This is a Specification and Bid Document package for the City of Kingman, Arizona's PAPI Replacement Project (2025-IFB-033) at Kingman Municipal Airport. The project involves the replacement of existing Precision Approach Path Indicators (PAPIs) for Runways 3-21 and 17-35, including removal of existing PAPI light housing assemblies, control units, power equipment, and installation of new LED PAPI systems with all associated electrical infrastructure. The scope of work includes removal and salvage of four existing 4-box PAPI units, two existing 2-box PAPI units, three PAPI power control units with concrete foundation removal, removal of 545 linear feet of existing conductor, installation of new transformers and disconnect switches on concrete pads, installation of 1,165 linear feet of underground L-824 cable, installation of 1,055 linear feet of control cables, installation of 1,045 linear feet of underground conduit in two configurations, four new junction cans, and two each of new LED 4-box and 2-box PAPI systems complete with wiring, grounding, and flight testing. Bidder questions must be submitted by 5:00 pm Arizona time on January 26, 2026, with sealed bids due by 11:00 am Arizona time on February 9, 2026, through the City of Kingman's OpenGov procurement portal. The contract term is 28 calendar days from the Notice to Proceed, with work phased into two 14-day work areas that cannot be performed concurrently. A mandatory pre-bid conference is required to discuss material requirements, submittals, quality control/quality assurance, construction safety and phasing plans, and airfield paving construction requirements.
Liquidated damages are assessed at $1,000 per day for failure to complete within the 28 calendar days. The project requires a 10 percent bid bond, performance bond equal to 100 percent of the contract amount, and payment bond equal to 100 percent of the contract amount. Insurance requirements include General Liability ($1,000,000 per occurrence, $3,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), and Worker's Compensation coverage. The contract is funded by an ADOT Grant (E2S4U01C) and is subject to prevailing wage requirements established by the State and Federal Departments of Labor. The project includes extensive safety and phasing requirements detailed in the Construction Safety and Phasing Plan (CSPP), including runway closures coordinated with airport operations between 9 pm and 6 am, Foreign Object Debris (FOD) management, utility coordination, and compliance with FAA Advisory Circular 150/5370-2 for operational safety during construction. All work must comply with FAA technical specifications, National Electrical Code standards, and Arizona Department of Transportation requirements, including certifications regarding forced labor compliance and boycott of Israel provisions. The contractor must also submit a Safety Plan Compliance Document (SPCD) prior to receiving the Notice to Proceed and maintain compliance throughout the construction period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kingman_Municipal_Airport_PAPI_Project_(Addendum_#1_Revision).pdf | ||
| Kingman_Municipal_Airport_PAPI_Project.pdf | ||
| AD87611_jnl.pdf | ||
| AD87611_jnl.pdf | ||
| IGM_-_PAPI_-_SPECS.pdf | ||
| IGM_-_PAPI_-_PLANS.pdf | ||
| IGM_-_PAPI_-_PLANS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
FOR THE CONSTRUCTION OF
2025-IFB-033
PAPI REPLACEMENT PROJECT
KINGMAN MUNICIPAL AIRPORT
CITY OF KINGMAN
KINGMAN, ARIZONA
ADOT Grant No. E2S4U01C
C&S PROJECT: K32.007.008
MAY 2025
100% SUBMITTAL
rbehm Rectangle rbehm Text Box
SEPTEMBER 2025
rbehm Snapshot
2018 TOC-1
TABLE OF CONTENTS
ADVERTISEMENT
PROPOSAL
ATTACHMENTS TO PROPOSAL
Non-Collusive Bidding Certificate
Resolution For Corporate Bidders
Certification for Receipt of Addenda
Statement of Surety’s Intent
Contractor's Storm Water Pollution Prevention Plan Certification
List of Subcontractors and Professional Services Providers
Contractor Immigration Warranty
Safety Plan Compliance Document (SPCD) Certification
Prohibition of Forced Labor of Ethnic Uyghurs Certification
Participation in Boycott of Israel
CONTRACT AGREEMENT (SAMPLE)
SPECIFICATIONS
PART 1 - GENERAL CONTRACT PROVISIONS
Section 10 Definition of Terms
Section 20 Proposal Requirements and Conditions
20-01 - Advertisement (Notice to Bidders)
20-02 - Qualifications of bidders
20-03 - Contents of proposal forms
20-04 - Issuance of proposal forms
20-05 - Interpretation of estimated proposal quantities
20-06 - Examination of plans, specifications and site
20-07 - Preparation of proposal
20-08 Responsive and responsible bidder
20-09 - Irregular proposals
20-10 - Bid guarantee
20-11 - Delivery of proposal
20-12 - Withdrawal or revision of proposals
20-13 - Public opening of proposals
20-14 - Disqualification of bidders
20-15 - Discrepancies and omissions
Section 30 Award and Execution of Contract
30-01 - Consideration of proposals
30-02 - Award of contract
30-03 - Cancellation of award
30-04 - Return of proposal guarantee
30-05 - Requirements of contract bonds
2018 TOC-2
30-06 - Execution of contract
30-07 - Approval of contract
30-08 - Failure to execute contract
Section 40 Scope of Work
40-01 - Intent of contract
40-02 - Alteration of work and quantities
40-03 - Omitted items
40-04 - Extra work
40-05 - Maintenance of traffic
40-06 - Removal of existing structures
40-07 - Rights in and use of materials found in the work
40-08 - Final cleanup
Section 50 Control of Work
50-01 - Authority of the Resident Project Representative (RPR)
50-02 - Conformity with plans and specifications
50-03 - Coordination of contract, plans and specifications
50-04 - List of Special Provisions
50-05 - Cooperation of Contractor
50-06 - Cooperation between contractors
50-07 - Construction layout and stakes
50-08 - Authority and duties of Quality Assurance (QA) inspectors
50-09 - Inspection of the work
50-10 - Removal of unacceptable and unauthorized work
50-11 - Load restrictions
50-12 - Maintenance during construction
50-13 - Failure to maintain the work
