS.

CONTRACTOR TO PROVIDE AND INSTALL RO-2 FLOAT INSIDE EXISTING RO WATER

STORAGE TANK AT THE SAME HEIGHT AS THE X-RO-1 FLOAT. CONTRACTOR TO

INSTALL ALL CONTROL WIRING, CONTROLS, AND ALL ASSOCIATED ACCESSORIES

TO CONNECT FLOAT TO NEW TOUCHSCREEN DDC CONTROL PANEL.

CONTRACTOR TO INSTALL ALL CONTROL WIRING, CONTROLS, AND ALL

ASSOCIATED ACCESSORIES TO TO CONNECT X-RO-1 FLOAT INSIDE EXISTING RO

WATER STORAGE TANK TO NEW TOUCHSCREEN DDC CONTROL PANEL.

RELOCATE EXISTING WALL MOUNTED GARDEN HOSE REEL AS REQUIRED TO

INSTALL NEW BRINE PUMP AND CONTROL PANELS IN THE LOCATION SHOWN.

PLUMBING GENERAL NOTES

1. INSTALL NEW DOMESTIC COLD WATER PIPING, SOFTENED DOMESTIC COLD

WATER PIPING, BRINE PIPING, DRAIN PIPING, VALVES, FITTINGS, AND ALL

ASSOCIATED ACCESSORIES IN THE LOCATION SHOWN. ROUTE EXPOSED

DOMESTIC COLD WATER PIPING, SOFTENED DOMESTIC COLD WATER PIPING,

BRINE PIPING, AS HIGH AS POSSIBLE IN SPACE. COORDINATE PIPE ROUTING

WITH STRUCTURAL COMPONENTS, EXISTING PIPING, AND ELECTRICAL

COMPONENTS.

2. INSTALL ALL NEW EQUIPMENT PER THE MANUFACTURERS INSTALLATION

INSTRUCTIONS. ENSURE ALL MANUFACTURER REQUIRED CLEARANCES ARE

MAINTAINED.

3. PROVIDE ALL REQUIRED CONTROLS EQUIPMENT/COMPONENTS TO HAVE THE

NEW WATER SOFTENING SYSTEM OPERATE STANDALONE PER THE

MANUFACTURER'S INSTRUCTIONS AND PROJECT SEQUENCE OF OPERATIONS.

4. ALL NEW CONTROL WIRING IS TO BE INSTALLED PER THE DIVISION 26

SPECIFICATIONS AND MDOC REQUIREMENTS.

5. INSTALL 0.020" THICK ALUMINUM, STUCCO EMBOSSED JACKET AROUND ALL

EXTERIOR/ABOVE GRADE DOMESTIC COLD WATER AND BRINE PIPING. SUPPORT

DOMESTIC COLD WATER AND BRINE PIPING WITH MIRO 24-BASE STRUT OR

APPROVED EQUAL. SUPPORTS SHALL BE CAPABLE OF BEING FIELD ADJUSTED

BY CONTRACTOR TO SUPPORT DX PIPING WITH UP TO A 2% SLOPE. SPACING

AND QUANTITY OF PIPE SUPPORTS SHALL BE DETERMINED BY PIPE SUPPORT

MANUFACTURER, BUT NOT TO EXCEED 8' SPACING. STRUT AND ALL HARDWARE

FOR SUPPORTS SHALL BE GALVANIZED AND BASES SHALL BE POLYCARBONATE.

6. EXISTING SOFTENED DOMESTIC COLD WATER SERVICE AND REVERSE OSMOSIS

SYSTEM IS TO REMAIN OPERATIONAL THROUGHOUT THE PROJECT DURATION

BESIDES SMALL CHANGE OVER SHUTDOWNS THAT ARE COMPLETED AT NIGHT

AND ARE COORDINATED/APPROVED BY MDOC AT LEAST 10 DAYS IN ADVANCE.

REFER TO PHASING SCHEDULE ON P-100 DRAWING FOR HOW TO COMPLETE

THE DEMOLITION OF THE EXISTING DOMESTIC WAS SOFTENING SYSTEM AND

INSTALLATION OF THE NEW SOFTENING SYSTEM TO KEEP THE SYSTEM

OPERATIONAL THROUGHOUT THE PROJECT DURATION.

7. THE POWER PLANT BUILDING HAS A CRANE AND ACCESS HOLE IN THE FIRST

FLOOR CONCRETE. CONTRACTOR TO USE ACCESS HOLE AND CRANE FOR THE

INSTALLATION OF LARGE EQUIPMENT/MATERIALS INTO THE BASEMENT.

