KMEP 26.1 Performance Work Statement_PWS.docx

DOCX document 61 KB Posted

Attached to
Cell Phones and Wifi Puck ISO KMEP 26. 1
Solicitation number
W90VN926QA019
Issued by

About this file

This is a Performance Work Statement (PWS) for the Korea Marine Exercise Program 2026 (KMEP 26.1) outlining requirements for WiFi pucks, SIM cards, and cellphones to support III Marine Expeditionary Force communications operations in South Korea. The contractor must supply 15 WiFi pucks (100 GB 5G monthly data capacity), approximately 151 cellphones with Korean phone numbers (unlimited 5G LTE services), and 180 SIM cards (unlimited data with 5G capability) across multiple units and locations from February 21 through April 25, 2026. iPhones are the preferred smartphone, though other smartphones are acceptable; standard flip phones do not meet requirements. Devices must support application downloads including Signal for secure communications. Drop-off locations include Camp Mujuk (Pohang), Warrior Base (Story Live Fire Complex), Rodriguez Live Fire Complex (Pocheon), and Kunsan Air Base (Gunsan City).

The contractor must deliver equipment by specified dates for each unit with coordinated drop-off logistics, maintain 24-hour helpdesk support for troubleshooting and software repairs, and provide replacement equipment within 48 hours of notification for unserviceable items. The government allows a ±1 day schedule deviation with 24-hour notice. All hardware must be secured devices. The acquisition is limited to local contractors already licensed and authorized to conduct business in the Republic of Korea under applicable ROK laws, or contractors that can demonstrate requisite authorization and capacity to operate as local sources. The Contracting Officer is the sole authority for approving contract modifications, and the contractor must immediately notify the contracting representative of any anticipated delivery delays.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

WIFI PUCKS AND CELLPHONES FOR KOREA MARINE EXERCISE PROGRAM 2026

POHANG, REPUBLIC OF KOREA

1.0 BACKGROUND

The purpose of this Performance Work Statement (PWS) is to outline requirements for WiFi Pucks, SIM Cards, and cellphones for support of the Korea Marine Exercise Program 2026 (KMEP 26.1). III Marine Expeditionary Force units supporting KMEP 26.1 require communications via WiFi and cellphones with a Korean number to support mission requirements. The specific requirements for WiFi Pucks and cellphones are outlined in this PWS. For Official Use Only. U.S. Government accepts no liability for vendors, its employees, and agents.

2.0 Locations

· Drop Off Location (1) – Camp Mujuk main gate, Pohang, Korea

· Drop Off Location (2) – Warrior Base, Story Live Fire Complex

· Drop Off Location (3) – Rodriguez Live Fire Complex Main Gate, Pocheon, Korea

· Drop Off Locaiton (4) -- Kunsan Air Base main gate, Gunsan City, Korea

3.0 United States Point of Contact

The United States Government (USG) representative will be the following:

Miscellaneous Points of Contact listed in tables of Para. 6.0 for each unit.

4.0 OBJECTIVES

The Wifi Pucks , SIM Cards and cellphones will be utilized to enable efficient and necessary communications between Joint US, Bilateral, forces to enable the completion of the KMEP training and exercise sites primarily in the vicinity of Pohang and Busan, Republic of Korea. Cellphones must possess a Korean phone number to enable and assist forces traveling throughout the peninsula. The contractor shall supply WiFi Pucks, and cellphones with Korean numbers, and a support hotline as required as needed and/or set forth below in the requirements section. SIM cards shall have unlimited data with 5G capability.

5.0 SCOPE OF WORK:

WiFi Pucks and cellphones will be available on the below dates and starting locations. Communication and data services will be utilized during all hours as required. Cellphones must be able to download different lines of communication via apps such as but not limited to Signal. Requiring 100 GB of 5G per month for WiFi data capacity, and unlimited 5G LTE services for cellphone capability. All hardware will be secured devices. iPhones are the preferred smartphone to use for the purpose of this contract. Other smartphones are acceptable. Standard flip phones will not suffice for the scope of this contract. SIM cards shall have unlimited data with 5G capability.

6.0 DESCRIPTION OF SERVICES

With a 24-hour notice from the U.S Government, the contractor shall allow +/- 1 day deviation from the schedule to allow flexibility and changes to the schedule. The total number of days for services rendered are listed below.