50-14 - Partial acceptance
50-15 - Final acceptance
50-16 - Claims for adjustment and disputes
Section 60 Control of Materials
60-01 - Source of supply and quality requirements
60-02 - Samples, tests and cited specifications
60-03 - Certification of compliance/analysis (COC/COA)
60-04 - Plant inspection
60-05 - Engineer/ Resident Project Representative (RPR) field office
60-06 - Storage of materials
60-07 - Unacceptable materials
60-08 - Owner furnished materials
Section 70 Legal Regulations and Responsibility to Public
70-01 - Laws to be observed
70-02 - Permits, licenses and taxes
70-03 - Patented devices, materials and processes
70-04 - Restoration of surfaces disturbed by others
70-05 - Federal participation
70-06 - Sanitary, health and safety provisions
70-07 - Public convenience and safety
70-08 - Construction Safety and Phasing Plan (CSPP)
70-09 - Use of explosives
70-10 - Protection and restoration of property and landscape
2018 TOC-3
70-11 - Responsibility for damage claims
70-12 - Third party beneficiary clause
70-13 - Opening sections of the work to traffic
70-14 - Contractor’s responsibility for work
70-15 - Contractor’s responsibility for utility service and facilities of others
70-16 - Furnishing rights-of-way
70-17 - Personal liability of public officials
70-18 - No waiver of legal rights
70-19 - Environmental protection
70-20 - Archaeological and historical findings
70-21 - Insurance Requirements
Attachment A to Section 70-08 – Construction Safety and Phasing Plan (CSPP)
Section 80 Execution and Progress
80-01 - Subletting of contract
80-02 - Notice to proceed
80-03 - Execution and progress
80-04 - Limitation of operations
80-04.1 - Operational safety on airport during construction
80-05 - Character of workers, methods and equipment
80-06 - Temporary suspension of the work
80-07 - Determination and extension of contract time
80-07.1 - Contract time based on Working Days
80-08 - Failure to complete on time
80-09 - Default and termination of contract
80-10 - Termination for national emergencies
80-11 - Work area, storage area and sequence of operations
Section 90 Measurement and Payment
90-01 - Measurement of quantities
90-02 - Scope of payment
90-03 - Compensation for altered quantities
90-04 - Payment for omitted items
90-05 - Payment for extra work
90-06 - Partial payments
90-07 - Payment for materials on hand
90-08 - Payment of withheld funds
90-09 - Acceptance and final payment
90-10 - Construction warranty
90-11 - Contractor Final Project Documentation
SPECIAL PROVISIONS TO THE GENERAL CONTRACT PROVISIONS
SP 20-16 Addenda and interpretation
SP 30-09 Conformed Contract Documents
SP 60-09 Shop and setting drawings and catalogue data
SP 60-10 Electrical shop drawings
SP 60-11 Substitute items
SP 60-12 Submittal procedure
SP 70-22 Arizona Department of Transportation (ADOT) Requirements
2018 TOC-4
FAA TECHNICAL SPECIFICATIONS
Item Number Description
C-105 Mobilization
C-106 Safety, Security, and Maintenance of Traffic
P-153 Controlled Low-Strength Material (CLSM)
P-610 Concrete for Miscellaneous Structures
L-100 Electrical General Requirements
L-108 Underground Power Cable for Airports
L-110 Airport Underground Electrical Duct Banks and Conduits
L-115 Electrical Manholes and Junction Structures
L-125 Installation of Airport Lighting Systems
CONTRACT DRAWINGS
See Contract Drawings for sheet list
END OF TABLE OF CONTENTS
ADV-1
ADVERTISEMENT
NOTICE TO BIDDERS FOR THE CONSTRUCTION OF THE
PAPI REPLACEMENT PROJECT
AT THE
KINGMAN MUNICIPAL AIRPORT
KINGMAN, ARIZONA
Sealed proposals for the construction of the PAPI Replacement Project Contract will be submitted through the
City’s Bidding Opportunities portal.
https://procurement.opengov.com/portal/cityofkingman?departmentId=4652&status=open&page=1&limit=10& sortField=proposalDeadline&sortDirection=ASC
Please Note: Electronic responses will be required for all formal solicitations beginning on December 5, 2024, paper submissions will no longer be accepted
This project generally includes the following:
• Replacement of the existing Runway 3-21 and 17-35 Precision Approach Path Indicators (PAPIs), including the PAPI control unit, cable, and other components deemed in need of replacement, and installation of new LED PAPI systems.
The Contract Documents (consisting of the Advertisement, the Proposal, the Agreement, and the Specifications) and the Contract Drawings and other pertinent information may be obtained through the City’s Bidding
Opportunities portal.
https://procurement.opengov.com/portal/cityofkingman?departmentId=4652&status=open&page=1&limit=10& sortField=proposalDeadline&sortDirection=ASC
A pre-bid conference, questions, amendments, and other schedule submittable and response dates can be found on the City's Bidding and Opportunities portal.
The Owner reserves the right to waive any informality in the proposal, and to reject any and all proposals.
PROPOSAL-1
PROPOSAL
FOR CONSTRUCTION OF THE
PAPI REPLACEMENT PROJECT
AT
CITY OF KINGMAN
KINGMAN, ARIZONA
TO: City of Kingman
310 N. Fourth St.
Kingman, AZ 86401
The undersigned, as bidder, hereby declares that he/she has examined the site of the work and informed himself/herself fully in regard to all conditions pertaining to the place where the work is to be done; that he/she has examined and read the Contract Documents and Contract Drawings for the work and all addenda relative thereto furnished prior to the opening of bids; that he/she has satisfied himself/herself relative to the work to be performed.
The bidder understands that the advertisement, located in the front of these Contract Documents, contains the location and a description of the proposed construction, as well as indicates the place, date, and time of the proposal opening; information about a Pre-Bid conference, if scheduled, is contained in the advertisement; the time in which the work must be completed shall be in accordance with the subsection titled FAILURE TO COMPLETE ON TIME of Section 80. If the bidder considers that the time to complete the work is inadequate, they should not submit a bid.