CONTRACTOR TO COORDINATE WITH MDOC IN ADVANCE WHEN CRANE NEEDS

TO BE UTILIZED. ONLY MDOC STAFF MAY OPERATE THE CRANE.

8. ALL EXTERIOR EXCAVATION IS TO BE COMPLETED BY HYDRO-VAC.

2"NC

1" TO SUMP

(ROUTE SIMILAR

TO X-RO-1)

P

REVERSE

OSMOSIS

SYSTEM

CA

RB

ON

F

ILT

ER

DRAIN

VALVE

4" CONCRETE PAD

REVERSE OSMOSIS

SYSTEM, RO-2

CONNECT TO

X-2" SW PIPING

CONNECT TO

X-2" RO PIPING

2 REVERSE OSMOSIS PIPING CONFIGURATION

SCALE: NTS

2"

2"

P-400

POWER PLANT - BASEMENT

FLOOR PLAN - PLUMBING NEW

DBP

CAT

260704.00

472/26279.JLM

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

10/16/2026 CD SET

10/28/2026 ADDENDUM 1

POWER PLANT - BASEMENT FLOOR PLAN - PLUMBING NEW

SCALE: 1/4" = 1'-0"

0 1 5 10

N

WS-1

120V-1Ø

BP-1 (DUPLEX SYSTEM)

208V-3Ø, (2) 2 HP

BRINE LEVEL

INDICATOR

BRINE SILO FILL

CONTROLLER

BS-1

120V-1Ø

WS-1

120V-1Ø

WS-1

120V-1Ø

BP-1 CONTROL PANEL1

EX. PNL "BLDG

G2"

GFI

+48"

MAINTENANCE PACKAGE

CONTROL PANEL

(5) 500W 120V HEAT PANELS

HEAT TRACE

EX. "MDPB"

EX. "MDPA"

EX. PNL "SUB

PANEL B"

EX. ATS

EX. PNL "D"

TEX EX EX

EX. XFMR X-PUMP VFD

X-P

X-TRANSFORMER

X-RO WATER

STORAGE TANK

X- P

X-CARBON

FILTER

X-RO-1

MDPA-26,28,30

E-1

GFI

+48"

GFI

+48"E-3

E-2

E-4

WP

E-6

NEW PNL "E"6

CARBON FILTER

120V-1Ø

RO SYSTEM

208V-3Ø, 5 HPE-7,9,11

E-5

30/25/3

RO CONTROL

PANEL

E-8

ELECTRICAL KEY NOTES

CONTRACTOR TO PROVIDE 208V-3Ø CONNECTION TO CONTROL PANEL FOR

MOTOR POWER AND 120V-1Ø CONNECTION FOR CONTROL POWER AS

INDICATED. MANUFACTURER PROVIDED CONTROL PANEL INCLUDES FUSED

DISCONNECT SWITCH. COORDINATE CONNECTION OF CONTROL WIRING

WITH MECHANICAL CONTRACTOR.

PROVIDE CONNECTION TO MANUFACTURER PROVIDED NEMA 4X CONTROL

PANEL. CONNECTIONS TO HEAT PANELS BY MANUFACTURER.

PROVIDE CONNECTION TO PIPING HEAT TRACE. COORDINATE WITH

MECHANICAL CONTRACTOR FOR EXACT REQUIREMENTS.

CONNECT TO EXISTING 30A-3P SPARE BREAKER IN PANEL "MDPA". PROVIDE

NEW CONDUIT AND WIRE.

PROVIDE NEW PERMANENT LABEL FOR EXISTING PANELBOARD. REFER TO

PANEL LABEL DETAIL.

PROVIDE AND INSTALL NEW 200A PANELBOARD AS INDICATED. CONNECT TO

EXISTING 200A SPARE IN PANEL "MDPA".

PROVIDE AND INSTALL UNISTRUT MOUNTING RACK FOR RO SYSTEM

DISCONNECT AND CARBON FILTER CONTROL TRANSFORMER.

1 PANEL LABEL DETAIL (TYPICAL)

PANEL NAME - XXXA, MLO

208/120V 3-PHASE

FED FROM "XXX"

1. REFER TO PLUMBING SHEET P-100 FOR DEMOLITION AND NEW INSTALLATION PHASING

DESCRIPTION.

GENERAL ELECTRICAL NOTES

260704.00

472/26279.JLM

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

10/16/2026 CD SET

10/28/2026 ADDENDUM 1

E-500

POWER PLANT - BASEMENT

FLOOR PLAN - ELECTRICAL

NEW

JLS

JFS

POWER PLANT - BASEMENT FLOOR PLAN - ELECTRICAL NEW

SCALE: 1/4" = 1'-0"

0 1 5 10

N

260704.00

472/26279.JLM

file no.

checked by drawn by consultant issue date contract order no.

consultant job no.

