This is Addendum #2 for NC State University RFP #63-KGS1054211 regarding an Irrigation Pond & Water Farming System project in Kinston, NC. The addendum provides corrections and clarifications, including updated certificate of insurance requirements listing NC Department of Agriculture and Consumer Services as the certificate holder. Construction must be completed between February 1, 2025, and June 15, 2025. The addendum includes 16 questions and answers from the site visit covering topics such as guide wire arrangements, soil management, and construction specifications. Key technical updates include a correction to the Details Notes changing 6' to 6", wood perimeter ditch grading quantity of 1500, and replacement of Construction Plan pages 2.1 and 5.1.

The addendum specifies that bonding is only required if the project bid exceeds $500,000. The utility access ramp specifications are detailed as 16 feet wide and 81 feet long with a 6% ramp slope and 2:1 side slopes. Contractors must coordinate with the City of Kinston regarding guide wire removal/modifications and include NCDA in this process. The document includes updated AutoCAD files and a revised Section 7 Cost Proposal spreadsheet that must be downloaded and used for bid submission. The attached construction plans show the project layout including the pond, ditches, berms, and drainage specifications with various invert elevations ranging from 81.50' to 83.00'.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #2

TO: POTENTIAL RESPONDING SUPPLIERS

FROM: Kristen Shelton, CPPB Procurement Specialist

DATE: December 11, 2024

SUBJECT: NC State University RFP #63-KGS1054211 Irrigation Pond & Water Farming System, Kinston, NC (REBID)

This addendum is issued as a result of questions raised on the above referenced request for proposal. This addendum is part of the bid process and must be returned with your proposal response. Failure to include this addendum with your response will cause your proposal to not be considered for award.

1. See below questions & answers from the site visit.

2. The following are corrections that need to be made:

● RFP:

i. Section 5: #4: Certificate of Insurance must list the following as the certificate holder: NC Department of Agriculture and Consumer Services, 1001 Mail Service Center Raleigh, NC 29699-1001

● Appendix_A._Construction_Plans:

i. page 8.1 Details Notes - 2nd bullet should be 6" not 6'.

ii. page 9.1 Wood perimeter ditch grading quantity is 1500 per #2, 5.1 Construction

Plans update.

3. Appendix_A._Construction_Plans, pages 2.1 & 5.1 are replaced with the attached design updates.

4. Section 7 Cost Proposal spreadsheet has been updated and must be downloaded due to the Construction Plan updates, page 5.1 and quantity correction for page 9.1.

Please sign, date and return this addendum with your proposal response. Failure to return this addendum will cause your response to not be considered for award.

Company Name:

Acknowledge by Signature:

Acknowledge by Full Name (printed):

Date:

#63-KGS1054211_Addendum #2

RFP #63-KGS1054211 - Irrigation Pond & Water Farming System (REBID) Question # Reference Section Question University Response starting December 12-18

1 Terms and conditions Are any bonds required for this project?

If the project bid exceeds $500,000.00 in construction costs, a bond is required per . No bonding is required if it is below $500,000.00.

2 General If we want to come back here and see the project site can we?

All companies who attended the mandatory pre-proposal conference can arrange for a second site visit directly with the manager of the farm, Phillip Winslow, (during business hours). You must notify him with a day notice (preferred) or at least a 3 hour notice.

Phillip Winslow @ phone: 252-527-3579 or email:

phillip.winslow@ncagr.gov Note: Questions that arise during your site visit should be sent directly to NC State’s Procurement Specialist, Kristen Shelton, per Addendum #1. No questions should be asked to the owner to ensure we are fair and transparent to all contractors.

3 General Can the questions due date be extended?

Yes, see Addendum #1 and the updates on Bonfire listed under Important Events.

4 General Should we be as neat as we can?

Yes, we expect the contractor to operate and manage the excavated soil material in a neat and orderly fashion that concentrates material movement around the perimeter of the field rather than frequent/excessive tracking across the field.

5 Section 2 When should boots be on the ground, what are the dates between?

See Section 2. February 1, 2025 through June 15, 2025 - Completion - Construction must be completed.

6 Appendix_A._Construction_Plans Can you share the CAD files? Yes, you can view all the AutoCAD files, .

7 Appendix_A._Construction_Plans Are there guide wires in the berm?

Yes, the guide wires are inside the berm area. The berm construction includes a small ramp on the N.E. corner to allow Kinston Power access to utility lines. The berm is designed to accommodate equipment access for the utility company.

8 Appendix_A._Construction_Plans

What is the utility arrangement? Removal and/or modification of the guide wires will be completed by others in order to facilitate construction of the berm.The contractor is responsible for coordinating with the City of Kinston to do this work and must include NCDA (Phillip Winslow) in this process.

9 Appendix_A._Construction_Plans Are the guide wires in the way?

The guide wires are within in the berm. The berm must be compacted. The contractor must work with power company to address removal and/or adjustment of the guide wires so that the berm can be constructed and compacted (see response to question #7 above).