The bidder understands the quantities for bid items listed on the proposal sheets are estimated quantities only for the purpose of comparing bids; any difference between these estimated quantities and actual quantities required for construction shall not be taken as a basis for claims by the Contractor for extra compensation; compensation will be based upon the unit prices and actual construction quantities.
The bidder understands that the description under each item, being briefly stated, implies, although it does not mention, all incidentals and that the prices stated are intended to cover all such work, materials and incidentals as constitute bidder's obligations as described in the specifications and any details not specifically mentioned, but evidently included in the Contract shall be compensated for in the item which most logically includes it.
The bidder understands that proposal guaranty shall be in the form of a bid bond in the amount of ten percent (10%) of this bid in accordance with the subsection titled BID GUARANTEE of Section 20; the proposal guaranty shall become the property of the Owner in the event the Contract and bond(s) are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.
The bidder agrees that upon receipt of written notice of the acceptance of this proposal, bidder will execute the Contract attached within 15 days and deliver a Surety Bond or Bonds as required by the subsection titled REQUIREMENTS OF CONTRACT BONDS OF Section 30. The bidder further agrees to commence construction with an adequate work force, plant and equipment on the date stated in the written notice to proceed and will progress therewith to its completion within the time stated, and in accordance with this Contract and Specification.
PROPOSAL-2
KINGMAN MUNICIPAL AIRPORT
PAPI REPLACEMENT PROJECT
ITEM
NO.
FAA
SPEC
NO. QUANTITY
ITEM LIST
ITEM DESCRIPTION
(PRICE WRITTEN IN WORD)
UNIT PRICE
IN FIGURES TOTAL AMOUNT
DOLLARS CENTS DOLLARS CENTS
1 C-105-6.1 1 LS
MOBILIZATION
AT
PER LUMP SUM
2 C-106-3.1 1 LS
SAFETY, SECURITY AND MAINTENANCE OF TRAFFIC
AT
PER LUMP SUM
3 L-100-5.1 2 EA
REMOVE AND SALVAGE EXISTING 4-BOX PAPI LIGHT HOUSING ASSEMBLIES,
CONCRETE FOUNDATIONS TO REMAIN
AT
PER EACH
4 L-100-5.2 2 EA
REMOVE AND SALVAGE EXISTING 2-BOX PAPI HOUSING ASSEMBLIES,
CONCRETE FOUNDATIONS TO REMAIN
AT
PER EACH
5 L-100-5.3 4 EA
REMOVE AND SALVAGE EXISTING PAPI PCU, POWER EQUIPMENT AND RACK,
REMOVE CONCRETE FOUNDATION
AT
PER EACH
6 L-100-5.4 545 LF
REMOVE EXISTING CONDUCTOR, CONDUIT TO REMAIN
AT
PER LINEAR FOOT
7 L-100-5.5 3 EA
NEW PAPI 2KVA STEP-DOWN TRANSFORMER AND 600V FUSED
DISCONNECT WITH FRANGIBLE STRUT RACK ON NEW CONCRETE PAD
AT
PER EACH
8 L-100-5.6 1 EA
NEW FRANGIBLE STRUT RACK ON NEW CONCRETE PAD FOR PAPI PCU
(IF REQUIRED)
AT
PER EACH
9 L-100-5.7 1 EA
REMOVE AND REPLACE WITH NEW PAPI & REIL 21, 2 KVA 240V TO 480V
STEP-UP TRANSFORMER IN LIGHTING VAULT BUILDING
AT
PER EACH
PROPOSAL-3
10 L-108-5.1 1,165 LF
L-824, TYPE C, 2/C #8 AWG, 5KV CABLE, #8 GROUND
AT
PER LINEAR FOOT
11 L-108-5.2 1,055 LF
3-#10, #10 GROUND & TILT INTERCONNECT CABLES
AT
PER LINEAR FOOT
12 L-110-5.1 490 LF
SINGLE-WAY, (1) - 2" CONDUIT, DIRECT BURIED
AT
PER LINEAR FOOT
13 L-110-5.2 555 LF
MULTIPLE-WAY, (2) - 2" CONDUIT, DIRECT BURIED
AT
PER LINEAR FOOT
14 L-115-5.1 4 EA
NEW L-867E (24" DIA) JUNCTION CAN WITH STEEL COVER
AT
PER EACH
15 L-125-5.1 2 EA
NEW L-880A(L) LED 4-BOX PAPI AND CONTROLLER ON EXISTING
FOUNDATIONS WITH ALL WIRING AND GROUNDING, COMPLETE IN
PLACE, AIMED AND TESTED
AT
PER EACH
16 L-125-5.2 2 EA
NEW L-880A(L) LED 4-BOX PAPI AND CONTROLLER ON EXISTING
FOUNDATIONS WITH ALL WIRING AND GROUNDING, COMPLETE IN
PLACE, AIMED AND TESTED
AT
PER EACH
TOTAL PRICE (WRITTEN IN WORD) DOLLARS CENTS
PROPOSAL-4
The bidder states that this proposal is based upon prevailing wages in and in no case are wages considered less than those predetermined by the State and Federal Departments of Labor, schedules of which are contained in the Contract Documents.
The bidder proposes and agrees, if this Proposal is accepted, to contract in the form of contract specified with the City of Kingman (Owner), to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and labor necessary to complete the construction of the PAPI Replacement Project in full and complete accordance with the show, noted, described and reasonably intended requirements of the Contract Documents and Contract Drawings, to the full and entire satisfaction of the above said Owner, with a definite understanding that no money will be allowed for extra work except as set forth in the attached Contract Documents, for the unit prices listed for each item.
