Kingman_Municipal_Airport_PAPI_Project.pdf

PDF 256 KB Posted

Attached to
Kingman Municipal Airport PAPI Project
Solicitation number
2025-IFB-033
Issued by
Mohave County, Arizona

About this file

This Invitation for Bid (IFB) is issued by the City of Kingman, Arizona for the replacement and installation of Precision Approach Path Indicator (PAPI) systems at Kingman Municipal Airport. The project involves replacing existing Runway 3-21 and 17-35 PAPI systems, including the PAPI control unit, cables, and other components, and installing new LED PAPI systems. A non-mandatory pre-bid meeting is scheduled for 11:00 am Arizona time on Wednesday, January 21, 2026, at 7000 Flightline Drive in Kingman. Questions must be submitted through the procurement portal by 5:00 pm Arizona time on Monday, January 26, 2026. Sealed bids are due by 11:00 am Arizona time on Monday, February 9, 2026, through the OpenGov procurement portal at https://procurement.opengov.com/portal/cityofkingman. Bid opening will occur publicly on the City's bidding website, with results posted to the OpenGov portal. The award will be made to the lowest responsible, responsive bidder based on total cost using minimum quantities and ability to meet stated delivery dates.

Bidders must submit a bid guarantee equal to 10 percent of the bid amount as an unconditional certified check, cashier's check, or bid bond, payable to the City of Kingman, prior to bid closing. Pricing must be firm for City acceptance and include all applicable Transaction Privilege Tax (TPT), as the City is not exempt from TPT or sales tax. The City will apply preference in purchasing pursuant to City of Kingman Procurement Code Section CC 2-349, which provides advantages to resident bidders and Arizona-manufactured goods in cases of identical offers. All defective products must be replaced and exchanged by the bidder at the bidder's expense for shipping and transportation. Bidders must maintain current Federal, State, and local licenses and permits and comply with the Americans with Disabilities Act and Equal Employment Opportunity requirements. Required submittals include a New Vendor Application or Vendor Verification Form, W-9 Form, IFB Signature Page, References, Contractor's Qualification Statement (if applicable), Equal Employment Opportunity documentation, and proof of City business license (if applicable). No substitutions or alterations to specifications will be accepted unless the bidder provides descriptive literature and certifies that alternative items meet or exceed specifications, subject to City approval.

View the file

Other files

File Type Posted
Kingman_Municipal_Airport_PAPI_Project_(Addendum_#1_Revision).pdf PDF
AD87611_jnl.pdf PDF
AD87611_jnl.pdf PDF
IGM_-_PAPI_-_SPECS.pdf PDF
IGM_-_PAPI_-_SPECS.pdf PDF
IGM_-_PAPI_-_PLANS.pdf PDF
IGM_-_PAPI_-_PLANS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

CITY OF KINGMAN

Airport

2025-IFB-033

KINGMAN MUNICIPAL AIRPORT PAPI PROJECT

ISSUE DATE: January 5, 2026

BID DUE DATE: February 9, 2026, 11:00 am (Arizona Time)

CONTACT PERSON:

Doug Breckenridge, Airport General Manager

(928) 565-1420 dbreckenridge@cityofkingman.gov

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/cityofkingman

PLEASE NOTE: Bidder is responsible for obtaining any addenda and acknowledging it through the procurement portal.

https://secure.procurenow.com/portal/%7bproject.government.code%7d

CITY OF KINGMAN

INTRODUCTION

MINIMUM QUALIFICATIONS

SPECIFICATIONS

TERMS AND CONDITIONS

INSURANCE REQUIREMENTS

INSTRUCTIONS TO BIDDERS

BID OPENING AND AWARD

PREFERENCE IN PURCHASING

VENDOR QUESTIONNAIRE

Attachments:

A - IGM - PAPI - SPECS

B - IGM - PAPI - PLANS

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 3

1. INTRODUCTION

1.1. Summary

The intent of this Invitation for Bid (IFB) is to obtain

1.2. Contact Information

Doug Breckenridge

Airport General Manager

7000 Flightline Drive

Kingman, AZ 86401

Email: dbreckenridge@cityofkingman.gov

Phone: (928) 565-1420

1.3. Questions

Questions regarding this solicitation must be submitted online through the OpenGov portal. Questions must be received by no later than the date and time specified in the timeline included in this IFB (Questions Due

From Proposers).