M a t r ix funding code sheet description

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O F

M

IC

H

IG

A N

A D

A M

P . L

A C

H , R

A , D

IR

EC

TO

R

ST

A

TE

F

A C

IL

IT

IE

S

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

10/16/2026 CD SET

10/28/2026 ADDENDUM 1

E-900

ELECTRICAL PANEL

SCHEDULES

JLS

JFS

State of Michigan Project No. 260704.00

Department of Technology, Management and Budget October 2026

Design and Construction Division Addendum 1

Department of Corrections

File/No: 472/26279.JLM

Lakeland Correctional Facility - Water Softener & Salt Storage Upgrades

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 1

SECTION 230900 – INSTRUMENTATION AND CONTROL FOR HVAC

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Products Furnished But Not Installed Under This Section.

B. Products Installed But Not Furnished Under This Section.

C. Related Sections.

D. Description.

E. Approved Control System Contractor.

F. Quality Assurance.

G. System Performance.

H. Submittals.

I. Warranty.

J. Ownership of Proprietary Material.

1.2 RELATED SECTIONS

A. The General Conditions of the Contract, Supplementary Conditions, and General Requirements are a part of these Specifications and shall be used in conjunction with this Section as a part of the Contract Documents. Consult them for further instructions pertaining to this work. The

Contractor is bound by the provisions of other Divisions.

B. Refer to other Division 23 Sections for related work.

1.3 DESCRIPTION

A. General: The control system shall be as indicated on the drawings and described in the specifications.

B. Direct Digital Control (DDC) technology shall be used to provide the functions necessary for control of mechanical systems on this project.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 2

C. The control system shall be designed such that each mechanical system will be able to operate under stand-alone control. As such, in the event of a network communication failure, or the loss of any other controller, the control system shall continue to independently operate under control.

D. The documentation is schematic in nature. The Contractor shall provide hardware and software necessary to implement the functions and sequences shown and operate the systems in a safe and stable manner.

E. The control system shall be a BACnet standalone system and not utilize any existing networks in the building and there will be no exterior communication with the control system.

1.4 QUALITY ASSURANCE

A. System Installer Qualifications

1. The Installer shall have an established working relationship with the Control System

Manufacturer of not less than three years.

2. The Installer shall have successfully completed Control System Manufacturer's classes on the control system and have a minimum of five years experience in the design and installation of control systems. The Installer shall present for review the certification of completed training, including the hours of instruction and course outlines upon request.

3. The installer shall have an office within 75 miles of the project site and provide 24 hour response in the event of a customer call.

B. Codes and Standards: Meet requirements of all applicable standards and codes, except when more detailed or stringent requirements are indicated by the Contract Documents, including requirements of this Section.

1. Underwriters Laboratories: Products shall be UL-916-PAZX listed.

2. National Electrical Code -- NFPA 70.

3. Federal Communications Commission -- Part J.

4. ASHRAE/ANSI 135-1995 (BACnet).

C. All products used in this installation shall be new, currently under manufacture, and shall be applied in similar installations for a minimum of 2 years. This installation shall not be used as a test site for any new products unless explicitly approved by the Owner's representative in writing prior to bid date. Spare parts shall be available for at least 5 years after completion of this contract.

1.5 SYSTEM PERFORMANCE

A. Performance Standards. The system shall conform to the following:

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 3

1. Graphic Display. The system shall display a graphic with a minimum of 20 dynamic points. All current data shall be displayed within 20 seconds of the request.

2. Graphic Refresh. The system shall update all dynamic points with current data within 30 seconds.

3. Object Command. The maximum time between the command of a binary object by the operator and the reaction by the device shall be 10 seconds. Analog objects shall start to adjust within 10 seconds.

4. Object Scan. All changes of state and change of analog values shall be transmitted over the high-speed network such that any data used or displayed at a controller or work-station will be current, within the prior 60 seconds.

5. Alarm Response Time. The maximum time from when an object goes into alarm to when it is annunciated at the work-station shall not exceed 45 seconds.

6. Program Execution Frequency. Custom and standard applications shall be capable of running as often as once every 5 seconds. The Contractor shall be responsible for selecting execution times consistent with the mechanical process under control.

7. Performance. Programmable Controllers shall be able to execute DDC PID control loops at a selectable frequency from at least once every 5 seconds. The controller shall scan and update the process value and output generated by this calculation at this same frequency.