BIDDER, IF AN INDIVIDUAL:
BY:
(Printed Name)
(Signature)
COMPANY NAME:
ADDRESS:
PHONE NO:
DATE:
ARIZONA ROC CONTRACTOR’S LICENSE NO. _________________
dbreckenridge Cross-Out PAPI Needs to be all upper case
PROPOSAL-5
BIDDER, IF A PARTNERSHIP (GIVE NAMES AND ADDRESSES OF EACH PARTNER):
BY:
(Printed Name)
(Signature)
COMPANY NAME:
ADDRESS:
PHONE NO:
DATE:
ARIZONA ROC CONTRACTOR’S LICENSE NO._________________
PARTNER’S PARTNER’S
NAME: NAME:
BUSINESS BUSINESS
ADDRESS: ADDRESS:
PARTNER’S PARTNER’S
NAME: NAME:
BUSINESS BUSINESS
ADDRESS: ADDRESS:
PROPOSAL-6
BIDDER, IF A CORPORATION:
BY:
(Printed Name & Title)
(Signature)
CORPORATION
NAME:
ADDRESS: (SEAL)
STATE OF CORPORATION
CHARTER:
PHONE NO:
DATE:
ARIZONA ROC CONTRACTOR’S LICENSE NO._________________
PRESIDENT’S
NAME:
BUSINESS
ADDRESS:
SECRETARY’S TREASURER’S
NAME: NAME:
BUSINESS BUSINESS
ADDRESS: ADDRESS:
PROPOSAL-7
ATTACHMENTS TO PROPOSAL
BIDDER and his/her surety, where appropriate, have completed and executed the attached documents which are identified below.
Non-Collusive Bidding Certificate
Resolution For Corporate Bidders
Certification for Receipt of Addenda
Statement of Surety’s Intent
Contractor's Storm Water Pollution Prevention Plan Certification
List of Subcontractors and Professional Services Providers
Contractor Immigration Warranty
Safety Plan Compliance Document (SPCD) Certification
Prohibition of Forced Labor of Ethnic Uyghurs Certification
Participation in Boycott of Israel
PROPOSAL-8
NON-COLLUSIVE BIDDING CERTIFICATE
The Signer of this Bid declares:
A. That he/she has carefully examined the annexed form of the Agreement and Contract.
B. That each Bidder and each person signing on behalf of any Bidder certifies, and in the case of a joint
Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:
1. The prices in this Bid have been arrived at independently without collusion, consultation, communication or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor;
2. Unless otherwise required by law, the prices which have been quoted in this Bid have not been knowingly disclosed by the Bidder, and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and
3. No attempt has been made or will be made by the Bidder to induce any other person, partnership or corporation to submit or not to submit a Bid for the purpose of restricting competition.
I hereby affirm under the penalties of perjury that the foregoing statement is true.
Affix Seal BIDDER:
if Principal is Corporation BY:
TITLE:
STATE OF ARIZONA)
SS:
COUNTY OF _________)
On the day of , 20 , before me personally came to me known, who, being by me duly sworn, did swear and affirm that he/she resides at
; that he/she is the of the Bidder herein and signs the foregoing Non-Collusive Certification on behalf of such Bidder; that he/she executed the foregoing Non-Collusive Certification; and that, to the best of his knowledge and belief, the statement made in the foregoing Non- Collusive Certification is true.
NOTARY PUBLIC
MY COMMISSION EXPIRES:
(This form must be completed and submitted with the Proposal.)
PROPOSAL-9
RESOLUTION FOR CORPORATE BIDDERS
RESOLVED, that be authorized
(Name of Officer) to sign and submit the bid or proposal of this corporation for the following project:
Kingman Municipal Airport – PAPI Replacement Project and to include in such bid or proposal the certificate as to non-collusion as the act and deed of such corporation, and for any inaccuracies or misstatements in such certificate this corporate bidder shall be liable under penalties of perjury.
The foregoing is a true and correct copy of the resolution adopted by
Corporation at a meeting of its Board of
Directors held on the day of , 20 .
(Secretary)
(Seal)
PROPOSAL-10
CERTIFICATION FOR RECEIPT OF ADDENDA
Receipt of the following Addenda is acknowledged:
ADDENDUM NO.: DATED:
ADDENDUM NO.: DATED:
ADDENDUM NO.: DATED:
ADDENDUM NO.: DATED:
(Firm or Corporation Making Bid)
(Signature of Authorized Person)
P.O. Address:
Dated:
PROPOSAL-11
STATEMENT OF SURETY'S INTENT
TO:
We have reviewed the bid of
(Contractor) of
(Address) for the , project for which bids will be received on:
(Bid Opening Date) and wish to advise that should this Bid of the Contractor be accepted and the Contract awarded to him, it is our present intention to become surety on the performance bond and labor and material bond required by the Contract.
Any arrangement for the bonds required by the Contract is a matter between the Contractor and ourselves and we assure no liability to you or third parties if for any reason we do not execute the requisite bonds.
We are duly authorized to do business in the State of .
ATTEST:
Surety's Authorized Signature(s)
(Corporate seal, if any. If no seal, write "No Seal" across this place and sign.)
ATTACH PROPOSAL GUARANTEE
ATTACH POWER OF ATTORNEY
(This form must be complete and submitted with the Proposal.
Copies of this form may be filled out and attached to this page.)
PROPOSAL-12
CONTRACTOR'S STORM WATER POLLUTION PREVENTION PLAN CERTIFICATION
Airport Name/Location: Kingman Municipal Airport
Project Name: PAPI Replacement Project
Contractor's Official Name:
Address:
Telephone Number:
Certification Statement:
"I certify under penalty of law that I understand and agree to comply with the terms and conditions of the Storm Water Pollution Prevention Plan for this project presented in the technical specifications of these Contract Documents in Item C-102 Temporary Air and Water Pollution, Soil
Erosion, and Siltation Control”. I further agree that I shall be responsible for furnishing all materials, labor and equipment necessary to comply with all National Pollutant Discharge
Elimination System (NPDES) requirements for erosion control during construction including the installation of all construction BMP’s and the preparation and filing of a Notice of Intent, Inspection and Maintenance Reports and a Notice of Termination. All work and methods shall comply with the best management practices required by the Federal Aviation Administration (FAA), the Arizona
Department of Environmental Quality (ADEQ), the City of Kingman, and any other governing agencies. This work shall include preparing and revising as necessary a comprehensive stormwater pollution prevention plan, including descriptions of proposed measures to be implemented, a schedule detailing the proposed coordination for accomplishing the erosion control features in a timely and appropriate manner, and site-specific diagrams indicating proposed locations where erosion control devices or measures may be required during successive construction stages.”