2. MINIMUM QUALIFICATIONS

Bidders must demonstrate that they have the resources and capability to provide the materials and services as described herein. All Bidders must submit the documentation requested. Failure to provide any of the required documentation may cause the bid to be deemed non-responsive and/or non-responsible and rejected.

3. SPECIFICATIONS

Kingman Municipal Airport PAPI Project: Replacement of the existing Runway 3-21 and 17-35 Precision

Approach Path Indicators (PAPIs), including the PAPI control unit, cable, and other components deemed in need of replacement, and installation of new LED PAPI systems..

The Bidder shall provide the goods and services requested.

3.1. Delivery

Please attached IGM - PAPI - Specs for delivery information.

3.2. Specifications and Plans

See attached the attached files in Section 9. Vendor Questionnaire in subsection 1. IGM - PAPI

Specifications and Plans:

IGM - PAPI - Specs

IGM - PAPI - Plans

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 4

4. TERMS AND CONDITIONS

4.1. Bid Guarantee

No bid shall be read unless accompanied by the 10% bid proposal guarantee payable by unconditional certified check, cashier's check, or bid bond, payable to the City of Kingman. The bid guarantee payment shall accompany the bid response; if the response is submitted through the procurement portal, the payment should be issued in advance of the bid closing date. Failure to timely submit security in the amount and type required may result in the rejection of the bid. Bid guarantee payments must be uploaded Section 9.14.

4.2. Price Agreement

Please see IGM - PAPI - Spec attachment.

4.3. Firm Pricing

Bid price must be firm for City acceptance as instructed in the IGM - PAPI - Spec attachment.

4.4. Quantities

The quantities specified in the Pricing Table are minimum quantities to be ordered. In the event that additional quantities are needed beyond those contained herein, the Bidder shall provide those additional quantities at the same prices and terms as stated in this IFB.

4.5. Use of Brand Names

Unless otherwise provided in this IFB, the name of a certain brand, make or manufacturer does not restrict bidders to the specific brand, make or manufacturer named; it conveys the general style, type, character, and quality of the article desired, and any article which the City, in its sole discretion, determines to be the equal of that specified, considering quality, workmanship, economy of operation, and suitability for the purpose intended, shall be accepted. Any catalog, brand name or manufacturer's reference used in the IFB is descriptive – NOT restrictive – it is provided to generally indicate the type and quality desired, unless otherwise notes.

Bids on brands of like nature and quality will be considered for those items listed in the Scope of Work. If the bid is based on offering other than the referenced or specified items, the bid must show the name of the manufacturer, brand or trade name, catalog number, etc., of article offered. If other than the brand(s) specified is offered, descriptive literature must be submitted with bid. Samples may be required. Bidders must certify that item(s) offered meet and/or exceed specifications. If an item considered as being equal by the bidder is offered and not accepted, the bid shall be rejected. If a bidder makes no other offer and takes no exception to specifications or reference data, it will be required to furnish the brand names, numbers, etc., as specified.

4.6. Substitutions

No substitutions or alterations will be accepted.

4.7. Defective Products

All defective products shall be replaced and exchanged by the bidder. The cost for shipping, transporting, and other like expenses shall be paid by the bidder.

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 5

4.8. Subcontractors

Bidder must include in their submittal a list of any subcontractors that will be utilized in the performance of the work awarded under this procurement. Bidder must describe the subcontractors qualifications in detail in their response.

4.9. Basis for Award

The City intends to award the bid to the lowest responsible, responsive bidder (after applying any applicable preference under Section CC-249 of the Procurement Code which is referenced in Section 6), based on the total cost using the minimum quantities listed and the ability to provide the minimum quantities listed by the stated delivery date.

4.10. Rejection of Bids

The City reserves the right to waive technical defects, discrepancies and minor irregularities in a response.

The City reserves the right to re-seal any response that was opened prematurely; the City has determined this event as a minor irregularity. The Deputy City Manager/Finance Director shall be notified and shall log the event and place it in the procurement file.