8. Multiple Alarm Annunciation. All work-stations on the network shall receive alarms within 5 seconds of each other.

9. Reporting Accuracy. Table 1 lists minimum acceptable reporting accuracies for all values reported by the specified system.

a. Table 1 -- Reporting Accuracy

Measured Variable Reported Accuracy

Space temperature ±0.5°C (±1°F)

Ducted air ±1.0°C (±2°F)

Outside air ±1.0°C (±2°F)

Water temperature ±0.5°C (±1°F)

Delta-T ±0.15°C (±0.25°F)

Relative humidity ±5% RH

Water flow ±5% of full scale

Air flow (terminal) ±10% of reading *Note 1

Air flow (measuring stations) ±5% of reading

Air pressure (ducts) ±25 Pa (±0.1 "W.G.)

Air pressure (space) ±3 Pa (±0.01 "W.G.)

Water pressure ±2% of full scale *Note 2

Electrical Power 5% of reading *Note 3

Carbon Monoxide (CO) ± 50 PPM

Carbon Dioxide (CO2) ± 50 PPM

Note 1: (10%-100% of scale) (cannot read accurately below 10%)

Note 2: for both absolute and differential pressure

Note 3: * not including utility supplied meters

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 4

1.6 SUBMITTALS

A. Contractor shall provide shop drawings and manufacturers’ standard specification data sheets on all hardware and software to be provided. No work may begin on any segment of this project until submittals have been reviewed by the Engineer and Owner for conformity with the plan and specifications. PDF copies are required. All shop drawings shall be done on

AutoCAD, and provided to the Owner on a flash drive.

B. Quantities of items submitted shall be reviewed by the Engineer and Owner. Such review shall not relieve the contractor from furnishing quantities and specified functionality required for completion.

C. Provide the Engineer and Owner, any additional information or data which is deemed necessary to determine compliance with these specifications or which is deemed valuable in documenting the system to be installed.

D. Submit the following within 60 days of contract award:

1. A complete bill of materials of equipment to be used indicating quantity, manufacturer and model number.

2. A schedule of all control valves including the valve size, model number (including pattern and connections), flow, CV, pressure rating, and location.

3. A schedule of all control dampers. This shall include the damper size, pressure drop, manufacturer and model number.

4. Provide manufacturers cut sheets for major system components. When manufacturer's cut sheets apply to a product series rather than a specific product, the data specifically applicable to the project shall be highlighted or clearly indicated by other means. Each submitted piece of literature and drawings shall clearly reference the specification and/or drawing that the submittal is being submitted to cover. Include:

a. Building Controllers

b. Custom Application Controllers

c. Application Specific Controllers

d. Operator Interface Computer

e. Portable Operator Workstation

f. Auxiliary Control Devices

g. Proposed control system riser diagram showing system configuration, device locations, addresses, and cabling.

h. Detailed termination drawings showing all required field and factory terminations.

Terminal numbers shall be clearly labeled.

i. Points list showing all system objects and the proposed English language object names.

j. Sequence of operations for each system under control. This sequence shall be specific for the use of the Control System being provided for this project.

k. Provide a BACnet Product Implementation Conformance Statement (PICS) for each BACnet device type in the submittal.

l. Color prints of proposed graphics with a list of points for display.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 5

E. Project Record Documents: Upon completion of installation submit three (3) copies of record

(as-built) documents. The documents shall be submitted for approval prior to final completion and include:

1. Project Record Drawings - These shall be as-built versions of the submittal shop drawings. One set of magnetic media including CAD .DWG or .DXF drawing files shall also be provided.

2. Testing and Commissioning Reports and Checklists.

3. Operating and Maintenance (O & M) Manual - These shall be as-built versions of the submittal product data. In addition to that required for the submittals, the O & M manual shall include:

a. Names, address and 24-hour telephone numbers of Contractors installing equipment, and the control systems and service representative of each.

b. Operators Manual with procedures of operating the control systems including logging on/off, alarm handling, producing point reports, trending data, overriding computer control, and changing set points and other variables.

c. Programming Manual with a description of the programming language including syntax, statement descriptions including algorithms and calculations used, point database creation and modification, program creation and modification, and use of the editor.

d. Engineering, Installation and Maintenance Manuals that explains how to design and install new points, panels, and other hardware; preventative maintenance and calibration procedures; how to debug hardware problems; and how to repair or replace hardware.

e. A listing and documentation of all custom software created using the programming language including the point database. One set of magnetic media containing files of the software and database shall also be provided

f. One set of magnetic media containing files of all color-graphic screens created for the project.

g. A list of recommended spare parts with part numbers and supplier.

h. Complete original issue documentation, installation and maintenance information for all third party hardware provided including computer equipment and sensors.

i. Complete original issue CD for all software provided including operating systems, programming language, operator work-station software, and graphics software.

j. Licenses, Guarantee, and Warrantee documents for all equipment and systems.

k. Recommended preventive maintenance procedures for all system components including a schedule of tasks (inspection, cleaning, calibration, etc.), time between tasks, and task descriptions.