Printed Name of Bidder Signature
Title Date
PROPOSAL-13
LIST OF SUBCONTRACTORS
AND PROFESSIONAL SERVICES PROVIDERS
The bidder is required to furnish the following information for all proposed Subcontractors to be used in the completion of the project. All entities that will be providing work or services on this project must be included in this list. By submission of this form, Bidder certifies that all Subcontractors are eligible to perform work on public projects pursuant to A.R.S. 34-241.B.
Name Subcontractor is licensed under:
License Number:
Address of Subcontractor:
Percent (%) of Total Contract:
Specific Description of Subcontract:
Name Subcontractor is licensed under:
License Number:
Address of Subcontractor:
Percent (%) of Total Contract:
Specific Description of Subcontract:
Name Subcontractor is licensed under:
License Number:
Address of Subcontractor:
Percent (%) of Total Contract:
Specific Description of Subcontract:
Name Subcontractor is licensed under:
License Number:
Address of Subcontractor:
Percent (%) of Total Contract:
Specific Description of Subcontract:
Name Subcontractor is licensed under:
License Number:
Address of Subcontractor:
Percent (%) of Total Contract:
Specific Description of Subcontract:
(This form must be completed and submitted with the Proposal.
Copies of this form may be filled out and attached to this page.)
PROPOSAL-14
CONTRACTOR IMMIGRATION WARRANTY
(Compliance with Federal and State Laws)
The Contractor understands and acknowledges the applicability to it of the Americans with Disabilities
Act, the Immigration Reform and Control Act of 1986 and the Drug Free Workplace Act of 1989. The following is only applicable to construction contracts: The Contractor must also comply with A.R.S. §34-
301, “Employment of Aliens on Public Works Prohibited,” and A.R.S. §34-302, as amended, “Residence
Requirements for Employees.”
Under the provisions of A.R.S. §41-4401, Contractor hereby warrants to the Owner that the Contractor and each of its subcontractors (“Subcontractors”) will comply with, and are contractually obligated to comply with all Federal Immigration laws and regulations that relate to their employees and A.R.S. §23-
214(A) (hereinafter “Contractor Immigration Warranty”).
A breach of the Contractor Immigration Warranty shall constitute a material breach of this Contract and shall subject the Contractor to penalties up to and including termination of this Contract at the sole discretion of the Owner.
The Owner retains the legal right to inspect the papers of any Contractor or Subcontractor’s employee who works on this Contract to ensure that the Contractor or Subcontractor is complying with the
Contractor Immigration Warranty. Contractor agrees to assist the Owner in regard to any such inspections.
The Owner may, at its sole discretion, conduct random verification of the employment records of the
Contractor and any of its Subcontractors to ensure compliance with the Contractor’s Immigration
Warranty. Contractor agrees to assist the Owner in regard to any random verifications performed.
Neither the Contractor nor any Subcontractor shall be deemed to have materially breached the Contractor
Immigration Warranty if the Contractor or Subcontractor establishes that it has complied with the employment verification provisions prescribed by sections 274A and 274B of the Federal Immigration and Nationality Act and the E-Verify requirements prescribed by A.R.S. §23-214 Subsection A.
The provisions of this Article must be included in any contract the Contractor enters into with any and all of its subcontractors who provide services under this Contract or any subcontract. “Services” are defined as furnishing labor, time or effort in the State of Arizona by a contractor or subcontractor. Services include construction or maintenance of any structure, building or transportation facility or improvement to real property.
Printed Name & Title:
Signature:
Date:
PROPOSAL-15
SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) CERTIFICATION
Project Location: Kingman Municipal Airport
Project Name: PAPI Replacement Project
Contractor's Official Name:
Contact Person: _____________________________________ Telephone:
Street Address:
City: State: Zip:
Certification Statement:
I certify that I have read the Construction Safety and Phasing Plan (CSPP) included in the Contract
Documents and if awarded this Contract, I will abide by its requirements as written.
I certify that I have read the Safety Plan Compliance Document (SPCD) included in the Contract
Documents and if awarded this Contract, I will abide by its requirements as written;
I certify that I will provide the information required in the SPCD prior to the start of construction work, if awarded this Contract, and that I will provide any additional information requested by the Owner.
Printed Name of Signer Signature
Title Date
PROPOSAL-16
ADDITIONAL STATE LAW PROVISIONS: PROHIBITION OF FORCED
LABOR OF ETHNIC UYGHURS CERTIFICATION
The Contractor hereby certifies it shall comply with A.R.S. §35-394 which mandates the City of
Kingman, as a Public entity of Arizona, and using Public funds, may not enter into or renew a contract with a company unless the contract includes written certification that the company does not currently, and agrees for the duration of this contract that it will not use:
1) the forced labor of ethnic Uyghurs in the People’s Republic of China, or;
2) any goods or services produced by the forced labor of the ethnic Uyghurs in the People’s
Republic of China, or;
3) any subcontractors or suppliers that use the forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China.
Additionally, if during the term of this contract, after providing written certification pursuant to the above conditions, your company becomes aware that it is not in compliance with this written certification, your company shall notify the City of Kingman within five (5) business days.
If within one hundred and eighty (180) days of notification of noncompliance your company does not provide the City of Kingman with written certification of company’s remedy of the noncompliance, the City of Kingman shall terminate this contract. Exception: if the contract termination date occurs before the end of the remedy period, the contract shall terminate on the contract termination date.