The City reserves the right to award any alternatives set forth in the IFB documents at its sole discretion.

Bids may be rejected if there are any alterations to the required forms, additions not called for, conditional bids, incomplete bids, or irregularities of any kind. The City reserves the right to reject any bid not in compliance with the IFB documents, or prescribed public bidding procedures and requirements. Written notice of rejection of all bids shall be sent to all Bidders.

4.11. Reissuance of IFB

The City reserves the right to re-issue a subsequent procurement for this service at any time if deemed to be in the best interest of the City.

4.12. Protest of Award

A protest of award must be physically delivered to the Purchasing Officer within seven (7) business days of the notice of award date. Our office is open Monday through Thursday from 7:00 am to 6:00pm (closed on holidays). Packages containing protests shall be marked as follows:

RFB Award Protest - 2025-IFB-033 Attn: Tina D. Moline, Deputy City Manager/Finance Director 310 N. Fourth Street Kingman, AZ 86401

4.13. Disputes

In the event any doubt or differences of opinions exist as to the items or service to be furnished hereunder, or from evaluation and/or testing of substitutes, or the interpretation of the provisions of this procurement, the decision of the City of Kingman shall be final and binding upon all parties.

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 6

4.14. Collusion

Upon evidence that collusion exists among Bidders, none of the bids of participants in such collusion will be considered. All involved bids shall be rejected.

4.15. Conflicts of Interest

A. Notify. Prior to taking an action in connection with a City contract, every employee shall, in writing, notify the employee's supervisor, the City Attorney, and Purchasing Officer of any actual or potential conflict of interest of such employee. City employees shall comply with A.R.S. Title 38 regarding conflicts of interest in the purchasing of and contracting for goods, services, and construction for the City.

B. Review potential conflict of interest. Upon receiving notice of an actual or potential conflict of the interest, the City Attorney or designated representative shall review the purchasing procedures for compliance with applicable laws and regulations.

C. Determination of conflict of interest. If the City Attorney determines that an employee has an actual or potential conflict of interest in connection with a purchase, no contract shall be awarded without City

Council review and approval.

4.16. Extension of Time

Prior to proposal opening, the City shall have the authority to extend the deadline for the submittal of proposals when unforeseen circumstances arise. If this occurs, the City will post an addenda at a minimum of five (5) business days prior to the proposal’s original opening date.

4.17. Confidentiality

A. All documents, reports, proposals, submittals, responses, or other materials submitted to the City by frims shall become the sole and exclusive property of the City and become a public record.

B. Responses shall be opened publicly at the time and place designated in the RFQ. The name of each

Respondent and such other relevant information as is specified by rule shall be publicly read and recorded.

The responses shall be open for public inspection after contract award, if any.

C. To the extent the Respondent designates, trade secrets or other proprietary data contained in the response documents shall remain confidential. The City of Kingman is subject to the Arizona Revised Statutes, Title

39, Chapter 1, relating to public records.

4.18. (ADA) The Americans with Disabilities Act

The bidder shall comply with all applicable provisions of the Americans with Disabilities Act of 1990 and the Arizonans with Disabilities Act of 1992.

4.19. Transaction Privilege Tax (TPT)

The City is not exempt from Transaction Privilege Tax (TPT); Bidder must include tax in the pricing proposal, when applicable.

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 7

4.20. Licenses

Bidder will maintain, in current status, all Federal, State, and local licenses and permits required for the operation of the business.

Pursuant to the Kingman Municipal Code, Chapter 8, Article 1.5, Business Licenses, Vendors conducting business within the City of Kingman with a permanent or temporary physical business location within the city limits must apply for a business license and pay the applicable license fee, unless exempted under section 8-13. The full municipal code can be found on the City's website or at the following link:

https://www.codepublishing.com/AZ/Kingman/.

For details regarding how to submit an application, pay the license fee, etc., please visit our website at:

https://www.cityofkingman.gov/government/departments/city-clerk/business-licenses.

5. INSURANCE REQUIREMENTS

5.1. Required Insurance Policies

Please see the attached IGM-PAPI- SPEC for Insurance Requirements.