F. Training Manuals: The Contractor shall provide a course outline and training manuals for all training classes at least six weeks prior to the first class. The Owner reserves the right to modify any or all of the training course outline and training materials. Review and approval by

Owner and Engineer and shall be completed at least 3 weeks prior to first class.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 6

1.7 WARRANTY

A. Warrant all work as follows:

1. Labor & materials for control system specified shall be warranted free from defects for a period of twelve (12) months after final completion acceptance by the Owner. Control

System failures during the warranty period shall be adjusted, repaired, or replaced at no charge or reduction in service to the Owner. The Contractor shall respond to the Owner's request for warranty service within 24 hours during customary business hours.

2. At the end of the final start-up/testing, if equipment and systems are operating satisfactorily to the Owner and Engineer, the Owner shall sign certificates certifying that the control system's operation has been tested and accepted in accordance with the terms of this specification. The date of Owner's acceptance shall be the start of warranty.

3. Operator work-station software, project specific software, graphics, database, and firmware updates shall be provided to the Owner at no charge during the warranty period.

Written authorization by Owner must, however, be granted prior to the installation of such changes.

1.8 OWNERSHIP OF PROPRIETARY MATERIAL

A. All project developed hardware and software shall become the property of the Owner. These include but are not limited to:

1. Project graphic images,

2. Record drawings,

3. Project database,

4. Job-specific application programming code,

5. All documentation.

PART 2 - PRODUCTS

2.1 SECTION INCLUDES

A. Acceptable Manufacturers.

B. Operator Interface.

C. System Software.

D. Building Controllers.

E. Custom Application Controllers.

F. Application Specific Controllers.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 7

G. Communications.

H. Input/Output Interface.

I. Auxiliary Control Devices.

2.2 ACCEPTABLE MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. Trane, Tracer Summit SC+.

2. Johnson Controls (Corporate),

3. Honeywell (Corporate).

4. Siemens (Corporate).

B. The Contractor shall use only listed manufacturer’s products as shown in section 1 of this division. When a product or component is referred to by manufacturer's name and/or model number, the Contractor shall use only that product.

2.3 OPERATOR INTERFACE

A. Operator Interface. Furnish 1 laptop computer based work-station. The work-station shall be able to access all information in the system. The work-station shall reside on the same high speed network as the building controllers, and also be able to dial into the system. The laptop shall be located in the mechanical room and connected to the building control panel.

B. Work-station information access shall use the BACnet Protocol. Communication shall use the

ISO 8802-3 (Ethernet) or ARCNET (ASTM 878.1) Physical/Data Link layer protocol. Remote communications shall use the BACnet Point to Point Physical/Data Link Layer Protocol.

C. Hardware. Each operator work-station shall consist of the following:

1. Laptop Computer. Furnish Thinkpad laptop computer. The CPU shall be a minimum of an Intel Pentium and operate at a minimum of 266 MHz. A USB port, portable carry case. A minimum of 32 Megabytes of RAM, one 1.44 Megabytes, 16X CD ROM drive, and a 4 Gigabyte hard disk with a minimum access time of 12 milliseconds shall be provided. An internal and external mouse will also be provided. Furnish all required serial, parallel, and network communication ports, and all cables for proper system operation. The PC shall have a minimum of a 14" SVGA monitor.

2. BACnet. The PCWS shall use the Read (Initiate) and Write (Execute) Services as defined in Clauses 15.5 and 15.8, respectively, of ASHRAE Standard 135-95, to communicate with BACnet objects in the internetwork. Objects supported shall include:

Analog input, analog output, analog value, binary input, binary output, binary value, device.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 8

D. System Software

1. Operating System. Furnish a commercially available, concurrent multi-tasking operating system. The operating system shall also support the use of other common software applications that operate under Microsoft Windows. Acceptable operating systems are

Windows 11.

2. System Graphics. The Operator Work-station software shall be graphically oriented.

The system shall allow display of up to 10 graphic screens at once for comparison and monitoring of system status. Provide a method for the operator to easily move between graphic displays and change the size and location of graphic displays on the screen. The system graphics shall be able to be modified while on line. An operator with the proper password level shall be able to add, delete, or change dynamic points on a graphic.