CLR-37

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
15
Camp Mujuk, Pohang Korea
21 Feb – 7 May 2026

WO Johathan Coates jonathan.coates@usmc.mil +1 906-396-3038

Cell Phones
30
Camp Mujuk, Pohang Korea
21 Feb – 7 May 2026
WO Johathan Coates

jonathan.coates@usmc.mil +1 906-396-3038

CLR-35

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
11
Camp Mujuk, Pohang Korea
7 Mar – 18 Apr 2026

CWO2 Zavion Urquhart zavion.m.urquhart.mil@usmc.mil +81 090 8293 0271

Cell Phones
10
Camp Mujuk, Pohang Korea
7 Mar – 18 Apr 2026
CWO2 Zavion Urquhart

zavion.m.urquhart.mil@usmc.mil +81 090 8293 0271

9th ESB

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
4
Camp Mujuk, Pohang Korea
16 Mar – 3 Apr 2026

1stLt Timothy Jakell timothy.d.jakell.mil@usmc.mil +1 (951) 290-9656 (Signal) +81 80 6495 0448 (cell)

Cell Phones
3
Camp Mujuk, Pohang Korea
16 Mar – 3 Apr 2026
1stLt Timothy Jakell

timothy.d.jakell.mil@usmc.mil +1 (951) 290-9656 (Signal) +81 80 6495 0448 (cell)

EOD

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
2
Camp Mujuk, Pohang Korea
1 Mar – 20 Apr 2026

WO Thomas Gary Thomas.k.gary@usmc.mil +1-253-217-6707 (Signal) +81-080-4459-6707 (cell)

Cell Phones
2
Camp Mujuk, Pohang Korea
1 Mar – 20 Apr 2026
WO Thomas Gary

Thomas.k.gary@usmc.mil +1-253-217-6707 (Signal) +81-080-4459-6707 (cell)

3D MED Batallion

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
2
Camp Mujuk, Pohang Korea
6 Mar – 4 April 2026
LCDR Edgar Escobar

+1 240-618-70999 edgar.a.escobar.mil@usmc.mil

Cell Phone
2
Rodriguez Live Fire Complex Main Gate, Korea
6 Mar – 4 April 2026
LCDR Edgar Escobar

+1 240-618-70999 edgar.a.escobar.mil@usmc.mil

MASS-2

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
10
Warrior Base, Story Live Fire Complex
16 Mar – 5 Apr 2026
1stLt Anton Kerrigan

anton.d.kerrigan.mil@usmc.mil +1-402-992-6617 (Signal) +81-080-6499-4110 (cell)

Cell Phones
2
Warrior Base, Story Live Fire Complex
16 Mar – 5 Apr 2026
1stLt Anton Kerrigan

anton.d.kerrigan.mil@usmc.mil +1-402-992-6617 (Signal) +81-080-6499-4110 (cell)

LAAD UDP

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
3
Camp Mujuk, Pohang Korea
10 Mar – 3 Apr 2026
Capt Natalie Garcia

natalie.deleon@usmc.mil + (203) 885-4234 (Signal) +81 080-1385-7144 (cell)

Cell Phones
2
Camp Mujuk, Pohang Korea
10 Mar – 3 Apr 2026
Capt Natalie Garcia

natalie.deleon@usmc.mil + (203) 885-4234 (Signal) +81 080-1385-7144 (cell)

MAG-12

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
20
Camp Mujuk, Pohang Korea
23 Feb – 10 Apr 2026
1stLt Charles T. Stinson

Charles.stinson@usmc.mil +1 785-969-5034

Cell Phones
20
Camp Mujuk, Pohang Korea
23 Feb – 10 Apr 2026
1stLt Charles T. Stinson

Charles.stinson@usmc.mil +1 785-969-5034

SIM Cards
60
Gwangju Air Base Main Gate, Gwangju Korea
2 Mar – 8 Apr 2026
Capt Jacob W. Haan jacob.w.haan.mil@usmc.mil +81-80-4147-3667 (cell)

MAG-24

Requirement
Quantity
Location
Required Date
Point of Contact
Cell Phones
15
Kunsan Airbase Main Gate, Gunsan City, Korea
28 Feb – 21 Apr 2026
2ndLt Mario Celi

mario.j.celi.mil@usmc.mil +1-503-816-2803

Cell Phones
10
Kunsan Airbase Main Gate, Gunsan City, Korea
28 Feb – 25 Apr 2026
2ndLt Mario Celi

mario.j.celi.mil@usmc.mil +1-503-816-2803

V 2/8

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
10
Camp Mujuk, Pohang Korea
1 Mar – 30 Apr 2026
1stLt Nathan Allison