6. INSTRUCTIONS TO BIDDERS

6.1. Submission of Bids

Bids must be received by 11:00 am, Arizona time, on Monday, February 9, 2026, submitted directly through the OpenGov procurement portal.

Mailed, faxed, hand-delivered, and e-mailed responses will not be accepted. Mailed responses will be disposed of, unopened, and will not be returned to the Respondent.

Bidders wishing to submit responses must register for a free OpenGov account at:

https://procurement.opengov.com/signup. To receive notification of future solicitations, please subscribe to the City of Kingman OpenGov solicitations by clicking here:

https://procurement.opengov.com/portal/cityofkingman. For detailed instructions on how to register and subscribe, you can also visit the City of Kingman's website at:

https://www.cityofkingman.gov/government/advanced-components/list-detail-pages/rfp-posts-list.

Requests for extensions of this time and date will not be granted, unless deemed to be in the City’s best interest. Bids or unsolicited amendments to Bids received by the City after the acceptance date and time will not be considered.

Any bid may be withdrawn at any time prior to the specified date and time for IFB closing.

6.2. Documents to be Included with Bid

A. Please refer to the attached IGM - PAPI - SPECS

B. New Vendor Application (if not already a registered vendor)

C. W-9 Form https://www.codepublishing.com/AZ/Kingman/#!/Kingman08/Kingman08.html https://www.cityofkingman.gov/government/departments/city-clerk/business-licenses https://procurement.opengov.com/signup https://procurement.opengov.com/portal/cityofkingman https://procurement.opengov.com/portal/cityofkingman https://www.cityofkingman.gov/government/advanced-components/list-detail-pages/rfp-posts-list

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 8

D. Other applicable forms in Section 9. Vendor Questionnaire.

6.3. Subcontractors and Materials List

Bidders shall submit subcontractor and materials list with bid response which is located in the attached

IGM - PAPI - SPECS

6.4. Non-Mandatory Pre-Bid Meeting

A Non-Mandatory Pre-Proposal Meeting to clarify the contents of this solicitation will be held at 11:00 am, Arizona time, on Wednesday, January 21, 2026 at 7000 Flightline Drive Kingman, Arizona 86401.

Attendance is not required but is encouraged; written minutes and/or notes will NOT be provided.

6.5. Taxes

The City is not exempt from Transaction Privilege Tax (TPT) or Sales Tax. All applicable taxes should be included in the Bidder's quote.

6.6. Questions and Inquiries

Questions and inquiries, will be accepted from any and all Bidders through the procurement portal.

Unauthorized contact with other City staff regarding the IFB may result in the disqualification of the

Bidder. Inquiries pertaining to the IFB must list the IFB number and title. Material questions will be answered in writing with an Addendum provided.

All questions must be received by 5:00 pm, on Monday, January 26, 2026.

6.7. Addenda

All addenda shall be issued no later than five (5) business days prior to the IFB closing date.

It is the responsibility of the Bidder to ensure that they have received all Addendums. Solicitation Addenda will be posted on the City's link to the online bidding website. Vendors that have registered at https://procurement.opengov.com/portal/cityofkingman and who also follow the City of Kingman will receive email notifications of addenda.

6.8. Vendor Registration

Bidders must properly fill out and complete a City Vendor Application and IRS W-9 Form, and file the documents with the City's Finance Department. Forms are included in the attachments section of this IFB.

7. BID OPENING AND AWARD

7.1. Bid Opening

1. Bids shall be opened publicly on the City's Bidding Opportunities website.

2. The amount of each bid and such other relevant information as may be specified by the Purchasing

Officer or using department's director, together with the name of each offeror shall be recorded. This record shall be open to public inspection after the offer opening and will be posted to the bid on the OpenGov portal. Confidential, trade secrets or other proprietary data designated in the offers will remain confidential unless otherwise required by the public records law.

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 9

3. Bids will not be accepted after the closing of this solicitation.

4. Bids shall be evaluated based on the requirements set forth in the IFB, which may include criteria to determine acceptability such as inspection, testing, quality, workmanship, delivery, and suitability for a particular purpose. Those criteria that will affect the bid price and considered in evaluation for award, shall be objectively measurable. No criteria may be used in bid evaluations that are not set forth in the IFB.