Tampering with Public Records: Per A.R.S. §13-2407, this certification is a public record and concerns a matter within the jurisdiction of Arizona in that the making of a false record may render the maker subject to prosecution for a class 6 felony.
Signature of Legally Authorized Person Date
Company Name Title
This certification must be completed and submitted with the Agreement.
PROPOSAL-17
EXHIBIT “A” – A.R.S §35-393 and 35-393.01 CERTIFICATION
Definitions contained in A.R.S. 35-393:
1. "Boycott" means engaging in a refusal to deal, terminating business activities or performing other actions that are intended to limit commercial relations with Israel or with persons or entities doing business in Israel or in territories controlled by Israel, if those actions are taken either:
(a) In compliance with or adherence to calls for a boycott of Israel other than those boycotts to which 50 United States Code section 4607(c) applies.
(b) In a manner that discriminates on the basis of nationality, national origin or religion and that is not based on a valid business reason.
2. "Company" means a sole proprietorship, organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, and includes a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate.
3. "Direct holdings" means all publicly traded securities of a company that are held directly by the state treasurer or a retirement system in an actively managed account or fund in which the retirement system owns all shares or interests.
4. "Indirect holdings" means all securities of a company that are held in an account or fund, including a mutual fund, that is managed by one or more persons who are not employed by the state treasurer or a retirement system, if the state treasurer or retirement system owns shares or interests either:
(a) together with other investors that are not subject to this section.
(b) that are held in an index fund.
5. ”Public entity" means this State, a political subdivision of this STATE or an agency, board, commission or department of this state or a political subdivision of this state.
6. ”Public fund" means the state treasurer or a retirement system.
7. "Restricted companies" means companies that boycott Israel.
8. "Retirement system" means a retirement plan or system that is established by or pursuant to title 38.
All offerors must select one of the following:
My company does not participate in, and agrees not to participate in during the term of the contract a boycott of Israel in accordance with A.R.S. §35-393.01.
My company does participate in a boycott of Israel as defined by A.R.S. §35-393.01.
By submitting this response, Contractor agrees to indemnify and hold the City, its agents and employees, harmless from any claims or causes of action relating to the City’s action based upon reliance on the above representations, including the payment of all costs and attorney fees incurred by the City in defending such an action.
Company Name Signature of Person Authorized to Sign
Company Street Address Printed Name of Signatory
City, State, Zip Title of Signatory
END OF PROPOSAL
Agreement-1
CITY OF KINGMAN
KINGMAN MUNICIPAL AIRPORT
PAPI REPLACEMENT PROJECT
CONTRACT AGREEMENT
This CONTRACT AGREEMENT (this “Contract”), is made and entered into this _____ day of
_________, 2025, by and between the City of Kingman, (the “Owner”), and
__________________________ of the City of ______________, County of _________, and State of
_____________, (the “Contractor”).
WITNESSETH:
WHEREAS, Contractor has been awarded the contract to complete Work on the Project as described in the PAPI Replacement Project Specifications and Contract Documents, dated
_______________, 2025 (the “Project Manual”);
WHEREAS, Owner and Contractor desire to memorialize Contractor’s agreement to complete the Project under the terms and conditions set forth herein;
AGREEMENTS
NOW THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, Owner and Contractor agree as follows:
1. Performance of the Work. For and in consideration of the payments made as provided for in the Project Manual, to Contractor by Owner, and under the penalty expressed in the bond hereto attached, Contractor hereby covenants and agrees, at his proper cost and expense, to do all the Work and furnish all materials, tools, labor, and all appliances and appurtenances called for by this Contract, free from all claims, liens and charges whatsoever, in the manner, and under the conditions hereinafter specified, that are necessary for the PAPI Replacement Project for the Kingman Municipal Airport, all to be performed within the Contract Time.
2. Compliance with Contract Documents. All Work done and materials and equipment furnished by Contractor or Contractor’s suppliers shall be strictly pursuant to and in conformity with the
Project Manual. The Project Manual furnished to the Contractor with his proposal and the additional drawings or prints and other information to be furnished by the Contractor in accordance with the Project
Manual, and the Plans and Specifications, supplemental information, plans, drawings, or prints furnished by the Contractor and approved in writing by Owner and the Engineer, shall be complementary to each other and any Work appearing in or upon the one and not mentioned in the others shall be executed according to the true intent and meaning of the Project Manual, drawings, or prints the same as though the said Work were contained and described in all.
rbehm Text Box
(SAMPLE)
Agreement-2
3. Incorporation of other Contract Documents. The Project Manual, Plans and
Specifications, Special Notice of Offerors, Notice Inviting Proposals, Instruction to Offerors, Offer
Response Form, General and Special Provisions, Proposal, Payment Bond, Performance Bond, Certificate of Insurance, Contractor’s Affidavit, Technical Provisions, Appendix, Plans, Addenda No.’s
_______________, and Change Orders issued and any additional or supplemental specifications, notices, instructions and drawings issued in accordance with the provisions of the Contract Documents are hereby understood to be a part of this Contract and are hereby incorporated herein in their entirety.
Unless otherwise defined herein, all capitalized terms in this Contract shall have the same meanings as defined in the General or Special Provisions.
4. Oversight and Approval of Work. The parties covenant and agree that the Work shall be executed under the direction of the Engineer, acting under the supervision of the Owner or Owner’s properly authorized agents, on whose inspection all Work shall be accepted or rejected. Owner shall have full power to reject or condemn all materials furnished or Work performed under this Contract which do not conform to the terms and conditions herein expressed.
5. Resolution of Disputes. To prevent all disputes and litigation, it is further agreed by and between Owner and Contractor, that the Engineer shall determine all questions in relation to the Work and the construction thereof, and it shall in all cases decide all questions which may arise relative to the execution of the Work under this Contract on the part of Contractor and its estimates and decisions shall be final and conclusive; and such estimates and decisions, in case any questions may arise, shall be a condition precedent to the right of said Contractor to receive any money or compensation for anything done or furnished under this Contract.