nathan.j.allison.mil@usmc.mil +1 971-400-3727

Cell Phones
5
Camp Mujuk, Pohang Korea
1 Mar – 30 Apr 2026
1stLt Nathan Allison

nathan.j.allison.mil@usmc.mil +1 971-400-3727

Sim Cards
10
Camp Mujuk, Pohang Korea
1 Mar – 30 Apr 2026
1stLt Nathan Allison

nathan.j.allison.mil@usmc.mil +1 971-400-3727

LAR

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
4
Camp Mujuk, Pohang Korea
23 Feb – 19 Apr 2026
Captain Jordan P. Diehl

jordan.diehl@usmc.mil +1-540-908-7120

Cell Phones
4
Camp Mujuk, Pohang Korea
23 Feb – 19 Apr 2026
Captain Jordan P. Diehl

jordan.diehl@usmc.mil +1-540-908-7120

12th LLB

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
5
Camp Mujuk, Pohang Korea
7 Mar – 10 Apr 2026
Capt James M. Ward

james.ward.mil@usmc.mil

DSN: 315-623-7734

Cell: +1 239-822-9750

Cell Phones
5
Camp Mujuk, Pohang Korea
7 Mar – 10 Apr 2026
Capt James M. Ward

james.ward.mil@usmc.mil

DSN: 315-623-7734

Cell: +1 239-822-9750

SIM Cards
10
Camp Mujuk, Pohang Korea
7 Mar – 10 Apr 2026
Capt James M. Ward

james.ward.mil@usmc.mil

DSN: 315-623-7734

Cell: +1 239-822-9750

12th LCT

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
10
Camp Mujuk, Pohang Korea
7 Mar – 11 Apr 2026
1stLt Lachlan B. Ewald

lachlan.b.ewald.mil@usmc.mil Cell: +1 317-495-8096

Cell Phones
40
Camp Mujuk, Pohang Korea
7 Mar – 11Apr 2026
1stLt Lachlan B. Ewald

lachlan.b.ewald.mil@usmc.mil Cell: +1 317-495-8096

SIM Cards
100
Camp Mujuk, Pohang Korea
7 Mar – 11 Apr 2026
1stLt Lachlan B. Ewald

lachlan.b.ewald.mil@usmc.mil Cell: +1 317-495-8096

3/12

Requirement
Quantity
Location
Required Date
Point of Contact
Wifi Pucks
3
Camp Mujuk, Pohang Korea
3 Mar – 21 Apr 2026
1stLt Mehrotra, Sajan S.

sajan.mehrotra@usmc.mil +1-917-480-1260

Cell Phones
3
Camp Mujuk, Pohang Korea
3 Mar – 21 Apr 2026
1stLt Mehrotra, Sajan S.

sajan.mehrotra@usmc.mil +1-917-480-1260

7.0 CONDITION

N/A.

8.0 MAINTENANCE

The Contractor shall ensure that helpdesk services are available on a 24-hour basis for troubleshooting and software repairs.

9.0 CLIMATE CONTROL

N/A.

10.0 SAFETY ITEMS

N/A.

11.0 DELIVERY

The Contractor shall deliver the WiFi Pucks and cellphones by the time and date specified in the period of performance. The Contractor will coordinate with the POC to ensure delivery and pick-up at the proper locations as identified in Paragraph 2.0.

12.0 RECOVERY/REPLACEMENT

Upon proper notification, the Contractor shall provide replacement WiFi Pucks or cellphones within 48 hours of notification by the Government. The Contractor shall provide a replacement asset for all unserviceable pucks and cellphones at the time of recovery.

13.0 DAMAGES

The Government will be responsible for damage in excess of existing wear that results from negligence, neglect, or similar acts of the Government. All Contractor claims for damage by the Government should be submitted to the contracting officer for consideration in accordance with FAR

14.0 CONTRACTOR RESPONSIBILITIES - IS REQUIRED TO:

a. Drop off WiFi Pucks and cellphones and coordinate with Government POC for drop off.

b. Ensure that all items are serviceable, available for immediate use, and all government road paperwork is completed.

15.0 HOLIDAYS

The Contractor will be available for helpdesk service during the holiday periods.

16.0 POINTS OF CONTACTS AND AUTHORITIES

The Contracting Officer is the only person authorized to approve any changes to the requirements of this contract and not withstanding provisions contained elsewhere in this contract, the authority remains solely with the Contracting Officer. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price as a result of the change.

17.0 CONTRACTOR NOTICE REGARDING LATE DELIVERY.

In the event the contractor anticipates or encounters difficulty in complying with the delivery schedule, the Contractor shall immediately notify the contracting representative giving full detailed reasons for the delay. Receipt of contractor’s notice does not constitute acceptance of an alternate delivery schedule waiver of the U.S. Government’s rights under this contract or at law.

(End Statement of Work) DISTRIBUTION: DoD COMMUNITY ONLY