7.2. Bid Award

The bid shall be awarded to the lowest responsible, responsive bidder, after applying any applicable preference under CC 2-349. The successful offeror shall submit all required information and documents as a condition of final award of the contract. The winning bidder will be notified by email.

IFB results will be posted on the City of Kingman's OpenGov portal.

7.3. Commencement of Work

Bidder will not perform any billable work, provide any material or service under this contract until the

Bidder receives a purchase order, or is otherwise directed to do so in writing by the City of Kingman.

8. PREFERENCE IN PURCHASING

Preference in Purchasing (City of Kingman, Procurement Code, 2-349):

A. Resident bidders. When evaluating a bid, except for procurement of construction services, the applicable amount of the City’s transaction privilege taxes shall not be included when the City is evaluating an award to be made between a City of Kingman bidder and an Arizona based non-City of Kingman bidder. This section may be utilized for non-bid purchases as well.

B. Non-resident bidders; award of identical offers. When a department receives offers identical in price, fitness, availability, and quality, and chooses to award a contract, the department shall award the contract based on the following order of precedence:

1. The department shall award the contract to the offeror among those submitting identical offers that is offering goods and/or services that have been manufactured or produced in

Arizona.

2. If 2 or more offerors submit identical offers, and they offer goods and/or services manufactured or produced in Arizona, the department shall award the contract by drawing lots among the identical offers offering goods and/or services that have been manufactured or produced in Arizona. The department may request either in the solicitation document, following closing of the solicitation or at any other time deemed appropriate, any information needed to determine if the goods and/or services in the solicitation are manufactured or produced in Arizona. The offerors that submitted the identical offers subject to the drawing of lots shall be given notice and an opportunity to be present when the lots are drawn.

3. If the department receives identical offers, and none of the identical offers offer goods and/or services manufactured or produced in Arizona, and then the department shall award the contract by drawing lots among the identical offers. The offerors that submitted the

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 10 identical offers subject to the drawing of lots shall be given notice and an opportunity to be present when the lots are drawn.

C. Determining if offers are identical. A department shall consider offers identical in price, fitness, availability, and quality as follows:

1. Bids received in response to an invitation to bid (IFB) or request for quotation are identical in price, fitness, availability, and quality if the bids are responsive and offer the goods and/or services described in the IFB or request for quotation at the same price.

2. Proposals received in response to a request for proposals (RFP) are identical in price, fitness, availability, and quality if they are responsive and achieve equal scores when scored in accordance with the evaluation criteria set forth in the RFP.

3. Evaluating each offeror’s performance of previous work history for the City.

D. Procedure for drawing lots. In any instance when this section calls for the drawing of lots, the department shall draw lots by a procedure that affords each offeror subject to the drawing a substantially equal probability of being selected, and that does not allow the person making the selection the opportunity to manipulate the drawing of lots to increase the probability of selecting 1 offeror over another.

If the solicitation is for the procurement of goods for less than $50,000, the offeror shall include a statement as to qualification for any preference in purchasing pursuant to CC 2-349.

9. VENDOR QUESTIONNAIRE

9.1. Bidder Response *

Please download the below documents, complete, and upload IGM - PAPI - Specs.

• IGM_-_PAPI_-_SPECS.pdf

• IGM_-_PAPI_-_PLANS.pdf

*Response required

9.2. New Vendor Application/Existing Vendor Verification Form* Please download the below documents, complete, and upload. If you are a new vendor, please complete the

New Vendor Application. If you are already a vendor with the City of Kingman, please complete the Vendor

Verification Form.