Dynamic points shall include analog and binary values, dynamic text, static text, and animation files. Graphics shall have the ability to show animation of equipment.

a. Custom Graphics. Custom graphic files shall be created with the use of commonly available graphics packages such as PC Paint. The graphics generation package shall create and modify graphics that are saved in industry standard formats such as PCX, BMP, GIF and JPEG. The graphics generation package shall also provide the capability of capturing or converting graphics from other programs such as

Designer, or AutoCAD.

b. Graphics Library. Furnish a complete library of standard HVAC equipment such as chillers, boilers, air handlers, terminals, fan coils, and unit ventilators. This library shall also include standard symbols for other equipment including fans, pumps, coils, valves, piping, dampers, and duct-work. The library shall be furnished in a file format compatible with the graphics generation package program.

c. Engineering Units. Allow for selection of the desired engineering units (i.e. Inch pound or SI) in the system. Unit selection shall be able to be customized by locality to select the desired units for each measurement. Engineering units on this project shall be: Standard Inch Pound.

E. System Applications. Each work-station shall provide operator interface and off-line storage of system information. Provide the following applications at each work-station.

1. Automatic System Database Save and Restore. Each work-station shall store on the hard disk a copy of the current database of each building controller. This database shall be updated whenever a change is made in any panel in the system. The storage of this data shall be automatic and not require operator intervention. In the event of a database loss in a building management panel, the first work-station to detect the loss shall automatically restore the database for that panel.

2. Manual Database Save and Restore. A system operator with the proper password clearance shall be able to archive the database from any system panel and store on magnetic media. The operator shall also be able to clear a panel database and manually initiate a download of a specified database to any panel in the system.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 9

3. System Configuration. The work-station software shall provide a graphical method of configuring the system. The user with proper security shall be able to add new devices, and assign modems to devices. This shall allow for future system changes or additions.

4. On-Line Help. Provide a context sensitive, on line help system to assist the operator in operation and editing of the system. On line help shall be available for all applications and shall provide the relevant data for that particular screen. Additional help information shall be available through the use of hypertext.

5. Security. Each operator shall be required to log on to the system with a user name and password in order to view, edit, add, or delete data. System security shall be selectable for each operator. The system supervisor shall have the ability to set passwords and security levels for all other operators. Each operator password shall be able to restrict the operators access for viewing and/or changing each system application, full screen editor, and object. Each operator shall automatically be logged off of the system if no keyboard or mouse activity is detected. This auto logoff time shall be set per operator password.

All system security data shall be stored in an encrypted format.

6. System Diagnostics. The system shall automatically monitor the operation of all work-stations, printers, modems, network connections, building management panels, and controllers. The failure of any device shall be annunciated to the operator.

7. Alarm Processing. Any object in the system shall be configurable to alarm in and out of normal state. The operator shall be able to configure the alarm limits, warning limits, states, and reactions for each object in the system.

a. Alarm Reactions. The operator shall be able to determine what actions, if any, are to be taken, by object (or point), during an alarm. Actions shall include logging, printing, starting programs, displaying messages, dialing out to remote stations, paging, providing audible annunciation or displaying specific system graphics.

Each of these actions shall be configurable by work-station and time of day. An object in alarm that has not been acknowledged within an operator specified time period shall be re-routed to an alternate operator specified alarm receipt device.

b. Binary Alarms. Each binary object shall be set to alarm based on the operator specified state. Provide the capability to disable alarming when the associated equipment is turned off or is being serviced.

c. Analog Alarms. Each analog object shall have both high and low alarm limits and warning limits. Alarming must be able to be automatically and manually disabled.

8. Trend Logs. The operator shall be able to define a custom trend log for any data in the system. This definition shall include interval, start-time, and stop-time. Trend intervals of 1, 5, 15, 30, and 60 minutes as well as once a shift (8 hours), once a day, once a week, and once a month shall be selectable. All trends shall start based on the hour. Each trend shall accommodate up to 64 system objects. The system operator with proper password shall be able to determine how many samples are stored in each trend. Trend data shall be sampled and stored on the Building Controller panel and be archived on the hard disk.

Trend data shall be able to be viewed and printed from the operator interface software.

Trends must be viewable in a text based format or graphically. They shall also be storable in a tab delimited ASCII format for use by other industry standard word processing and spreadsheet packages.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 10

9. Dynamic Graphical Charting. The operator shall be able to select system values to be charted in real time. Up to three values at one time can be selected for each chart. The type of chart (bar, line, 3-D, etc.) shall be selectable.

10. Alarm and Event Log. The operator shall be able to view all logged system alarms and events from any location in the system. Events shall be listed chronologically. An operator with the proper security level may acknowledged and clear alarms. All that have not been cleared by the operator shall be archived to the hard disk on the work-station.

11. Object and Property Status and Control. Provide a method for the operator with proper password protection to view, and edit if applicable, the status of any object and property in the system. These statuses shall be available by menu, on graphics, or through custom programs.