6. Cancellation Pursuant to A.R.S. Section 38-511. Pursuant to A.R.S. Section 38-511, Owner may cancel this Contract, without penalty or further obligation, if any person significantly involved in initiating, negotiating, securing, drafting or creating this Contract on behalf of Owner is, at any time while the Contract or any extension of this Contract is in effect, an employee or agent of any other party to this Contract in any capacity or a consultant to any other party of this Contract with respect to the subject matter of this Contract. In the event of the foregoing, Owner further elects to recoup any fee or commission paid or due to any person significantly involved in initiating, negotiating, securing, drafting or creating this Contract arising as a result of this Contract.
7. Owner’s Right to Offset. Prior to the final payment or any progress payment due to
Contractor, Owner shall be entitled to deduct therefrom any and all unpaid taxes, fees and any and all other unpaid monies due to Owner from the Contractor, and shall apply those monies to the appropriate account. Contractor shall provide to Owner any information necessary to enforce the rights of the parties of this Contract.
8. Default by Contractor. Upon the occurrence of any violation or breach of the terms of this Contract on the part of the Contractor and if such breach or default remains uncured after the expiration of any applicable notice or cure period, Owner may suspend or terminate this Contract, or exercise any other enforcement remedies as set forth in the Contract Documents. All of Owner’s remedies in this Contract are distinct and cumulative to any other right or remedy under this Contract, the other Contract Documents or applicable law, and may be exercised concurrently, independently or successively.
Agreement-3
9. Independent Contractor. Contractor warrants and represents to Owner that it is fully experienced and properly qualified as an expert to perform the Work required hereunder and that it is properly licensed, equipped, organized and financed to perform such Work. Contractor shall finance its own operations, shall operate as an independent contractor and not as the agent of Owner, and shall indemnify and hold Owner free and harmless from all liabilities, costs, and charges by reason of any act, omission, or representation of Contractor or of its subcontractors, agents, or employees.
10. Notices. All notices required or permitted to be given hereunder shall be in writing and shall be deemed to have been given when delivered in person or on the third business day after posting in the United States Post Office, postage prepaid by certified mail or registered mail, return receipt requested, to a party as follows, or to such address as a party may later designated by like notice to any other:
TO OWNER: City of Kingman
310 N 4th Street
Kingman, Arizona 86401
TO CONTRACTOR: __________________________
11. Successors in Interest. This Contract shall be binding upon and inure to the benefit of the parties and their respective successors and assigns.
12. Authorizations. The signatories to this Contract warrant each to the other that they have the authorization to enter into this Contract and to bind themselves to the terms and conditions of this
Contract.
13. Attorney’s Fees. In the event a party commences litigation to enforce any of the terms or conditions of this Contract and/or to recover damages or for other relief on account of the breach of this Contract, the prevailing party in such litigation shall be entitled to receive, in addition to all other relief to which such party shall be entitled, all costs and expenses, including reasonable attorneys’ fees, incurred by the prevailing party.
15. Severability and Waiver. The invalidity or unenforceability of any provision hereof shall in no way effect the validity or enforceability of any provision hereof. Any waivers must be in writing and signed by the party sought to be charged. The waiver by any party of a right provided thereunder shall not be deemed to be a continuing waiver of that right or a waiver of any other right.
16. Construction. The parties agree that each party has reviewed this Contract and that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not apply to the interpretation of this Contract.
Agreement-4
17. Interpretation. The paragraph headings used in this Contract are for convenience only and shall not be used in the interpretation hereof. This Contract shall be interpreted and enforced in accordance with the laws of the State of Arizona, except when preempted by Federal laws.
18. Time of the Essence. Time shall be of the essence of the terms hereof.
IN WITNESS WHEREOF, five (5) identical counterparts of this Contract, each of which shall for all purposes be deemed an original thereof, have been duly executed by the parties hereinabove named, on the date and year first herein written.
OWNER:
CONTRACTOR:
2019 AC 150/5370-10H
Section 10 Definition of Terms GP 10-1
Part 1 – General Contract Provisions
Section 10 Definition of Terms
When the following terms are used in these specifications, in the contract, or in any documents or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be defined as follows:
Paragraph
Number
Term Definition
10-01 AASHTO The American Association of State Highway and Transportation
Officials.
10-02 Access Road The right-of-way, the roadway and all improvements constructed thereon connecting the airport to a public roadway.
10-03 Advertisement A public announcement, as required by local law, inviting bids for work to be performed and materials to be furnished.
10-04 Airport Airport means an area of land or water which is used or intended to be used for the landing and takeoff of aircraft; an appurtenant area used or intended to be used for airport buildings or other airport facilities or rights of way; airport buildings and facilities located in any of these areas, and a heliport.
10-05 Airport Improvement
Program (AIP)
A grant-in-aid program, administered by the Federal Aviation
Administration (FAA).
10-06 Air Operations Area
(AOA)
The term air operations area (AOA) shall mean any area of the airport used or intended to be used for the landing, takeoff, or surface maneuvering of aircraft. An air operation area shall include such paved or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiway, or apron.
10-07 Apron Area where aircraft are parked, unloaded or loaded, fueled and/or serviced.
10-08 ASTM International
(ASTM)
Formerly known as the American Society for Testing and
Materials (ASTM).
10-09 Award The Owner’s notice to the successful bidder of the acceptance of the submitted bid.
10-10 Bidder Any individual, partnership, firm, or corporation, acting directly or through a duly authorized representative, who submits a proposal for the work contemplated.
Section 10 Definition of Terms GP 10-2
Paragraph
Number
Term Definition
10-11 Building Area An area on the airport to be used, considered, or intended to be used for airport buildings or other airport facilities or rights-of-way together with all airport buildings and facilities located thereon.
10-12 Calendar Day Every day shown on the calendar.
10-13 Certificate of Analysis
(COA)
The COA is the manufacturer’s Certificate of Compliance (COC) including all applicable test results required by the specifications.