• New_Vendor_Application.pdf

• Vendor_Verification_Form.pdf

*Response required https://government-project.s3.us-west-2.amazonaws.com/209764/573d7d1f-8065-472f-9ebf-001b3c853fe5_IGM_-_PAPI_-_SPECS.pdf https://government-project.s3.us-west-2.amazonaws.com/209764/a7659de5-d8db-43a9-9cb5-c3193abb3055_IGM_-_PAPI_-_PLANS.pdf https://government-project.s3.us-west-2.amazonaws.com/51163/d7bd2007-a0d7-45cd-8bba-a5e4f9568d3f_New_Vendor_Application.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=918ef55312fe7d67c601c9b714e4c6629d56bb5666624260f7db3b7199c8b62f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22New_Vendor_Application.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/51163/ad22c5bc-a7f0-4ab7-94d8-21ed6d005363_Vendor_Verification_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=b53f928d88a234b9916ffbff20ede68e0b40727ec19c66ea63ddd8cf5b30b460&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Vendor_Verification_Form.pdf%22&x-id=GetObject

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 11

9.3. Bids must be signed by a duly authorized representative of the Bidder. If a bid is signed by an agent of the Bidder, a Power of Attorney showing the authority of the agent to sign must be submitted with the bid or the bid will be rejected.

FAILURE TO SIGN AND SUBMIT THE BIDDER SIGNATURE PAGE

SHALL RESULT IN REJECTION OF THE BID.*

Please download the below documents, complete, and upload.

• IFB_Signature_Page.docx

*Response required

9.4. References*

Please download the below documents, complete, and upload.

• REFERENCES.pdf

*Response required

9.5. Bidder Addenda Confirmation *

Bidder hereby acknowledges it is the responsibility of the Bidder to ensure they have received all

Addendums and responses to questions. Solicitation Addenda will be posted to the IFB on the City's

OpenGov procurement portal where the IFB is posted. Vendors that have registered at https://procurement.opengov.com/portal/cityofkingman and who also follow the City of Kingman will receive email notifications of addenda.

All addenda shall be issued no later than five (5) business days prior to the IFB closing date.

☐ Please confirm

*Response required

9.6. Contractor's Qualification Statement (Only If Applicable) Please download the below documents, complete, and upload. Contractors can also use AIA Document

A305)

• City_of_Kingman_-_Contracto...

9.7. Will this project be classified as MRRA or Modification for the purposes of determining TPT (Transaction Privilege Tax) requirements?

Please select the type of project.

☐ MRRA

☐ Modification

9.8. If the project is MRRA, do not include TPT (Transaction Privilege Tax) in your bid. If this project is a Modification project, please ensure you have included TPT in your bid price.* Please check the box acknowledging you have read this question and understand the requirements.

☐ Please confirm https://government-project.s3.us-west-2.amazonaws.com/51163/5d0eccb7-bda0-42ae-b9b2-6550193a5386_IFB_Signature_Page.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=32f7081400c8cdb4e91868aa709d2a58548947883c203c83012d0e56cda8508c&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22IFB_Signature_Page.docx%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/51163/6ef6c54c-1321-48ce-bdc1-3aa956c56061_REFERENCES.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=5879ba41f3a4753fc5cf46aeec01c2a651209df558de682bb08354a690906178&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22REFERENCES.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/51163/10303028-30eb-42a7-a3b1-539c6ea1f47b_City_of_Kingman_-_Contractor_Qualifications.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=47f58b290951e8b99ba3f3385088e1a641822320579cd7690de43d0ac08658eb&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22City_of_Kingman_-_Contractor_Qualifications.pdf%22&x-id=GetObject

Invitation for Bid #2025-IFB-033, Kingman Municipal Airport PAPI Project 12

*Response required

9.9. Equal Employment Opportunity

Please download the below documents, complete, and upload.

• EQUAL_EMPLOYMENT_OPPORTUNIT...

9.10. Arizona Statutory Bid Bond (If Applicable)

Please download the below documents, complete, and upload.

• Bid_Bond.pdf

9.11. (Optional) Vendor EFT Form Please download the below documents, complete, and upload.

• Vendor_EFT_form,_FAQ_and_in...

9.12. W-9*

Please download the below documents, complete, and upload.

• W-9.pdf

*Response required

9.13. Please upload a copy of your City of Kingman business license (if applicable)

9.14. Please upload your bid Guarantee here.*

All Bid Guarantee documents will not be made available for public viewing.