10 Appendix_A._Construction_Plans What do the water controls look like?

The Water Control Structures (WC) consist of an aluminum box riser (inlet) with a round metal outlet pipe section that inserts into the double-wall plastic pipe like what has already been installed in the plastic pipe at the downstream end of the property. The metal pipe section will be fastened to the plastic pipe and a water tight sealant installed. Stainless bolts and nuts should be utilized to fasten the provided aluminum structures to the plastic pipe in at least 6 locations around the pipes. The 1 foot drop box must be filled with concrete not to exceed the elevation of the aluminum channel that is at the bottom of the pipe.

11 Appendix_A._Construction_Plans

Do we need to keep the guide wires in the berm? Or can we take the wires down temporarily and fill the berm and put it back?

The power company will either temporarily detach and reinstall or replace the guide wires. See response to question #7 above).

Statute 44A-26 here https://www.ncleg.net/enactedlegislation/statutes/html/bysection/chapter_44a/gs_44a-26.html#:~:text=In%20the%20discretion%20of%20the,1.)

https://drive.google.com/file/d/1WZsByaQ8oZPA1BW9h-VTfImiGWvRkREE/view

12 Appendix_A._Construction_Plans

Where do we pile the topsoil, anywhere or a specific spot? The topsoil can be temporarily stored in the field area near the pond.

This should be convenient since the contractor will not want to move the material far from the pond excavation area. The contractor must still limit tracking across the field.

13 Appendix_A._Construction_Plans Will the project team provide any survey staking?

No, we will not provide any survey staking. We will provide the AutoCAD files (see response to question #6 above).

14 Appendix_A._Construction_Plans Compaction dirt in the bottom of the cut if the dirt is wet?

Proper dewatering of the pond must occur before the start of and during excavation. Any wet soil that is encountered shall be placed on the field berm near the upstream end of the project (south). We do not want this material on the berm downstream of the pond as this could result in failure of the pond embankment

15 Appendix_A._Construction_Plans In building the berms, is it limited tracking equipment?

Our suggestion is to excavate and dispose of the material by tracking in a loop around the perimeter of the fields in order to construct the berm. This will limit tracking across the field area.

16 Appendix_A._Construction_Plans; 2.1 Please provide some clarification regarding the ramp for electrical utility berm access

The utility access ramp is 16 feet wide and 81 feet long. It has a ramp slope of 6% with side slopes of 2:1.

LE

N

IO

R

C O

U N

TY

, N

C C

AS

W

EL

L

R

ES

EA

R

C H

F

AR

M W

AT

ER

F

AR

M

IN

G D

EM

O

AP

PR

O

VE

D

C H

EC

K

D R

AW

N

D

ES

IG

N

PR

O

JE

C

T

N

AM

E

SC

AL

E

D

AT

E

PR

O

JE

C

T

PH

AS

E

JK

F

JK

F, B

AD

, M Y, C P

W

AT

ER

F

AR

M

IN

G

AS

O

TE

D

N O

VE

M

BE

R

, 2

C

AS

W

EL

L W

AT

ER

N C

SU

B

AE

W

EA

VE

R A

D M

IN

. B

LD

F

AU

C

ET

TE

D

R

IV

E R

AL

EI

G H

, N C

9-

5-

BA

D

BA

D

AutoCAD SHX Text

AutoCAD SHX Text

PROJECT OVERVIEW

AutoCAD SHX Text 2.1

AutoCAD SHX Text

POND

AutoCAD SHX Text

REGRADE DITCH TO DRAIN NORTH (RED)

AutoCAD SHX Text

NEW DITCH DRAINING NORTH (RED)

AutoCAD SHX Text

NEW DITCH DRAINING NORTH (RED)

AutoCAD SHX Text

DITCH

AutoCAD SHX Text

DITCH

AutoCAD SHX Text

BERM (GREEN)

AutoCAD SHX Text

RAMP FOR ELECTRICAL UTILITY BERM ACCESS

AutoCAD SHX Text

HULL RD

AutoCAD SHX Text

CONSTRUCTION ACCESS (DASHED BLACK LINE)

AutoCAD SHX Text 1" = 175'

AutoCAD SHX Text

PROJECT DETAIL AREA (ORANGE) - SEE SHEETS 4.1, 5.1, AND 6.1

AutoCAD SHX Text

REGRADE DITCH TO DRAIN SOUTH

AutoCAD SHX Text

LIMIT TRACKING OF EQUIPMENT IN HATCHED AREAS TO PREVENT COMPACTION

jjkurkif Pencil jjkurkif Pencil

LE

IO

R

C O

U N

TY

, N

C C

AS

W

EL

L

R

ES

EA

R

C H

F

AR

M W

AT

ER

F

AR

M

IN

G D

EM

O

AP

PR

O

VE

D

C H

EC

K

D R

AW

N

D

ES

IG

N

PR

O

JE

C

T

N

AM

E

SC

AL

E

D

AT

E

PR

O

JE

C

T

PH

AS

E

JK

F

JK

F, B

AD

, M Y, C P

W

AT

ER

F

AR

M

IN

G

AS

O

TE

D

N O

VE

M

BE

R

, 2

C

AS

W

EL

L W

AT

ER

N C

SU

B

AE

W

EA

VE

R A

D M

IN

. B

LD

F

AU

C

ET

TE

D

R

IV

E R

AL

EI

G H

, N C

9-

5-

BA

D

BA

D

THIS SECTION OF DITCH

SHALL BE COVERED

UNDER BID ITEM #3. ALL

OTHER DITCH GRADING

SHALL BE PART OF BID

ITEMS #1 AND #2

NOTES:

· PROPOSED DITCH GRADING SHOWN IN RED

· *THE DITCH ALONG THE EDGE OF THE WOODS SHALL BE

GRADED JUST OUTSIDE THE EXISTING VEGETATION. NO

CLEARING AND GRUBBING WILL BE REQUIRED. SPOIL MATERIAL

SHALL BE PLACED BETWEEN THE DITCH AND THE WOODS LINE

AND TAMPED DOWN AND SMOOTHED SO THAT IT IS NOT ROUGH

AND IRREGULAR.

AutoCAD SHX Text

AutoCAD SHX Text

2 FT BOTTOM WIDTH 2:1 SIDE SLOPE INVERT ELEV = 92.00'

AutoCAD SHX Text

DRAINAGE DITCHES

AutoCAD SHX Text 5.1

AutoCAD SHX Text

REGRADE/EXPAND 2200 LF OF DITCH. PLACE SPOIL ADJACENT TO DITCH. SEE NOTES*

AutoCAD SHX Text

REGRADE DITCH TO DRAIN NORTH)

AutoCAD SHX Text

2 FT BOTTOM WIDTH 2:1 SIDE SLOPE INVERT ELEV = 90.00'

AutoCAD SHX Text

1 FT BOTTOM WIDTH 3:1 SIDE SLOPE

AutoCAD SHX Text

2 FT BOTTOM WIDTH 2:1 SIDE SLOPE

AutoCAD SHX Text

2 FT BOTTOM WIDTH 2:1 SIDE SLOPE INVERT ELEV = 81.50'

AutoCAD SHX Text

2 FT BOTTOM WIDTH 2:1 SIDE SLOPE INVERT ELEV = 82.25'

AutoCAD SHX Text

INVERT ELEV. 83.00'

AutoCAD SHX Text

INVERT ELEV. 83.00'

AutoCAD SHX Text

INVERT ELEV. 82.50'

AutoCAD SHX Text

INVERT ELEV. 82.00'

AutoCAD SHX Text

INVERT ELEV. 81.50'

AutoCAD SHX Text

INVERT ELEV. 81.50'

AutoCAD SHX Text

INVERT ELEV. 82.00'

AutoCAD SHX Text

LIMIT TRACKING OF EQUIPMENT IN HATCHED AREAS TO PREVENT COMPACTION

AutoCAD SHX Text

EXISTING DITCH (BLUE)'

AutoCAD SHX Text 1"=125' jjkurkif Pencil jjkurkif Pencil jjkurkif Pencil jjkurkif Text Box REGRADE 1500' OF DITCH FROM ELEVATION 0.5' BELOW EXISITNG CATCH BASIN TO ELEVATION OF EXISTING DITCH jjkurkif Rectangle jjkurkif Text Box

EXISITNG CATCH BASIN

jjkurkif Line jjkurkif Line jjkurkif Pencil jjkurkif Rectangle jjkurkif Pencil jjkurkif Pencil jjkurkif Text Box

EXISTING

jjkurkif Text Box

2:1 SIDE SLOPE WHERE POSSIBLE WITHOUT IMPACTING EXISITNG WOODY VEGITATION

jjkurkif Pencil jjkurkif Pencil jjkurkif Pencil jjkurkif Text Box

2:1 SIDE SLOPE WHERE POSSIBLE WITHOUT IMPACTING EXISITNG WOODY VEGETATION

jjkurkif Text Box

EXISTING

jjkurkif Text Box

EXISTING

jjkurkif Text Box

EXISTING

jjkurkif Text Box

PROPOSED

jjkurkif Line jjkurkif Line jjkurkif Line jjkurkif Line jjkurkif Line jjkurkif Polygonal Line jjkurkif Polygon jjkurkif Text Box

PLACE SPOIL FROM DITCH GRADING HERE AND LEVELED

jjkurkif Line jjkurkif Pencil jjkurkif Text Box

MATCH ELEVATION OF EXISTING DITCH

jjkurkif Line

KGS1054211_Addendum #2_Appendix A. Construction Plans_2.1_5.1.pdf
Sheets and Views
Caswell_jan24-TITLE SHEET
Caswell_jan24-OVERVIEW
Caswell_jan24-EXISTING
Caswell_jan24-GRADING
Caswell_jan24-DRAINAGE DITCHES
Caswell_jan24-DRAINAGE2
Caswell_jan24-S & EC
Caswell_jan24-Dimension
Caswell_jan24-SECTION 1
Caswell_jan24-SECTION 2
Caswell_jan24-DETAILS
Caswell_jan24-S&EC DETAILS
Caswell_jan24-QUANTITIES AND NOTES
Company Name:
Acknowledge by Signature:
Acknowledge by Full Name printed:
Date:

File details come from the government source that posted it. Updated .