10-14 Certificate of
Compliance (COC)
The manufacturer’s certification stating that materials or assemblies furnished fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer’s authorized representative.
10-15 Change Order A written order to the Contractor covering changes in the plans, specifications, or proposal quantities and establishing the basis of payment and contract time adjustment, if any, for work within the scope of the contract and necessary to complete the project.
10-16 Contract A written agreement between the Owner and the Contractor that establishes the obligations of the parties including but not limited to performance of work, furnishing of labor, equipment and materials and the basis of payment.
The awarded contract includes but may not be limited to:
Advertisement, Contract form, Proposal, Performance bond, payment bond, General provisions, certifications and representations, Technical Specifications, Plans, Supplemental
Provisions, standards incorporated by reference and issued addenda.
10-17 Contract Item (Pay Item) A specific unit of work for which a price is provided in the contract.
10-18 Contract Time The number of calendar days or working days, stated in the proposal, allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date.
10-19 Contractor The individual, partnership, firm, or corporation primarily liable for the acceptable performance of the work contracted and for the payment of all legal debts pertaining to the work who acts directly or through lawful agents or employees to complete the contract work.
10-20 Contractors Quality
Control (QC) Facilities
The Contractor’s QC facilities in accordance with the Contractor
Quality Control Program (CQCP).
Section 10 Definition of Terms GP 10-3
Paragraph
Number
Term Definition
10-21 Contractor Quality Control
Program (CQCP)
Details the methods and procedures that will be taken to assure that all materials and completed construction required by the contract conform to contract plans, technical specifications and other requirements, whether manufactured by the Contractor, or procured from subcontractors or vendors.
10-22 Control Strip A demonstration by the Contractor that the materials, equipment, and construction processes results in a product meeting the requirements of the specification.
10-23 Construction Safety and
Phasing Plan (CSPP)
The overall plan for safety and phasing of a construction project developed by the airport operator, or developed by the airport operator’s consultant and approved by the airport operator. It is included in the invitation for bids and becomes part of the project specifications.
10-24 Drainage System The system of pipes, ditches, and structures by which surface or subsurface waters are collected and conducted from the airport area.
10-25 Engineer The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for engineering, of the contract work and acting directly or through an authorized representative.
10-26 Equipment All machinery, together with the necessary supplies for upkeep and maintenance; and all tools and apparatus necessary for the proper construction and acceptable completion of the work.
10-27 Extra Work An item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, but which is found by the Owner’s Engineer or Resident Project
Representative (RPR) to be necessary to complete the work within the intended scope of the contract as previously modified.
10-28 FAA The Federal Aviation Administration. When used to designate a person, FAA shall mean the Administrator or their duly authorized representative.
10-29 Federal Specifications The federal specifications and standards, commercial item descriptions, and supplements, amendments, and indices prepared and issued by the General Services Administration.
10-30 Force Account a. Contract Force Account - A method of payment that addresses extra work performed by the Contractor on a time and material basis.
b. Owner Force Account - Work performed for the project by the
Owner's employees.
Section 10 Definition of Terms GP 10-4
Paragraph
Number
Term Definition
10-31 Intention of Terms Whenever, in these specifications or on the plans, the words
“directed,” “required,” “permitted,” “ordered,” “designated,”
“prescribed,” or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation, or prescription of the Engineer and/or Resident
Project Representative (RPR) is intended; and similarly, the words “approved,” “acceptable,” “satisfactory,” or words of like import, shall mean approved by, or acceptable to, or satisfactory to the Engineer and/or RPR, subject in each case to the final determination of the Owner.
Any reference to a specific requirement of a numbered paragraph of the contract specifications or a cited standard shall be interpreted to include all general requirements of the entire section, specification item, or cited standard that may be pertinent to such specific reference.
10-32 Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.
10-33 Major and Minor Contract
Items
A major contract item shall be any item that is listed in the proposal, the total cost of which is equal to or greater than 20% of the total amount of the award contract. All other items shall be considered minor contract items.
10-34 Materials Any substance specified for use in the construction of the contract work.
10-35 Modification of
Standards (MOS)
Any deviation from standard specifications applicable to material and construction methods in accordance with FAA Order 5300.1.
10-36 Notice to Proceed (NTP) A written notice to the Contractor to begin the actual contract work on a previously agreed to date. If applicable, the Notice to
Proceed shall state the date on which the contract time begins.
10-37 Owner The term “Owner” shall mean the party of the first part or the contracting agency signatory to the contract. Where the term
“Owner” is capitalized in this document, it shall mean airport
Sponsor only. The Owner for this project is.
10-38 Passenger Facility Charge
(PFC)
Per 14 Code of Federal Regulations (CFR) Part 158 and 49
United States Code (USC) § 40117, a PFC is a charge imposed by a public agency on passengers enplaned at a commercial service airport it controls.
Section 10 Definition of Terms GP 10-5
Paragraph
Number
Term Definition
10-39 Pavement Structure The combined surface course, base course(s), and subbase course(s), if any, considere4d as a single unit.
10-40 Payment bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will pay in full all bills and accounts for materials and labor used in the construction of the work.
10-41 Performance bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will complete the work in accordance with the terms of the contract.
10-42 Plans The official drawings or exact reproductions which show the location, character, dimensions and details of the airport and the work to be done and which are to be considered as a part of the contract, supplementary to the specifications. Plans may also be referred to as 'contract drawings.’
10-43 Project The agreed scope of work for accomplishing specific airport development with respect to a particular airport.
10-44 Proposal The written offer of the bidder (when submitted on the approved proposal form) to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and specifications.
10-45 Proposal guaranty The security furnished with a proposal to guarantee that the bidder will enter into a contract if their own proposal is accepted by the Owner.
10-46 Quality Assurance (QA) Owner’s responsibility to assure that construction work completed complies with specifications for payment.
10-47 Quality Control (QC) Contractor’s responsibility to control material(s) and construction processes to complete construction in accordance with project specifications.
10-48 Quality…