*Response required https://government-project.s3.us-west-2.amazonaws.com/51163/474d315a-f042-4188-ac11-60f49d68c1b1_EQUAL_EMPLOYMENT_OPPORTUNITY.pdf https://government-project.s3.us-west-2.amazonaws.com/51163/811a5c44-d0d2-413c-b912-9430fd7614d9_Bid_Bond.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=55e8a2b739c4a52185cb4c92266e89b3471e90c65db2257ddbb830adb911e4fd&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Bid_Bond.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/51163/043d191f-6eb2-4be3-9436-8022f84ae82f_Vendor_EFT_form%2C_FAQ_and_instructions_3_PG.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=6e50aff9d54dc6b2b1c7a839abdad91b725e1b0bdd1cae7b3928dedb488a9624&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Vendor_EFT_form%252C_FAQ_and_instructions_3_PG.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/51163/ac3e5200-22bd-4c6c-b1b8-7b17eab2bffd_W-9.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4OIGKG2KH%2F20260105%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260105T150001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEH0aCXVzLXdlc3QtMiJGMEQCIBqmUHaBkTjtJQtpLPX%2B%2BOK4MnbB3zWc%2BkN5eHmlKpEDAiB8vytr1gCiP6crHFpcvl3p6Se8kjdf1%2FNCLkkDZWY5aiqMBQhGEAIaDDg5MjM2NDY4NzY3MiIMhvZACYXHuHxKL1gBKukEF8W6M68VHTodGlEWSc7C6eFuSDXt5ynNHXryRQGc5D0xZI0TMcugCEhYXKLYxGqr6IhMJw051SRoMWWzt7U09iIWKI%2F3uHlGSkRCvOFIC%2FnU2SVhAf5qOA%2FDw8MVVc%2FrumWyV0D%2F%2BEN91xh%2BkBuTckIsi2wBjnIMd0gXakPW%2F7hnydeKK5Tx%2BZMBcqx4DMBUOPaWssBzIItaQHF%2FdRB2Zz9IEs5RrW4fg8d5kHkUUSQLpYFMMrAnXYbRMdGe6cZ0FM6TovTcErjRVJCdLdpOs07DQreA9x%2Bz3VcYrA1i1xshtsZ3xhlIMwK4PoLYdr391v%2B5C2%2BzISlTBwYjN6AUHy8x3Eod8Iy9h4MefeBLMem63XY12pt%2FYqrBLMFl0Ap4kJi0Z5YHUYiX553smbpPXUqOuKpA7l6eVkD4HPmlf%2BrGumEnmfSYDiBiFgZvNygdMwmBs5oaxuRhd3ufeNd0zW4JVCfYz8ewi%2FpQiKBZ0Dc0%2BkOfy4YXpidGrr1ZleSv8nzCJtmOBIBio983RNLGTaXsVhEocrnS5bEVzypoKfMab1mxsnbfn%2FVqMFGhmCbhVA%2FRX05DkgdfSubxYxlB1QUeLfhBmkiFFppyWEexQ2vkvzalCFytIriG2FMGsYGXkI2Pbawnfl6k32S6NawzGWN216%2FuZ7WuD54IFpL%2BMiU9Y7bJg1aLkzbZlD64RaHSZmdGkl7%2BmKhsUXpIyFgrYDon6Ot7lN3xWg6TBI8e4fN8moxaTezACBuFY6BBqBfnzfrfCaMZ1K04Id0QNZOvRdo9dBcnXG8kM%2FcbKENBxXGb5UjlLRZmES4w%2Bu%2FuygY6mgFfpNDHORGAYdBB1XoiouDFCnclVz0NwlGme3HTUt12CyF%2BNOp1O2a0e15UFCzZN7IRLDYx1UkvR5bdcbytPil5KzVvBiZA3LWcHGegCVb3MVuTJyVV5hmYHHJrzzeJvLXx7eL14XSym47OJG0okM7OvOGB56oMvouylay31bb5695JjNNzRq8rtSUXAybe7yNHge9y%2FWiq2%2Fmr&X-Amz-Signature=052af2cf0e3a17871c2ef9895c1503007d093720394637c57ab0869bbe27359d&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9.pdf%22&x-id=GetObject