12. Clock Synchronization. The real time clocks in all building control panels and work-stations shall be synchronized on command of an operator. The system shall also be able to automatically synchronize all system clocks, daily from any operator designated device in the system. The system shall automatically adjust for daylight savings and standard time if applicable.

13. Reports and Logs. Provide a reporting package that allows the operator to select, modify, or create reports. Each report shall be definable as to data content, format, interval, and date. Report data shall be archived on the hard disk for historical reporting. Provide the ability for the operator to obtain real time logs of designated lists of objects. Reports and logs shall be stored on the PC hard disk in a format that is readily accessible by other standard software applications including spreadsheets and word processing. Reports and logs shall be readily printed to the system printer. The operator shall be able to designate reports that shall be printed or stored to disk at selectable intervals.

a. Custom Reports: Provide the capability for the operator to easily define any system data into a daily, weekly, monthly, or annual report. These reports shall be time and date stamped and shall contain a report title and the name of the facility.

b. Standard Reports. The following standard system reports shall be provided for this project. These reports shall be readily customized to the project by the owner.

14. Electrical Meter Report: Provide a monthly report showing the daily electrical consumption and peak electrical demand for each building meter. Provide an annual (12 month) summary report showing the monthly electrical consumption and peak demand for each meter. Include 12 meters.

15. Weather Data Report: Provide a monthly report showing the daily minimum, maximum and average outdoor air temperature and the number of heating and cooling degree days for each day. Provide an annual (12 month) report showing the minimum, maximum and average outdoor air temperature for the month and the number of heating and cooling degree days for the month.

16. Tenant Override Reports: Provide a monthly report showing the daily total time in hours that each tenant has requested after hours HVAC and lighting services. Provide an annual summary report that shows the override usage on a monthly basis.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 11

F. Work-station Applications Editors. Each PC work-station shall support full screen editing of all system applications. Provide editors for each application at the PC work-station. The applications shall be downloaded and executed at the appropriate controller panels.

1. Controller. Provide a full screen editor for each type controller and application, that shall allow the operator with proper password to view and change the configuration, name, control parameters, and system set-points.

2. Scheduling. An editor for the scheduling application shall be provided at each work-station. Provide a monthly calendar for each schedule. Exception schedules and holidays shall be shown clearly on the calendar. Provide a method for allowing several related objects to follow a schedule. The advance and delay time for each object shall be adjustable from this master schedule.

a. An operator with proper password level shall be able to modify the schedule.

Schedules shall be able to be easily copied between objects and/or dates.

3. Equipment Coordination. Provide a full screen editor that allows equipment to be grouped for proper operation as specified in the sequence of operations. This shall include the coordination of VAV boxes with their associated Air Handling Equipment.

4. Custom Application Programming. Provide the tools to create, modify, and debug custom application programming. The operator shall be able to create, edit, and download custom programs at the same time that all other system applications are operating. The system shall be fully operable while custom routines are edited, compiled, and downloaded. The programming language shall have the following features:

a. The language shall be English language oriented and be based on the syntax of programming languages such as BASIC. It shall allow for free form or fill in the blank programming. Alternatively, the programming language can be graphically-based using function blocks as long as blocks are available that directly provide the functions listed below, and that custom or compound function blocks can be created.

b. A full screen character editor/programming environment shall be provided. The editor shall be cursor/mouse-driven and allow the user to insert, add, modify, and delete code from the custom programming. It shall also incorporate word processing features such as cut/paste and find/replace.

c. The programming language shall allow independently executing program modules to be developed. Each module shall be able to independently enable and disable other modules.

d. The editor/programming environment shall have a debugging/simulation capability that allows the user to step through the program and to observe any intermediate values and or results. The debugger shall also provide error messages for syntax and execution errors.

e. The programming language shall support conditional statements

(IF/THEN/ELSE/ELSE-IF) using compound Boolean (AND, OR, and NOT) and/or relations (EQUAL, LESS THAN, GREATER THAN, NOT EQUAL) comparisons.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 12

f. The programming language shall support floating point arithmetic using the following operators: +, -, /, x, square root, and xy. The following mathematical functions shall also be provided: natural log, log, absolute value, and minimum/maximum value from a list of values.

g. The programming language shall have pre-defined variables that represent clock time, day of the week, and date. Variables that provide interval timing shall also be available. The language shall allow for computations using these values.

h. The programming language shall have ability to pre-defined variables representing the status and results of the System Software, and shall be able to enable, disable, and change the values of BACnet objects in the system.

2.4 SYSTEM SOFTWARE

A. Furnish the following applications software for building and energy management. All software applications shall reside and run in the system controllers. Editing of applications shall occur at the operator work-station.

