NOTES:

1. EMERGENCY STOP BUTTON SHALL INTERLOCK WITH REACTOR EXTERNAL INTERLOCK CONTACTS

ONLY. POWER SHALL REMAIN AT REACTOR TO FACILITATE REACTOR'S TRANSFER TO SAFE MODE.

UHP ARGON

CYLINDER BLOCK

AUTO

SWITCHOVER

PANEL

GAS PAD - OUTSIDE

UTILITY NITROGEN

CYLINDER OR

DEWER BANK

AUTO

SWITCHOVER

PANEL

HYDROGEN

CYLINDER BANK

AUTO

SWITCHOVER

PANEL

TWO

CYLINDER

MANIFOLD

UHP

METHANE

UHP

METHANE

AIR

PURIFIER

ROOM L130

UHP N2

LINE

PURGE

VMB

H2

PURIFIER

CH4

PURIFIER

WALL

PANEL

UHP N2

OXY

PURGE

OXYGEN

PH3/H2 N2/H2 PH3/H2 N2/H2 B2H4/H2 N2/H2

UHP N2

DOPANT

PURGE

UHP O2

TO REACTORS

UHP CH4

TO REACTORS

UHP H2

TO REACTORS

ARGON TO

REACTORS

UTILITY N2

TO REACTORS

ROOM L131/132

PH3/H2

N2/H2

PH3/H2

N2/H2

B2H4/H2

N2/H2

PH3/H2

N2/H2

B2H4/H2

TO REACTORS

VMB

ENCLOSURE

UHP CH4

FROM PAD

UHP H2

FROM PAD

CH4

PURIFIER

H2

PURIFIER

P

P R

CH4 TO REACTORS

P

P R

H2 TO REACTORS

UHP N2

LINE

PURGE

PH3/H2 N2/H2

CABINET

PANEL

CABINET

PANEL

P P

TO REACTOR #1

PH3/H2 N2/H2

CABINET

PANEL

CABINET

PANEL

P P

N2/H2

CABINET

PANEL

CABINET

PANEL

P P

TO REACTOR #2

TO REACTOR #3

UHP N2

DOPANT

PURGE

B2H4/H2

OXYGEN

P

PR

UHP N2

LINE

PURGE

WALL MOUNTED

PANEL

O

T

O

R

E A

C T

O R

S

AR

PURIFIER

UHP AR

FROM PAD

P R

AR TO REACTORS

UHP AR

FROM PAD

P R

P R

N2 TO REACTOR

CHAMBER PURGES

INSTRUMENT AIR (N2)

FLEXIBLE HOSES

(TYP. FOR 3)

1. AIR FLOW DUCT SWITCH TO BE LOCATED AS NOTED ON THE MECHANICAL DRAWINGS.

2. HAZARDOUS GAS DETECTOR LIMITS: THE HAZARDOUS GAS DETECTOR WILL BE SET

TO ALARM AT THE GAS LIMITS NOTED BELOW.

NOTES

GAS HAZARD CLASSIFICATION TARGET CONTROL LEVELS

H2 FLAMMABLE LEL = 1%

CH4 FLAMMABLE 50% TLV

O2 OXIDIZING GAS N/A

AR INERT N/A

N2/H2 INERT N/A

B2H6/H2 FLAMMABLE, HIGHLY TOXIC 50% TLV

PH3/H2 FLAMMABLE, HIGHLY TOXIC 50% TLV

N2 INERT N/A

A W

P

I S

S U

E

F

O R

B

I D

N O

T

F

C

N

S T

R U

C T

I O

N

REV

PRINCETON UNIVERSITY

PRINCETON PLASMA PHYSICS LABORATORY

D

FOLDFOLD

A

B

C

E

F

GG

F

E

D

C

B

F O

L D

F O

L D

F O

L D

F O

L D

F O

L D

12111098754321

1211109875432

CADD FILE:

SUPV

DATE:

CHK

ENG:

DIV:

DWN:

APPROVED

Dsize

SHEET

CHK:

OF

F O

L D

A

C22-M801-00.DWG

N O

R

E V

I S

I O

N

E

N

W

P D

A T

E

D W

N C

H K

A P

P

R E

V I S

I O

N

D

E S

C R

I P

T I O

N

C22 - LABORATORY BUILDING RENOVATION PROJECT

ROOMS L130-L131

FACILITIES

C22-M801

C

M

1 1 0

FACILTIES

E. EGAN

T. KUCKER

P. EGAN

08/04/20222

P. EGAN

PE

1:1

A W

P

I S

S U

E

F

D

N O

T

F

N

S T

R U

C T

I O

N

8 9 12 13 14 15 16 17

L1

C22-142.1

C22-142.2

C

C

C

C22-108.4

C22-1COR1.2

8.5 1110

REACTOR ROOM

GAS

HANDLING

ROOM

EXISTING STRUCTURE

NOT IN SCOPE

MECH

STAIR

1STR1

ELEVATOR

1ELE1

OFFICE

108A

STOCK

MEN

WOMEN

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

STAIR

2STR1

LAB

116B

MECH

CORR

2COR1

JAN

C32-1VST1.2

C32-109.1

C32-109.2

C

C D

LAB

VEST

1VST1

SHOP

STORAGE

109A

STORAGE

107A

STORAGE

LOBBY

LAB

CORR

1COR1

EXISTING STRUCTURE

NEW WORK AREA

REFER TO C22-AP101 FOR ADDITIONAL

INFORMATION

NEW WORK AREA

REFER TO C22-AP101 FOR ADDITIONAL

INFORMATION

NEW WORK AREA

REFER TO MECHANICAL AND ELECTRICAL DRAWINGS

FOR ADDITIONAL INFORMATION

REV

PRINCETON UNIVERSITY

PRINCETON PLASMA PHYSICS LABORATORY

D

FOLDFOLD

A

B

C

E

F

GG

F

E

D

C

B

F O

L D

F O

L D

F O

L D

F O

L D

F O

L D

12111098754321

1211109875432

CADD FILE:

SUPV

DATE:

CHK

ENG:

DIV:

DWN:

APPROVED

Dsize

SHEET

CHK:

OF

F O

L D

A

C22-ASP001-00.DWG

N O

R

E V

I S

I O

N

E

N

W

P D

A T

E

D W

N C

H K

A P

P

R E

V I S

I O

N

D

E S

C R

I P

T I O

N

C22 - LABORATORY BUILDING RENOVATION PROJECT

ROOMS L130-L131

FACILITIES

C22-ASP001

C

A

S P

1 1 0

FACILTIES

E. EGAN

T. KUCKER

P. EGAN

08/04/20222

P. EGAN

PE

1:1

A W

P

I S

S U

E

F

D

N O

T

F

N

S T

R U

C T

I O

N

0 4 168

EXISTING CONDITIONS REFERENCE PLAN - 1ST FLOOR

F1

D

D

D

D

BUILDING C32

BUILDING C22

L

L1

K

J

- GAS STORAGE AREA

Sheets and Views
PLOT