B. System Security

1. User access shall be secured using individual security passwords and user names.

2. Passwords shall restrict the user to only the objects, applications, and system functions as assigned by the system manager.

3. User logon/logoff attempts shall be recorded.

4. The system shall protect itself from unauthorized use by automatically logging off following the last keystroke. The delay time shall be user definable.

C. Scheduling. Provide the capability to schedule each object or group of objects in the system.

Each of these schedules shall include the capability for start, stop, optimal start, optimal stop, and night economizer actions. Each schedule may consist of up to 10 events. When a group of objects are scheduled together, provide the capability to define advances and delays for each member. Each schedule shall consist of the following:

1. Weekly Schedule. Provide separate schedules for each day of the week.

2. Exception Schedules. Provide the ability for the operator to designate any day of the year as an exception schedule. This exception schedule shall override the standard schedule for that day. Exception schedules may be defined up to a year in advance. Once an exception schedule is executed it will be discarded and replaced by the standard schedule for that day of the week.

3. Holiday Schedules. Provide the capability for the operator to define up to 99 special or holiday schedules. These schedules may be placed on the scheduling calendar and will be repeated each year. The operator shall be able to define the length of each holiday period.

4. Optimal Start/Stop. The scheduling application outlined above shall support an optimal start/stop algorithm. This shall calculate the thermal characteristics of a zone and start the equipment prior to occupancy to achieve the desired space temperature at the specified occupancy time. The algorithm shall calculate separate sets of heating and

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 13

cooling rates for zones that have been unoccupied for less then and greater than 24 hours.

Provide the ability to modify the start/stop algorithm based on outdoor air temperature.

Provide an early start limit in minutes to prevent the system from starting before an operator determined time limit.

D. Alarm Reporting. The operator shall be able to determine the action to be taken in the event of an alarm. Alarms shall be routed to the appropriate work-stations based on time and other conditions. An alarm shall be able to start programs, be logged in the event log, printed, generate custom messages graphics.

E. Demand Limiting.

1. The demand limiting program shall monitor building power consumption from signals generated by a pulse generator (provided by others) mounted at the building power meter, or from a watt transducer or current transformer attached to the building feeder lines.

2. The demand limiting program shall be based on a predictive sliding window algorithm.

The sliding window duration and sampling interval shall be set equal to that of the local

Electrical Utility.

3. Control system shall be capable of demand limiting by resetting HVAC system set-points to reduce load while maintaining Indoor Air Quality (humidity, VOC, CO2) and comfort control in the space.

4. Input capability shall also be provided for an end-of-billing period indication.

F. Maintenance Management. The system shall monitor equipment status and generate maintenance messages based upon user designated run time, starts, and/or calendar date limits.

G. PID Control. A PID (proportional-integral-derivative) algorithm with direct or reverse action and anti-wind-up shall be supplied. The algorithm shall calculate a time-varying analog value used to position an output or stage a series of outputs. The controlled variable, set-point, and

PID gains shall be user-selectable. The set-point shall optionally be chosen to be a reset schedule.

H. Staggered Start. This application shall prevent all controlled equipment from simultaneously restarting after a power outage. The order in which equipment (or groups of equipment) is started, along with the time delay between starts shall be user-selectable.

I. System Calculations. Provide software to allow instantaneous power (e.g. KW), flow rates

(e.g. L/s [GPM]) to be accumulated and converted to energy usage data. Provide an algorithm that calculates a sliding-window KW demand value. Provide an algorithm that calculates energy usage and weather data (heating and cooling degree days). These items shall all be available for daily, previous day, monthly and the previous month.

J. Anti-Short Cycling. All binary output points shall be protected from short cycling. This feature shall allow minimum on-time and off-time to be selected.

Design and Construction Division Addendum 1

Department of Corrections

INSTRUMENTATION AND CONTROL FOR HVAC 230900- 14

2.5 BUILDING CONTROLLERS

A. General. Provide Building Controllers to provide the performance specified in section 1 of this division. Each of these panels shall meet the following requirements.

1. The Building Automation System shall be composed of one or more independent, stand-alone, microprocessor based Building Controllers to manage the global strategies described in System software section.

2. The Building Controller shall have sufficient memory to support its operating system, database, and programming requirements.

3. The controller shall provide a communications port for connection of the Portable

Operators Terminal using Point to Point BACnet physical/data link layer protocol or a connection to the inter-network.

4. The operating system of the Controller shall manage the input and output communications signals to allow distributed controllers to share real and virtual point information and allow central monitoring and alarms.

5. Controllers that perform scheduling shall have a real time clock.

6. Data shall be shared between networked Building Controllers.

7. The Building Controller…

This is the start of the file's text. The full file is on GovTribe.